Original source · versioned page text
Landscape Technical Specification - OPW14/0197
Attached to the e-mail Doonella Stage C (Email 7 of 7) Landscape Technical Specification & Transmittal - OPW14/0197.
Doonella – Stage C 14.1.7 PEST AND DISEASE CONTROL Spray for pests and disease infestations when the pest and fungal attack has been positively identified and when their populations have increased to a point that will become detrimental to plant growth. Apply all pesticides to manufacturer's directions. All safety controls shall be implemented prior to chemical spraying and site administration notified of the intent to spray. Frequency: weekly inspection 14.1.8 CONCRETE EDGING Undertake the following maintenance practices: Replace broken, chipped, subsided, failed or cracked concrete edging. Remove weed growth in paved areas, between cracks and joints, with an approved herbicide. 14.1.9 TIMBER Report any structural damage to timber kickrails and bollards. Repair as required using materials and methods conforming to the specified design. 14.1.10 FERTILISING Apply a balance of man made and natural slow release fertiliser to all planting areas. A slow release fertiliser equal to Nutricote or other granular fertiliser (e.g. Osmocote), 3 month formulation, 16 - 4. 4- 8.3 NPK should be used as well as a natural fertiliser such as Dynamic Lifter or equal. The fertilising program shall be determined on the basis of the periodic soil test results, and amended as necessary. Soil tests shall be carried out by the contracts on a 2 monthly basis. Generally check for signs of nutrient deficiencies (yellowing of leaves, failure to thrive), and adapt fertiliser regime to suit. Fertiliser should be applied at the beginning and the end of the (summer) growing season. 14.1.11 SOIL MIXES Soil depths are to be maintained at the specified depths. Replenish any areas of subsidence with topsoil equal to that nominated in the Specification. 14.1.12 SUBSOIL DRAINS Ensure drains are working in an efficient manner, free from sediment build-up, litter and obstructions. Flush out and clean drain as required: Reinstate damaged or sunken drains. 14.1.13 FURNITURE Secure and retighten all bolt and screw fixings, replace if necessary broken or missing fixings with those specified. All furniture shall be recoated with applied finishes prior to the final certificate / handover being issued. AECOM 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.