NOOSA COUNCIL IDAS Development Application Decision Notice 4
9. Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant
shall sign a written undertaking to be responsible for the full cost of repairs to road pavement, footpath,
kerb and gutter, or other Council property damaged as a result of construction of the proposed
development.
If any person acting under this permit damages any Council property or facilities (such as underground
drainage, water supply and sewerage) , through any cause whatsoever in the course of, directly or
indirectly carrying out development, that person shall forthwith notify the Manager - Land Development
and shall forthwith rectify that damage at its cost and to the satisfaction of the Manager - Land
Development. Alternatively, the Applicant may request the Council to carry out the rectification works.
Any damage to a water main shall be rectified by Council. Any damage to a sewer main shall be
undertaken by either Council or a Council approved contractor.
In all cases, Council reserves the right to carry out rectification works in an emergency and where no
reasonable attempt has been made to complete the rectification works as part of the development.
All costs incurred by Council in any rectification works shall be repaid to Council prior to the endorsement
of the Plan of Survey.
10. Deleted.
11. Deleted.
12. Prior to works being taken on maintenance, the remainder of the footpath area shall be topsoiled and
established with couch or buffalo turf, free of weeds.
13. Access to each lot shall be constructed to the standards and requirements of the Manager - Land
Development. Proposed Lot 80 will access off Gateway Drive and proposed Lot 81 off Venture Drive.
The accesses will be industrial type crossovers in accordance with Council’s Engineering Standards.
14. All redundant vehicular crossings to the site shall be removed and replaced by kerb and channel and
footpath paving in accordance with Council’s Standard specifications prior to commencement of the use
permitted by this permit.
15. The following steps shall be undertaken prior to commencement of any construction:-
15.1. The Principal Contractor shall give Council's Inspector seven (7) days' notice of intention to
commence works.
15.2. The Principal Contractor or any of his subcontractors shall not undertake any works unless each
contractor has public liability insurance in the sum of $10,000,000 and copies of current public
liability insurance policies are submitted to Council’s inspector.
15.3. The Principal Contractor shall nominate a site representative and give a telephone number that
can reach the site representative at any time during a 24-hour day.
15.4. The site representative shall arrange to meet on-site with Council's Inspector to obtain Council's
requirements for construction of access.
15.5. All signage, including that for safety during construction, shall be in accordance with the Manual of
Uniform Traffic Control Devices and Department of Transport (Main Roads Division) Roadworks
Signing Guide.
16. Operational works shall be carried out in a manner that prevents:-
16.1. Pollution of a waterway
16.2. Dust/sand nuisance to residents in the vicinity
16.3. Transfer of dirt and debris onto a public road
16.4. Excessive noise (less than 1.5 Dba above ambient measured at the lot boundaries)
16.5. Excessive traffic delays (less than 5 minute delays)
SEP o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 42 KB (small file)
- File type
No other editions are linked here.