Council archive · source document
Compiled Decision Notice [As Published] · 152003.220942.2
Form 6 – Compiled Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 23438 DA Date of Decision: 14 October 2004
1. APPLICANT DETAILS
Name: PIKE MIRLS MCKNOULTY PTY LTD
Postal address: ATTN:SIMON FORSYTH PO BOX 3797 SOUTH BRISBANE QLD 4101
Phone no: 3846.3344 Fax no: 3846.7844 Mobile:
2. PROPERTY DESCRIPTION
Street address: 178-182 EUMUNDI NOOSA ROAD
Suburb/locality NOOSAVILLE
Real property LOT 1 RP 133192, LOT 21 RP 867627, LOT 25 RP 151406, COUNTY OF MARCH, PARISH
description: OF TEWANTIN
3. OWNER DETAILS
Name: BUNNINGS PROPERTIES PTY LTD
Postal address: PO BOX 37, CANNON HILL QLD Postcode: 4170
4. REFERRAL AGENCIES
Referral Agency Address Basis
Department of Main PO Box 183 Gympie 4570 Advice
Roads
5. APPLICATION TYPE
Development Development Details Preliminary Development
Approval Permit
Material Change of Use Showroom & Nursery (Bunnings NO YES
Warehouse)
Lot Reconfiguration 3 lots to 2 lots NO YES
6. DECISION DETAILS
Council on 14 October 2004 decided to:
A. Refuse the Material Change in Use component;
B. Approve the reconfiguration of a lot component subject to conditions.
In relation to a request to change conditions of the development approval, Council on 12 February 2008 resolved
to:-
A. Agree to delete Conditions 10, 11 and 26 as they are no longer relevant.
B. Issue a Compiled Decision Notice incorporating the above recommendations.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
NOOSA COUNCIL IDAS Development Application Decision Notice 2
7. APPLICABLE CODES
The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Not applicable.
8. SUBMISSIONS
146 properly made submissions (179 total)
9. CONDITIONS
The lot reconfiguration approval is subject to conditions. Noosa Council’s conditions are attached.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Operational Works Access.
11. REASONS FOR REFUSAL
Material Change of Use
1. The proposal is likely to prejudice the future growth of industrial activities within the Shire by introducing
non-industrial uses on land designated for industrial development.
2. The proposal is likely to adversely impact upon the ability of the Shire Business Centre to operate as the
principle business, retail and administrative centre.
3. The applicant has failed to demonstrate that the proposed increase in retail/showroom floor space will not
adversely impact upon the Shire Business Centre.
4. Part of the proposed use is considered a shop which is not consistent with the intent of the Industry zone.
5. The proposal is contrary to Strategic Aims 27.5.1 and 27.5.3 for Industrial Development and Strategic
Aims 27.2.3.2, 27.2.3.3 and 27.2.3.4 for Business, Retail and Administrative Development.
6. The proposal is contrary to Industry Objective 19.5.1 for the Noosa Heads/Noosaville Locality.
7. The proposal is in conflict with Planning Scheme Policy 39 as it is not located within the Shire Business
Centre site.
8. The proposed development will have significant adverse impact on the operation of the Eumundi Road
intersections at Beckmans Road, Rene Street and Eenie Creek Road.
9. Insignificant justification has been provided that would warrant approving the application for a material
change of use given the conflict with the Strategic Plan and likely adverse traffic impacts.
12. RIGHTS OF APPEAL
Rights of appeal in relation to this application are attached.
13. ASSESSMENT MANAGER
Name: Noosa Council Signature: Date:
DECISION NOTICE HISTORY
Original Decision Notice issued on 14 October 2004
Compiled Decision Notice issued on 12 February
2008 with amendment to Conditions 10, 11, 26..
SEP o:\database\onestop\decision.doc
Page 3
NOOSA COUNCIL IDAS Development Application Decision Notice 3
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
1. For the purpose of these conditions, the following definitions apply: -
1.1. A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by
Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
1.2. A registered Professional Civil Engineer means an civil engineer who is listed under the
Institution of Engineers, Australia “National Professional Engineers Register 3” (NPER 3) or an
engineer who is registered in Queensland pursuant to the Professional Engineers Act 1988.
1.3. The person acting on this permit means any person or company who undertakes development
pursuant to this permit.
1.4. AS 2890.1 – 1993 means Australian Standard for Off Street Carparking - AS 2890.1-1993.
1.5. Principal Contractor means the person nominated by the Applicant and approved by the Manager
- Land Development at a pre-start meeting as being responsible for the major component of works
associated with a Development Permit for Operational Works of any works on the site.
2. The lot reconfiguration shall be in accordance with plan reference 6631-01 B dated 30/7/03 as submitted
by PMM Land Surveyors and Town Planners except as modified herein.
3. Pursuant to Section 3.5.21(6) of the Integrated Planning Act 1997, the currency period is four (4) years
from the day this permit takes effect during which time all conditions must have been complied with,
operational works completed, and the Plan of Survey lodged with the Council for endorsement.
4. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal documentation
shall be presented to Council and shall be submitted in the correct form with the fees prescribed in
Council's adopted fee schedule.
5. Pursuant to Section 3.7.3(c) of the Integrated Planning Act, all outstanding rates and charges due and
payable to Noosa Council in respect of the lots being reconfigured shall be paid prior to endorsement of
the Plan of Survey.
6. Prior to undertaking any excavation, the person acting on this permit shall contact public utility service
providers to ascertain the location of their underground services.
7. For the following classes of work associated with development, a Development Permit for Operational
Works must be obtained prior to commencement of works relating to that class of work. The application
may combine any or all of these classes of work: -
7.1. Access
7.2. Site Civil Works
7.3. Frontage works
7.4. Sewer reticulation including new mains
7.5. Water reticulation
8. The person acting on this permit shall apply and obtain for all other necessary permits including crane
permits, road opening permits, hoarding permits, footpath occupation permits and/or any other approvals
required under any other Act.
SEP o:\database\onestop\decision.doc
Page 4
NOOSA COUNCIL IDAS Development Application Decision Notice 4
9. Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant
shall sign a written undertaking to be responsible for the full cost of repairs to road pavement, footpath,
kerb and gutter, or other Council property damaged as a result of construction of the proposed
development.
If any person acting under this permit damages any Council property or facilities (such as underground
drainage, water supply and sewerage) , through any cause whatsoever in the course of, directly or
indirectly carrying out development, that person shall forthwith notify the Manager - Land Development
and shall forthwith rectify that damage at its cost and to the satisfaction of the Manager - Land
Development. Alternatively, the Applicant may request the Council to carry out the rectification works.
Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall be
undertaken by either Council or a Council approved contractor.
In all cases, Council reserves the right to carry out rectification works in an emergency and where no
reasonable attempt has been made to complete the rectification works as part of the development.
All costs incurred by Council in any rectification works shall be repaid to Council prior to the endorsement
of the Plan of Survey.
10. Deleted.
11. Deleted.
12. Prior to works being taken on maintenance, the remainder of the footpath area shall be topsoiled and
established with couch or buffalo turf, free of weeds.
13. Access to each lot shall be constructed to the standards and requirements of the Manager - Land
Development. Proposed Lot 80 will access off Gateway Drive and proposed Lot 81 off Venture Drive.
The accesses will be industrial type crossovers in accordance with Council’s Engineering Standards.
14. All redundant vehicular crossings to the site shall be removed and replaced by kerb and channel and
footpath paving in accordance with Council’s Standard specifications prior to commencement of the use
permitted by this permit.
15. The following steps shall be undertaken prior to commencement of any construction:-
15.1. The Principal Contractor shall give Council's Inspector seven (7) days' notice of intention to
commence works.
15.2. The Principal Contractor or any of his subcontractors shall not undertake any works unless each
contractor has public liability insurance in the sum of $10,000,000 and copies of current public
liability insurance policies are submitted to Council’s inspector.
15.3. The Principal Contractor shall nominate a site representative and give a telephone number that
can reach the site representative at any time during a 24-hour day.
15.4. The site representative shall arrange to meet on-site with Council's Inspector to obtain Council's
requirements for construction of access.
15.5. All signage, including that for safety during construction, shall be in accordance with the Manual of
Uniform Traffic Control Devices and Department of Transport (Main Roads Division) Roadworks
Signing Guide.
16. Operational works shall be carried out in a manner that prevents:-
16.1. Pollution of a waterway
16.2. Dust/sand nuisance to residents in the vicinity
16.3. Transfer of dirt and debris onto a public road
16.4. Excessive noise (less than 1.5 Dba above ambient measured at the lot boundaries)
16.5. Excessive traffic delays (less than 5 minute delays)
SEP o:\database\onestop\decision.doc
Page 5
NOOSA COUNCIL IDAS Development Application Decision Notice 5
16.6. Diminution of neighbourhood amenity (long term parking of employees vehicles, parking of
construction equipment etc.)
17. Prior to endorsement of the Plan of Survey, a registered practicing Geotechnical Engineer shall submit
site classifications reports for both parcels. The extent of uncontrolled fill and each lot site classification
shall be shown on a metes and bounds survey plan.
An appropriate property notation shall be placed on Council's rates records to advise prospective
purchasers of lots that have been filled that special foundations requirements will apply.
18. To provide adequate vehicle sight distance at the corner of Gateway Drive and Eumundi-Noosa Road, a
minimum 5m x 5m splay corner shall be created at property corner of proposed Lot 80, and dedicated to
the public for road widening at no cost to Council. The dedication shall ensure an appropriate width for
footpath behind the existing kerb and channel.
19. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works, which shall be submitted in conjunction with an application for a
Development Permit for Operational Works.
20. Prior to Council endorsing the Plan of Survey, a certificate from a registered Professional Civil Engineer
shall be submitted to Council for each Development Permit for Operational Works issued pursuant to this
permit. The engineer shall certify that he/she has supervised those works and that they have been
completed in a workman like manner in accordance with good engineering practice and in accordance
with that permit.
21. As Constructed drawings certified by a registered surveyor and RPEQ showing the extent and finished
levels of the works are to be submitted for Council's records.
These drawings must fully detail levels for all engineering works including but not limited to water supply
and sewer reticulation, drainage structures, finished ground levels, pavement surface levels and
footpaths. Drawings shall be a hard copy highlighting any changes from design and in electronic format on
an IBM PC compatible floppy disk in a format capable of integration with Council’s computer system.
Approval of works shall not be granted until as constructed drawings have been supplied.
22. All declared plants, including but not limited to Groundsel bush (Baccharis halimifolia), Giant Rats Tail
Grass (Sporobolus pyramidalis and S. natalensis), and Salvinia molesta, shall be cleared from the site
prior to Council endorsement of the Plan of Survey.
Under State Legislation, Gall Fly (Rhopalomyia Califormica) is not a recognised means of control or
destruction of groundsel bush. Any existing Declared Noxious Plants under the Rural Lands Protection Act
(1985), which have a control category of P2, P3 or P4, shall be controlled in a manner pursuant to the
Rural Lands Protection Act (1985).
The notification period to Council of the completion of eradication works shall be a minimum of thirty (30)
days. The applicant is advised that Council's Noxious Weeds Officer will not undertake an inspection the
site until after this notification period has expired.
23. The existing vegetation on the site shall be retained except where removal is required to enable
construction of roads, accesses or pegging of surveyed boundaries.
24. Prior to commencement of any operational works arising out of this permit, security in the sum of $5,000
must be lodged with Noosa Council, to secure performance of all conditions of this permit. The security
shall be in the form of cash or unconditional trading bank guarantee acceptable to the Manager - Land
Development.
The security will be returned upon satisfactory performance of all the conditions of this permit and any
other related development permits for operational works, less any costs incurred by Council in ensuring
compliance with these conditions or for any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
25. To protect the environment against siltation/sediment export or soil erosion as a result of this
development, an erosion and sediment control plan shall be submitted in conjunction with any
Development Permit for Operational Works. Site control measures such as silt fencing, controlled gravel
access to the site and controlled disposal of waste, may be necessary.
SEP o:\database\onestop\decision.doc
Page 6
NOOSA COUNCIL IDAS Development Application Decision Notice 6
All physical site control measures shall be installed and maintained until all operational works have been
completed and accepted on maintenance. The erosion and sediment control plan must be adhered to at
all times.
26. Deleted.
27. All connections to sewer system shall be carried out either by Council or by a Council approved
Contractor and at no cost to Council. Any connection to a water main shall be undertaken by Council.
28. Any alteration of a public utility or other facility necessitated by the development of the land or associated
construction works either internal or external to the site shall be at no cost to Council.
29. Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining properties to the
reasonable satisfaction of the Manager - Land Development. A Development Permit for Building Works
shall not be granted until a Development Permit for Operational Works has been issued in regard to the
drainage scheme.
30. All site drainage shall be by means of gravity systems.
SEP o:\database\onestop\decision.doc
Page 7
NOOSA COUNCIL IDAS Development Application Decision Notice 7
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated (5) If an application is processed under section
Planning Act (Chapter 4). 6.1.28(2), appeal rights for submitters for the
application are available only for the aspects of the
Division 8 - Appeals to court relating to development that would have required public
development applications notification under the repealed Act.
Appeals by applicants (6) If an application involves assessment against
4.1.27.(1) An applicant for a development application a concurrence agency code, appeal rights for
may appeal to the court against any of the following- submitters for the application are not available
against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a concurrence agency’s response for the code.
development application;
Appeals by advice agency submitters
(b) a matter stated in a development approval,
including any condition applying to the 4.1.29.(1) An advice agency may, within the limits of
development, and the identification of a code its jurisdiction, appeal to the court about the giving of
under section 3.1.6;1 a development approval for a development
application if-
(c) the decision to give a preliminary approval when a
development permit was applied for; (a) the development application involves impact
assessment; and
(d) the length of a currency period;
(b) the advice agency told the applicant and the
(e) a deemed refusal. assessment manager to treat its response to the
application as a submission for an appeal.
(2) An appeal under subsection (1)(a) to (d) must
be started within 20 business days (the “applicant’s (2) The appeal must be started within 20 business
appeal period”) after the day the decision notice or days after the day the decision notice or negotiated
negotiated decision notice is given to the applicant. decision notice is given to the advice agency as a
submitter.
(3) An appeal under subsection (1)(e) may be
started at any time after the last day a decision on the Appeals for matters arising after approval given
matter should have been made. (co-respondents)
Appeals by submitters 4.1.30.(1) For a development approval given for a
development application, a person to whom any of
4.1.28.(1) A submitter for a development application
the following notices have been given may appeal to
may appeal to the court about-
the court against the decision in the notice-
(a) the giving of a development approval, including
(a) a notice giving a decision on a request for
any conditions (or lack of conditions) or other
extension of the currency period for an approval;
provisions of the approval; or
(b) a notice giving a decision on a request to make a
(b) the length of a currency period for the approval.
minor change to an approval.
(2) The appeal must be started within 20 business
(2) The appeal must be started within 20 business
days (the “submitters appeal period”) after the day days after the day the notice of the decision is given
the decision notice or negotiated decision notice is to the person.
given to the submitter.
(3) Subsection (1)(a) does not apply if the
(3) If a person withdraws a submission before the approval resulted from a development application
application is decided, the person may not appeal the (superseded planning scheme) that was assessed as
decision. if it were an application under a superseded planning
(4) If an application involves both impact scheme.
assessment and code assessment, appeal rights for (4) Also, a person who has made a request
submitters are available only for the part of the mentioned in subsection (1) may appeal to the court
application involving impact assessment. against a deemed refusal of the request.
(5) An appeal under subsection (4) may be
started at any time after the last day the decision on
the matter should have been made.
1
Section 3.1.6 (Preliminary approval may override local planning
instrument)
SEP o:\database\onestop\decision.doc 14/02/08
Page 8
NOOSA COUNCIL IDAS Development Application Decision Notice 8
Division 9 - Appeals to court about other matters
Appeals for matters arising after approval given
(no co-respondents)
4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
(b) a notice under section 6.1.442 giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2
Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
SEP o:\database\onestop\decision.doc 14/02/08
Used in these records
Compiled Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 42 KB (small file)
- File type
No other editions are linked here.