21556 Response to Information Request OPW220104
Attached to the e-mail 25 Pavilion St - Response to information Request - OPW22/0104.
Response The footpath width has been increased to 2m wide west of the existing property along the frontage of the new lots. Issue It is not clear that all lots achieve a minimum 1% fall towards the internal road. 5. Information Required Demonstrate that all the lots achieve a minimum 1% fall towards the internal road. Alternately, provide amended plans detailing an inter-allotment drainage system for the lots. Response Minor earthworks shaping has been added to lots 1 & 2 (similar to approach taken with lots 8 & 9) to provide 1% fall towards the new internal road. The natural slope towards the west has generally been maintained with this proposed shaping. Roof water from houses on these lots can free drain to the street via pipes connected to the proposed kerb adaptors. Issue From the review of the SWMP and the OPW drawings, it seems that the overflow pit for the bioretention basin needs to have a sealed lid in order for the detention function to work as modelled. 6. Information Required Provide confirmation that this is the case and update the plans as necessary. Response Peak Urban (authors of the SWMP) have confirmed that the outlet pit in the bioretention basin needs to have a sealed lid. Drawings have been amended accordingly to reflect this requirement. Issue The submitted documentation, indicates that the ESC plan and the sizing of the sediment basin are based on a catchment area which excludes the 2 existing properties.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.