Council archive · source document
H083-14 Arch rev A (2) · 132000.200278.6
Attached to the e-mail Change to DA (enclose part of verandah) - 132000.200278.6.
ARCHITECTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ENGINEERS DESIGN AND DETAILS. ALL DIMENSIONS ARE TO BE CHECKED AND VERIFIED ON SITE PRIOR TO COMMENCEMENT 2010-01A D.L.T.| As shown H083-14 04/09/2018 m ba vu 9 QD u | \ Post Remove window— I | H Proposed - Ground Floor Plan Project number Checked by EXTENSION EXISTING TENANCY 8 SHOWROOM 151 m? Ex Posty i il Remove window || Hl il Ex Sant Ex. Sidewalk 2960 2800 Ex Post = © = ® 2 n < Ww x down pi Ex Post _ Ex Post Ex Ex. Parking EXISTING & DEMOLITION - GROUND FLOOR PLAN SCALE 1: 100 DEMOLITION NOTES: 1) Dashed lines on demo plans represent items to be removed. Patch, repair and make good existing and adjoining areas, surfaces and finishes as required to match and align with proposed finishes. 2) The contractor shall not consider demolition and alteration notes to be all inclusive. It is the contractor's responsibility to inspect and assess each area and to fulfil the intent of the design indicated by the contract documents. The Contractor shall coordinate architectural demolition drawings and notes in conjunction with structural, HVAC, electrical, fire protection and plumbing drawings and notes etc. Patch or rebuild any elements remaining that have been damaged or disturbed by Structural, HVAC electrical, fire protection and plumbing demolition. 3) For all surfaces scheduled to remain, patch and match surfaces disturbed by demolition or removal of equipment or utilities. Install patching to match adjacent work in finish, structural qualities, coursing of masonry, and other characteristics. Patch surfaces to comply with fire ratings, smoke-tight ratings, acoustical criteria and other performance criteria indicated. 4) All demolition shall be performed in a safe and acceptable manner to all authorities having jurisdiction and the owner. A fire watch shall be provided if any hazardous situations are thought to be possible. Comply with Governing regulations pertaining to environmental protection for pollution control. Thoroughly clean adjacent areas of dust, dirt and debris caused by demolition work. Before new work begins, return adjacent areas to condition found prior to start of demolition work. Dp ELEVATION LEGEND 5) The contractor shall verify all conditions and dimensions within the Contract documents and confirm site set out and building dimensions. The contractor shall notify the architect immediately in writing of any deviation from contract documents necessitated by field conditions or items not covered. 6) Maintain access to exits and exit stairs at all times. Fire alarm and smoke detection system and emergency lighting and exit signs shall remain operational at all times. Protect smoke detectors as required and in conformance with codes and local authorities having jurisdiction. 7) Hazardous material note: The contractor shall stop work and inform both the architect and principal immediately in writing of any hazardous material encountered or thought to be hazardous material. The architect after receiving written notice shall instruct contractor on how to proceed. 8) Prior to any demolition, the contractor shall coordinate and review existing bracing systems so as to maintain the structural integrity of the remaining elements of the building and its systems as required during the construction period. The contractor shall be responsible for the support of adjacent structures during demolition and new construction work. The contractor shall provide all temporary shoring, scaffolding, etc., which are necessary to prevent collapse, subsidence, deflection or any other type of damage. Repair all fire proofing systems and mechanisms damaged during demolition work to ensure its integrity and associated fire rating is maintained. EXISTING TENANCY 8 SHOWROOM 151 m? TENANCY 8 ANCILLARY OFFICE AREA 20 m? Ex Pose | Ex Post | Post Ex. Sidewalk Ex Post Ex Post 100x100 Ex. Sidewalk |\ Post 100x100 ep 4 Ex. Parking PROPOSED - GROUND FLOOR PLAN SCALE 1: 100 Ex Post \ Ex Dp 100~) 9) Provide temporary partitions/dust protection (rated and/or non-rated) as required. Review locations of temporary partitions/dust protection with architect and principal prior to the commencement of work. 10) All work shall be carried out in protected space. No dust or dirt shall travel from construction area to adjacent areas. Temporary dust protection shall be erected prior to start of work. Contractors shall review provisions to control airborne dust with Facilities-building manager and construction manager. Coordinate additional filtration of exterior air intakes to mechanical systems. 11) Cap off and terminate all services as required. Coordinate termination of existing services in conjunction with all new services drawings to ensure integrity of remaining existing services is not disrupted or compromised during the construction period. 12) Any floor openings shall be covered during demolition and construction. DOWNPIPES Locality: Rainfall intensity 20 year ARI: Noosaville, QLD 253mm/h 51 m? 1.08 Roof catchment area: Slope factor: Eaves Gutter: 8299 mm? min Gutter selected: Stramit Quad 150 Gutter slope steeper than 1:500: No Downpipe size: 290mm No of Downpipes required: 2 DEMOLITION LEGEND REMOVED ELEMENTS & Yaa: DEMOLISHED WALLS/ELEMENTS APPROVED | Existing & Demolition - Ground Floor Plan For & on behalf of AAA Design & Development Consutting Hindmarsh Property Services Lot 308 Eumundi-Noosa Rd Noosaville PROPOSED ANCILLARY OFFICE Date 30/08/2018 Description Design amend A AAA Design & Development Pty Ltd 34/13 Norval Court, MAROOCHYDORE, QLD 4558 Tel/Fax: (07) 5479 6747 Mob: 0422 039 247 [email protected] email:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
>
a 3 8
2820 2820 3320 5
To be confirmed on-site To be confirmed on-site 8
2300 2300 =
To be confirmed on-site To be confirmed on-site S z a
So a 9
6 yu - = s
> WD g =
o no oe m oO = 2
3= a! 8= vu 8 3 a
ZN > z= =O Ss So no
m 7 m = WM > i
2 so >
$ om = cc
= Als = oO s oo
on 3h wn Y = a
° a o DD
7 m 5
2 — 3 &
2 mM n >
. a < * z
z > Q
8 a a z
3\= Oo 8 s
z|5 2 6
2820 5 > 9
To be confirmed on-site 3 <
o & 5
2300 3 =x
To be confirmed on-site a
m
m
5
a
gs <i
O z
zw —_ — 6
m z
o * Ht
> = &
8 3 a
a an
213 Q
28 5
g 6
= g
oO
>
n”
ao AY,
2
m O
a
sm
oO
1
m
[_
mM
S
a
O
Zz
RO
X
PS
\
3
3 NK x
si. L
°
8
L
&
| =
8
n
3320 g
mn nn §
z e °
gv Ay Ny
2
m O
a
= o o
Sm aS 8
0 <
osm
1 m 3 6
” QxzS
vu m BNZ
A oO 3
oO a
Qu O
o Zz
m P
0 >
'
wo
8 §
< | 8
m e
= 3320 _ 8
a 1 $
a 8
AAA Design & Development Pty Ltd No. Description Date Hindmarsh Property Services APPROVED | Proposed - Elevation 1,2
Proposed - Section A-A, Windows Scheme
34/13 Norval Court, MAROOCHYDORE, QLD 4558 Lot 308 Eumundi-Noosa Rd
Tel/Fax: (07) 5479 6747 Noosaville Project number H083-14
Mob: 0422 039 247 pas owovr0rs] ~—2010-02A
email: [email protected] PROPOSED ANCILLARY OFFICE coctonvenareraaa Lawn by RS)
A Design amend 30/08/2018 Design & Development Consulting) Checked by D.L.T.| As shown
Used in these records
H083-14 Arch rev A (2).pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.