Council archive · source document
Delegated Report - Code - Planning MCU26 0012 (As Published) · MCU26/0012
DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (OPW26/0034) (Driveway & Earthworks) APPROVED PLANS 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 0577-OW3.1 - Earthworks Plan Part 1, prepared by SCG Feb 2026 Engineers 0577-OW3.2 - Earthworks Plan Part 2, prepared by SCG Feb 2026 Engineers 0577-OW3.3 - Earthworks Sections, prepared by SCG Feb 2026 Engineers 0577-OW4.1 - Driveway Levels Plan Part 1, prepared by Feb 2026 SCG Engineers 0577-OW4.2 - Driveway Levels Plan Part 2, prepared by Feb 2026 SCG Engineers CURRENCY PERIOD 2. The Currency Period for this development approval lapses if the development has not substantially started by 27 April 2028, unless an application to extend the currency period is approved by Council. PRIOR TO COMMENCEMENT OF WORKS Engineering 3. Copies of the approved plans, duly signed by the consultant Registered Professional Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer Construction at the “pre start” meeting. 4. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works: a. Civil engineering works; b. Erosion and sediment control works; c. Other relevant parties 5. A Construction Management Plan must be submitted with the Operational Works application and must address the following: a. Haulage routes and earthworks spoil disposal location b. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD); and c. provision for safe vehicle and pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased. Page 16 of 21 Document Set ID: 24620687 Version: 4, Version Date: 28/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU26 0012 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.