Council archive · source document

Delegated Report - Code - Planning MCU26 0012 (As Published) · MCU26/0012

of 21

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                      Lighting Amenity
               11.    No flood lighting must be used on site. Any vertical illumination resulting from direct, reflected
                      or other incidental external lighting emanating from the site must not exceed 8 lux when
                      measured at any point 1.5 metres outside the boundary and at any level from ground level
                      upward.
                      Environment
               12.    Sediment or any other material including building materials or waste products must not be
                      deposited or released into the road reserve, stormwater drain or adjacent properties.
                      Landscaping Works
               13.    A minimum of 20% of the site must be retained as soft landscaping.
               14.    Areas of the site proposed to be cut or filled to establish the approved development are
                      required to be landscaped and returned to a either a grassed or landscaped setting. Areas
                      of exposed earth hillside resulting from the development is not approved.
               15.    Existing vegetation in the road reserve must be retained, unless written authorisation from
                      Council is granted for the clearing.
               16.    All excavation/fill and associated batters must be contained entirely within the subject site
                      unless written permission from the respective landowner(s) is provided to Council. All
                      earthworks must be undertaken in accordance with the provisions of Australian Standard
                      AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
               17.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height.
                      Water Supply
               18.    The approved dwelling must be serviced with a rainwater tank having a minimum storage
                      capacity of no less than 60,000 litres.
                      Site Access and Driveways
               19.    An access driveway must be provided from Lukes Rd to all parking and manoeuvring areas
                      of the development. The works must be undertaken in accordance with Driveway Levels Plan
                      Part 1 & 2 prepared by SCG Engineers (00577-OW4.1 & 00577-OW4.2) and dated February
                      2026.
                      Stormwater Drainage
               20.    Stormwater runoff from the development must be disposed of on-site without causing scour
                      or damage to the subject site or any adjoining property.
                      Easements
               21.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               22.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               23.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Geotechnical Stability
               24.    All works must be carried out in accordance with the recommendations contained in Slope
                      Stability Assessment (26020-001-Rev0), prepared by tectonic and dated 13 February 2026,
                      listed within this Decision Notice.


                                                                                                        Page 14 of 21

Document Set ID: 24620687
Version: 4, Version Date: 28/04/2026

Used in these records

About this file

File size
3.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU26 0012 (As Published).pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.