Original source · versioned page text
Z40770_Response to InformationRequest_NC_final
Attached to the e-mail Response to Information Request MCU16/0112 & OPW16/0209.
6.0
–
��
5.8
‘ ’
��
��
INDUSTRIAL DEVELOPMENT ��
5.6
��
��
��
��
5.4
��
��
��
5.2
4.8 5.0
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
_=
LOT 4 ON SP 244573
Level Datum AHD
Level Origin PSM
KEY
EX. SWPT EXISTING STORMWATER PIT
EX. SMCP EXISTING STORMWATER CONNECTION POINT
REINFORCED CONCRETE HEADWALL
EXISTING SEWER MANHOLE
EXISTING EDGE OF BITUMEN
EXISTING KERB & CHANNEL
NATURAL SURFACE LEVEL
RC. HW.
EX. SMH
E.0.B.
K&C
MIN. 1 IN 100
FALL ALONG =————
SWALE LENGTH.
200mm
MIN
FIRE HYDRANT
TELSTRA PIT
=e
_
ELECTRICAL POWER POLE
LIGHT POLE
EXISTING KERBING
LANDSCAPING OVER WITHIN SWALE
REFER LANDSCAPE ARCHITECT FOR
PLANTING
2000mm_MIN
TYPICAL SECTION VEGETATED SWALE
WATERTANK FOR
STORMWATER
RE-USE
WATER STORAGE
TANK
RAINFALL
>
ROOF RUNOFF
DRIVEWAY
S
BIORETENTION
BED
a
v
BIO-RETENTEION BED
FOR TREATMENT OF
STORMWATER
RUNOFF
RUNOFF TO COUNCIL
INFRASTRUCTURE
WATER CYCLE DIAGRAMATIC
STORMWATER RUNOFF ASSESMENT
— THE EXISTING SITE IS WITHIN AN INDUSTRIAL DEVELOPMENT WHICH
HAVE BEEN DESIGNED WITH A FRACTION IMPERVIOUS OF 0.9
— THE PROPOSED SITE HAS A FRACTION IMPERVIOUS OF 0.93. ONLY
A MINIMAL INCREASE OF 1.7 Lt/s WILL RESULT. THE STORAGE TANK
WILL OFFSET THIS INCREASE
WATER SENSITIVE URBAN DESIGN
— RUNOFF FOR THE SITE WILL BE DRAINED THROUGH A
BIO-RETENTION BED SIZED IN ACCORDANCE WITH THE DEEMED TO
COMPLY SOLUTION BY WATER BY DESIGN (2.2% OF CATCHMENT AREA)
—ADDITIONAL TREATMENT WILL OCCUR THROUGH THE USE OF A
VEGETATED SWALE FOR DRAINING STORMWATER AND THE RE-USE OF
STORMWATER VIA THE INCLUSION OF A WATERTANK
www.dialbeforeyoudig.com.au
DIAL1100
BEFORE YOU DIG
SITE PLAN — DRIVEWAY & ACCESS PLAN
CONNECT BIN WASH
BAY DRAINAGE PIT TO
SEWER STUB. PLUMBER
TO LOCATE ON SITE.
v
VEGETATED SWALE
LEGEND
4.00
ae
Xv
eee +
x | 29.740
FALL.
GD-200
(TTT)
GP1
GP2
GPS
GP4
STONE PITCHED SWALE
(UNGROUTED) APPROACH
TO BIO-RETENTION BED.
. CREATE LOW POINT IN DRIVEWAY
. ADJACENT BIO-RETENTION BED, TO
PROMOTE STORMWATER RUNOFF INTO
BED.
Lot 5
SP264847
BIORETENTION BED
MIN AREA 50m? FILTER, REFER
TYPICAL DETAIL. FINISHED SURFACE
LEVEL RL 5.64m
R.P. BOUNDARY
Sw
HALF CUT PIPE FOR EVEN
FLOW DISTRIBUTION INTO
BIORETENTION BED. REFER
DETAIL ON THIS SHEET.
SW/EX
— SWALE +> -
KERB
CONNECT NEW SW PIT TO EXISTING SW
rT BRANCH AS PER QDC REQUIREMENTS.
CONFIRM SW BRANCH JUMP UP
LOCATION.
EXISIING CONCRETE —~ “=
EXISITNG a)
Scale 1: 200
CONTRACTOR TO LOCATE ALL SERVICES PRIOR TO
COMMENCING WORKS ON SITE. ALL SERVICES ARE
TO BE PROTECTED IN ACCORDANCE WITH THE
AUTHORITY RESPONSIBLE FOR THE SERVICE
‘STREET
| |
Q/SP104321 | S/SP1043521 | A/SP156940
_ | _ _ R.P. BOUNDARY
1 GRAVELLED AREA-FOR (Gg0]* on ee
PN FUTURE DEVELOPMENT. & we
I = 4 y x
z= & Yo (5.79)*
Np) Y : FLOW INVERT LINE ®
| >= GP3-} - we 1509 uPVC 1 in 100 ([&0)"— — — ~~ TN 495 A
B Sw B Sw sw sw sw BJ cP4 7 |
IL 5.355) 5.25 wy wy 5 % y
a ew NY S “ 5.65 = ; “ NX a
F “(55 2B 575) > X _ ’
yor P Xe 3
iy 4, Yo Yo 7, 4 / , Y = %
i / a 0 A iy
i| >
XY |
| k / g ON 2
Lo Sa) 4
|
le |
So] 4, Fe L Z
Si], 58 4
Cc -— -- -—- ty
Eb Kk 2 So &
S fr -—— (573) S “ |
Sih “ Ss S a
s = =o v
wo] < =
—_— | — ao |
| oO 4
2 J
bo SA 8% |
= INDUSTRIAL DEVELOPMENT s yy
=| Ww
S iB gb
S . ty
3 /. &
ai! a NX AX
Lot 3 al ee al Lot 4 a S
SP244573 Sy SP244573 / | BB ., 550
Y - FFL 5.80 - :
5000(Lt) SLIM LINE TANK o / SS
FOR RE-USE IN IRRIGAT S \
& WC's, REFER DETAIL. i a \ 7 sw
oe ae LY / 1508 uPVC ben
ae ay | op |s cpa pate
|} > = a — 6
3. e J < —s
al 8 _ +
a a ie =) 2256 uPVC
4 HALF CUT PIPE FOR EVEN , 11S i
OP FLOW DISTRIBUTION INTO BIORETENTION BED CA \s 2
2 Y vee MIN. AREA 20m? FILTER, REFER “5 4 \2
x TYPICAL DETAIL. FINISHED SURFAC 7) & |S
> BB LEVEL RL 5.65m »
FE y y 575 1
E - » CD-200 FAL x
sw sw - SW
2256 uPVC 1 in 100 »
2250 uPVC sm t
Fh . T4475 AS 4555 r
\ ~N
oO
4 / ENRY = “la
\ Ww ; % s|s
\ « <
CREATE LOW POINT IN DRIVEWAY = cp? Eg /
ee | /
ADJACENT BIO-RETENTION BED, TO RP. BOUND aRp [
TO GROUNDWATER PROMOTE STORMWATER RUNOFF INTO By 52
BED. 25°
ao
EMT J EMT kK 2
. ~= y EXISITNG CONCRETE SERVICE ROAD. s
~~ EX. SMH Be
\ z 2 K<-
\ —= SW/EX —— sw/Ex
_ \ — —
ee 4
EXISITNG CONCRETE
CROSSOVER. EXISIING CONCRETE FOOTPATH CROSSOVER.
INDICATES EXISTING SURFACE
CONTOUR AND LEVEL TO AHD.
EXISTING SURFACE SPOT LEVELS.
INDICATES PROPOSED FINISHED
SURFACE LEVELS
INDICATES DIRECTION OF FALL
TO FINISHED SURFACES.
200(W) GRATED DRAIN WITH
HEAVY DUTY GRATE.
450Sq FIELD INLETS, PRE-CAST
CONCRETE WITH RAISED GRATE.
TO BE INSTALLED IN
BIO-RETENSION BED.
450Sq FIELD INLETS, PRE-CAST
CONCRETE WITH GALV.GRATE
MOUNTED FLUSH WHEN
INSTALLED IN DRIVEWAY.
300Sq FIELD INLET, PRE-CAST
CONCRETE.
450Sq STORMWATER JUNCTION
BOX, PRE-CAST CONCRETE WITH
HEAVY DUTY LID.
INDICATES OVERHEAD ELECTRICITY
SUPPLY LINE
INDICATES EXISTING SEWER LINE
INDICATES WATER MAIN APPROX
ALIGNMENT, BUILDER TO CONFIRM
EXACT LOCATION PRIOR TO WORKS
INDICATES TELSTRA LINE APPROX
ALIGNMENT, BUILDER TO CONFIRM
EXACT LOCATION PRIOR TO WORKS
INDICATES STORMWATER DRAIN
PROPOSED AS NOTED MIN 1 IN
100 FALL UNLESS NOTED
OTHERWISE
INDICATES STORMWATER DRAIN
EXISTING AS NOTED MIN 1 IN 100
FALL UNLESS NOTED OTHERWISE
INDICATES ALIGNMENT OF SWALE
AND DIRECTION OF FLOW, REFER
TYPICAL SWALE DETAILS
Ce EXISTING ISLAND.
SURFACE OF BIORETENTION BED SET 200mm
LOWER THAN FINSHED GROUND LEVEL
(Approx RL 5.30m), PROVIDE EDGE BOARD
SUCH AS PEGGED TIMBER SLEEPER OR 450 SQ GRATED SW INLET PIT
HALF SW PIPE ALONG EDGE OF BED
SIMILIAR WITH RAISED GRATE, SET TOP SET LEVEL 70 ENABLE EQUAL
OF PIT 100mm ABOVE FINISHED DOSING ALONG LENGTH OF BED
SURFACE IN BED
IN R s INFLO
a \ "| EBON TOK ee te OVERFLOW TO k & ¢
MIN 600mm APPROVED FILTER 4 oO
MEDIA LAYER 0} Yi A
4 ‘ ‘ “B eos ae
100mm CLEAN COARSE SAND ___g¥zatez7Zz7zZ7777z iB MIN. 600mm A LLLLE Za 57mm CLEAN
TRANSITION LAYER (HATCHED). tee 14475 FILTER MEDIA cS GRAVEL DRAINAGE
: AS PER PLAN LAYER, GEOFAB BELOW
[gS FER PN!
3(No) SLOTTED 100¢ uPVC PIPES
SET IN 150 THICK 5-7mm CLEAN
GRAVEL DRAINAGE LAYER.
\
225 DIAM TO GP4
BIORETENTION PIT DETAIL
¢ : STIL SECTON ~~ A-A
DETAILS
>, _ CAPPED
“| END
BIORETENTION PLANTING
8(No.) Plants per 1m2
Utilize at least 3(No.)
approved species type
APPROVED PLANTING
Corex appressa, Gahnia
sieberiana, Ficnia nodosa,
Lomandra hystrix or
Isolepsis nodosa
FILTER MEDIA TO BE IN
ACCORDANCE WITH FAWB
GUIDELINES FOR SOIL
FILTER MATERIALS FOR
USE IN BIOFILTRATION
SYSTEMS. BIORET PLUS
BY SOUTHERN PACIFIC
BIO-RETENTION BED MAINTENANCE REQUIREMENTS
Vegetation plays a key role in maintaining the porosity of the
filter media of a bioretention basin and a strong healthy growth
of vegetation is critical to its performance. Therefore the most
intensive period of maintenance is during the plant establishment
period (first two years) when weed removal and replanting may
be required.
Inflow systems and overflow pits require careful monitoring, as
these can be prone to scour and litter build up. Debris can block
inlets or outlets and can be unsightly, particularly in high
visibility areas.
Inspection and removal of debris should be done regularly, and
debris should be removed whenever it is observed on a site.
Where sediment forebays are adopted, regular inspection of the
forebay is required (3 monthly) with remove of accumulated
sediment undertaken as required.
For larger bioretention basins, it is essential that a maintenance
access point is designed for and maintained in the bioretention
basin. The size and complexity of the system will guide its design
and may involve provision of a reinforced concrete ramp/ pad
for truck or machinery access.
2005 Edition
Amended June 2007
Policy 11: Land Development Guidelines Section 13.6 -Bioretention
Basins 27 of 43
Typical maintenance of bioretention basin elements will involve:
(11 routine inspection of the bioretention basin profile to
identify any areas of obvious increased sediment deposition,
scouring from storm flows, rill erosion of the batters from lateral
inflows, damage to the profile from vehicles and clogging of the
bioretention basin (evident by a boggy’ filter media surface);
(1 routine inspection of inflows systems, overflow pits and
under—drains to identify and clean any areas of scour, litter build
up and blockages;
LL removal of sediment where it is smothering the
bioretention basin vegetation;
(1 where a sediment forebay is adopted, removal of
accumulated sediment;
(repairing any damage to the profile resulting from scour,
rill erosion or vehicle damage by replacement of appropriate fill
(to match onsite soils) and revegetating;
LH tilling of the bioretention basin surface, or removal of the
surface layer, if there is evidence of clogging;
LI regular watering/ irrigation of vegetation until plants are
established and actively growing;
(11 removal and management of invasive weeds (herbicides
should not be used);
(11 removal of plants that have died and replacement with
plants of equivalent size and species as detailed in the plant
schedule;
(11 pruning to remove dead or diseased vegetation material
and to stimulate growth;
(11 vegetation pest monitoring and control.
Resetting (ie. complete reconstruction) of the bioretention basin
will be required if the system fails to drain adequately after
tilling of the surface. Maintenance should only occur after a
reasonably rain free period when the soil in the bioretention
system is dry. Inspections are also recommended following large
storm events to check for scour and other damage.
All maintenance activities must be specified in o maintenance
plan (and associated maintenance inspection forms) to be
documented and submitted to Council as part of the
Development Approval process. Maintenance personnel and asset
managers will use this plan to ensure the bioretention basins
continue to function as designed. An example operation and
maintenance inspection form is included in the checking tools
provided in Section 13.6.7. These forms must be developed on a
site specific basis as the nature and configuration of bioretention
basins varies significantly.
BED PIPE INTO
CONCRETE TO RETAIN
ITS POSITION
DOG LEG PIPE UP TO CUT PIPE
JUNCTION TO MAINTAIN MIN.
COVERS 10 STORMWATER PIPES.
A. INVERT LEVELS ADDED. 01.11.16.
Revision Description Date
Iss
*FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
The design and associated details contained on this and associated
drawings are copyright and ore not to be used or reproduced without
the written permission of SCG Consulting Engineers.
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
email:[email protected]
web:www.scg-engineers.com
‘ABN 40 098 481 699,
C) Ste
DEBUILD T/A
Title:
OPERATIONAL WORKS:
STORMWATER MANAGEMENT
Project
Lot 4 SP244573
85 RENE St, NOOSAVILLE
Date: Drawn
SANDS IS AN APPROVED Aug 16 CSK
MATERIAL o Checked: Drg No. Rev
rege, WN | 26232-SW1 | A.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.