Other Change Decision Notice - Council Meeting Decision 51995 1611 04 (As Published)
9. Payment of contributions in accordance with Council's Policy on Water Supply and
Sewerage Headworks. An estimate only of the charges as at May 1995 under the current
policy is as follows:-
Water Supply - $16,148.00
Sewerage $14,907.00
TOTAL: $31,055.00
Please note that the headworks charges will alter in accordance with Price Index
variations or if any amendment is made to Council's policy.
Headworks contributions shall be calculated and paid in accordance with either of the
following alternatives:-
9.1. Payment to be made prior to the issue of a Building Approval in the amount
calculated under the Policy at that date; or
9.2. Payment may be deferred to a date:-
9.2.1.prior to Council sealing plans of the development for titling purposes;
9.2.2.prior to the issue of a Certificate of Classification for any building approved
under this application; or
9.2.3.prior to commencement of the approved use at the relevant premises;
whichever is the sooner. Payment of deferred headworks contributions shall
also be subject to the following requirements:-
9.2.4.Submission of a trading bank guarantee to the value of headworks assessed
at the time prescribed by the Local Government (Planning and Environment)
Act 1990, plus 20%, prior to Building Approval;
9.2.5.Headworks shall be calculated as the value of headworks assessed at the
time prescribed by the Local Government (Planning and Environment) Act
1990, plus interest charged at the rate set by the Queensland Treasury
Corporation for Local Government borrowings as they apply to Noosa Shire.
The interest rate used shall be the rate current at the "time prescribed"
above;
9.2.6.Should the contributions not be paid at the due time, Council shall call upon
the security lodged; and
9.2.7.in the case of a building permit, if a permit expires the securities held will be
returned.
10. The footpath across the frontage of the site is to be upgraded by the provision of a 1.2
metres wide concrete footpath and the forming, grassing and topsoiling of the remaining
area to the standards and requirements of the Shire Engineer. The applicant is to contact
Council's Engineering Department to determine the footpath alignment prior to the
commencement of any works. A meandering footpath is desirable.
11. The developer shall bear the cost of alteration of any public utility or other facilities
necessitated by the development of the land or associated construction works external
to the site.
12. Connection to Council's existing water supply and sewerage reticulation systems at the
developer's expense to the standards and requirements of Council's Shire Engineer.
Page 3 of 14
Document Set ID: 24239488
Version: 7, Version Date: 23/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.