6 FOOTING AND SLAB SPECIFICATIONS
Footing Details
All footings must be founded a minimum of 300mm into the NATURAL STIFF SILTY CLAY (shown shaded on the
attached log sections). Dimensions and reinforcement requirements are detailed on the structural plans and
details.
Where the NATURAL STIFF SILTY CLAY is deep or is covered by the introduction of or the presence of existing fill,
the footings are to be increased in depth to reach this level. Alternatively the footings can be supported on
piers founded into the foundation material or deeper as required to obtain the required strength. Refer to the
structural plans for details.
Drilled Piers Supporting the Footings
Where the NATURAL STIFF SILTY CLAY is deep or to be covered by fill the footings can be supported on drilled
concrete filled piers founded at a minimum of 300mm into the NATURAL STIFF SILTY CLAY. The size and spacing
of these piers is nominated on the structural plans.
Floor Slab Details
The thickness and reinforcement for slabs on ground are shown on the structural plans.
Ground slabs may require thickenings or stiffening beams incorporated in their construction. It may be
advantageous to excavate them at the same time as the perimeter footings. Refer to the structural plans for
the locations and extent of these.
Where the stiffening beams intersect a perimeter footing, their base must be graded down to the footing base
level, 3 x N12 bars must be cogged into the footing and lapped 500 with the beams trench mesh. Refer to the
structural plans for details.
Where the stiffening beams intersect a blockbase or retaining wall, 3-N12 bars must be dowelled 150mm into
the blockbase and lapped 500 with the beams trench mesh. Refer to the structural plans for details.
A levelling layer under the ground floor slab is to comprise of granular material such as clean sand or crusher
dust compacted in 150mm layers. Either well graded sand or crusher dust can be used.
An approved polyethylene damp proof membrane of 0.2mm (min) thickness is to be placed over the levelling
layer. Laps are to be a minimum of 200mm and be taped. All service penetrations and punctures are to be
fully taped. The membrane is to be extended down the inside face of the perimeter footings and must continue
under any thickenings or stiffening beams.
Drilled Piers Supporting the Slab
Slab piers are required where there is more than 300mm of uncontrolled fill beneath the slab. They are to be
founded at a minimum of 300mm into the NATURAL STIFF SILTY CLAY. Special attention must be paid to the
extra slab thickening required over slab piers as detailed in the structural plans.
Drilled Pier Reinforcement
Pier Depth mm Perimeter Piers Slab Piers
up to 1500 None required none required
1500-2500 2xN12bars none required
2500-4000 4xN12bars 2xN12bars
4000-6000 6xN12 bars 4xN12bars
Unexcavatable Rock
Where unexcavatable rock is encountered at depths shallower than the founding depth the engineer is to be
contacted for alternative footing details.
SCG Consulting Engineers 3 SCG Ref: 26232(S)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.