Council archive · source document
09/1058 - Approved Plans [As Published] · 132009.1058
Plans and drawings: the text below has words only, no drawings.
Rev
Oate
Issued
Details
31.08.09
UN
DA sumbmission 2
DA approval _ )
CB Colorbond
FC Fibre cement sheeting
PLY Plywood
PS Painted steel
RB Rendered block
TP Twin wall translucent
polycarbonate
HWD Recycled hardwood
RS1 Colorbond custom orb
RS2 Twin wall translucent
All structural elements including footings, walls
and framing to be in accordance with engineers
design and detail.
first floor
covered deck
polycarbonate
- ffl 11.700
- ffl 11 400
sparks architects
dary
RS2
jorthem boun
‘
7.
NT ORAEDTT
il
LU
thern boundary,
southern boun
photovoltaic array
height limit at Eastern most building
extremity running parallel with boundary
c fed Vet
4
Wy
1é
3,000
2,400
SUNS
EGIO
Signature: Kb
Date: AL Oksbe-
LS iin
CI
9. tax 2
lever Pai td er GH cans New Residence
scale 00@ 43 ANUS Ld
bw
One cases com 8 Piper Street Peregian Beach Doug and Pam McTaggan 025 Os July 09 NORTH EAST ELEVATION SK2.2 C)
iouctswpeoenn sor project dient jobno. | drawn | date offirstissue | drawing dwg no.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1058 - Approved Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.