Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

09/1058 - Approved Plans [As Published] · 132009.1058

of 12

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

wo

 

 

 

oe,

—_
Seat [ane eae,

 

Rev | Date Issued [Details

File, Copy

 

 

 

 

 

 

   

sparks architects

Sketch Design

of

Proposed New Residence
for

Doug and Pam Mc Taggart
at

8 Piper St, Peregian

Date: 31 August 2009

16
i

ine

A_ (31.08.09, LN

DA sumbmission 2

 

 

DA approval })

 

Drawing Schedule

1.0° TITLE SHEET
1.1 SITE PLAN

---4-2—GROUND FLOOR PLAN -

1.3; FIRST FLOOR PLAN
ROOF PLAN

2.4: NORTH WEST ELEVATION
22 NORTH EAST ELEVATION
2.3 SOUTH EAST ELEVATION
2.4 SOUTH WEST ELEVATION

3.1 SECTIONA
3.2 SECTION
3.3 SECTIONC

 

 

 

 

 

So

 

 

 

( site details ( floor areas ‘\
LOT 405 ON P 93116 Internal
Parish of Maroochy Ground Floor 137.6m? i
County of Canning 2 |!
First Floor 69.1m
Local Authority:
Sunshine Coast Regional TOTAL 206.7m? |;
Council |
; : External 1
" Ground Floor t
. decks / stairs & seat - 17.1m?
raised lawn / garden - 33.0m?
}
+ First Floor 176.6m?
SITE AREA 531.1 m? decks & stairs ‘

 

TOTAL 226.7m?

 

 

 

Pool & pond 52.3m?
Ko

 

 

 

 

a: Wad 28 henreytew pce mt ninety Gel enrsectin
7 5472 7603,

New Residence

 

#1071 5472 6326
2 donespare cess com

8 Piper Street Peregian Beach

Doug ond Pam McTaggart

 

 

 

 

sparks crchaecte pay Be, chun 8 124 617 724
8 orchtects reystnion Re 3975

 

project

client

 

 

Taree nw te te

 

 

 

 

 

not to scale
025 os July 09 TITLE SHEET SKI1.0
job no. draven date of firstissue | drawing dwg no.

 

 
Full text of the other 11 pages

Page 2

 

 
  

 

 

@ :
-
&.
a
..
5.
a
a.

 

 

 

 

 

extent of existing residence shown
smail dashed, to be demolished

232°00°

 

Rev | Date Issued

Details

 

 

 

 

 

8 [37.08.09] LN

 

DA sumbmission 2

DA approval +

 

 

“Be
+

ames
Cl

959.0 85

  
 

    

        
   
     

SUNSHINE
REGIONAL COURSIL
PLANS APPROVED

Signature: LAL PT ey
Date: 2 kober

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

‘
: sada 33 honeydew ploce 22 rinGerry OF aan: New Residence { Scale 1:200 @ A3 | nu- Le LIL
sparks architects 8 Piper Street Peregian Beach 1 | Doug ond Pam McTaggart 025 DS July 09 [| SITE PLAN ski
igs acta Bc F247 project dient job no. drawn dote of first issue {| drawing dwg no.

 

 

 

 

 

 

 

Page 3

 

 

 

‘
Date Issued [Details

 

 

 

 

 

me

8 [31.08.09] _LN

DA sumbmission 2

 

 

 

 

 

a
2

™,

legend

 

ref. refridgerator
hp hot plate
dw dishwasher
s sink

t laundry tub
vb vanity basin
st store

robe

garage
honed cone

   

driveway |
gravol

 

daybed / bunks

ce honed cone
pe (acs 700 }

------- H , robe

 

 

CJ

 

 

 

 

 

 

 

1.5m setback |

    
  

           
  

        

Scale 1:100 @ A3
July 09
daie of first issue

1. SAxE9 33 hormeytiew place 78 cancerny aed ance
OTs S472 703

$9 sa? 6332
2 dodepatearchiects con
spars architects ply Bd ath €¢ 12s 60 921
Be cxcheects registrinn No. 3474

 

New Residence
8 Piper Street Peregian Beach 3

project !

       

     

               

       

  

os

drawn

Doug and Pam McTaggart
dient

sparks architects

      
 

   

     

   

 

   
 

        

 

 

 

 

 

RE

            
     

drawing

 

 

 

 

      

PLANS APPR

Signature: Lille

“Sage |201058
Date: - 2204 °

GROUND FLOOR PLAN

    

  

 

 

 

Page 4

 

 

 

 

C Rev [Date issued [Details DA appr oval )

A 31.08.09 LN [DA sumbmission 2

 

 

 

 

 

 

legend . ;

                 
              

refridgerator
hp hot plate
dw dishwasher
s sink

t laundry tub
vb vanity basin
st store

robe

 

 

 

1
1
1
1
1

 

 

covered’deck’
hardwood decking.

 

     

 

 

 

 

 

 

| |

living pavilion
recycled hardwood

 

dining pavilion
recycied hardwood

[R11 700) 11.700

 

aie

  

 

—— entry Trace

honed conc

Ri 11 $50 RL 11 700

 

bed 1
recycled hardwood

       

  

RL 11 400

 

powder room

 

 

 

 

study

honed conc

[RU11 700) 14.700

 

vo

 

 

 

 

 

  

ensuite

 

Doda

1.5m

8.0%

               
  

SHINE @OA
NAL UNE
PPROVE

Signature: ..¢ A Le Mi.
Date: Ah CAB, 2008
Seale OO@ AR (MUUUNL._F LL 2/098

July 09 FIRST FLOOR PLAN SKIS

date of firsi issue dwg no.

. SUN
Ee

 
  

  

it

       

      

      

Stns 23 Ronee Dice Orne OPE usar cD
ERA Sar

Wan 5472 e826
& Oantspaortieess «:
Rats archnocte gay. ba. ab
Ge orchtects eagishctwr No

 

New Residence
8 Piper Street Peregian Beach

project

        
      

  

 
         

    

    

    

    

          
   

025
job no.

Ds

drawn

      

 

sparks architects Doug and Pam McTaggart

client

        

      

  

     

   

 

       

    

            

drawing

 

Page 5

 

 

 

 

 

 

 

i - Rev | Date Issued | Details
C A 3108.00] LN [DAsumbmission 2 DA approval )

{ legend |

RS1 custom orb
RS2 twin wall translucent
polycarbonate

 

 

 

 

 

 

 

proposed position of
future photovoltaic array

 

 

 

 

 

 

Scale 100@A3 INUIL_S LC

4. State 33 hansen phe Fd Aenderty OH canta New Residence

   

 

 

 

 

 

 

 

 

 

107) $472 303
PLAN ski4
sparks architects Ciro settac xn 8 Piper Street Peregian Beach Doug and Pam McTaggor 025 os 2 09 _ oc
sparks arches pay Bd cha Eg 124 6ti 72 projeci dient job no. drawn date of first issue _| drawing dwg no.

 

 

 

 

i crchtec’s regres Ko 375

 

Page 6

 

 

 

 

 

 

 

 

 

' A 131.68.09[ LN {DA sumbmission 2

: . _ Rev|bate_| sued | Details DA approval +)

 

 

 

Colorbond

Fibre cement sheeting
Plywood

Painted steel
Rendered block

Twin wall translucent
polycarbonate
Recycled hardwood
Colorbond custom orb |
Twin wall translucent |
polycarbonate 2

 

 

All structural elements including footings, walls
and framing to be in accordance with engineers
design and detail.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

\ =

 

 

   

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Scale 1:100 @ uuUL_ Sd
ee — ; = NORTH WEST ELEVATION SK2.1
k hit t be) said eee 8 Piper Street Peregian Beach Doug and Pam McTaggart 025 DS. July 09 .
SParks archirects = —= j date of first issue drawint dwg no.
‘sparks cichwest: ply ta abn 64 124 61} 721 project client job no. drown die of tirst issue 9
(Bd trchibect's registration No. 3073

 

 

Page 7

 

 

Rev

Oate

Issued

Details

 

 

 

31.08.09

 

UN

 

DA sumbmission 2

 

DA approval _ )

 

 

CB Colorbond

FC Fibre cement sheeting

PLY Plywood

PS Painted steel

RB Rendered block

TP Twin wall translucent
polycarbonate

HWD Recycled hardwood

RS1 Colorbond custom orb

RS2 Twin wall translucent

All structural elements including footings, walls
and framing to be in accordance with engineers
design and detail.

first floor

covered deck

   

polycarbonate

 

- ffl 11.700

- ffl 11 400

sparks architects

 

 

dary

    

RS2

jorthem boun

 

      

‘
7.

 

 

 

 

 

 

NT ORAEDTT

il

 

LU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

thern boundary,

southern boun

photovoltaic array

height limit at Eastern most building
extremity running parallel with boundary

c fed Vet
4

Wy

1é

         

3,000

2,400

SUNS
EGIO

Signature: Kb

Date: AL Oksbe-

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LS iin

CI

 

 

 

 

 

 

 

9. tax 2

 

lever Pai td er GH cans New Residence

 

scale 00@ 43 ANUS Ld

 

  

 

 

 

bw
One cases com 8 Piper Street Peregian Beach Doug and Pam McTaggan 025 Os July 09 NORTH EAST ELEVATION SK2.2 C)
iouctswpeoenn sor project dient jobno. | drawn | date offirstissue | drawing dwg no.

 

 

 

 

 

 

 

 

Page 8

 

 

 

 

Rev [Date Issued | Details )
C A 31.08.08; LN [DA sunibmission 2 DA approval

 

 

 

 

 

 

 

 

height limit at Southern facade

Legend )
CB Colorbond
FC Fibre cement sheeting
PLY Plywood
PS Painted steel
RB Rendered block
TP Twin wail translucent |
polycarbonate {
HwWD Recycled hardwood |
RS1 Colorbond custom orb
RS2 Twin wall translucent
polycarbonate
fn . : :
All structural elements including footings, walls '
and framing ig,be‘n-accordance with engineers |
design and“detail. LAV I~ 2. Yy

 

ary

i
|

dary

                           
   

4
4

eastern bounda

western boun

 

 

 

 

 

 

 

 

 

 

 

 

 

ae

 

 

 

 

 

 

 

 

 

 

 

 

 

first floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

SUNSHINE COAST
REGIONAL COUNCIL

| PLANS P €D |
| Signature: ..¢ Lal,

| Date: a OkekerZo 07.

ZOOY 108%

 

 

HWD timber screen

 

existing ground line shown dashed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

i4
sl 39 aria Ae FT HS nC New Residence Scale 1:100 @ A3 a
B. B7) S67
: rion 577 ae 8 Piper Street Peregian Beach Doug and Pam McTaggart 025 ps July 09 SOUTH EAST ELEVATION :
sparks architects boar ct - date of fast i rawin dwg no.
Poca ee ae project client jobno. | drawn te of first issue | drawing

 

 

 

 

 

 

 

 

 

Page 9

 

Rev | Date Issued | Details

 

 

 

DA approval )

 

 

 

A [31.08.09] LN [DAsumbmission 2

 

   
              

 

CB Colorbond

FC Fibre cement sheeting

PLY Plywood

PS Painted steel

RB Rendered block

TP Twin wall translucent
polycarbonate

HWD Recycled hardwood

RS1 Colorbond custom orb

RS2 Twin wall transtucent

polycarbonate

Ail structural elements including footings, walis
and framing to be in accordance with engineers

 

design and detail.

 

boundary ___

northem boun

FC

first oor = 117000
entrydeck = ffl 114000

cg
ground floor - ffl 8 700

ee

     

|
z

height limit at Western most building
extremity running parallel with boundary

'
‘

i
'
(
‘

sliding HWD screen

    

      

SUNSHINE COA
REGIONAL COUNCIL

| [Pans SPP D
Signature: pc lige fee

E
bae:.2. Ole cassvaven 204

 

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cl

 

 

 

 

New Residence

|
Scale 1:100 @ A3 f

 

sparks architects 8 Piper Street Peregian Beach

Doug and Pam McTaggart

025

duly 09 SOUTH WEST ELEVATION SK2.4

 

   

  

 

OE orchtent's rayiston be 9473 project

 

cliant

 

 

job no.

drawn

 

 

 

date of first issue : | drowing dwg no.

 

Page 10

 

 

 

: ]Rev]Date | Issued | Details
. 0 C [B [31.08.001_ LN TDA sumbmission 2 DA approval

 

 

 

 

 

     
              

 

 

Colorbond
FC Fibre cement sheeting
PLY Plywood
PS Painted steel
RB Rendered block
TP Twin wall translucent
polycarbonate
HWD Recycled hardwood
RS1 Colorbond custom orb
RS2 Twin wall translucent = mont
polycarbonate s x \
o Bok f
Sf hns “8
Alt structural elements including footings, walls. af §
aaa ote in accordance with engineers height limit at section A Ig

 

RS2

eastern boundary

COAST
L COUNCIL

PPROVED

existing ground line shown dashed

 

6m setback { 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| | oO

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

i
. sey 33 boreraew place od Rinoetes oA Suse New Residence ' Scale 1:100 @ A3. uu Ed
sparks architects FiO oe 8 Piper Street Peragian Beach . | Doug and Pam McTaggart 025 DS July 09 | SECTION A SK3.1
emer tiamte were project client jobno. | drawn date of first issue |! drawing dwg no

 

 

 

 

 

 

 

 

 

|

Page 11

 

 

Rev [Date Issued | Details :
A_ {31.08.09] LN [DAsumbmission 2 DA approval +

 

 

 

 

 

 

 

Fibre cement sheeting
Plywood
Painted steel

Rendered block |
t

Twin wall translucent
polycarbonate
Recycled hardwood
Colorbond custom orb
Twin wall transtucent

height limit at section B

 

 

polycarbonate &
3 POs
jer
All structural elements including footings, walls a=
and framing to be in accordance with engineers 48
design and detail. 'g

   

 

 

eastem boundary
XN
\
\

existing ground line
shown dashed

      

     

Platature:

M88: on.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

ft
q Ty l i t
=
‘ 1
New Residence Scale 1:100 @ A3
sparks architects 8 Piper Street Peregian Beach Doug and Pam McTaggart 025 DS July 09 SECTION B SK3.2
project ‘dient job no. draven date of firstissue | drawing dwg no.

 

 

 

 

 

 

 

 

 

Page 12

 

Rev | Date tssued | Details

 

 

 

 

 

A |31.08.09! LN {DA sumbmission 2

DA approval )

 

 

Legend

                

cB Colorbond

FC Fibre cement sheeting

PLY Plywood

PS Painted steel

RB Rendered block

TP Twin wall translucent
polycarbonate

HWD Recycled hardwood

RS1 Colorbond custom orb

RS2 Twin wall translucent

polycarbonate

All structural elements including footings, wails
and framing to be in accordance with engineers

design and detail.

 

 

firstfloor

HWD timber screen

- 111.700

   

my

=.
o
3
e
3
6
a
€
S
£
tt
S

 

op

   

 

 

 

t
t
'
'

Te

TaE ME RON Ay IS

4

      

 

SUNSHINE COAST
REGIONAL COUNCIL

\ Signature: ...

Date: ZL.

 

PLANS APP BP D
existing ground fine shown dashed Le Z .

 

  

 

 

2001/1058

 

 

 

 

 

 

 

 

 

 

 

 

 

TP

 

Ml

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

©. i 35 Fence BA mE Raocrey OS cana New Residence Scale 1:100 @ A3 l t j

sparks architects 8 acs corn 8 Piper Street Peregian Beach Doug and Pam McTaggart 025 DS July 09 SECTION C SK3.3
sparks orchecs pe Ki, abn 68 Fea 771 project client jobno. | drawn | dateoffirstissue | drawing dwg no.
A ordeext's cegsbolinn Na 3975 {

 

 

 

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1058 - Approved Plans [As Published].pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.