Council archive · source document
09/1058 - Approved Plans [As Published] · 132009.1058
Plans and drawings: the text below has words only, no drawings.
C Rev [Date issued [Details DA appr oval )
A 31.08.09 LN [DA sumbmission 2
legend . ;
refridgerator
hp hot plate
dw dishwasher
s sink
t laundry tub
vb vanity basin
st store
robe
1
1
1
1
1
covered’deck’
hardwood decking.
| |
living pavilion
recycled hardwood
dining pavilion
recycied hardwood
[R11 700) 11.700
aie
—— entry Trace
honed conc
Ri 11 $50 RL 11 700
bed 1
recycled hardwood
RL 11 400
powder room
study
honed conc
[RU11 700) 14.700
vo
ensuite
Doda
1.5m
8.0%
SHINE @OA
NAL UNE
PPROVE
Signature: ..¢ A Le Mi.
Date: Ah CAB, 2008
Seale OO@ AR (MUUUNL._F LL 2/098
July 09 FIRST FLOOR PLAN SKIS
date of firsi issue dwg no.
. SUN
Ee
it
Stns 23 Ronee Dice Orne OPE usar cD
ERA Sar
Wan 5472 e826
& Oantspaortieess «:
Rats archnocte gay. ba. ab
Ge orchtects eagishctwr No
New Residence
8 Piper Street Peregian Beach
project
025
job no.
Ds
drawn
sparks architects Doug and Pam McTaggart
client
drawing
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1058 - Approved Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.