Julie' und'Johw Lee' ■o
77 ShorehaA/ew'DriA/e' /?
v.7 r£C;:J
■/W
Noouvi/dle' -7 ?0
Qld'4566 f°\ /k <^7
\ 1
9 February 2021
Dear Council,
1) We bought our house at 77 Shorehaven Drive in 2018.
2) At that time, it had a jetty and a boatlift.
3) The boatlift was ofthe type that resembles a car trailed mounted on 3 poles
sunk into the canal bed.
4) We decided to replace the boatlift with a floating boat dock. There are many
examples of these in the estate. They consist mainly of 500 mm cubes, which
are interlocked together to form a platform. Typically, they are secured to an
accompanying jetty by two anchors, that have a foot on the jetty, then rise up
about 900 mm, have a horizontal section of about 300 mm, and then return
down through 2 locating plates on the side ofthe boat dock. This provides
stability, and also allows forthe device to rise and fall automatically with the
altering water level in the canal.
5) I contacted the Council to determine what approvals I would need. I received
an email dated 14 September 2020 from Mark Lewis, which told me that the
boatlift did not have approval. Before receiving Mark's email, I was unaware
that there was no approval for the boatlift.
6) I have since commissioned the removal ofthe boatlift, save forthe pole placed
about 1.5 m from the revetment wall. It had a winch mounted on it, and I
intend it continue to do so.
7) I seek the approval of Council to amend the existing approval (File Number
15203) to incorporate the boat dock. I have attached a drawing ofthe boat
dock (together with the 2 anchors), and it is proposed the boat dock be
positioned in the same place the offending unapproved structure occupied for
the last 19 years.
8) I am aware that there will be a fee forthe work done to assess this Application,
and I imagine that fee would be somewhat less than a fee for assessment of an
Page 1 of 2
Box:.......
3/« R;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 20 pages
Page 2
entirely new proposal. Could you please advise me what the fee is, and I shall
attend at the Council chambers to pay it.
Yours,
John Lee
Enclosures:
1. 9 February 2021 Application.
2. 11 December 2001 Approval (File Number 15203).
3. Sketch Plan of Proposed Boat Dock.
Page 2 of 2
Page 3
DA Form 1 - Development application details
Approved form (version 1.2 effective 7 February 2020) made under section 282 of the Planning Act 2016.
This form must be used to make a development application involving code assessment or impact assessment,
except when applying for development involving only building work.
For a development application involving building work only, use DA Form 2 - Building work details.
For a development application involving building work associated with any other type of assessable development
(i.e. material change of use, operational work or reconfiguring a lot), use this form (DA Form 1) and parts 4 to 6 of
DA Form 2 - Building work details.
Unless stated otherwise, all parts of this form must be completed in full and all required supporting information must
accompany the development application.
One or more additional pages may be attached as a schedule to this development application if there is insufficient
space on the form to include all the necessary information.
This form and any other form relevant to the development application must be used to make a development
application relating to strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994,
and airport land under the Airport Assets (Restructuring and Disposal) Act 2008. For the purpose of assessing a
development application relating to strategic port land and Brisbane core port land, any reference to a planning
scheme is taken to mean a land use plan for the strategic port land, Brisbane port land use plan for Brisbane core
port land, or a land use plan for airport land.
Note: All terms used in this form have the meaning given under the Planning Act 2016, the Planning Regulation 2017, or the Development
Assessment Rules (DA Rules).
PART 1 - APPLICANT DETAILS
1) Applicant details
Applicant name(s) (individual or company full name) Jl rtfu UiirjlAim JifUitC (j&Cz-
Contact name (only applicable for companies)
Postal address (P.O. Box or street address) 77 t>//y^r
Suburb
State
Postcode
Country
Contact number
Email address (non-mandatory)
Mobile number (non-mandatory)
Fax number (non-mandatory)
Applicant’s reference number(s) (ifapplicable) 1^2-Cp
2) Owner's consent
2.1) Is written consent of the owner required for this development application?
□ Yes - the written consent of the owner(s) is attached to this development application
0 No - proceed to 3)
Queensland
life" Government
Page 4
PART 2 - LOCATION DETAILS
3) Location Of the premises (complete 3.1) or 3.2), and 3.3) as applicable)
Note: Provide details below and attach a site plan for any or all premises part of the development application. For further information, see DA
Forms Guide: Relevant plans.
3.1) Street address and lot on plan
□ Street address AND lot on plan (ail lots must be listed), or
□ Street address AND lot on plan for an adjoining or adjacent property of the premises (appropriate for development in
water but adjoining or adjacent to land e g. jetty, pontoon. All lots must be listed).
Unit No. Street No. Street Name and Type Suburb
*77 QHfL&tfMj'^7U
a)
Postcode Lot No. Plan Type and Number (e.g. RP. SP) Local Government Area(s)
4-5" tie ^
Unit No. Street No. Street Name and Type Suburb
b)
Postcode Lot No. Plan Type and Number (e.g. RP. SP) Local Government Area(s)
3.2) Coordinates Of premises (appropriate tor development in remote areas, over part of a lot or in water not adjoining or adjacent to land
e.g. channel dredging in Moreton Bay)
Note: Place each set of coordinates in a separate row.
□ Coordinates of premises by longitude and latitude
Longitude(s) Latitude(s) Datum Local Government Area(s) (if applicable)
□ WGS84
□ GDA94
□ Other:
□ Coordinates of premises by easting and northing
Easting(s) Northing(s) Zone Ref. Datum Local Government Area(s) (if applicable)
□ 54 □ WGS84
□ 55 □ GDA94
□ 56 □ Other: [
3.3) Additional premises
□ Additional premises are relevant to this development application and the details of these premises have been
attached in a schedule to this development application
□ Not required
4) Identify any of the following that apply to the premises and provide any relevant details
0Tn or adjacent to a water body or watercourse or in or above an aquifer
Name of water body, watercourse or aquifer: )JQO>A AJAfeTHA
□ On strategic port land under the Transport Infrastructure Act 1994
Lot on plan description of strategic port land:
Name of port authority for the lot:
□ In a tidal area
Name of local government for the tidal area (if applicable):
Name of port authority for tidal area (if applicable):
□ On airport land under the Airport Assets (Restructuring and Disposal) Act 2008
Name of airport:
Page 2
DA Form 1 - Development application details
Version 1.2— 7 February 2020
Page 5
□ Listed on the Environmental Management Register (EMR) under the Environmental Protection Act 1994
EMR site identification:
□ Listed on the Contaminated Land Register (CLR) under the Environmental Protection Act 1994
CLR site identification:
5) Are there any existing easements over the premises?
Note: Easement uses vary throughout Queensland and are to be identified correctly and accurately. For further information on easements and
how they may affect the proposed development, see DA Forms Guide.
□ Yes - All easement locations, types and dimensions are included in plans submitted with this development
application
PART 3 - DEVELOPMENT DETAILS
Section 1 - Aspects of development
6.1) Provide details about the first development aspect
a) What is the type of development? (tick only one box) G^&jilding work
□ Material change of use □ Reconfiguring a lot [^Operational work
b) What is the approval type? (tick only one box)
Q'Development permit □ Preliminary approval □ Preliminary approval that includes a variation approval
c) What is the level of assessment?
0 Code assessment □ Impact assessment (requires public notification)
d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3
lots)'.
e) Relevant plans
Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms guide:
Relevant plans.
DfRelevant plans of the proposed development are attached to the development application
6.2) Provide details about the second development aspect
a) What is the type of development? (tick only one box)
□ Material change of use □ Reconfiguring a lot □ Operational work □ Building work
b) What is the approval type? (tick only one box)
□ Development permit □ Preliminary approval □ Preliminary approval that includes a variation approval
c) What is the level of assessment?
□ Code assessment □ Impact assessment (requires public notification)
d) Provide a brief description Of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3
lots)'.
e) Relevant plans
Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms Guide:
Relevant plans.
□ Relevant plans of the proposed development are attached to the development application
6.3) Additional aspects of development
□ Additional aspects of development are relevant to this development application and the details for these aspects
tjaat would be required under Part 3 Section 1 of this form have been attached to this development application
[d Not required
Rage 3
DA Form 1 - Development application details
Version 1.2— 7 February 2020
Page 6
Section 2 - Further development details
7) Does the proposed development application involve any of the following?
Material change of use □ Yes - complete division 1 if assessable against a local planning instrument
Reconfiguring a lot □ Ves - complete division 2
Operational work 0 Yes - complete division 3
Building work GrT^es - complete DA Form 2 - Building work details
Division 1 - Material change of use
Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a
local planning instrument.__________________________ ___________________________________________________________
8 1) Describe the proposed material change of use
Provide a general description of the Provide the planning scheme definition Number of dwelling Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m2)
(if applicable)
8.2) Does the proposed use involve the use of existing buildings on the premises?
□ Yes
□ No
Division 2 - Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.
9.1) What is the total number of existing lots making up the premises?
9.2) What is the nature of the lot reconfiguration? (tick ail applicable boxes)
□ Subdivision (complete 10)) □ Dividing land into parts by agreement (complete n))
□ Boundary realignment (complete 12)) □ Creating or changing an easement giving access to a lot
from a constructed road (complete 13))
10) Subdivision
10.1) For this development, how many lots are being created and what Is the intended use of those lots:
Intended use of lots created Residential Commercial Industrial Other, please specify:
Number of lots created
10.2) Will the subdivision be staged?
□ Yes - provide additional details below
□ No
How many stages will the works include?
What stage(s) will this development application
apply to?
Page 4
DA Form 1 - Development application details
Version 1.2— 7 February 2020
Page 7
11) Dividing land into parts by agreement - how many parts are being created and what is the intended use of the
parts?
Intended use of parts created Residential Commercial Industrial Other, please specify:
Number of parts created
12) Boundary realignment
12.1) What are the current and proposed areas for each lot comprising the premises?
Current lot Proposed lot
Lot on plan description Area (m2) Lot on plan description Area (m2)
12.2) What is the reason for the boundary realignment?
13) What are the dimenoions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two easements)
Existing or Width (m) Length (m) Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement
Division 3 - Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14 1) What is the nature of the operational work?
□ Road work □ Stormwater □ Water infrastructure
□ Drainage work □ Earthworks □ Sewage infrastructure
□ Landscaping __________________________________
□ Signage □ Clearing vegetation
G'fOther - please specify: \ Oi* ft)
14.2) Is the operational work necessary to facilitate the creation of new lots7 (e g subdivision)
□ Yeg - specify number of new lots:
□''No
14.3) What is the monetary value of the proposed operational work7 (inciudeGST, materials and labour)
$5,000.CO
PART 4 - ASSESSMENT MANAGER DETAILS
15) Identify the assessment manager(s) who will be assessing this development application
16) Has the local government agreed to apply a superseded planning scheme for this development application?
□ Yes - a copy of the decision notice is attached to this development application
□ The local government is taken to have agreed to the superseded planning scheme request - relevant documents
attached
□ No
Page 5
DA Form 1 - Development application details
Version 1.2— 7 February 2020
Page 8
PART 5 - REFERRAL DETAILS
17) Does this development application include any aspects that have any referral requirements?
Note A development application will require referral if prescribed by the Planning Regulation 2017.
[4 No, there are no referral requirements relevant to any development aspects identified in this development
application - proceed to Part 6
Matters requiring referral to the Chief Executive of the Planning Act 2016:
□ Clearing native vegetation
□ Contaminated land (unexploded ordnance)
□ Environmentally relevant activities (ERA) (only If the ERA has not been devolved to a local government)
□ Fisheries - aquaculture
□ Fisheries - declared fish habitat area
□ Fisheries - marine plants
□ Fisheries - waterway barrier works
□ Hazardous chemical facilities
n Heritage places - Queensland heritage place (on or near a Queensland heritage place)
□ Infrastructure-related referrals - designated premises
□ Infrastructure-related referrals - state transport infrastructure
□ Infrastructure-related referrals - State transport corridor and future State transport corridor
□ Infrastructure-related referrals - State-controlled transport tunnels and future state-controlled transport tunnels
□ Infrastructure-related referrals - near a state-controlled road intersection
□ Koala habitat in SEQ region - interfering with koala habitat in koala habitat areas outside koala priority areas
□ Koala habitat in SEQ region - key resource areas
□ Ports - Brisbane core port land - near a State transport corridor or future State transport corridor
□ Ports - Brisbane core port land - environmentally relevant activity (ERA)
□ Ports - Brisbane core port land - tidal works or work in a coastal management district
□ Ports - Brisbane core port land - hazardous chemical facility
□ Ports - Brisbane core port land - taking or interfering with water
□ Ports - Brisbane core port land - referable dams
□ Ports - Brisbane core port land - fisheries
□ Ports - Land within Port of Brisbane’s port limits (below high-water mark)
□ SEQ development area
□ SEQ regional landscape and rural production area or SEQ rural living area - tourist activity or sport and
recreation activity
□ SEQ regional landscape and rural production area or SEQ rural living area - community activity
□ SEQ regional landscape andrural production area or SEQ rural living area - indoor recreation
□ SEQ regional landscape and rural production area or SEQ rural living area - urban activity
□ SEQ regional landscape andrural production area or SEQ rural living area - combined use
□ Tidal works or works in a coastal management district
□ Reconfiguring a lot in a coastal management district or for a canal
□ Erosion prone area in a coastal management district
□ Urban design
□ Water-related development - taking or interfering with water
□ Water-related development - removing quarry material (from a watercourse or lake)
□ Water-related development - referable dams
□ Water-related development -levees (category 3 levees only)
□ Wetland protection area
Matters requiring referral to the local government:
□ Airport land
□ Environmentally relevant activities (ERA) (only if the ERA has been devolved to local government)
Page 6
DA Form 1 - Development application details
Version 1.2— 7 February 2020
Page 9
□ Heritage places - Local heritage places
Matters requiring referral to the Chief Executive of the distribution entity or transmission entity:
□ Infrastructure-related referrals - Electricity infrastructure
Matters requiring referral to:
• The Chief Executive of the holder of the licence, if not an individual
• The holder of the licence, if the holder of the licence is an individual
□ Infrastructure-related referrals - Oil and gas infrastructure
Matters requiring referral to the Brisbane City Council:
□ Ports - Brisbane core port land
Matters requiring referral to the Minister responsible for administering the Transport Infrastructure Act 1994:
I I Ports — Brisbane core port land (where inconsistent with the Brisbane port LUP for transport reasons)
□ Ports - Strategic port land
Matters requiring referral to the relevant port operator, if applicant is not port operator:
□ Ports - Land within Port of Brisbane's port limits (below high-water mark)
Matters requiring referral to the Chief Executive of the relevant port authority:
□ Ports - Land within limits of another port (below high-water mark)
Matters requiring referral to the Gold Coast Waterways Authority:
□ Tidal works or work in a coastal management district (in Gold coast waters)
Matters requiring referral to the Queensland Fire and Emergency Service:
□ Tidal works or work in a coastal management district (involving a marina (more than six vessel berths))
18) Has any referral agency provided a referral response for this development application?
□ Yes - referral response(s) received and listed below are attached to this development application
□ No
Referral requirement Referral agency Date of referral response
Identify and describe any changes made to the proposed development application that was the subject of the
referral response and this development application , or include details in a schedule to this development application
(if applicable).
PART 6 - INFORMATION REQUEST
19) Information request under Part 3 of the DA Rules
0i agree to receive an information request if determined necessary for this development application
□ I do not agree to accept an information request for this development application
Note: By not agreeing to accept an information request I, the applicant, acknowledge:
• that this development application will be assessed and decided based on the information provided when making this development
application and the assessment manager and any referral agencies relevant to the development application are not obligated under the DA
Rules to accept any additional information provided by the applicant for the development application unless agreed to by the relevant
parties
• Part 3 of the DA Rules will still apply if the application is an application listed under section 11.3 of the DA Rules.
Further advice about information requests is contained in the DA Forms Guide
Page 7
DA Form 1 - Development application details
Version 1.2— 7 February 2020
Page 10
PART 7 - FURTHER DETAILS
20) Are there any associated development applications or current approvals? (e g. a preliminary ap/xovai)
□ Yes - provide details below or include details in a schedule to this development application
0No
List of approval/development Reference number Date Assessment
application references manager
□ Approval
□ Development application
□ Approval
□ Development application
21) Has the portable long service leave levy been paid? (only applicable to development applications involving building work or
operational work)
□ Yes - a copy of the receipted QLeave form is attached to this development application
□ No - I, the applicant will provide evidence that the portable long service leave levy has been paid before the
assessment manager decides the development application. I acknowledge that the assessment manager may
give a development approval only if I provide evidence that the portable long service leave levy has been paid
□ Not applicable (e.g. building and construction work is less than $150,000 excluding GST)
Amount paid Date paid (dd/mm/yy) QLeave levy number (A, B or E)
$
22) Is this development application in response to a show cause notice or required as a result of an enforcement
notice?
□ Y>s - show cause or enforcement notice is attached
□'No
23) Further legislative requirements
Environmentally relevant activities
23.1) Is this development application also taken to be an application for an environmental authority for an
Environmentally Relevant Activity (ERA) under section 115 of the Environmental Protection Act 1994?
□ Yes -the required attachment (form ESR/2015/1791) for an application for an environmental authority
apcompanies this development application, and details are provided in the table below
0No
Note: Application for an environmental authority can be found by searching “ESR/2015/1791” as a search term at www. ald.aov. au. An ERA
requires an environmental authority to operate. See www.business.ald.aov.au for further information.
Proposed ERA number: Proposed ERA threshold:
Proposed ERA name:
□ Multiple ERAs are applicable to this development application and the details have been attached in a schedule to
this development application.
Hazardous chemical facilities
23.2) Is this development application for a hazardous chemical facility?
□ Yes - Form 69: Notification of a facility exceeding 10% of schedule 15 threshold is attached to this development
lication
Note: See www.business.ald.aov.au for further information about hazardous chemical notifications.
Page 8
DA Form 1 - Development application details
Version 1.2— 7 February 2020
Page 11
Clearing native vegetation
23.3) Does this development application involve clearing native vegetation that requires written confirmation that
the chief executive of the Vegetation Management Act 1999 is satisfied the clearing is for a relevant purpose under
section 22A of the Vegetation Management Act 1999?
□ Yes - this development application includes written confirmation from the chief executive of the Vegetation
Mianagement Act 1999 (s22A determination)
GlNo
Note: 1. Where a development application for operational work or material change of use requires a s22A determination and this is not included,
the development application is prohibited development.
2. See https://www. old, gov. au/environment/land/veaetation/aoDlvina for further information on how to obtain a s22A determination.
Environmental offsets
23 4) Is this development application taken to be a prescribed activity that may have a significant residual impact on
a prescribed environmental matter under the Environmental Offsets Act 2014?
□ Yes - I acknowledge that an environmental offset must be provided for any prescribed activity assessed as
ving a significant residual impact on a prescribed environmental matter
Note: The environmental offset section of the Queensland Government's website can be accessed at www. aid, aov. au for further information on
environmental offsets.
Koala habitat in SEQ Region
23.5) Does this development application involve a material change of use, reconfiguring a lot or operational work
which is assessable development under Schedule 10, Part 10 of the Planning Regulation 2017?
□ Yes - the development application involves premises in the koala habitat area in the koala priority area
□ Yes - the development application involves premises in the koala habitat area outside the koala priority area
[ZNo
Note: if a koala habitat area determination has been obtained for this premises and is current over the land, it should be provided as part of this
development application. See koala habitat area guidance materials at www.des.ald.aov. au for further information.
Water resources
23 6) Does this development application involve taking or interfering with underground water through an
artesian or subartesian bore, taking or interfering with water in a watercourse, lake or spring, or taking
overland flow water under the Water Act 2000?
□ Yes - the relevant template is completed and attached to this development application and I acknowledge that a
relevant authorisation or licence under the Water Act 2000 may be required prior to commencing development
H'No
Note: Contact the Department of Natural Resources, Mines and Energy at www.dnrme.qld.aov.au for further information.
DA templates are available from httpsV/plannina.dsdmiD. aid, aov. au/. If the development application involves:
• Taking or interfering with underground water through an artesian or subartesian bore: complete DA Form 1 Template 1
• Taking or interfering with water in a watercourse, lake or spring: complete DA Form 1 Template 2
• Taking overland flow water: complete DA Form 1 Template 3.
Waterway barrier works
23.7) Does this application involve waterway barrier works?
□ Y»s - the relevant template is completed and attached to this development application
Bno
DA templates are available from httDs://olanninq dsdmio. old, gov, au/. For a development application involving waterway barrier works, complete
DA Form 1 Template 4.
Marine activities
23.8) Does this development application involve aquaculture, works within a declared fish habitat area or
removal, disturbance or destruction of marine plants?
□ Yes - an associated resource allocation authority is attached to this development application, if required under
isheries Act 1994
Note: See guidance materials at www.daf. old, gov, au for further information.
Page 9
DA Form 1 - Development application details
Version 1.2— 7 February 2020
Page 12
Quarry materials from a watercourse or lake
23.9) Does this development application involve the removal of quarry materials from a watercourse or lake
under the Water Act 2000?
□ Yes - I acknowledge that a quarry material allocation notice must be obtained prior to commencing development
□'No
Note: Contact the Department of Natural Resources, Mines and Energy at www'. dnrme. old, gov, au and www.business.ald.aov.au for further
information.
Quarry materials from land under tidal waters
23.10) Does this development application involve the removal of quarry materials from land under tidal water
under the Coastal Protection and Management Act 1995?
□ Y£s -1 acknowledge that a quarry material allocation notice must be obtained prior to commencing development
B'fjo
Note: Contact the Department of Environment and Science at www.des.ald.aov.au for further information.
Referable dams
23.11) Does this development application involve a referable dam required to be failure impact assessed under
section 343 of the Water Supply (Safety and Reliability) Act 2008 (the Water Supply Act)?
□ Yes - the ‘Notice Accepting a Failure Impact Assessment1 from the chief executive administering the Water
Supply Act is attached to this development application
□'No
Note: See guidance materials at www. dnrme. aid, aov.au for further information.
Tidal work or development within a coastal management district
23.12) Does this development application involve tidal work or development in a coastal management district?
□ Yes - the following is included with this development application:
□ Evidence the proposal meets the code for assessable development that is prescribed tidal worV. (only required
if application involves prescribed tidal work)
A certificate of title
Note: See guidance materials at www.des.old.aov.au for further information.
Queensland and local heritage places
23 13) Does this development application propose development on or adjoining a place entered in the Queensland
heritage register or on a place entered in a local government’s Local Heritage Register?
ny£s - details of the heritage place are provided in the table below
ZlNo
Note: See guidance materials at www.des.ald.aov.au for information requirements regarding development of Queensland heritage places.
Name of the heritage place: Place ID:
Brothels
23.14) Does this development application involve a material change of use for a brothel?
□ Yes - this development application demonstrates how the proposal meets the code for a development
plication for a brothel under Schedule 3 of the Prostitution Regulation 2014
Decision under section 62 of the Transport Infrastructure Act 1994
23.15) Does this development application involve new or changed access to a state-controlled road?
□ Yes - this application will be taken to be an application for a decision under section 62 of the Transport
Infrastructure Act 1994 (subject to the conditions in section 75 of the Transport Infrastructure Act 1994 being
satisfied)
No
Page 10
DA Form 1 - Development application details
Version 1.2— 7 February 2020
Page 13
PART 8 - CHECKLIST AND APPLICANT DECLARATION
24) Development application checklist
I have identified the assessment manager in question 15 and all relevant referral
requirement(s) in question 17 □ Yes
Note: See the Planning Regulation 2017 for referral requirements
If building work is associated with the proposed development, Parts 4 to 6 of DA Form 2 - □ Yeg^
Building work details have been completed and attached to this development application applicable
Supporting information addressing any applicable assessment benchmarks is with the
development application
Note: This is a mandatory requirement and includes any relevant templates under question 23, a planning report
and any technical reports required by the relevant categorising instruments (e.g. local government planning
schemes, State Planning Policy, State Development Assessment Provisions). For further information, see DA
Forms Guide: Planning Report Template.
Relevant plans of the development are attached to this development application
Note: Relevant plans are required to be submitted for all aspects of this development application. For further ETYes
information, see DA Forms Guide: Relevant plans.
The portable long service leave levy for QLeave has been paid, or will be paid before a □ Y£S
development permit is issued (see 21) OlTot applicable
25) Applicant declaration
Qoy making this development application, I declare that all information in this development application is true and
car rect
□ where an email address is provided in Part 1 of this form, I consent to receive future electronic communications
from the assessment manager and any referral agency for the development application where written information
is required or permitted pursuant to sections 11 and 12 of the Electronic Transactions Act 2001
Note: It is unlawful to intentionally provide false or misleading information.
Privacy - Personal information collected in this form will be used by the assessment manager and/or chosen
assessment manager, any relevant referral agency and/or building certifier (including any professional advisers
which may be engaged by those entities) while processing, assessing and deciding the development application.
All information relating to this development application may be available for inspection and purchase, and/or
published on the assessment manager's and/or referral agency's website.
Personal information will not be disclosed for a purpose unrelated to the Planning Act 2016, Planning
Regulation 2017 and the DA Rules except where:
• such disclosure is in accordance with the provisions about public access to documents contained in the Planning
Act 2016 and the Planning Regulation 2017, and the access rules made under the Planning Act 2016 and
Planning Regulation 2017; or
• required by other legislation (including the Right to information Act 2009)\ or
• otherwise required by law.
This information may be stored in relevant databases. The information collected will be retained as required by the
Public Records Act 2002.
r&kujsi'11? (
Page 11
DA Form 1 - Development application details
Version 1.2— 7 February 2020
Page 14
PART 9 - FOR COMPLETION OF THE ASSESSMENT MANAGER - FOR OFFICE
USE ONLY
Date received: Reference number(s):
Notification of engagement of alternative assessment manager
Prescribed assessment manager
Name of chosen assessment manager
Date chosen assessment manager engaged
Contact number of chosen assessment manager
Relevant licence number(s) of chosen assessment
manager
QLeave notification and payment
Note: For completion by assessment manager if applicable
Description of the work
QLeave project number
Amount paid ($) Date paid (dd/mm/yy)
Date receipted form sighted by assessment manager
Name of officer who sighted the form
Page 12
DA Form 1 - Development application details
Version 1.2— 7 February 2020
Page 15
. -TS
Dana McKenzie (07)5449 5293
15203
Email: [email protected]
11 December 2001
DANIEL REED
28 SUNSET DRIVE
NOOSA HEADS QLD 4567
Dear Sir,
Re: Application for a Jetty at 77 Shorehaven Drive, Noosaville described as Lot 463 on
■■
c RP 868304
With reference to the above matter, I wish to advise that your application has been approved,
subject to the following conditions:-
1. This approval is for the jetty only and the approved plans comprise Drawings 01-164-1 and
01-164-2 dated September 2001 by John Norden & Associates, copies of which are
attached.
2. The jetty supports shall be founded well clear of the rock wall or revetment wall as the case
may be, and shall not touch it in any way.
3. The jetty is to be used for private purposes only, and no commercial operations are to be
undertaken.
4. The mooring facility shall not be utilised for live aboard purposes.
5. The jetty shall be licensed with the Council upon completion of the structural work and
shall be licensed annually thereafter.
e 6. The jetty, is. to, comply with the requirements of Council's Planning Scheme Policy on,
‘Private Jetties, Wharves, Pontoons and Boat Ramps’ (PSP No. 5).
7. The jetty should have a level walking surface of R.L 1.000m AHD or be level with the top
of the revetment wall.
8. The approval or conditions do not constitute a ailing on structural safety. Prior to licensing
by Council, the applicant must provide a certificate from a suitably qualified Registered
Professional Engineer that the jetty has been designed and constructed to comply with all
relevant codes and standards.
9. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
elevating a vessel above the water without Council approval.
10. No posts or vertical supports of the proposed jetty are to extend vertically from the
structure unless they provide support for the handrail.
11. Structures should be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall.
12. Erosion and sediment controls are to be implemented during any construction activities.
DUr \nrnrI\\vnrr/\rlnr\it>l/iev\Ie'ffr*rK\l 17f)^-77vhnrph/nifin dnr
Page 16
13. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act
(EPA) 1994.
14. Construction works should be undertaken so as not to impact on the receiving waters.
15. There is to be no loss of flood storage as a result of any use or development activity in
the area at an elevation below the 1 OOyr ARI flood level.
16. Rock scour protection, wrapped in geotextile, extends 750 mm from the face of the
revetment wall in this locality. Piles are to be located clear of this rock protection.
17. ft is important to note that any works that have been constructed prior to the approval of
Engineering Drawings may, under the direction of the Chief Executive Officer, require
reconstruction to suit Council’s requirements. This work shall be undertaken at the cost
of the applicant.
18. Any deviation from the approved Engineering Drawings that may occur in the field as a
result of on site or in-situ conditions will require that amended Engineering Drawings
are submitted for further assessment.
f
19. Any approval granted does not warrant that such plans and specifications have been
checked in detail, nor does it absolve the owner of the land from complying with all the
conditions of this approval and/or relevant Council By-Laws and Policies and/or
relevant statutes and/or statutory regulations in the execution and/or performance of
said works. Neither the Council nor the Chief Executive Officer accepts any
responsibility for the accuracy of such plans and specifications as approved. It is to be
noted that variations and/or additions to the approved plans may be required as directed
by the Chief Executive Officer, as a result of insufficient detail on the plans or to ensure
that Council Policies and/or good engineering practices are achieved.
20. There shall be no electrical reticulation system carrying electricity in excess of 24 volts
beyond the revetment wall.
21. This approval lapses where the construction of the jetty has not commenced within two (2)
years of the date of issue of the approval, unless application is made and approved by
Council for an extension.
c Please return the attached ‘Request for Inspection” cards prior to the works being commenced
and also prior to completion. Upon completion of the relevant works and their inspection and
approval by Council’s Development Section, arrangements will be made for the return of the
$500.00 bond.
Yours faithfully,
Shane Adamson
MANAGER - LAND USE
i
DU r \nmr}\\\<nr/1\rlnr\iptti0c\lptiprv\1 $Jni-77chn}-phsivp)i Hnr
Page 17
. MAXIMUM RECORDED FLC
TOP OF WALL
DECK RL 1.0 AMD
RL 1.0 AMD
. MINIMUM WATER RL 0.44 A
/
I V
^i
g PILES:
8
ALL PILES SHALL BE APPROVE
ELEVATION 1 AND TREATED TO HAZARD 6
ALL PILES SHALL BE INSTALLS
WITH AS 2159 - PILING CODE
1:50
u "7
1500 OVERALL
CONCRETE RETAINING WALL NOTE: DO NOT FIX
c / I ■ s.'
I / JETTY TO WALL
V 4#
/
PROPERTY BOUNDARY
'VT
\/) i'3
PILES TO BE CLEAR OF STONE A' >*
PITCHING AND ASSOCIATED
GEOTEXILE FABRIC
DECKING:
38 x 125 F14 HWD
FIXED TO BEARERS
WITH TWO STAINLESS
STEEL SCREWS EACH END
PILES:
0 200 MIN TREATED
HWD POLES
I
£
FRAMING LAYOUT \
1:50
;• ■ b / 1
Page 18
APPROVED HANDRAIL
| TO ONE SIDE (MINIMUM)
DD LEVEL RL 2.00 AMD
TOP OF WALL
RL 1.0 AND DECK .1
RL1.0AHD
■(
: V: T/ i'
:vS 5'T-d.
/
/
STONE PITCHING
■. "" ■: ■
.J' S:i. ii- .
■ L'-.'i'■TLS'. >: r
~P
u i 5.
rS.U ivj !N0*' if'
•
0 HARDWOOD ' F > S’ v1
) IN ACCORDANCE ELEVATION 2
3000
CANAL 1 ■7
/
NQOSA SHIRE COUNCIL
PROPOSED "
JETTY --------
I PROPOSED PL4HS APPROVED
FLOATING
11511 4------ 04' SO" i BOAT LIFT
DATE:................................ !/
<s
3*
G J DUNN
PROPOSED JETTY
LOT 463
No. 77
LOT 463
743 m2 SHOREHAVEN DRIVE
NQOSA WATERS
' aK. ’ 1 RABRINK PTYLT^T/A
s
LOT 463
RP'868304
yr tohnNomen
PARISH WEYBA
COUNTY MARCH
& Associates
ACN 010 263 877
Structural/OMI
Design Engineers
SUITE 16 PH: 07 - 5449 7137
PO BOX 205 FAX.-G7.5449 7172 j
TEWANTIN PLAZA
POINCIANA
Email:
)nortJen@lprimus i
SITE PLAN AVENUE
TEWANTIN 4565
.oom^u ;
1:200 DRAWN DATE 1
SASHTON
1
■ c
o; ?
^
SEPTEMBER 2001 >■
2 SCALE
h ASSHOWN (
-274* 3R175- DRQ NO. ;
15330
SHOREHAVEN DRIVE / 01-164-1
j
Page 19
DECKING:
126 x 38 HWD
SCREWED TO BEARERS
2 M16 S/S^^
C''
PILES:
KICKER:
75x38 HWD 0 200 H6 MARINE HWD POLES
1/75x No14 TYPE 17 NOTE THAT ALL POLES TO COMPLY
STAINLESS STEEL WITH AS 2159 - PILING CODE
SCREWS @ 450 CRS /
PILES:
0 200 H6 MARINE HWD POLES
BEARERS; NOTE THAT ALL POLES TO COMPLY
150x75 HWD WITH AS 2159 - PILING CODE
FIX TO EACH PILE
WITH 2/M 16 S/S BOLT
DETAIL
1:20
SECTION/ A
R
DETAIL/^
1:20 t 7
2 M16 S/S
150x75 HWD
DETAIL/^
1:20
1
Page 20
-Sr"
>
7SHWD NOTES:
s/s
1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE
DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE
A STRESS GRADE OF F14 MIN.
2. ALL TIMBER SHALL RECEIVE A FLOOD COAT OF CREOSOTE
WD
OR APPROVED EQUIVALENT.
3. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL
COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS'
"GUIDELINES’ FOR CONSTRUCTION OF WORKS ON TIDAL LANDS
OR WATERS FOR PRIVATE USE.
4. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,
SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.
5. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED
OR RINGED.
! r/- /
6. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM
THE DRAWINGS.
D
:BRACKET
} EACH MEMBER
NOOSA SHIRE CCuHCU- ___ _ ^ ^
VD
SONATUKE:
i
GJ DUNN 5
'
PROPOSED JETTY
WD
LOT 463
No. 77
SHOREHAVEN DRIVE
NOOSA WATERS it j/
'■ •• feawhkmLrDTM
w lohnNorflen
& Associates
ACN 010 263 877
StructuraJ/CMI
WALKWAY DECK VERTICAL Design Eixjlneers
SUITE 16 PH:07 - 5449 7137
DESIGN LIVE LOAD - 2.0 kPa PO BOX 205
TEWANTIN PLAZA
FAX 07 - 5448 7172
Email:
POINCIANA jnocden@iprimu8
AVENUE .com.au
MAXIMUM MOORED VESSEL - 5m TEWANTIN 4565
0 RAVIN DATE
BERTHING VELOCITY - 0.5 m/sec SASHTON SEPTEMBER 2001
SCALE DESIGNED'' ~ J
AS SHOWN
CPe4 MIEAusL RPEQ.
DRG NO.
01-164-2
:
-------
Page 21
1 ; ioo
N-i
/-vi^
,X A^t? f riP^
^<P£ <<£hl
^CC'Ai'V'
if-mei^ ^ a, /w^tAt7^
rrie't ^
ELEVATION 2
1:60 /
CANAL I
§ /
i /
JETTY — ....... .......... pROPoa
fL0ATlN(
/ BOAT UK
h
;. 4
i>
LOT 463
743 mz
LOT 463
ftP 868304
F'ARISH WEYBA
COUNTY MARCH
SITE PLAN
1:200
----------
SHORE HAVEN DRIVE
Used in these records
Operational Works Application OPW21/0044 - DA Form 1 - Cover Letter - Plans - copy 15203 DA - 77 Shorehaven Dr Noosa WatersRelated documentApplication case desk ↗
About this file
- File size
- 11.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.