NOOSA COUNCIL IDAS Development Application Decision Notice 6
All physical site control measures shall be installed and maintained until all operational works have been
completed and accepted on maintenance. The erosion and sediment control plan must be adhered to at
all times.
26. Deleted.
27. All connections to sewer system shall be carried out either by Council or by a Council approved
Contractor and at no cost to Council. Any connection to a water main shall be undertaken by Council.
28. Any alteration of a public utility or other facility necessitated by the development of the land or associated
construction works either internal or external to the site shall be at no cost to Council.
29. Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining properties to the
reasonable satisfaction of the Manager - Land Development. A Development Permit for Building Works
shall not be granted until a Development Permit for Operational Works has been issued in regard to the
drainage scheme.
30. All site drainage shall be by means of gravity systems.
SEP o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 42 KB (small file)
- File type
No other editions are linked here.