Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Appendix E - Local Code Response

Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).

of 162

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

RECONFIGURING A LOT CODE

Table 14-66—All reconfiguring a lot


SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS                                                ASSESSMENT

14.183 Lot Size and Dimensions

O1 Lots have the appropriate area33 and         S1.1 If for reconfiguration other than community title            S1.1 Complies
                                                                                                                  Both lots are greater than 1000m2 which is
dimensions to provide for—                      subdivision, Council will require the following—
                                                                                                                  the minimum lot size for lots in the Industry
   a) the intended use and, if not intended         a) Minimum lot area and minimum average width
                                                                                                                  Zone and Noosaville Locality.
       to be used by the Council or State for           consistent with the relevant provisions of Table 14-

       community infrastructure,                        68; and

       conservation purposes or public              b) If for residential development—
       utilities including road widening are
                                                           i.     the minimum house site area is not less
       not less than the minimum sizes
                                                                  than that specified in Table 14-69; and
       specified in Table 14-68; and
                                                           ii.    if not in a sewerage service area an effluent
   b) if for residential development—
                                                                  disposal area is provided
       i.      a house site area of not less

               than that specified in Table

               14-69; and
Log in to download the original file

Appendix E - Local Code Response.pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 161 pages

Page 2

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS   ASSESSMENT

       ii.     if not within a sewerage

               service area, an effluent

               disposal area;

  c) if for community title subdivision, the

       minimum lot sizes for the intended use

       are not less than identified for the

       relevant zone specified in Table 14-

       68;

  d) siting and construction of buildings to

       minimise risk of soil erosion, landslide,

       flooding and bushfire;

  e) siting and construction of buildings to

       minimise detrimental impacts of

       effluent disposal and water quality

       impacts;

  f)   retention of natural environmental

       values, including native vegetation;

  g) retention of cultural features and

Page 3

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS                                        ASSESSMENT

         protect views to cultural features;

    h) minimisation of earthworks or retaining

         walls associated with building

         construction on sloping sites;

    i)   private and public open space and on-

         site landscaped areas; and

    j)   convenient vehicle access and on-site

         parking, loading and manoeuvring

         areas

14.184 Noosa North Shore Locality

14.185 Lake Macdonald Water Supply Catchment Area

14.186 Lot layout


O4 Subdivision of land for residential           S4.1 Lots are arranged to front streets and public open   S4.1 Complies

development provides for a neighbourhood         space; AND                                                Both lots have a street frontage and access
with a strong and positive identity through—                                                               to public open space.

    a) legible streets and open space            S4.2 Rear lots have views over public open space; AND     S4.2 – S4.3 Not Applicable
         networks;

Page 4

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                           ASSESSMENT

  b) integrating prominent site features,                                                                      No rear lots are proposed nor are the lots

       including landmarks, native vegetation     S4.3 Lots intended for urban settlement are located within   intended for urban settlement.

       and views into the design;                 1km of retail or commercial uses or land within a

  c) the location of community, retail and        commercial zone.

       commercial facilities at focal points

       either within convenient walking

       distance for residents where the

       development is urban settlement or

       within reasonable vehicular proximity;

  d) the location of lots intended for urban

       settlement within proximity of retail

       and commercial facilities;

  e) shared use of public facilities by

       adjoining communities;

  f)   enhancement of personal safety and

       minimisation of potential for crime,

       vandalism and fear by maximising

       opportunities for casual surveillance of

Page 5

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                              ASSESSMENT

        public spaces; and

    g) establishment of a sense of place.

O5 House site areas are—                          No solution provided.                                           O5 Not Applicable

    a) located at least 50m from any land                                                                         The proposed lots are not intended for

        including within a national park,                                                                         residential use

        conservation park, state forest

        reserve, nature refuge, coordinated

        conservation area or wilderness area;

        and

    b) not located on steep slopes

O6 Lots for residential development are           S6.1 A variety of lot sizes and shapes is provided within the   O6 Not Applicable

designed to ensure variety in residential         subdivision                                                     The proposed lots are not intended for
streetscapes                                                                                                      residential use

O7 The street network—                            S7.1 Where involving the construction of a new road, road       S7.1 Not Applicable

    a) has design features, which convey the      planning and design supports the hierarchy and functional       The proposal does not include the

        primary function of each type of street   aspects identified in Sections 2 and 3 of PSP5 Engineering      construction of a new road.

        and encourage driver behaviour,           Design Standards – Roads, Drainage and Earthworks; AND

Page 6

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                           ASSESSMENT

      speeds and traffic volumes that are         S7.2 Road and pathway planning and design is in              S7.2 Complies

      safe and appropriate to that function;      accordance with, in order of precedence—                     Where minor alterations or upgrades are

  b) provides a high level of internal                a) Noosa Integrated Local Transport Plan;                required to existing pathways, the proposal

      accessibility both within the site and to       b) Queensland Transport’s Shaping Up                     will comply with the relevant standards

      external sites and appropriate external                                                                  where applicable.
                                                      c) Queensland Design Code for Residential Streets;
      connections for vehicles, pedestrian
                                                      d)   AUSTROADS Guide to Traffic Engineering
      and cycle movements;
                                                           Practice;
  c) deters through-traffic from residential
                                                      e) Sections 2 and 3 of PSP5 Engineering Design
      areas and creates safe conditions for
                                                           Standards- Roads, Drainage and Earthworks;
      local road users, pedestrians and
                                                      f)   The Noosa Cycling and Walking Network
      cyclists;
                                                           Development Plan; or
  d) incorporates street junctions and
                                                      g) A combination of the principles in these documents;
      access to lots that are located and
                                                           AND
      spaced to facilitate safe and
                                                  S7.3 The achievement of multiple connections for all roads
      convenient vehicle movements;                                                                            S7.3 – S7.8 Not Applicable
                                                  and streets (excluding culs-de-sac) within the subdivision
  e) provides for street widths and lengths                                                                    The proposal does not include the
                                                  and to adjoining subdivisions; AND
      that optimise the cost effectiveness of                                                                  construction of a new road.
      the network and the provision of public

Page 7

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                           ASSESSMENT

       utilities;                                  S7.4 Road networks provide connectivity between

  f)   provides for road reserve widths not        residential areas, both internally and to adjoining sites,

       less than the minimum identified            using access roads AND

       Section 2.3 of PSP5 Engineering

       Design Standards – Roads, Drainage          S7.5 The length of a cul-de-sac does not exceed 200m in
       and Earthworks;                             urban areas and 500m in rural areas; AND

  g) minimises the extent of earthworks

       required by being sympathetic to the
                                                   S7.6 The layout uses street and road design, including
       terrain;
                                                   variations in carriageway width, as a traffic calming
  h) has no significant adverse effects on         measure to encourage lower traffic speeds. (Note:
       habitat corridors or areas of significant   Carriageway widths are identified in Section 2.3 of PSP5
       native vegetation;                          Engineering Design Standards – Roads, Drainage and

  i)   does not create noise attenuation           Earthworks.) AND

       difficulties;

  j)   incorporates pedestrian and cyclist         S7.7 On-road cycling treatment is utilised to provide safe
       crossings at intersections or where         and continuous movement of cyclists along a roadway such
       required to access high activity nodes      as—
       and public transport;
                                                       a) sealed shoulders;

Page 8

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                           ASSESSMENT

   k) has regard to the potential for conflict         b) wide kerbside lane;

        between vehicles, pedestrians and              c) exclusive or peak period bicycle lane;
        cyclists; and
                                                       d) advisory treatments such as Bicycle Awareness
   l)   incorporates on-road cycling facilities.            Zone;

                                                       e) shared parking / bicycle lane;

                                                       f)   contra flow bicycle lane; or g) bus/bicycle lane;

                                                            AND



                                                   S7.8 The provision of bicycle lanes at intersections is

                                                   generally in accordance with AUSTROADS Part 14, section

                                                   5 and Manual of Uniform Traffic Control Devices (MUTCD)

                                                   Part 9



O8 The development contains a pathway              S8.1 Subdivision design and layout provides for walking      S8.1- S8.6 Not Applicable

system that encourages walking and cycling         and cycling routes designed and constructed in accordance    A pedestrian and cyclist pathway is
and provides a safe environment for users,         with—                                                        provided along the entire frontage of the
and is—                                            a) Sections 2 and 3 of PSP5 Engineering Design               site. Therefore, it is considered that this

Page 9

SPECIFIC OUTCOMES                              PROBABLE SOLUTIONS                                                ASSESSMENT

  a) a stable, smooth surface, including           Standards – Roads, Drainage and Earthworks;                   probable solution is not necessary.

      across driveways, sections and joins;    b) AUSTROADS Parts 13 and 14; and                                 This pathway will be maintained.

  b) easily maintained;                        c) The Noosa Cycling and Walking Network Development              Where minor alterations or upgrades are

  c) of a width and longitudinal gradient to       Plan; AND                                                     required to existing pathways, the proposal

      cater for projected usage                                                                                  will comply with the relevant standards

  d) inclusive of clear sight-lines for safe                                                                     where applicable.
                                               S8.2 If within 1km of the Pathways Network identified in the
      use; e) be free of any obstructions      Priority Infrastructure Plan in Part 15, the subdivision design
      such as fences, signage and bollards.    and layout includes pathways —

                                                   a) located in accordance with the Pathways Network

                                                       identified in the Priority Infrastructure Plan; or

                                                   b) linking to the Pathways Network identified in the

                                                       Priority Infrastructure Plan ; AND



                                               S8.3 Pedestrian routes are planned to provide clear, safe

                                               connections between residential, open space, transit stops

                                               and retail areas, and are located along, or are visible from,

                                               streets or other public spaces; AND

Page 10

SPECIFIC OUTCOMES   PROBABLE SOLUTIONS                                              ASSESSMENT



                    S8.4 Primary pedestrian routes border the frontages of

                    residential, public parks and business uses; AND



                    S8.5 Pedestrian routes through parking lots or at the rear of

                    lots are avoided; AND



                    S8.6 Pedestrian and cycle path infrastructure is designed

                    and constructed to —

                        a) have sign posting, particularly where they are

                            commuter and recreational paths, and incorporate

                            pavement markings and line work in accordance

                            with AUSTROADS Part 14 Bicycles, Section 9;

                        b) have navigational signs generally in accordance

                            with the Manual for Uniform Traffic Control Devices

                            Bicycle Directional Signage Guidelines, and

                            Australian Standard 1742.9: 2000 Manual of

                            Uniform Traffic Control Devices Bicycle Facilities ;

Page 11

SPECIFIC OUTCOMES                          PROBABLE SOLUTIONS                                               ASSESSMENT

                                              c) be clearly delineated by pavement markings and

                                                   warning signs when an on -road bicycle lane;

                                              d) incorporate kerb ramps at all intersections and

                                                   designated crossings;

                                              e) have refuge islands on all roads with median strips;

                                              f)   have holding rails for cyclists at the intersection of

                                                   district collector, sub - arterial and arterial roads

                                                   that are positioned in accordance with Australian

                                                   Standard 1742.9:2000 – Manual of Uniform Traffic

                                                   Control Devices Bicycle Facilities, and

                                                   AUSTROADS Part 14 Bicycles Section 9;

                                              g) have marked bicycle lanes, bicycle awareness

                                                   zones or storage boxes; and h) Include lighting to

                                                   pedestrian and cycle pathways to local government

                                                   requirements and in accordance with Australian

                                                   Standard 1583.1 Road Lighting – Pedestrian area

                                                   (Category P) lighting.

O9 The subdivision layout is designed to   S9.1 Where there is no relevant approved master plan,            S9.1 Complies

Page 12

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                          ASSESSMENT

facilitate linkages with adjoining sites in the    concept plan, or site analysis plan, subdivision design     The proposal will comply where reasonably

immediate area.                                    incorporates future road, street, cycleway and pedestrian   applicable.

                                                   path and open space connections to adjoining sites

O10 Where the lots are to be used for              No solution provided.                                       O10 Complies

Industrial business or Commercial business                                                                     Landscaped buffering has been provided
uses, the layout provides for appropriate buffer                                                               along all boundaries adjoining the school to
areas, to mitigate possible impacts on nearby                                                                  the east.
residences or other noise sensitive uses

O11 For lots in the Rural Settlement Zone—a        No solution provided.                                       O11 Not Applicable

sealed access to the nearest urban settlement

is available

14.187 Water supply for fire fighting

Page 13

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS                                             ASSESSMENT

O12 An adequate and accessible water supply      S12.1 For development in a water service area, water           S12.1- 12.2 Complies
                                                                                                                Will comply as applicable.
is provided for fire fighting purposes.          mains within the development shall comply with the:

                                                     a) Queensland Water Resource Commission -
                                                         Guidelines for Planning and Design of Urban Water

                                                         Supply Schemes; and

                                                     b) Australian Standard 2419 and the Water Providers

                                                         Network Model Criteria; AND



                                                 S12.2 Facilitate the connection of fire services that comply

                                                 with the requirements of the Building Code of Australia.

14.188 Energy efficiency

O13 The street and lot orientation facilitates   S13.1 For Community Title Development or urban                 S13.1- S13.2 Not Applicable

the construction of energy efficient buildings   residential development each lot contains a rectangular

that respond to the local climate conditions.    house site area where the long axis faces true North or is

AND                                              no more than 20 degrees off true north and has minimum

                                                 dimensions of—

Page 14

SPECIFIC OUTCOMES                              PROBABLE SOLUTIONS                                       ASSESSMENT

                                                  a) if the lot is between 450m2 and 599m2 - 10m x

                                                      15m; or

                                                  b) if the lot is less than 450m2 - 9m x 15m.

                                                      AND

                                               S13.2 Community Title Development lots are generally

                                               rectangular in shape and have a maximum slope of—

                                                  a) 1 in 10 (10%); and

                                                  b) 1 in 20 (5%) when measured from the front to the

                                                      rear of the lot.

O14 For residential development, the           S14.1 No Solution provided                               O14 Not Applicable
                                                                                                        The proposal is not for residential
subdivision design provides for the maximum
                                                                                                        development.
practicable number of lots with house site

areas that—

    a) maximise solar access to the north in

        winter;

    b) minimise solar access to the east and

        west in the summer;

Page 15

SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS                                        ASSESSMENT

    c)   maximise access to any prevailing

         summer breezes; and

    d) minimise exposure to prevailing winter

         winds.

14.189 Infrastructure


O15 Each lot is capable of being serviced by    S15.1 All lots are connected to power supply and          S15.1 Complies
                                                                                                          All services are available to the subject site.
appropriate levels of—                          telecommunications services; AND

    a) water supply;

    b) reticulated sewerage;

    c) stormwater drainage;

    d) power supply; and

    e) telecommunications;

AND
                                                                                                          S16.1 Not Applicable
O16 The design and provision of public          S16.1 For lots in urban settlements—power supply and
                                                                                                          Lots are not for residential development.
services and utilities, including sewerage,     communications infrastructure are provided underground;

water, electricity, street lighting and         OR

telecommunication services—                     S16.2 For lots elsewhere—power supply and                 S16.2 Complies

Page 16

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS                                             ASSESSMENT

  a) meets the needs of users;                   communications infrastructure are provided underground         Will comply where required.

  b) ensures health, safety and                  unless—

       convenience of the community;                 a) located in the Rural Zone or Rural Settlement Zone

  c) protects the natural environmental                  and where not in a Bushfire Hazard Area as defined

       values of the site and surrounds,                 on Overlay Maps OM1.4-OM9.4;

       including visual amenity and native           b) new low voltage lines can be strung from poles

       vegetation;                                       carrying existing high voltage lines; or

  d) are cost effective over their life cycle;       c) no extensions to the existing reticulation network is

  e) minimises adverse impacts to the                    necessary; or

       environment (including the amenity of         d) it is necessary to cross a body of water; AND

       the local area) in the short and long
                                                                                                                S16.3 Complies
       term; and
                                                 S16.3 Street lighting is provided in accordance with Section
                                                                                                                Will comply where required.
  f)   ensures that the existing systems are     3.19 of PSP5 Engineering Design Standards – Roads,
       upgraded or relocated to be capable       Drainage and Earthworks; AND
       of supporting the proposed

       development; AND                                                                                         S16.4 Not Applicable
                                                 S16.4 For lots not within a sewerage service area—the lot

                                                 has sufficient area and other attributes to ensure

                                                 sustainable on-site sewerage disposal;

Page 17

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                                       ASSESSMENT

                                                   Advisory note PSP24 – Effluent Disposal details requirements for the
                                                   design and siting of effluent disposal systems where located outside a
                                                   sewerage service area.

                                                   Compliance with PSP24 will be considered as part of Council’s

                                                   assessment of the plumbing and drainage application.




                                                   S17.1 Components of the infrastructure that are likely to fail           S17.1 Complies
O17 Essential public utilities are available and
                                                                                                                            The site is not subject to a defined flood
                                                   or may result in contamination are—
maintain their function during flood events up                                                                              event however infrastructure will comply
to a 1% AEP (1:100 year ARI) flood event.               a) located above the level of a 1% AEP (1:100 year                  where required.
                                                             ARI) flood event; or

                                                        b) designed and constructed to exclude water

                                                             inundation or infiltration and resist hydrostatic and

                                                             hydrodynamic forces as a result of inundation

Electricity supply infrastructure                  S18.1 Building footprints are situated clear of any power                S18.1 Complies
                                                                                                                            Buildings and structures are not located on
O18 Uses and works maintain a safe distance        easements on-site; AND
                                                                                                                            any existing easements.
from electrical infrastructure including

substations, overhead power lines, power           S18.2 Building footprints are not less than 50m from an                  S18.1 Complies
poles and transformers.                            existing fenced electricity substation                                   The proposed building is located more than
                                                                                                                            50m from the adjoining substation

Page 18

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS     ASSESSMENT

                                                                        boundary.
14.190 Earthworks and stormwater management


O19 Stormwater run-off is managed so as not      No solution provided   O19 Complies
                                                                        Refer Appendix B Stormwater Management
to cause any adverse impacts on the built or
                                                                        Plan for details.
natural environment including changes in

quality, quantity or location of stormwater

discharges


O20 Filling or excavation only occurs where it   No solution provided   O20 Complies
                                                                        Will comply where applicable
does not adversely impact on—

    a) watercourses, drainage lines and

        wetlands; or

    b) vegetation on land identified on

        Biodiversity Overlay Maps OM1.1-

        OM9.1; or

    c) water levels on properties elsewhere.

14.191 Landscaping and visual amenity

Page 19

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS                                          ASSESSMENT

O21 Land development responds to the                S21.1 The natural landform and landscape are not modified   S21.1 Complies
                                                                                                                The natural land form is not being modified
distinctive landscape character of the site by      to accommodate the development.
                                                                                                                to accommodate the proposed
utilising the natural features of the site, which
                                                                                                                development.
include—

    a) watercourses and drainage lines;

    b) significant trees;

    c) understorey vegetation;

    d) rock outcrops; and

    e) views

O22 Native vegetation, including individual         S22.1 Buffers of existing native vegetation around site     S22.1 Complies
                                                                                                                Existing vegetation is to be retained where
mature trees are retained, protected,               boundaries and environmentally sensitive areas are
                                                                                                                possible.
maintained and supplemented, with particular        retained and reinforced through additional planting; AND

consideration given to—

    a) roadsides;                                                                                               S22.2 Not Applicable
                                                    S22.2 For reconfiguring in the Rural Zone and Rural

    b) the amenity of adjoining land uses; and      Settlement Zone—

    c) the protection of environmentally                a) a 10m landscaped buffer area is provided along

        sensitive areas.                                    road frontages;

Page 20

SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS                                            ASSESSMENT

                                                    b) clearing and disturbance to vegetation is minimised

                                                        around road works, laying of services and utilities

                                                        and construction of property entrances;

                                                    c) revegetation of disturbed areas occurs after

                                                        completion of works; and d) planting of clusters of

                                                        trees along the road reserves to form a tree canopy

                                                        cover is provided

O23 Buildings and other structures do not       S23.1 All lots include a building envelope that enables       S23.1 Complies
                                                                                                              Existing vegetation is to be retained where
have a significant adverse impact upon the      buildings and structures to be sited so they do not—
                                                                                                              possible.
visual amenity of surrounding areas.                a) protrude above ridgelines; or

                                                    b) result in the unnecessary removal of vegetation

                                                        from the site.

14.192 Open space and environmental protection


O24 Public open space provides for a diverse    S24.1 Active Parkland or open space linkage to Active         S24.1 – S26.4 Not Applicable
                                                                                                              The proposed development does not
range of passive and active quality             Parkland is provided in accordance with the Priority
                                                                                                              include a park or public open space.
recreational opportunities including sport to   Infrastructure Plan in Part 15; OR

meet the outdoor recreational needs of the

Page 21

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS                                             ASSESSMENT

community.                                          S24.2 Park contributions are paid in accordance with the

O25 Public open space is designed and               applicable infrastructure charging instrument.

located to—

   a) be safe and easily accessible;                S25.1 A park has direct road frontages of a minimum of

   b) contribute to the legibility, accessibility   25% of the total allotment boundary of the park to provide

       and character of the locality;               physical access and visibility; AND

   c) create attractive environment settings

       and focal points;                            S25.2 Land intended for public open space complements

   d) enable the retention and protection of        existing adjacent and surrounding open space areas and

       significant vegetation, wetlands,            physical linkages to these areas are provided; AND

       watercourses, drainage lines and

       other native habitat areas, their            S25.3 Open space is provided adjacent to watercourses,
       associated buffers and                       with roads servicing the linear parkland and lots located on
       linkages/corridors and natural and           the opposite side of the road to the watercourse. AND
       cultural features; and

   e) be cost effective to maintain.
                                                    S25.4 Public open space has good connectivity for users

                                                    via pedestrian and cycle paths.

Page 22

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                              ASSESSMENT

O26 Land provided for active recreation areas      S26.1 Active parkland is of a compact shape free of             S26.1- S26.4 Not Applicable

is of a physical standard and condition suitable   irregular boundaries; AND
                                                                                                                   No active parkland is proposed as part of
for the intended uses and is not subject to
                                                                                                                   this application.
physical or other constraints including
                                                   S26.2 Active parkland is located on land that is exclusive
contamination, environmental or biophysical
                                                   of—
constraints or legislative protection that would
                                                       a) flood inundation below the 20% AEP (1:5 year ARI
encumber its use.
                                                            level);

                                                       b) land affected by stormwater or overland flow

                                                            discharge from adjacent allotments;

                                                       c) drainage reserves and detention basins, which

                                                            cannot be shown to safely and effectively contribute

                                                            to the network of parks and open space areas;

                                                       d) land with a slope, or subject to cut and fill with a

                                                            batter slope, that exceeds a slope of 1 in 67 (15%);

                                                       e) areas of land less than 15m wide, such as access

                                                            and service and utility easements;

                                                       f)   land required to serve primarily as a buffer area to

                                                            any existing development or major transport

Page 23

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                               ASSESSMENT

                                                          corridor; and

                                                      g) power easements; AND



                                                  S26.3 At least 10% of the total open space provision for

                                                  active parkland is exclusive of flood inundation below the

                                                  1% AEP (1:100 year ARI level or the highest recorded flood

                                                  level, whichever is the greatest; AND



                                                  S26.4 Recreational facilities (including playgrounds,

                                                  pergolas, barbeques etc.) are setback a minimum of 30m

                                                  from the top of the bank of any watercourse and 10m from

                                                  the top of the bank of any drainage line;

O27 Active parklands will provide a diverse       27.1 Active parkland in all areas except industrial areas will   27.1- 27.2 Not Applicable
                                                                                                                   The   proposed    development    does   not
range of recreational opportunities for all age   contain embellishment in accordance with the Priority
                                                                                                                   include a park or public open space.
groups and are designed as attractive and         Infrastructure Plan in Part 15 such as:

enjoyable, functional and safe places to              a) children’s play facilities catering for various ages;
recreate and meet.
                                                      b) a soft fall surface where required;

Page 24

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS                                             ASSESSMENT

                                                     c) a shade cover over any play equipment;

                                                     d) picnic table/s with seats;

                                                     e) seating;

                                                     f)   landscaping; AND

                                                 27.2 Landscaping is designed to create aesthetically

                                                 pleasing open space areas and to suit the type, setting and

                                                 purpose of the particular park.

O28 The natural environmental and cultural       S28.1 Land in the Open Space Conservation zone is              S28.1 Not Applicable

values of land in the Open Space                 retained in one contiguous lot.

Conservation Zone are not adversely affected

by subdivision, and land in freehold tenure in

this zone is not subdivided.

O29 Lands with high biodiversity values which    S29.1 Lands with high biodiversity values are transferred to   S29.1 Not Applicable

warrant conservation status are formally         public ownership.

protected for the long term

O30 Buffers are provided incorporating           S30.1 A buffer of no less than 5m is provided to all           S30.1 Not Applicable

development setback/s from the stream that       development adjacent to either Stream orders 1, 2 or 3

Page 25

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                              ASSESSMENT

will ensure that the development does not         where not within the Riparian Buffer Area on the

result in a negative impact upon the long-term    Biodiversity Overlay Maps (with the buffer measured from

viability of the stream.                          the centreline of the stream).

14.193 Road and rail corridors


O31 Lots for residential development are not      S31.1 Lots intended for residential development are             S31.1– S31.3 Not Applicable

subjected to high traffic noise levels from the   separated by a minimum of—

major road network or rail corridors.                 a) 40m from the property boundary of roads within the

                                                          major road network; and

                                                      b) 80m from the property boundary of rail corridors;

                                                          OR

                                                  S31.2 Development in the vicinity of road corridors meets

                                                  the following external design criteria for roads in the major
                                                  road network— 54dB(A)L10 (18hours) based on predicted

                                                  traffic volumes ten years hence; OR

                                                  S31.3 Development in the vicinity of rail corridors meets the

                                                  following external design level noise criteria—

                                                      a) 65dB(a), assessed as the 24hour average

Page 26

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS                                        ASSESSMENT

                                                            equivalent continuous Aweighted sound pressure

                                                            level; and

                                                        b) 87dB (A), assessed as a single event maximum

                                                            sound pressure level.

14.194 Access easements


O32 Access easements are in appropriate             S32.1 Access easements are designed in accordance         S32.1 Complies
                                                                                                              It is considered that the proposed access
locations for safe access and egress, and           Sections 2 and 3 of PSP5 Engineering Design Standards –
                                                                                                              easement has been designed in
supply appropriate widths and levels of service     Roads, Drainage and Earthworks.
                                                                                                              accordance with Sections 2 and 3 of PSP5
for the number of vehicles that will utilise them
                                                                                                              Engineering Design Standards – Roads,
                                                                                                              Drainage and Earthworks.
14.195 Traffic


O33 Traffic generated by the development is         S33.1 Any required upgrading of external roads to the     S33.1 Complies
                                                                                                              The development will comply where
within the acceptable capacity of external          necessary standard to cater for the expected traffic
                                                                                                              reasonably applicable.
roads and does not have an adverse impact           numbers is undertaken at no cost to Council.

upon the functioning of the road network

Page 27

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS                                               ASSESSMENT

14.196 Noosa Trail Network


O34 A comprehensive network of trails is         S34.1 The proposal includes linkages to existing or planned      S34.1- S34.2 Not Applicable
                                                                                                                  The subject site is not mapped as
established incorporating road reserves, State   components of the Noosa Trail Network (refer Schedule 5,
                                                                                                                  containing any existing or proposed
forests, Council owned land and private lands    Map 3—Noosa Trail Network); OR
                                                                                                                  components.
consistent with the lifestyle and outdoor

recreation needs of the Shire’s residents and
                                                 S34.2 The proposal includes linkages between existing or
visitors.
                                                 planned components of the Noosa Trail Network (refer

                                                 Schedule 5, Map 3—Noosa Trail Network).

O35 The proposal does not have an adverse        S35.1 Existing or potential pedestrian, horse trail or bicycle   S35.1- S35.3 Not Applicable

impact on the Noosa Trail Network.               movement linkages are retained or enhanced; or
                                                                                                                  As above.
                                                 S35.2 Alternative linkages are provided; AND

                                                 S35.3 Linkages and associated infrastructure are designed,
                                                 located and constructed in accordance with—

                                                     a) Australian Standard 2156.1 Walking Tracks Part 1:

                                                         Classification and Signage to a minimum of a Class

                                                         4 Standard; and

                                                     b) Australian Standard 2156.2 Walking Tracks Part 2:

Page 28

SPECIFIC OUTCOMES           PROBABLE SOLUTIONS           ASSESSMENT

                                 Infrastructure Design

14.197 Cooroibah Locality                                Not Applicable

Page 29

BUSINESS USES CODE

Table 14-8 For all Business Uses


SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                               ASSESSMENT

14.16 Effects of use

Electricity infrastructure

O18 The development does not adversely            S18.1 No solution provided                                       O18 Complies
                                                                                                                   The development will have no effect on
impact on existing or future electricity supply
                                                                                                                   existing infrastructure.
infrastructure; AND

O19 All uses and works maintain an adequate                                                                        O19 Complies
                                                  S19.1 Development for uses adjacent to or within 50m of an
safe distance from electrical infrastructure                                                                       The proposed service station building,
                                                  existing electricity substation incorporates noise attenuation
including substations, overhead powerlines,                                                                        associated structures and works are an
                                                  measures to mitigate noise impacts; AND
power poles and transformers.                                                                                      adequate distance from the adjoining
                                                                                                                   substation. All relevant measures will be
                                                  S19.2 Buildings and structures (including swimming pools,        taken to ensure that electrical infrastructure

                                                  sheds, tennis courts and outbuildings) are not constructed       will not be compromised.

                                                  under overhead electricity transmission lines, or within

                                                  electricity easements.

Page 30

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                             ASSESSMENT

Noise

O20 Development is designed and sited to          No solution provided                                           O20 Complies
                                                                                                                 The proposed development is suitably
avoid noise emissions that unreasonably
                                                                                                                 distance and buffered through landscaping
diminish the amenity of the area or
                                                                                                                 from sensitive land uses. Further, as the
surrounding uses.
                                                                                                                 site is located on a busy road and
                                                                                                                 roundabout, it is considered that there will
                                                                                                                 be no worsening effects in terms of noise.
Mechanical plant and equipment and storage areas


O21 Mechanical plant and equipment                S21.1 Mechanical plant and equipment are—                      S21.1 Complies

(including air conditioning equipment) and           a) located more than 2m from any property boundary;         All mechanical equipment is located on the
storage areas are designed and located to—
                                                     b) where located at ground level, screened by fencing       ground floor, more than 2m from a property
a) avoid adverse visual impacts when viewed
                                                         1.5m in height or dense vegetation of at least 1.5m     boundary. This equipment is to be screened
from the street and adjoining properties; and
                                                         in width incorporating grouped trees and shrubs         from view.
b) visually integrate with the building design.
                                                         with maximum separation distance of 1m measured

                                                         from the centre of the tree or scrub; and

                                                     c) are visually integrated into the line and plane of the

                                                         building and roof design and do not project beyond

Page 31

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS                                                ASSESSMENT

                                                            the height or width of the building when viewed

                                                            from the street and adjoining properties; AND
                                                                                                                      S21.2 Not Applicable
                                                    S21.2 For Industrial business and Retail business Type 3,

                                                    materials stored outside of a building do not exceed 4m in

                                                    height or half the height of the on-site buildings whichever is

                                                    the greater

Safety and security


O22 All property boundaries are clearly             S22.1 Boundaries are identified by such means as –                S22.1 Complies

identifiable with public and private spaces             c) fencing; or                                                The   proposed   development    comprises
clearly defined.
                                                        d) changes in surface materials or levels; or                 landscape   treatments   to   identify   the
O23 All premises and access routes are                                                                                boundaries. These are located on both
                                                        e) landscape treatments;
clearly identifiable to all persons, particularly                                                                     street frontages and on the proposed
                                                    AND
emergency services personnel. O24 All                                                                                 boundary between proposed lot 1 and lot 2.
                                                    S22.2 Loading and storage areas are well lit or can be
building entries are designed to be obvious
                                                    locked after hours.                                               S22.2 Complies
and easily identifiable.

O25 Uses are arranged within buildings and                                                                            The proposed development will comply as
on sites to enable external areas to be                                                                               required.

Page 32

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                                ASSESSMENT

monitored.                                        S23.1 All premises are identified by the provision of the         S23.1 Complies

O26 Communal open space, including                street number in a prominent location, preferably near the
                                                                                                                    This is not considered necessary given the
congregation and seating areas, is located        site entry, (i.e. on the kerb or letterbox or by signage on the
                                                                                                                    proposed use for a service station; however
where it can be monitored.                        building or site).
                                                                                                                    the   development     will   comply       where
O27 Buildings and structures are designed to                                                                        required.
minimise opportunities for vandalism.
                                                                                                                    S24.1 Complies
O28 Lighting of appropriate intensities is        S24.1 The number of entrances and exits are limited and

provided to maximise safety.                      main building entrances/exits are located at the front of the     The service station has one entrance which

O29 Public toilets are designed and               site, in view of the street. Where this is not possible, due to   has been orientated towards the refuelling

constructed to—                                   site or existing building constraints, a well defined path is     forecourt area for casual surveillance.
                                                  provided to the entrance/exit; AND
    a) ensure the safety of all people using
                                                                                                                    S24.2 Complies
        them; and                                 S24.2 All entrances/exits to buildings, are well lit and

                                                  signed, and signage includes hours of operation; AND              Will comply as required and in accordance
    b) take advantage of informal
                                                                                                                    with Australian Lighting Standards.
        surveillance from adjoining uses and

        activities, discouraging non-legitimate   S24.3 Entrances/exits are located to provide a direct link to     S24.3 Complies
        uses.                                     driveways and carparking areas; AND
                                                                                                                    Refer S24.1- S25.1

Page 33

SPECIFIC OUTCOMES   PROBABLE SOLUTIONS                                               ASSESSMENT

                    S24.4 Recessed doorways are avoided where the recess is          S24.4 Complies
                    of sufficient size to conceal a person. Where recessed

                    doorways are unavoidable, measures are used to enhance

                    safety, as follows—

                        a) good lighting installed;

                        b) strategically placed mirrors installed;

                        c) angled approaches provided; or

                        d) gates which restrict access provided.                     S25.1 Complies

                    S25.1 Windows and main entrances are positioned to allow

                    for casual surveillance.
                                                                                     S26.1 Not Applicable


                    S26.1 Communal open spaces, including congregation and

                    seating areas are situated where they are in the line of sight

                    of windows, doors and/or balconies of buildings, or can be

                    seen from a street or other public space.

                    S27.1 Buildings or structures that are visible from a public
                                                                                     S27.1 Complies
                    street or laneway—
                                                                                     The proposed development will incorporate
                        a) avoid the use of solid fences and blank walls which

Page 34

SPECIFIC OUTCOMES   PROBABLE SOLUTIONS                                             ASSESSMENT

                            attract graffiti. Where solid blank surfaces are       a building design and layout which will
                            unavoidable, measures in the form of landscaping,      provide         for        non-graffiti        friendly
                                                                                   development, structures and layout through
                            creepers, murals, vandal resistant paint, etc are
                                                                                   design     within     an    absence       of   natural
                            used;
                                                                                   ladders, minimal unbroken vertical surface
                        b) use toughened glass, security screens and other         areas, CCTV surveillance, a small retail and
                            measures (but not including security shutters that     fast food component (not conducive to
                            obscure the view of shopfronts) are used in            loitering), a layout which will promote

                            windows which are provided at ground level, to         passive surveillance over the site, be well
                                                                                   illuminated          and     comprise          minimal
                            deter break and enters; and
                                                                                   opportunities for concealment.
                        c) use hardy vandal proof materials and anti-graffiti

                            paint are used in the construction of buildings.



                    S28.1 Lighting of appropriate intensities is provided which    S28.1- S28.4 Complies

                    satisfies the requirements of Australian Standard AS1158:
                                                                                   Lighting      will    comply      with     Australian
                    Public Lighting Code, unless otherwise specified in this
                                                                                   Standards.
                    Code; AND

                    S28.2 External lighting of a graduated intensity is provided

                    which starts at a lower level of brightness at the perimeter

Page 35

SPECIFIC OUTCOMES                           PROBABLE SOLUTIONS                                               ASSESSMENT

                                            of the site and rises to a higher level at the entrance to

                                            buildings or at the centre of the site; AND

                                            S28.3 Lighting is directed onto the site and away from

                                            neighbouring properties; AND

                                            S28.4 Vandal-resistant lighting is used in public and publicly

                                            accessible areas.
                                                                                                             S29.1- S29.3 Not Applicable
                                            S29.1 Public toilets are located in high traffic areas; AND
                                                                                                             No public toilets or features that may

                                                                                                             legitimise loitering are proposed.
                                            S29.2 Features that may legitimise loitering, such as

                                            seating or public telephones are not located within 20m of

                                            toilet entrances; AND

                                            S29.3 Entrances to public toilets are visible from the street,

                                            footpath and other activity areas on the site or adjoining

                                            sites.

O30 Premises have accessibility to public   S30.1 Safe and convenient pathway access is provided             O30 Complies

transport.                                  from the site to link to existing pathway networks that
                                                                                                             A pedestrian pathway exits along both road
                                            services public transport facilities; OR
                                                                                                             frontages. This pathway will be maintained

Page 36

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                                  ASSESSMENT

                                                   S30.2 Direct pathway access is provided to the public               as required, and where upgrades are

                                                   transport facility if the facility is contained on site or within   required,   they   will   comply   with   the

                                                   50m from the property boundary.                                     applicable provisions.


O31 Business Uses are designed and                 S31.1 Safe and convenient cycle access to and from the              O31 Not Applicable

constructed to encourage users of the              site from the existing road and bicycle network, and safe
                                                                                                                       Not considered applicable, given the nature
development to access the site by means of         pathway movement within the site is provided; AND
                                                                                                                       of the proposed use to be predominantly
foot or bicycle through provision of appropriate   S31.2 Secure and convenient parking space for bicycles is           utilised by motorists.
end-of trip facilities including bicycle parking   provided on site in accordance with AS2890.3 Bicycle
and shower/change rooms.                           Parking Facilities and Figure 14-1 Minimum Requirements

                                                   for Bicycle Parking; AND

                                                   S31.3 Where at least 5 bicycle parking spaces are required

                                                   in accordance with Figure 14-1 Minimum Requirements for

                                                   Bicycle Parking, end-of-trip cycle facilities are provided at

                                                   the following rate: a) 1 locker per 2 bicycle parking spaces;

                                                   and b) 1 shower cubicle with ancillary change rooms per 10

                                                   bicycle spaces or part thereof; AND

                                                   S31.4 Bicycle parking spaces and cyclist facilities are

                                                   designed in accordance with AUSTROADS Guide to Traffic

Page 37

SPECIFIC OUTCOMES   PROBABLE SOLUTIONS                                          ASSESSMENT

                    Engineering Practice, Part 14 – Bicycles, Section 10; AND

                    S31.5 On-site pedestrian facilities such as seating and

                    shade structures are provided in developments for the

                    convenience of persons walking to the site. Figure 14-1

                    Minimum Requirements for Bicycle Parking

                    Figure 14-1 Minimum Requirements for Bicycle Parking

Page 38

SPECIFIC OUTCOMES                             PROBABLE SOLUTIONS                                          ASSESSMENT




Site facilities


O32 Waste storage areas, external storage     S32.1 Waste storage areas, external storage areas and       S32.1-S32.2 Complies

areas and loading docks do not detract from   loading docks are situated to the rear of the building or

Page 39

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                          ASSESSMENT

the visual amenity of the streetscape or cause    under the ground; OR                                        The refuse storage area is located adjacent

nuisance to adjoining properties.                 S32.2 With the exception of the access way, waste storage   to the retail store, hidden from the street

                                                  areas, external storage areas and loading docks are         frontages.

                                                  visually screened by landscaping or fencing.
                                                                                                              The refuse area will be appropriately

                                                                                                              screened from view.


Environment & heritage values


O33 There are no significant adverse effects      No solution provided                                        O33 Complies

on the biodiversity, natural vegetation, native
                                                                                                              The proposal complies with all relevant
wildlife, habitats, landscape quality, water
                                                                                                              standards to ensure that no contaminants
quality or heritage values, including those
                                                                                                              are released in the natural receiving
related to—
                                                                                                              environment.
    a) changes to natural drainage;

    b) disturbance to any of the wetland

        systems;

    c) management of landslide and fire risk;

    d) erosion and the transport of sediments

Page 40

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS   ASSESSMENT

       offsite;

  e) unmanaged public access;

  f)   effluent disposal ;

  g) changes to fauna habitat and

       behaviour; and

  h) disturbance of buildings and features,

       including natural features, of heritage

       significance

Page 41

Table 14-10– Entertainment & Dining Business or Retail Business Types 1 or 2


SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                               ASSESSMENT

14.18 Effects of use

Noise and visual amenity

O35 Uses maintain a satisfactory level of          S35.1 For uses involving outdoor courts including tennis         S35.1 Not Applicable

acoustic and visual amenity for surrounding        courts, half courts and netball courts—the use complies

uses.                                              with the requirements in Section 2 of PSP8 Tennis and

                                                   other Courts.

Outdoor dining areas

O36 Outdoor dining areas are designed and          S36.1 Walls to outdoor dining areas are—                         S36.1- S37.1 Not Applicable

located so that—                                       a) if facing a roadway or other public area,                 The proposal does not include an outdoor
    a) structures are aesthetically pleasing               transparent;                                             dining area.
        and in keeping with the existing               b) not made of flexible, roll-up or drop plastic sheeting;
        character of the area, including the
                                                       c) separated from the floor and any roof by a minimum
        architecture of the associated building;
                                                           vertical gap of 500mm; and
    b) outdoor dining adds to the landscaped
                                                       d) if detachable or collapsible, are only used during
        streetscape without increasing
                                                           inclement weather; AND

Page 42

SPECIFIC OUTCOMES                              PROBABLE SOLUTIONS                                           ASSESSMENT

       perceived building bulk;                S36.2 Roof, walls or other structures do not extend beyond

   c) temporary walls or roofs are stored      the boundaries of the premises; AND

       when not in use and secured at all      S36.3 The outdoor dining area complies with Planning

       times;                                  Scheme Policy PSP14 Outdoor Dining.

   d) adequate air movement is available;      S37.1 Roof structures over outdoor dining areas have a

       and e) structures do not impede the     minimum clearance height of 2.1m

       movement of pedestrians or vehicles;

       AND

O37 Adequate clearways and head clearance

are provided to allow safe movement of users

of the premises

Page 43

Table 14-15 Service Station


SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                                ASSESSMENT

14.25 Effects of use

Siting

O76 Service stations are located only where       S76.1 The service station is located in a Commercial zone,        O76 Complies
                                                                                                                    It is considered that the proposed
they are compatible with the existing and         on a site fronting part of the major road network; OR
                                                                                                                    development is suitably located, given that
proposed amenity and development of a             S76.2 The service station is co-located with, or adjoining,
                                                                                                                    the immediate locality comprises
neighbourhood and where they are                  shopping facilities or established business development.          predominantly industry zoned land with a
appropriate given the existing or likely future                                                                     variety of uses including retail and
traffic movements in the area.                                                                                      commercial.

O77 Service stations are sited and designed       S77.1 Publicly accessible parts of the service station            S77.1 Complies

for maximum surveillance from adjacent            including the point of sale and the entrance to any external
                                                                                                                    The service station has one entrance which
streets and other activities                      toilets are well lit and clearly visible from areas of activity
                                                                                                                    has been orientated towards the refuelling
                                                  within the site (such as petrol pumps) as well as from
                                                                                                                    forecourt area, the highest area of activity,
                                                  adjacent uses and the street.
                                                                                                                    for casual surveillance


O78 The site is large enough to accommodate       S78.1 The site has—                                               S78.1 Complies

the service station and associated carparking,        a) an area of a least 1,500m2 ;                               The subject site and leased area is greater

Page 44

SPECIFIC OUTCOMES                              PROBABLE SOLUTIONS                                            ASSESSMENT

accessways and landscaping.                        b) a frontage of at least 40m; and                        than 1,500m2 and comprises a frontage of

                                                   c) where a corner site, a frontage of at least 30m to     greater than 30m on both frontages.

                                                       each road to which the site has frontage.

Neighbouring amenity


O79 Service stations ensure the amenity of     S79.1 Where located within 150m of a residential use or       S79.1-S79.2 Not Applicable

neighbouring residential areas is protected.   land included in a residential zone—
                                                                                                             The site does not adjoin a residential use or
                                                   a) buildings are constructed of nonreflective material,   zone.
                                                       including concrete, brick or timber; and

                                                   b) a landscaped area , a minimum of 2m, is provided

                                                       along the property boundary to any road; AND

                                               S79.2 Where the site adjoins a Residential Use or land

                                               included in a residential zone—

                                                   a) a 2m high solid screen fence is provided along the

                                                       common boundaries; and

                                                   b) hours of operation are limited to between 7.00 am

                                                       and 10.00 pm.

Page 45

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS                                         ASSESSMENT

Site layout & design


O80 Buildings, structures, driveways, tanks         S80.1 Fuel pumps are not less than 8m from any frontage;   S80.1 Complies

and fuel bowsers are sited to—                      AND
                                                                                                               Fuel pumps are greater than 8m away from
    a) ensure the safe and efficient use of         S80.2 Inlets to bulk fuel storage tanks are located so     the street frontages.
        the site;                                   tankers stand wholly within the site and on level ground
                                                                                                               S80.2 Complies
    b) maintain visual amenity and                  while discharging fuel into tanks.

        streetscape character;                                                                                 Refer Appendix A, Tanker turning path

    c) provide adequate separation to                                                                          plan.

        adjoining land uses; and

    d) not cause an environmental nuisance

        to neighbouring properties

O81 Customer air and water facilities, and any      S81.1 Customer air and water facilities, and any car       S81.1 Not Applicable

automatic mechanical car washing facilities         washing facilities are setback 5m from any residential
                                                                                                               The     site   does   not   adjoin   residential
are located such that—                              property boundary.
                                                                                                               development.
    a) vehicles using or waiting to use such

        facilities are standing wholly within the

        site; and

Page 46

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                          ASSESSMENT

    b) an adequate buffer area can be

        provided to any adjoining Residential

        Use

O82 The layout and design of the service          S82.1 Sealed impervious surfaces are provided where         S82.1- S82.2 Complies

station ensures that on site operations do not    potential spills of contaminants may occur; AND
                                                                                                              The proposed development will comprise
cause any environmental nuisance or harm or       S82.2 Grease and oil arrestors or other infrastructure is   an   oily   water   holding   tank   to   treat
result in the release of untreated pollutants.    provided to prevent the movement of contaminants from the   stormwater    flows   from    the    refuelling
                                                  site.                                                       forecourt area prior to being directed to a

                                                                                                              legal point of discharge.


                                                                                                              Refer Appendix B Stormwater Management

                                                                                                              Plan.




General retail component


O83 The associated sale of goods, including       S83.1 The gross floor area used for the associated retail   O83 Complies

foodstuffs, is ancillary to the service station   sale of goods is limited to 15% of the gross floor area.
                                                                                                              The associated sale of good will remain
use.

Page 47

SPECIFIC OUTCOMES                             PROBABLE SOLUTIONS                                            ASSESSMENT

                                                                                                            ancillary to the service station use.


Traffic & Access


O84 The layout of the site facilities and     S84.1 Where the site is situated at the intersection of two   S84.1- S85.1 Not Applicable

vehicular accesses result in unrestricted     roads, separate entrances and exits are provided to one or

vehicle access to and egress from the site.   more of the adjoining roads.

O85 The use of land for a service station—

    a) does not impair traffic flow or road   S85.1 Any vehicular crossing over a footpath is—

        safety;                                   d) not less than 8m in width;

    b) facilitates safe and convenient            e) located so the crossing is not less than 14m from
        movement to and from the site                  any other vehicular crossing on the same site; and
        through the design and arrangement
                                                  f)   not less than 12m from any road intersection.
        of vehicular crossovers; and

    c) provides adequate, safe and

        functional on-site parking and

        manoeuvring areas

Page 48

NOOSAVILLE LOCALITY CODE

Table 11.13- Specific Outcomes and Probable Solutions for the Noosaville Locality


SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS              ASSESSMENT

11.9 Effects of use

Amenity

O1 Uses are located, designed and operated          No solution provided            O1 Complies
                                                                                    The proposed development includes all
to avoid significant adverse changes to the
                                                                                    believed necessary mitigation measures to
light, air quality, noise, accessibility or other
                                                                                    ensure that the amenity of adjoining uses is
conditions enjoyed by users of associated,
                                                                                    maintained.
adjoining or nearby uses.

Major Road Network

O2 Through traffic in Noosaville uses Gibson        No solution provided            O2 Not Applicable

Road or Eenie Creek Road, ensuring the

visual amenity of Gympie Terrace is protected

with a consequent enhancement of visitor and

recreation opportunities and benefit to

businesses along Gympie Terrace

Page 49

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS     ASSESSMENT

Visual amenity


O3 The visual amenity and character               No solution provided   O3 Complies

surrounding the major road network is
                                                                         The    proposed     development     will   not
protected and enhances the recognisable
                                                                         adversely impact on Eumundi- Noosa Road
entrance to Noosaville through—
                                                                         which is a council owned road and is
      a) retaining and enhancing the visual                              classified as a major road.
          and physical separation of
                                                                         The    proposed     development     will   not
          Noosaville from other localities; and
                                                                         dramatically affect the visual amenity and
      b) ensuring development does not
                                                                         character of this road.
          encroach upon existing native

          vegetation along the road frontage                             The site comprises established landscaping
          other than for accessways.                                     that is to be retained where possible, further

                                                                         the    proposal      comprises     additional

                                                                         landscaping along this road to enhance

                                                                         visual amenity.

Page 50

SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS     ASSESSMENT

Neighbourhood identities


O4 The separate identities of the various       No solution provided   O4 Not Applicable

residential neighbourhoods remain important
                                                                       The subject site is not located in a
and distinct elements of the residential
                                                                       residential neighbourhood.
character of Noosaville

Lake Entrance Boulevard


O5 There is no increase in the number of lots   No solution provided   O5 Not Applicable

that gain access via Lake Entrance Boulevard.


Airport                                                                Not Applicable


11.10 Built form


Density


O7 The density of development within the site   No solution provided   O7 Complies

area—
                                                                       The proposed development is considered to
      a) is compatible with surrounding                                be   compatible     with   the   surrounding

Page 51

SPECIFIC OUTCOMES                            PROBABLE SOLUTIONS   ASSESSMENT

       development; and                                           development. The proposed development is

    b) does not exceed—                                           appropriately located on the subject site

                                                                  with suitable setbacks from the adjoining
       i.     for the Semi-Attached
                                                                  community use (school).
              Housing Zone:

              A. for sites between

                  500m2 and 599m2

                  inclusive—4.8 persons;

              B. for sites 600m2 or more

                  — 6.6 persons or 100

                  persons per hectare

                  whichever is the higher;

       ii.    for the Attached Housing

              Zone a maximum

              population density of 100

              persons per hectare with

              the exception of Lot 21 on

              RP815864 situated at 11-

              13 William Street which has

Page 52

SPECIFIC OUTCOMES                           PROBABLE SOLUTIONS   ASSESSMENT

              an allowable population

              density of 320 persons per

              hectare exclusively for the

              purpose of a visitor hostel

       iii.   For the Visitor Mixed Use

              Zone— 160 persons per

              hectare; and

       iv.    for the Business Centre

              Zone a maximum

              population density of 100

              persons per hectare with

              the exception of Lots 3 & 4

              on RP122928 situated at

              14-16 Mary Street which

              have an allowable

              population density of 320

              persons per hectare

              exclusively for the purpose

Page 53

SPECIFIC OUTCOMES                             PROBABLE SOLUTIONS   ASSESSMENT

                of a visitor hostel

         v.     for the Shire Business

                Centre Zone 160 persons

                per hectare or 320 persons

                per hectare exclusively for

                the purpose of a visitor

                hostel

         vi.    for the Community Services

                Zone maximum population

                density of 320 persons per

                hectare exclusively for the

                purposes of Residential

                Aged Care and 160

                persons per hectare for any

                other form of Retirement &

                Special Needs Housing;

                and

    c)   has a low site impact to enhance

Page 54

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                               ASSESSMENT

          the opportunity to maintain natural

          site characteristics, including native

          vegetation and natural landforms

Height


O8 Buildings and other structures—                 S8.1 Buildings and other structures have a maximum               S8.1 Complies

      a) are low rise and have a visual bulk       building height of—
                                                                                                                    All proposed buildings and structures are
          and an architectural scale                  a) if in the Attached Housing Zone – 8m, with the             below the maximum height of 8m.
          consistent with structures on                   exception of those properties with frontage to the

          adjoining or nearby land;                       following streets: - Russell St, William St and

      b) do not exceed a building height of               Howard St, or Weyba Rd, James St and Albert St

          —                                               north of their intersections with Elizabeth St (as well

                                                          as properties fronting Gympie Terrace or Noosa
          i.      for the Attached Housing
                                                          Parade between Weyba Road and Russell Street)
                  Zone 2 storeys unless
                                                          where they have a maximum building height of
                  located on property with
                                                          12m;
                  frontage to the following

                  streets: - Russell St, William      b) if in the Visitor Mixed Use Zone – 12m;

                  St and Howard St, or                c) if in the Business Centre or Industry Zones — 10m;

                  Weyba Rd, James St and

Page 55

SPECIFIC OUTCOMES                             PROBABLE SOLUTIONS                                       ASSESSMENT

              Albert St north of their          d) if in the Shire Business Centre Zone – 8m, except

              intersections with Elizabeth         in Precinct E1 or E2 where 12m or in Precinct

              St (as well as properties            REC/MU where 6m;

              fronting Gympie Terrace or        e) in all other zones—8m.
              Noosa Parade between

              Weyba Road and Russell

              Street), where they are not

              to exceed a maximum

              building height of 3 storeys;

       ii.    for the Visitor Mixed Use

              Zone– 3 storeys, although

              present only 1-2 storey

              façades to Gympie Terrace;

       iii.   for the Shire Business

              Centre Zone– 2 storeys,

              except in Precinct E1 and

              E2 where 3 storeys and

              Precinct REC/MU where 1

Page 56

SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS                                       ASSESSMENT

                   storey; and

           iv.     for all other zones— 2

                   storeys;

      c) do not visually dominate the street

           or surrounding spaces;

      d) preserve the amenity of surrounding

           land;

      e) ensure that development responds

           to the site topography; and

      f)   are well articulated with strong

           horizontal and vertical design

           elements to provide an interesting

           streetscape and to complement

           landform changes and landscapes.

Setbacks


O9 Buildings and other structures are           S9.1 Buildings and structures comply with the setbacks   S9.1 Complies

appropriately designed and sited to—            identified in Schedule 1 - Minimum Boundary Setbacks.
                                                                                                         The proposed buildings and structures are

Page 57

SPECIFIC OUTCOMES                             PROBABLE SOLUTIONS   ASSESSMENT

    a) provide amenity for users of the                            setback more than 7m from the road

         premises as well as preserve the                          frontages in accordance with Schedule 1-

         visual and acoustic amenity of                            Minimum Boundary Setbacks.

         adjoining and nearby properties;

    b) provide adequate distance from

         adjoining land uses;

    c) allow space for required vehicle

         parking;

    d) preserve any existing vegetation

         that will buffer the proposed

         building;

    e) allow for landscaping to be provided

         between buildings;

    f)   maintain the visual continuity and

         pattern of buildings and landscape

         elements within the street;

    g) avoid large areas of continuous wall

         planes by varying the building

Page 58

SPECIFIC OUTCOMES                                     PROBABLE SOLUTIONS     ASSESSMENT

           setbacks and using appropriate

           techniques to provide visual relief;

           and

      h) help protect the natural character

           and visual amenity of the Noosa

           River system and other

           watercourses

Site cover, gross floor area and plot ratio


O10 The site cover, gross floor area and plot         No solution provided   O10 Complies

ratio of buildings and other roofed structures—
                                                                             Given the size of the lot and the proposed
      a) results in a building scale that is                                 developable area, the proposed scale of the
           compatible with surrounding                                       development     is   considered    to   be
           development;                                                      compatible to the surrounding development.
      b) does not present an appearance of
                                                                             The site is to be suitably landscaped in
           bulk to adjacent properties, roads or
                                                                             order to present a reduced scale to
           other areas in the vicinity of the site;
                                                                             adjoining properties as well as soften the
      c) maximises the retention of existing
                                                                             impact of hard surfaces.

Page 59

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS   ASSESSMENT

         vegetation and allows for soft                                 Existing established trees along Walter Hey

         landscaping between buildings;                                 Drive are to be retained where possible.

     d) allows for adequate area at ground

         level for outdoor recreation,

         entertainment, clothes drying and

         other site facilities; and

     e) facilitates onsite stormwater

         management and vehicular access.



O11 Site cover—
                                                                        O11-O16 Not Applicable
     a) for a class 1 or class 10a structure
                                                                        The development is not located within any
         within the Detached Housing Zone,
                                                                        of the listed zones.
         does not exceed—

         i.       for a single storey building -

                  50%; or

         ii.      for a building of 2 or more

                  storeys - 50% on the

                  ground floor and 30% for

Page 60

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS   ASSESSMENT

                   the upper storey(s), or 40%

                   for all storeys for a building

                   of 2 or more storeys;

      b) for other classes with the Detached

           Housing Zone, does not exceed—

           40%;

      c) for the Semi-Attached Housing

           Zone does not exceed 40%;

      d) for the Attached Housing Zone does

           not exceed 40%;

      e) for the Visitor Mixed Use Zone does

           not exceed 40%; or

      f)   for the Shire Business Centre Zone

           in Precincts E1, E2, E6 and E7

           does not exceed 50%.

O12 For the Semi-Attached Housing Zone

buildings do not exceed a plot ratio of 0.45:1

O13 For the Attached Housing Zone the

Page 61

SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS   ASSESSMENT

maximum gross floor area is equivalent to the

maximum allowable population in persons

multiplied by 40m2.



O14 For the Visitor Mixed Use Zone, the

maximum gross floor area equals the

allowable population in persons multiplied by

40m2, provided that the gross floor area does

not exceed 13,600m2.



O15 For the Business Centre Zone, outside of

the Mary Street/Thomas Street Precinct the

maximum plot ratio is —

      a) 0.8:1 for site areas up to and

          including 2,000m2 ; plus

      b) 0.3:1 for the balance portion of the

          site area in excess of 2000m2.

Page 62

SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS   ASSESSMENT

O16 Within the Shire Business Centre Zone,

the maximum plot ratio for development within

the following precincts is —

    a) Precincts B1 and B2 combined- 0.5:1;

    b) Precinct B3- 0.8;

    c) Precinct E1- 0.6;

    d) Precinct E2- 0.6;

    e) Precinct E3- 0.6;

    f)   Precinct E4- 0.6;

    g) Precinct E5- 0.6

    h) Precinct E6- 0.6;

    i)   Precinct E7- 0.6;

    j)   Precinct RES- 0.6; and

    k) Precinct REC/MU- 0.1.

Page 63

SPECIFIC OUTCOMES                             PROBABLE SOLUTIONS                                              ASSESSMENT




Flooding and drainage


O17 Buildings and other works are designed    S17.1 For new buildings or structures or additions of more      S17.1 Not Applicable

and sited to—                                 than 50m2 gross floor area to an existing building or
                                                                                                              No habitable rooms are proposed
   a) provide flood free access to premises   structure, floor levels for habitable rooms are not less than

       and flood free habitable areas;        the specified minimum floor levels; AND

   b) allow only minor, short term and        S17.2 Where Council infrastructure is available—                S17.2 Complies
       infrequent flooding of non-habitable       a) any drainage (including buildings and yards) flows
                                                                                                              The proposal will comply as required.
       areas;                                         to that infrastructure; and

   c) ensure carparking areas can be              b) the infrastructure has the capacity to accept any

       adequately drained;                            additional loading; AND

   d) ensure drainage does not adversely      S17.3 For Residential Uses—

       impact upon other premises; and                                                                        S17.3 Not Applicable
                                                  a) where slab on ground construction is used, filling

   e) ensure filling or excavation does not           does not extend more than 1m beyond the building

       adversely impact upon other premises           footprint and access to car parking areas,

Page 64

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                                ASSESSMENT

        by—                                               measured from the outer walls of the building ; or

        i.      causing ponding on the site or        b) the design consists of a suspended floor

                nearby land;                              construction; AND
                                                                                                                    S17.4 Complies
        ii.     increasing flooding, which        S17.4 Car parking and manoeuvring areas are constructed

                adversely affects the safety or   at a level that permits the parking area to drain from the site

                use of any land upstream and      by gravity means, without the need for mechanical
                                                                                                                    S17.5- S17.6 Not Applicable
                downstream; and                   pumping; AND

        iii.    adversely affecting the flow of   S17.5 Basements for residential uses have flood immunity          No basements proposed.
                water in any overland flow        above the Q100 where alternative means to mechanical

                path.                             pumping are used to achieve such immunity; or

                                                  S17.6 Basements for non-residential uses have flood

                                                  immunity above the Q100 that may be achieved by means

                                                  of mechanical pumping where the mechanical feature is

                                                  installed with adequate holding tanks and an alternative

                                                  back up power source.

Sloping sites                                                                                                       Not Applicable


Roof form

Page 65

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                             ASSESSMENT

O20 Rooflines—                                    S20.1 With the exception of buildings within the Industry      S20.1 Complies

    a) contribute positively to the local         Zone, the main roof of the building has a roof pitch no less
                                                                                                                 The proposed roof form is acceptable as
        skyline;                                  than 5 degrees and has minimum 600mm eaves to at least
                                                                                                                 the site is in the Industry Zone.
                                                  75% of the perimeter of the building; AND
    b) complement the character of the
                                                                                                                 S20.2 Complies
        locality;

    c) are articulated, pitched or skillion;      S20.2 Buildings and structures do not include roof top

                                                  terraces.
    d) avoid low pitched (eg. less than 5

        degrees) or box roof profiles/parapets;

        and

    e) do not create opportunities for

        residents to overlook the private open

        space areas of neighbouring

        properties

Materials and finishes


O21 Buildings and other structures use            S21.1 With the exception of buildings within the Industry      S21.1 Complies

materials and finishes that complement the        Zone, buildings
                                                                                                                 The proposed materials are acceptable as
Noosaville character and integrate with the           a) use a mix of lightweight and textured external          the site is in the Industry Zone, however the

Page 66

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                                        ASSESSMENT

surrounding natural and built environment                    building materials, including timber finishes; or               petrol station buildings comprises a variety

                                                        b) use masonry construction where variation is                       of materials and features such as glazing

                                                             provided in texture, detailing and the like;                    and recessions to create visual appeal.

                                                        c) use open or transparent balustrades; and

                                                        d) d) incorporate open balconies.

11.11 Environment, conservation and recreation


Environment and cultural heritage values


O22 There are no significant adverse effects       No solution provided                                                      O22 Complies

on biodiversity, native vegetation, native fauna
                                                                                                                             The site does not contain any biodiversity,
habitat, landscaped quality, water quality or      Advisory note PSP24 – Effluent Disposal details requirements for the      native vegetation, native fauna habitat,
cultural heritage values, including those          design and siting of effluent disposal systems where located outside a
                                                                                                                             landscaped quality, water quality or cultural
                                                   sewerage service area. Compliance with PSP24 will be considered as part
related to—
                                                   of Council’s assessment of the plumbing and drainage application
                                                                                                                             heritage values; however the proposal does
    a) changes to natural drainage;                                                                                          take   urban   run-off   into   consideration,
    b) management of fire risk;                                                                                              ensuring   that   contaminants      are   not

    c) erosion and the transport of sediments                                                                                released through water sensitive urban

        off site;                                                                                                            design.

Page 67

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS                                            ASSESSMENT

   d) unmanaged public access;

   e) effluent disposal;

   f)   changes to fauna habitat and

        behaviour; and

   g) disturbance of buildings and features,

        including natural features of cultural

        heritage significance

Open space network


O23 An integrated open space network is          S23.1 Open space corridors and existing native vegetation     S23.1- S24.1 Not Applicable

established throughout the locality and—         in areas indicated in Schedule 5 – Map 4 are protected from
                                                                                                               The proposal does not include an open
   a) allows for both passive and active         fragmentation and encroachment by development.
                                                                                                               space corridor.
        recreational pursuits;

   b) provides safe and convenient

        connectivity for pedestrians and         S24.1 No solution provided
        cyclists to neighbourhood centres,

        community services and other key

        destinations such as public open

Page 68

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS                                                ASSESSMENT

        space, the Noosa River and Wallace

        Estate;

    c) provides habitat connectivity for

        wildlife;

    d) protects watercourses and drainage

        lines in the lowlands; and

    e) forms a scenic backdrop for the

        locality’s residential neighbourhoods.

        AND

O24 Physical and visual links between public

open space areas and watercourses are

retained.

Pedestrian and bicycle pathways


O25 Safe and convenient pedestrian and           S25.1 Pedestrian and bicycle pathways are provided and            S25.1- S25.2 Complies

bicycle pathways are provided and retained       retained where indicated in the Priority Infrastructure Plan in
                                                                                                                   Pedestrian   and   bicycle   pathways    are
between and around key destinations              Part 15; AND
                                                                                                                   already in place along both street frontages.
including—
                                                                                                                   The proposed development will ensure that

Page 69

SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS                                      ASSESSMENT

   a) an east-west link between the             S25.2 Contributions toward pedestrian and bicycle       these pathways are maintained. Where

        Tewantin & Doonan Locality and the      pathways are provided in accordance with the Priority   upgrades are required, they will comply with

        Noosa Heads Locality along the          Infrastructure Plan in Part 15.                         council provisions.

        Noosa River foreshore;

   b) a north-south link between the Shire

        Business Centre and Wallace Park to

        the Noosa River foreshore

   c) recreation areas off Shorehaven Drive

        and Seacove Court;

   d) scouting facilities at Gympie Terrace

        and Gibson Road;

   e) the Australian Rules field at Weyba

        Road; and

   f)   camping and caravanning facilities at

        Munna Point

Foreshore character                                                                                     Not Applicable


Watercourses                                                                                            Not Applicable

Page 70

Table 11.23 —Specific Outcomes and Probable Solutions for the Industry Zone


SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS           ASSESSMENT

11.51 Consistent uses

O186 The following defined uses and use          No solution provided         O186- O187 Complies
                                                                              The proposed service station (Retail Type
classes are consistent uses and are located in
                                                                              5) is a consistent use in this zone.
the Industry Zone—
                                                                              The proposed shop (Retail Type 2) while
    a) Industrial business Types 1 or 2;                                      not listed as a consistent use, is ancillary to
    b) Retail business Types 3, 5 or 6;                                       the proposed service station, therefore is
                                                                              considered to be compatible.
    c) Retail business Type 4 if a vehicle

         sales premises and located with

         frontage to Lionel Donovan Drive;

    d) Education Type 3 if trade related

         vocational training

    e) Emergency Service Type 2;

    f)   Service and utility;

    g) Transport Types 1, 2 or 3; and

    h) Ancillary dwelling unit.

Page 71

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS     ASSESSMENT

11.52 Inconsistent uses

O187The following defined uses and use           No solution provided

classes are inconsistent uses and are not

located in the Industry Zone—

    a) All Agricultural Uses;

    b) Commercial business;

    c) Entertainment and dining business;

    d) Home-based business;

    e) Industrial business Type 3

    f)   Retail business Types 1, 2 or 7;

    g) Retail business Type 4 if not a vehicle

         sales premises located with frontage

         to Lionel Donovan Drive

    h) Education if not Type 3 and trade

         related vocational training;

    i)   Emergency Service Type 1;

    j)   Open Space;

Page 72

SPECIFIC OUTCOMES                              PROBABLE SOLUTIONS      ASSESSMENT

    a) Wellbeing;

    b) Transport Type 4;

    c) Detached house;

    d) Community residence;

    e) Multiple housing; and

    f) Visitor accommodation

11.53 Effects of use


Amenity


O188 Uses are predominantly of an industrial   No solution provided.   O188 Complies

nature ordinarily expected in an industrial
                                                                       It is considered that the proposed use is
estate with ancillary uses compatible with
                                                                       predominantly of an industrial nature.
industrial businesses.
                                                                       O189 Not Applicable
O189 Industry business uses are located,

designed and operated to avoid significantly

changing the amenity enjoyed by users of

surrounding premises.

Page 73

SPECIFIC OUTCOMES                             PROBABLE SOLUTIONS                                          ASSESSMENT

Storage of materials                                                                                      Not Applicable


                                                                                                          No materials are to be stored outside of

                                                                                                          buildings.


Frontages


O193 The frontage of each site contains       S193.1 A landscaped building setback of 10m is to be        O193 Complies

landscaping without adversely screening the   provided to Walter Hay Drive, Eumundi-Noosa Road and
                                                                                                          A landscaped strip between 7m and 10m is
business or visitor carparking; AND           Eenie Creek Road, unless this is the only frontage to the
                                                                                                          proposed along the Walter Hay Drive
                                              site, in which case it can be reduced to 6m; AND
                                                                                                          frontage and 8.4m and 3m along Eumundi-

                                                                                                          Noosa Road frontage.


                                                                                                          These landscaped strips comprise
                                                                                                          landscaping suitable to the proposed use.
                                                                                                          This includes mulched garden beds with
                                                                                                          mass plantings of low level shrubs and
                                                                                                          ground covers to enable good visibility for
                                                                                                          traffic safety.



                                              S193.2 This setback area is to include a minimum of 2m of

Page 74

SPECIFIC OUTCOMES                                    PROBABLE SOLUTIONS                                             ASSESSMENT

                                                     soft landscaping behind which uncovered visitor carparking

                                                     may be located; AND


                                                                                                                    S194.1 Complies
O194 Vehicle display is focussed on and              S194.1 There is no display of motor vehicle for sale or hire   The proposal does not include motor
orientated towards Lionel Donovan Drive              on Walter Hay Drive, Eumundi-Noosa Road or Eenie Creek         vehicles for sale or hire.

rather than Walter Hay Drive, Eumundi-Noosa          Road frontages; AND

Road or Eenie Creek Drive; AND

                                                                                                                    S195.1 Complies
O195 Development fronting Walter Hay Drive,          S195.1 No direct vehicular access is taken off Eenie Creek     The proposed development is accessed via

Eumundi-Noosa Road and Eenie Creek Road              Road or Walter Hay Drive where the property has access to      Eumundi- Noosa Road.

is sympathetic to the character of the area and      any other road.

suitable for its position along the entry roads to

the coastal urban part of Noosa

Environmental Protection


O196 Industrial development is conducted in          No solution provided.                                          O196 Complies

an environmentally responsible manner,
                                                                                                                    All measures to ensure that environmental
operating without deleterious impacts on
                                                                                                                    values are not compromised have been

Page 75

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS      ASSESSMENT

immediate, surrounding or downstream                                      incorporated.
communities, environments and environmental

processes.

11.54 Built form


Visual amenity and character


O197 Buildings are designed and sited to          No solution provided.   O197 Complies

provide visual interest and amenity by—
                                                                          The petrol station building comprises a
    a) providing well articulated buildings                               variety of materials and features such as
        with strong horizontal and vertical                               glazing and recessions to create visual
        design elements and features;                                     appeal.
    b) using a variety of external building

        materials within external walls where                             O198 Complies
        such walls are visible from the street;

        and

    c) providing for interesting and varied

        site layouts and roof designs; AND

O198 Buildings are designed to provide for a

Page 76

SPECIFIC OUTCOMES                             PROBABLE SOLUTIONS   ASSESSMENT

range of potential users by allowing for

adaptable floor plans and adequate floor to

ceiling heights

Page 77

LANDSCAPING CODE

Table 14-55 — Landscaping


SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS                                        ASSESSMENT

14.134 General requirements

Streetscape and amenity

O1 Sufficient landscaped areas are provided      S1.1 Landscaped areas, not less than the minimum areas    S.1.1 Complies
                                                                                                           Approximately 30% of the total lease area
to—                                              and dimensions specified in Tables 14-56 or 14-57, are
                                                                                                           (2444m2) is landscaped.
   a) enhance the visual amenity and natural     provided and maintained; AND
                                                                                                           3m wide landscaping is provided along the
       landscape character of the area,          S1.2 Landscaping is designed, planted and maintained in   entire frontage of the lease area (proposed
       streetscape and local area;               accordance with PSP3 Landscaping Plants and Guidelines.   lot 1) apart from the vehicular access

   b) retain natural landscape features, such                                                              driveways.

       as rock outcrops and existing large

       trees;

   c) retain existing native vegetation and

       enhance buffer areas around property

       boundaries;

   d) suit the relative size and nature of the

Page 78

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                           ASSESSMENT

        development and its setting;

   e) reduce the visual impact of large or

        bulky structures and fencing along

        watercourses; and

   f)   conceal service, carparking and loading

        areas of developments;

   g) screen incompatible land uses; and

   h) provide privacy between any dwelling

        units and accommodation units on and

        adjoining the site to a height and

        density appropriate to the scale of the

        development.

Building and landscape design

O2 Site layout and building and landscape         S2.1 Below ground components of buildings do not extend      S2.1 Not Applicable

design—                                           beyond the above ground footprint to allow for landscaping

   a) provides for soft landscaping to be         particularly within building setback areas; AND
                                                                                                               S2.2 Not Applicable
        established in and around the             S2.2 Basement carparks do not encroach into building

Page 79

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                           ASSESSMENT

       development;                               setback areas; AND

  b) maximises the retention of large canopy      S2.3 Plants are grouped in mulched beds rather than
                                                                                                               S2.3 Complies
       trees;                                     planted individually to provide for optimum growing

                                                  conditions and less maintenance; AND                         Plans comprise of mulched garden beds
  c) within the Eastern Beaches Locality
                                                                                                               with mass plantings of low level shrubs &
       and Noosa Heads Locality, avoids the
                                                                                                               ground   covers.      This   landscaping   is
       removal of heath vegetation, except
                                                                                                               considered to comprise low maintenance.
       where required for internal roads and

       service and infrastructure construction;                                                                S2.4 Complies
                                                  S2.4 These plants grouped in mulched beds are not subject
  d) minimises the extent of impervious
                                                  to any hedging maintenance regimes; AND
       paved areas;

  e) provides for suitable plant layouts and
                                                  S2.5 Landscaping is designed, planted and maintained in
       densities;
                                                  accordance with PSP3 Landscaping Plants and Guidelines;      S2.4 Complies
  f)   facilitates the adoption of appropriate
                                                  AND
                                                                                                               Landscaping will comply as required.
       planting techniques; and

  g) considers on-going maintenance
                                                  S2.6 Alternatives to impervious pavement are provided and
       requirements to assure the
                                                  are located where landscaping and existing vegetation will   S2.5 Not Applicable
       establishment and ongoing survival of
                                                  benefit from increased infiltration of rainwater.
       plantings.

Page 80

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS                                            ASSESSMENT

Species selection


O3 Landscaped areas include plant species           S3.1 Plantings—                                               S3.1 Complies

that—                                                   a) comprise plant species identified for the relevant     The development will comply as required.
   h) are appropriate to the biophysical                    landscape character area in PSP3 Landscaping
                                                                                                                  It is proposed that local native species will
        conditions and landscape character of               Plants and Guidelines; and
                                                                                                                  be selected where appropriate.
        the area;                                       b) avoid undesirable plant species identified in PSP3

   i)   are suitable for the space available, the           Landscaping Plants and Guidelines; OR

        level of visual and climatic exposure,      S3.2 For landscaping around pool areas—
        the functional requirements of the site
                                                        a) no more than 30% of the landscaped area is a
        and the scale of the development;                                                                         S3.2- S3.3 Not Applicable
                                                            mixture of plants of local origin and exotic plant
   j)   provide for appropriate levels of shade             species, provided none of the plant species are
        and sunlight to occupants of the                    undesirable plants identified in PSP3 Landscaping
        development throughout the year;                    Plants and Guidelines; and

   k) minimise the demand for water use;                b) palms are specifically located in group plantings in

   l)   in road reserves, provide street trees              accordance with PSP3 Landscaping Plants and

        with effective canopy shading having                Guidelines; AND

        regard to the size and scale of the road    S3.3 Root guards are utilised around species with

Page 81

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS            ASSESSMENT

      reserve and the location of services and   potentially invasive roots.

      other structures;

  m) for street trees in towns are villages,

      are consistent with the existing

      streetscape character;

  n) do not cause potential damage to

      buildings or structures;

  o) are not harmful to pedestrians,

      particularly around schools, childcare

      centres, shopping areas and other high

      pedestrian areas;

  p) in intensively used environments, can

      endure high levels of activity; and

  q) for rural residential developments, are

      best suited to less intensive

      maintenance and low availability of

      water for gardens

Page 82

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                           ASSESSMENT

Safety and security


O4 Landscaping is designed and located to          S4.1 No solution provided.                                   O4 Complies

maximise the safety and security of public and
                                                                                                                Areas   around    entrances,    exits   and
private areas by—
                                                   Figure 14-16 — Landscaping allows for adequate safe          pedestrian crossing points to consist of low
    r)   clearly defining the boundaries between   vision at driveways and intersection                         shrubs and ground covers to enable good
         private and public spaces;                                                                             visibility for safe movement of vehicles &
    s) promoting casual surveillance of                                                                         pedestrians.
         buildings and public areas from the

         street and other public areas for

         personal security reasons;

    t)   avoiding concealment spots; and

    u) maintaining safe sight distances to and

         from road and building corners, carpark   S5.1 Landscaping provided which allows adequate visibility

         entrances and driveways (see Figure       for casual surveillance of public and semi-public spaces,

         14-16);                                   including entrances and exits to sites and buildings, by:

    v) maintain safe sight distances at                a) planting trees which have clean trunks to a height

         planting bed ends within carparks;                of at least 1.8 m; and

Page 83

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS                                           ASSESSMENT

    w) protecting solid fences from graffiti by         b) appropriately spacing shrubs at 1.2m horizontal

        incorporating elements such as                      centres, with a maximum height of 0.75m, to avoid

        landscaping, creepers, murals or                    clumping and to retain sightlines.

        vandal resistant paint; and                 S6.1 Street trees and trees in carparking areas achieve a

    x) separating and defining pedestrian and       maximum of 900mm clear trunk height for a 2.0m high tree

        vehicle circulation routes.                 at planting and are able to attain a clear trunk height of

O5 The provision of landscaping is to a             1900mm on maturity; AND

satisfactory standard ensuring that it does not     S6.2 All scrub planting to be a maximum height of 700mm

lead to opportunities for concealment and           from the road pavement (not top of kerb).

possible assault sites.

O6 Street trees and plantings in towns and

villages, carparks and other areas where

potential conflicts with vehicles and pedestrians

are evident, are planted so as to maximise

vehicle and pedestrian safety



Services and utilities

Page 84

SPECIFIC OUTCOMES                             PROBABLE SOLUTIONS                                                ASSESSMENT

O7 All landscaping works maintain adequate    S7.1 Plant species used in landscaping adjacent to                O7 Complies

safe distance from services and utilities     substations, or adjacent to or on electricity transmission line
                                                                                                                All proposed landscaping is suitably located
including substations, overhead powerlines,   easements, are less than 4m high at maturity and do not
                                                                                                                away from the adjoining substation.
power poles and transformers, street lamps,   encroach within 3m of a substation boundary; OR

stormwater catchment pits, and underground                                                                      The types of low shrubbery and garden
                                              S7.2 For trees higher than 4m, trees are planted at a
services and utilities.                                                                                         beds proposed will not compromise the
                                              distance from any part of an electricity transmission line at
                                                                                                                substation or any of its infrastructure.
                                              least equal to the expected height of the tree at maturity

                                              (see Figure 14-17); AND

                                              S7.3 For power lines that connect to a premises, the height

                                              of plant species at maturity provides for a 2m clearance

                                              below the power line; (see Figure 14-18) AND

                                              S7.4 Trees and large scrubs are located a minimum of—

                                                  a) 5m from electricity poles and pillars;

                                                  b) 4m from street lamps;

                                                  c) 2m from stormwater catchment pits; and

                                                  d) 2m from underground services and utilities; AND

                                              S7.5 Plants are located to enable tradespersons to access,

                                              view and inspect service meters, such as water and

Page 85

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS                                       ASSESSMENT

                                                 electricity meters; AND

                                                 S7.6 Root barriers are installed around trees that are

                                                 located within 3m of any infrastructures or that have

                                                 potentially invasive roots.




Entry statements


O8 Tree and plant massing are the dominant       S8.1 No solution provided.                               O8 Not Applicable

features of entry statements to residential or
                                                                                                          The proposal is not for a residential or

Page 86

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                      ASSESSMENT

commercial estates and are integrated with the     S9.1 Entry statements are low maintenance and located   commercial estate.
landscape theme of the estate and the natural      entirely within privately owned land.

landscape character of the locality, rather than

the entry being dominated by built elements

such as masonary walls, waterfalls and

assembled rock outcrops. (see Figure 14-19).



O9 Entry statements are low maintenance.




14.135 Specific requirements for Multiple housing & Visitor Accommodation                                  Not Applicable


14.136 Specific requirements for Business Uses

Page 87

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS     ASSESSMENT

Design of commercial and retail spaces


O19 Landscaping softens building bulk and          No solution provided   O19 Complies

creates pleasant settings for visitors and staff
                                                                          The   proposed   landscaping   along   all
that function well in an intensively used
                                                                          proposed       boundaries      comprises
environment by—
                                                                          landscaping to soften the impact on hard
    a) providing canopy trees and ancillary                               surfaces.
        shade structures;

    b) using shrubs and garden beds to

        clearly define public spaces and

        pedestrian walkways;

    c) providing areas for public art, where

        appropriate;

    d) providing outdoor areas with seating for

        staff and visitors;

    e) adopting landscape solutions that

        reduce the visual impact of building

        bulk (see Figure 14-23);

Page 88

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS     ASSESSMENT

    f)   using mounding and screen planting to

         conceal service and loading areas;

    g) making provision for outdoor dining

         areas where appropriate, that integrate

         well within the streetscape (see Figure

         14-24);

    h) providing adequate screening along the

         perimeters of the development;

    i)   avoiding the use of formal planting

         design for frontage works; and

    j)   providing planting design and species

         selection that can endure an intensively

         used environment.

Industrial Business


O20 Landscaping within industrial                   No solution provided   O20 Complies

developments is designed to—

    k) maximise retention of existing

Page 89

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS                                        ASSESSMENT

        vegetation;

   l)   provide planting in mulched areas at

        entrances, along boundaries and

        around car parking and site facilities to

        provide screening and shading;

   m) lessen the impact of building bulk

        though the planting of vegetation that is

        in scale with the building, and by using

        mounding where appropriate (see

        Figure 14-25); and d) provide outdoor

        areas for staff

14.137 Open space areas and road reserves


Active parkland                                                                                               Not Applicable


Passive parkland and reserves                                                                                 Not Applicable


Road reserves


O23 Landscaping within road reserves—               S23.1 A minimum of 1 street tree is provided per lot or   O23 Complies

Page 90

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS                                         ASSESSMENT

  a) enhances the streetscape quality and           every 8m of frontage, whichever is the greater; AND        It is considered that both Eumundi-Noosa
       natural landscape character of the area;                                                                Road and Walter Hay Drive road reserves
                                                    S23.2 Where vehicles are parked parallel to the kerb,
                                                                                                               comprise several established trees. It is
  b) provides buffering to adjoining uses;          landscaping is setback a minimum of 500mm from the back
                                                                                                               considered that these are more than
  c) maintains the functionality of the road        of the kerb to allow adequate access (see Figure 14-26);
                                                                                                               adequate and no additional plantings are
       reserve for vehicles, pedestrian and         AND                                                        required.
       bicycles, including providing adequate       S23.3 Street trees are planted a minimum of 1m from the
                                                                                                               The development will retain and maintain
       allowance for pedestrians to use the         back of the kerb in the road reserve verge
                                                                                                               these trees where possible.
       verge;

  d) provides for the retention of existing tall                                                               Where additional trees are required in the

       trees and remnant native vegetation;                                                                    road reserve, the proposal can comply via

                                                                                                               reasonable conditions.
  e) allows for the opening of car doors

       along urban streets;

  f)   allows for maintenance or emergency

       access to service corridors and utilities;

  g) maintains site distances to and from

       corners, intersections, driveways and

       pedestrian crossing points; and

  h) maintains overland stormwater flow to

Page 91

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS      ASSESSMENT

        avoid ponding on footpaths, nature

        strips or adjoining premises.

14.138 Environment protection and conservation


Watercourses and drainage lines


O24 Landscaping works along watercourses           No solution provided.   O24 Complies

and drainage lines—
                                                                           The   development   will   comply   where
   i)   retains and enhances the existing                                  applicable.
        riparian vegetation including

        understorey; and

   j)   rehabilitates and revegetates degraded

        riparian zones to filter stormwater run-

        off and provide for native wildlife

        habitat; and

   k) avoids slashing and turfing of

        watercourse edges and drainage lines;

        and

   l)   avoids engineering design solutions,

Page 92

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                              ASSESSMENT

         such as concrete drains; and

    m) use natural materials in the construction

         of boardwalks, bridges and similar

         structures to blend with the natural

         environment.

Wildlife habitat protection                                                                                        Not Applicable


                                                                                                                   The site is not mapped as containing koala

                                                                                                                   habitat


Water management


O26 Landscaping works promote the effective        S26.1 The infiltration and conservation of water is optimised   S26.1 Complies

use of water through appropriate plant selection   through—
                                                                                                                   The development will comply as required.
and layout and by maximising opportunities for         a) selecting native plant species identified in PSP3
water infiltration.                                        Landscaping Plants and Guidelines;

                                                       b) grouping plants in mulched beds;

                                                       c) minimising impervious surfaces;

                                                       d) using semi-pervious pavement surfaces; such as

Page 93

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                        ASSESSMENT

                                                          grass cell paving, as a alternative to pervious

                                                          surfaces

                                                     e) draining hard surfaces areas to landscaped areas;

                                                     f)   planting microphytes along driveways to absorb

                                                          hydrocarbons; and

                                                     g) using surface and subsurface drainage swales

Soil stability


O27 Landscaping works are design and sited to     No solution provided                                      O27 Complies

ensure the stability of soils and minimise
                                                                                                            The development will comply as required.
sediment and erosion activity, particularly on

steep slopes and in landslide hazard areas,

making use of soft landscaping rather than hard
landscaping solutions wherever possible

14.139 Carparking areas


Off street carparks


O28 Landscaping of carparking areas is            S28.1 One advanced canopy tree (a minimum of 100 litres   O28 Complies

Page 94

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                             ASSESSMENT

designed to—                                       pot size) is provided—                                         It is considered that one advanced tree for

   a) reduced the visual impact of the                 a) in towns and villages, shopping centres or              every 6 parking spaces is not appropriate

       development;                                        commercial areas— for every 4 carparking spaces;       given that the car parking area is located

                                                           or                                                     between the petrol building and the fuel
   b) provide for advanced canopy trees to
                                                                                                                  court. It is considered that trees will limit
       shade vehicles and to reduce reflected          b) otherwise—for every 6 carparking spaces; AND
                                                                                                                  casual surveillance of this area.
       radiation;                                  S28.2 A minimum area of 5m2 is provided around each

   c) ensure canopy trees are protected from       canopy tree, which is mulched and treated; AND                 The site comprises 30% landscaping. This
       vehicle damage by providing adequate        S28.3 Plants are grouped in mulched beds rather than           is considered more than suitable.
       sized garden beds;                          using individual, evenly spaced trees and scrubs; AND

   d) maximise opportunities for infiltration of   S28.4 Semi-pervious pavement surfaces are used, such as

       rainwater on-site; and                      grass cell paving, to increase infiltration of rainwater and

   e) minimise contaminated runoff entering        minimise contaminated runoff, including hydrocarbons,

       the stormwater system and                   entering the stormwater system and watercourses; AND

       watercourse.                                S28.5 Runoff from carparking areas is directed to

                                                   landscaped areas to minimise contaminate runoff, including

                                                   hydrocarbons, entering the stormwater system and

                                                   watercourses; AND

                                                   S28.6 Garden mounding is incorporated into carparking

Page 95

SPECIFIC OUTCOMES     PROBABLE SOLUTIONS                                         ASSESSMENT

                      areas adjacent to frontages; AND

                      S28.7 Surface and subsurface drainage swales are used to

                      maximise stormwater infiltration; AND

                      S28.8 A planting bed of at least 1m width with screen

                      fencing and dense planting is provided to any property

                      boundary with an adjacent residential development




On-street car parks                                                              Not Applicable


                                                                                 None proposed

Page 96

BUIDLING WORKS CODE

Table 14-44 — Building works


SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS                                          ASSESSMENT

14.95 Siting

Setbacks

O1 Buildings and other structures are            S1.1 The minimum setback of buildings and structures from   S1.1 Complies
                                                                                                             Setbacks comply with Schedule 1.
appropriately designed and sited to—             boundaries is not less than the minimum specified in

    a) provide amenity for users of the          Schedule 1.

        premises as well as preserve the         Alternative provision to QDC Parts MP1.1 and MP1.2, A1,

        visual and acoustic privacy of           A2 and A7.

        adjoining and nearby land uses;

    b) preserve any existing vegetation that

        will buffer the proposed building from

        adjoining uses;

    c) allow for landscaping to be provided

        between buildings;

    d) maintain the visual continuity and

Page 97

SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS                                          ASSESSMENT

        pattern of buildings and landscape

        elements within the street;

   e) for class 10a structures, do not

        visually dominate the street;

   f)   avoid any significant adverse impacts

        on the natural values of watercourses

        and their foreshores, including those

        of the Noosa River and its lakes; and

   g) do not interrupt the natural cycles of

        erosion and accretion of watercourses

        and foreshore areas.

Alternative provision to QDC Parts MP1.1 and

MP1.2, P1, P2 and P7

Flooding, drainage and earthworks

O2 Buildings and other works are designed       S2.1 For new buildings or additions of more than 50m2       S2.1- S2.2 Not Applicable

and sited to—                                   gross floor area to an existing building, floor levels of
                                                                                                            No habitable rooms are proposed.
   a) provide flood free access to premises     habitable rooms are—

Page 98

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                             ASSESSMENT

      and flood free habitable areas;                 a) for areas where minimum floor levels are available,

  b) allow only minor, short term and                     not less than the specified level;

      infrequent flooding of non-habitable            b) for areas where flood modelling is available, a

      areas;                                              minimum of 500mm above the modelled flood level;

  c) ensure drainage does not adversely                   and

      impact upon other premises; and                 c) for areas where flood modelling is not available, a

  d) ensure filling, excavation or retaining              minimum of 500mm above the highest known flood

      strctures do not adversely impact                   level; OR

      upon other premises by—                     S2.2 For additions of not more than 50m2 gross floor area

         i.    causing ponding of water on        to an existing building— floor levels of habitable rooms are

               the site or nearby land; and ii.   not less than the level of other habitable rooms in the

               increasing flooding, which         building; AND

               adversely affects the safety or

               use of any land upstream and                                                                      S2.3- S4.3 Complies
                                                  S2.3 Filling, other than for accessways, does not extend
               downstream;                        more than 1m beyond the footprint of any building,             The proposal will comply as required.
        ii.    adversely affecting the flow of    measured from outer walls of the building;

               water in any overland flow

               path; and iv. adversely
                                                  S3.1 No solution provided

Page 99

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS                                              ASSESSMENT

                  affecting the privacy or visual   S4.1 Fill material placed over services does not impose any

                  amenity of surrounding            additional surcharge loading on the service.

                  properties AND                    S4.2 Where excavation is carried out

O3 Finished surface levels ensure land is free          a) a minimum cover of 600mm is maintained around
draining.                                                   all utility infrastructure (to top, sides and base of

O4 Filling or excavation does not adversely                 services); or

affect sewer, stormwater or water utility               b) a retaining wall is provided to support the soil
infrastructure. Advisory note Council                       surrounding the service; AND
encourages building methods that avoid the
                                                    S4.3 Compaction with a vibrating roller is not carried out
use of fill, such as suspended floor
                                                    within 600mm of any utility infrastructure.
construction and stepping down slopes rather

than cutting and filling.
                                                    S5.1 Buildings or other structures within the Lake              S5.1 Complies
O5 Development does not adversely impact
                                                    Macdonald catchment (indicated on Figure 14-15) are
on the Lake Macdonald water supply                                                                                  Will comply as required.
                                                    located above the 98.5m AHD level.

Electricity supply infrastructure


O6 Uses and works maintain an adequate              S6.1 Buildings and structures (including swimming pools,        S6.1 Complies

safe distance from electrical infrastructure        sheds, tennis courts or outbuildings) are not constructed

Page 100

SPECIFIC OUTCOMES                                     PROBABLE SOLUTIONS                                            ASSESSMENT

including substations, overhead powerlines,           under overhead electricity transmission lines, or within

power poles and transformers                          electricity easements.

Steep slopes and Landslide hazard areas                                                                             Not Applicable


Gas Pipeline                                                                                                        Not Applicable


14.96 Built form


Height


O10 Buildings and other structures–                   S10.1 The maximum building height in storeys and metres       S10.1 Complies

    a) are low rise and present a building            is—
                                                                                                                    Building and structures height does not
         height consistent with structures on               a) if in the Visitor Mixed Use Zone – 12m (but not      exceed 8m in height.
         adjoining and surrounding land;                        exceeding 3 storeys);

    b) have a maximum building height of–                   b) if in the Noosa Heads Locality, Attached Housing

           i.      for Visitor Mixed Use Zone - 3               Zone –

                   storeys;                                     a. Lot 4 on SP 100064 in Serenity Close Noosa

           ii.     if in the Noosa Heads Locality,                  Heads - 15m (but not exceeding 4 storeys); or

                   Attached Housing Zone—                       b. otherwise - 12m (but not exceeding 3 storeys);

                             Lot 4 on SP 100064 in         c) if in the Shire Business Centre Zone –

Page 101

SPECIFIC OUTCOMES                                     PROBABLE SOLUTIONS                                           ASSESSMENT

                             Serenity Close Noosa            i.      Precinct E1 or E2 - 12m (but not exceeding

                             Heads - 4 storeys;                      3 storeys);

                            Otherwise - 3 storeys;          ii.     Precinct REC/MU - 8m (but not exceeding

        iii.     if in the Shire Business Centre                     1 storey);

                 Zone—                                  d) if in the Noosaville Locality and the Attached

                            Precinct E1 or E2 - 3           Housing Zone and with frontage to the following

                             storeys;                        streets – Russell St, William St and Howard St, or

                                                             Weyba Rd, James St and Albert St north of their
                            Precinct REC/MU - 1
                                                             intersections with Elizabeth St (as well as
                             storey;
                                                             properties fronting Gympie Terrace or Noosa
       iv.       if in the Noosaville Locality
                                                             Parade between Weyba Road and Russell Street)-
                 and the Attached Housing
                                                             12m (but not exceeding 3 storeys);
                 Zone - 2 or 3 storeys
                                                        e) if in the Noosa North Shore Locality and in the
                 depending on the location of
                                                             Detached Housing Zone – 8m or 9m where the
                 the site;
                                                             pitched roof, but no other part of the building or
        v.       otherwise - 2 storeys;
                                                             structure, exceeds 8m (but not exceeding 2 storeys
  c) do not visually dominate the street,
                                                             either way);
      surrounding spaces or the existing
                                                        f)   if in the Tewantin Locality and the Business Centre
      skyline;

Page 102

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS                                             ASSESSMENT

    d) preserve the amenity of surrounding                  Zone – 10m (but not exceeding 2 storeys);

         land including privacy, views and              g) if in the Rural Zone or Rural Settlement Zone – 8m
         access to sunlight;                                or 9m where the pitched roof, but no other part of

    e) respect the scale of surrounding                     the building or structure, exceeds 8m (but not

         vegetation; and                                    exceeding 2 storeys either way); or

    f)   respond to the topography of the site          h) otherwise – 8m (but not exceeding 2 storeys).

         by stepping down the slope or sitting

         above the ground level on stumps, for

         sloping sites.

Site cover


O11 The site cover of buildings and other           S11.1 If involving a class 1 or class 10a structure—the site   S11.1 Not Applicable

roofed structures—                                  cover does not exceed—
                                                                                                                   The proposal does not include a class 1 or
    a) is of a scale that is compatible with            a) for a single storey building – 50%; or                  10a structure.
         surrounding development;                       b) for a building of 2 or more storeys – 50% on the

    b) does not present an appearance of                    ground floor and 30% for the second storey; OR

         bulk to adjacent properties, roads or      S11.2 If otherwise—                                            S11.2- S11.3 Not Applicable
         other areas in the vicinity of the site;
                                                        a) for the Detached Housing, Semi-Attached Housing

Page 103

SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS                                         ASSESSMENT

   c) maximises the retention of existing               or Attached Housing Zone - 40%;                    The site is not included in the listed zones.
       vegetation and allows for soft               b) for the Visitor Mixed Use Zone –
       landscaping between buildings;
                                                        i.       if in Noosa Heads Locality - 45%;
   d) allows for adequate area at ground
                                                        ii.      otherwise - 35%; AND
       level for outdoor recreation,
                                                S11.3 If in the Eastern Beaches, Noosa Heads, Noosa
       entertainment, clothes drying and
                                                North Shore or Noosaville localities and in the Detached
       other site facilities; and
                                                Housing or Semi-Attached Housing Zone, soft landscaping
   e) facilitates on-site stormwater
                                                is provided and retained over 20% of the site area.
       management and vehicular access.
                                                Alternative provisions to QDC Parts MP1.1 and MP1.2, A3
Alternative provision to QDC Parts MP1.1 and

MP1.2 P3

Gross floor area - Noosa North Shore Locality, Rural Settlement Zone                                       Not Applicable


Gross floor area - Noosa Heads Locality, Detached House Zone, 6-14 Park Road                               Not Applicable


Roof form


O14 Roof forms—                                 S14.1 Buildings and structures do not include roof top     S14.1 Complies

   a) contribute positively to the local        terrace areas.

Page 104

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS   ASSESSMENT

        skyline;

    b) complement the low density character

        of the locality;

    c) do not present an appearance of

        excessive bulk to side neighbours (ie.

        avoid low pitched roofs or box

        profiles/parapets without eaves);

    d) use simple traditional roof designs;

        and

    e) do not create opportunities for

        residents to overlook the private open

        space areas of neighbouring

        properties

Streetscape & character–Kin Kin village                                Not Applicable


Streetscape & character–Boreen Point village                           Not Applicable


Garages, carports and other Class 10a buildings                        Not Applicable

Page 105

SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS                                                 ASSESSMENT

14.97 Effects of use


Lighting


O18 Lighting associated with the use or works   S18.1 A 1.5m landscaped buffer separates any private               S18.1- S18.3 Not Applicable

does not have an adverse impact upon the        tennis court or other sports court from side property

amenity enjoyed by users of adjoining or        boundaries; AND

nearby premises nor do it cause unreasonable    S18.2 Tennis courts or half courts are fenced with fencing
disturbance to local fauna.                     of 3.6m in height for a full sized court or 2.4m in height for a

                                                half court; AND

                                                S18.3 Any lit tennis court or other sports court is located at

                                                least 60m from the external wall of an existing or approved

                                                residential dwelling on an adjacent or nearby lot (as

                                                measured from the centre line of the court); AND

                                                S18.4 For lighting–                                                S18.4 Complies

                                                    a) the vertical illumination resulting from direct,            All lighting will comply with the relevant
                                                        reflected or other incidental lighting emanating from
                                                                                                                   requirements where possible.
                                                        the site does not exceed 8 lux when measured at

                                                        any point 1.5m outside the boundary and at any

Page 106

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS                                              ASSESSMENT

                                                         level from ground level upward;

                                                     b) all flood lighting is hooded or baffled to direct

                                                         lighting downward or is of a type that gives no

                                                         upward component of light when mounted

                                                         horizontally;

                                                     c) all flood lighting is setback a minimum of–

                                                         i.       6m from the boundary to any frontage; and

                                                         ii.      2m to any other boundary; and

                                                     d) lighting structures are not more than 8m in height.

Environmental Protection


O19 The design, siting and construction of       S19.1 Where there is an existing building envelope on the       S19.1 Not Applicable

buildings and structures minimise the clearing   lot that contains vegetation protection measures, clearing of
of vegetation and where there is an existing     native vegetation and building works do not extend beyond

preliminary approval for the property that       the building envelope, except for the purposes of a

contains vegetation protection measures, the     driveway access; OR

proposal is consistent with those measures.
                                                                                                                 S19.2 Not Applicable
                                                 S19.2 Where there is no building envelope existing on the

Page 107

SPECIFIC OUTCOMES                             PROBABLE SOLUTIONS                                              ASSESSMENT

                                              lot, clearing of native vegetation, other than for a driveway   The site does not include any mapped

                                              access does not extend beyond—                                  native vegetation.

                                                  a) 30m of a building or 10m of a structure on lots

                                                      greater than 10ha;

                                                  b) 10m of a building or structure on lots 10ha or less

                                                      but more than 0.3ha; or

                                                  c) 3m of a building or structure on lots 0.3ha or less

14.98 Self-contained units - building works                                                                   Not Applicable


14.99 Protection of Extractive Resources                                                                      Not Applicable

Page 108

DRIVEWAYS AND CAR PARKING CODE

Table 14-49 — Driveways


SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                          ASSESSMENT

14.113 General

O1 Vehicular access does not adversely            S1.1 Vehicular access is located and designed in            S1.1- S1.3 Complies
                                                                                                              Vehicle access is considered to be
impact on safety, capacity and operations of      accordance with AUSTROADSGuide to Traffic Engineering
                                                                                                              compliant with the relevant requirements.
the existing or planned road network, the         Practice requirements for sight distance and Section 3 of
                                                                                                              The development will comply where
proposed driveway, cycleways or pedestrian        AS2890.1 Parking Facilities; AND
                                                                                                              applicable.
pathway systems.                                  S1.2 Only one footpath crossing is provided; AND

                                                  S1.3 Driveways, other than within any setback have a

                                                  maximum grade in accordance with Section 3 of AS/NZS

                                                  2890.1

O2 Driveways and crossovers—                      S2.1 Design of the driveway across the footpath is in       S2.1- S2.3 Complies
                                                                                                              Driveways and crossovers will comply with
    a) are suitable and safe for their intended   accordance with Council’s Standard Drawings 9002 or 9005
                                                                                                              the relevant council standard drawings.
        use; and                                  as appropriate for the particular type of development as

                                                  annotated on the drawings; AND
    b) match Council infrastructure.
                                                  S2.2 Driveways are designed and constructed in

Page 109

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                                   ASSESSMENT

                                                  accordance with Council Standard Drawings 9014, 9019,

                                                  9020, 9021, as appropriate for the particular type of

                                                  development as annotated on the drawings; AND

                                                  S2.3 The change in grades in the driveways and ramps is in

                                                  accordance with Section 3 of AS2890.1 Parking Facilities.

O3 In commercial zoned areas, the number of       S3.1 Design of multi-tenanted developments in commercial             O3 Not Applicable
                                                                                                                       The site is not located in the commercial
driveways across pedestrian footpaths is          zoned areas include shared driveways and parking areas;
                                                                                                                       zone.
minimised.                                        AND

                                                  S3.2 Driveways are located so they abut existing driveways

                                                  of adjoining development where practicable and reciprocal

                                                  easements are created to reduce the sealed driveway

                                                  width.

O4 Vehicular access does not adversely            S4.1 Footpath and kerb crossings are located clear of                S4.1 Complies
                                                                                                                       The development will comply as required.
impact on the capacity, operations and            existing stormwater inlet structures, water and sewerage

maintenance of the existing infrastructure;       infrastructure fittings, any other exiting utility infrastructure,
                                                                                                                       O5 Complies
AND                                               existing landscaping and vegetation.
                                                                                                                       The proposed access upgrade does not
O5 Vehicular access does not adversely            S5.1 No solution provided                                            impact on existing landscaping. This area
impact on the integrity of existing landscaping                                                                        comprises predominantly loose gravel and

Page 110

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                              ASSESSMENT

or native vegetation                                                                                               grassed area.


O6 Driveway run-off is filtered prior to leaving   S6.1 For—                                                       O6 Complies
                                                                                                                   Run-off from the premises is to be treated
the premises.                                         a) Ancillary dwelling unit, Multiple housing Types 1 or
                                                                                                                   prior to discharge into council’s network.
                                                          2 if less than 5 carparking spaces, Visitor

                                                          accommodation Type 1 and Homebased business

                                                          Type 3—the driveway is formed to drain to

                                                          landscaped areas; and

                                                      b) for other uses—grease and oil arrestors or

                                                          stormwater quality improvement devices are

                                                          incorporated into the design to treat run-off prior to

                                                          run-off exiting from the premises.

Page 111

Table 14-50 — Carparking and manoeuvring


SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS                                         ASSESSMENT

14.114 Carpark design and layout

O7 Sufficient carparking is provided to         S7.1 The number of parking and loading bays is not less    O7 Complies
                                                                                                           The proposed development will provide 10 car
accommodate the number and type of              than the minimum number specified in Table 14-51 Vehicle
                                                                                                           parking spaces. Technically this is below the
vehicles likely to be generated by the          Parking Requirements;
                                                                                                           minimum according to Table 14-51 Vehicle
development having regard to the specifics of
                                                                                                           Parking Requirements. However, it is considered
the use including—
                                                                                                           that 10 spaces are suitable given the ancillary
    a) the type and intensity of land use;                                                                 nature of the proposed petrol building. The likely

                                                                                                           number of users of the service will be there to
    b) any existing parking available on the
                                                                                                           refuel their vehicles, which comprises leaving
         site;
                                                                                                           the vehicle at the fuel dispenser. The amount of
    c) hours of operation;
                                                                                                           users specifically using the site for the ancillary
    d) likely numbers of users;                                                                            shop component is considered to be low. It is

    e) the peak parking demand periods of                                                                  there considered that 10 spaces is appropriate.

         uses on the site; and

    f)   the availability of alternative

         carparking.

Page 112

SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS                                             ASSESSMENT

O8 The layout of the development provides       S8.1 Parking bays, manoeuvring areas, queuing areas,           S8.1 –S8.2 Complies
                                                                                                               The listed items have been designed in
adequate, clearly defined and easily            loading, setdown and pickup areas and driveways are
                                                                                                               accordance with Australian Standards.
accessible—                                     designed to the standards set out in Sections 2 and 3 of

    a) on-site vehicle parking and              Australian Standard AS 2890.1 Parking Facilities (Part 1:

        manoeuvring areas; and                  Off-street Carparking) and AS 2890.2 – Off-street Parking

                                                (Part 2: Commercial Vehicles); AND
    b) loading and manoeuvring areas for

        delivery and service vehicles

                                                S8.2 The number of loading bays is not less than the

                                                minimum number specified in Table 14-51.

O9 Parking areas are located where they will    S9.1 Carparking areas are accessed from rear laneways          O9 Complies
                                                                                                               Car parking is located at the front of the
not unduly conflict with pedestrians and will   where practicable
                                                                                                               building, the most suitable location for a
not dominate the streetscape.
                                                                                                               service station use.

O10 Provision is made for a reasonable          S10.1 Carparking spaces are provided for people with           S10.1 Complies
                                                                                                               1 space is provided.
number of onsite carparking spaces identified   disabilities at the rate specified in Section 2.4.5 of AS

and reserved for people with disabilities       2890.1 – Parking Facilities (Part 1: Off-street Carparking).

O11 Access and egress points do not impact      S11.1 Vehicle manoeuvring areas are provided in                S11.1 Complies

on the safety and operations of the road        accordance with Section 3 of AS 2890.1 Parking Facilities

Page 113

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                              ASSESSMENT

system.                                            (Part 1: Offstreet Carparking) so vehicles enter and leave

                                                   the site in a forward gear.

O12 Parking areas are designed to –                S12.1 At locations where pedestrian and vehicle conflicts       S12.1 Complies
                                                                                                                   Can comply via condition where applicable.
    a) provide a progressive reduction in          are likely to occur –

          speed between the external road and          a) sight distances of at least 2.5 seconds of travel time

          internal parking spaces;                         at the designated speed are provided;

    b) ensure lower speeds near areas of               b) splayed corners on structures are incorporated;

          high pedestrian activity through the         c) landscaping is designed to allow clear views;
          use of appropriate road geometry or
                                                       d) sign placement ensures that views are not
          devices designed to limit speed; and
                                                           impeded;
    c) maintain sight distances which are                                                                          S13.1 Not Applicable
                                                   S13.1 In large open car parks with greater than 200 car
          appropriate for the likely operating
                                                   parking spaces, a pedestrian path between parking spaces
          speeds in all areas of potential
                                                   is provided on every second aisle;
          pedestrian/vehicle and vehicle/vehicle

          conflict;

O13 A clearly defined pedestrian network is

provided that –

    a) is located in areas where people will

Page 114

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                            ASSESSMENT

        choose to walk;

    b) ensures that pedestrian movement

        through car parking areas or

        structures are along aisles rather than

        across them;

O14 Provision is made for pedestrian and                                                                        O14 Complies
                                                  S14.1 No probable solution identified;
vehicular queues at conflict points;                                                                            Can comply via condition where applicable.
                                                  S15.1 Lighting is provided in accordance with Australian
O15 Parking areas are lit to provide security
                                                  Standard 1158.1:1997 - Road Lighting - Vehicular Traffic      S15.1 Complies
for night-time users.
                                                  (Category V) Lighting - Performance Installation and Design   Lighting will comply with the standards.

                                                  Requirements

O16 In mixed use areas of Business centres        S16.1 Resident carparking is limited to one space per         S16.1-S16.2 Not Applicable

residents do not compete with customers for       dwelling unit or accommodation unit. AND

carparking spaces                                 S16.2 Resident carparking is not located in the road

                                                  reserve or between the residential or business building and

                                                  the principal street frontage.

O17 Car parking areas are landscaped to—          No solution provided                                          O17 Complies
                                                                                                                Car parking areas have been suitably
    a) provide shade;
                                                                                                                landscaped.

Page 115

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                          ASSESSMENT

    b) maximise infiltration of stormwater

        run-off;

    c) define parking areas;

    d) reduce direct visibility of car parking

        areas from external viewpoints;

    e) soften views of hardstand areas

O18 Development with the potential to              No solution provided                                        O18 Not Applicable
                                                                                                               It is not considered that the development
generate significant traffic and parking impacts
                                                                                                               has the potential to generate significant
gives appropriate consideration to transport
                                                                                                               traffic and parking impacts.
and land use issues.

Motor Cycles & Motor Scooters


O19 Designated Motor cycle or motor scooter        S19.1 For Commercial businesses, Entertainment & dining     S19.1 Not Applicable
                                                                                                               Not considered applicable due to the nature
parking spaces reduce the reliance on cars.        business, Industrial business Types 1 and 2, Retail
                                                                                                               of the development predominantly being
                                                   business Types 2, 4, 5, 6 and 7, Education Types 1 and 2,
                                                                                                               utilised by motorists.
                                                   Open Space, Wellbeing Uses and Transport Types 1, 2, 3

                                                   and 4 motor cycle parking spaces accord with Planning

                                                   Scheme Policy PSP26 Motor Cycle & Motor Scooter

Page 116

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                            ASSESSMENT

                                                   Parking


O20 Carparks are designed to ensure run-off        S20.1 Grease and oil arrestors or stormwater quality          S20.1 Complies
                                                                                                                 All run-off will be treated prior to discharge
is treated to remove pollutants prior to leaving   improvement devices are incorporated into the design to
                                                                                                                 into council’s network.
the premises                                       treat run-off prior to it leaving the premises.

O21 Carparking areas are designed to ensure        No solution provided                                          O21 Complies

drainage without the use of pumps or other

electrical apparatus

O22 Site layout and building design provides       S22.1 Below ground components of buildings, including car     S22.1 Not Applicable

for soft landscaping to be established.            parks, do not extend beyond the above ground footprint to

                                                   allow for the provision of landscaping, particularly within

                                                   building setbacks.

Education Types 1, 2 or 3


O23 Carparking and setdown areas are               S23.1 Paved setdown areas are provided within the site;       Not Applicable

designed and located to facilitate their safe      AND

and efficient use
                                                   S23.2 For a minimum of 50% of carparking spaces,

                                                   pedestrian access to buildings is not across or through

Page 117

SPECIFIC OUTCOMES   PROBABLE SOLUTIONS                                         ASSESSMENT

                    driveways, carparks, setdown or manoeuvring areas; AND

                    S23.3 Carparking and setdown areas are visible from off-

                    site.

Page 118

EARTHWORKS CODE

Table 14-52 — Earthworks


SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS                                             ASSESSMENT

14.120 Effects of works

Drainage

O1 Finished surface levels ensure land is free   S1.1 The finished surface gradient of any filled or            S1.1 Complies
                                                                                                                The proposal will comply where required
draining.                                        excavated area is within the range 0.5% to 1.5% and drains

                                                 to Council’s stormwater infrastructure where available or

                                                 where stormwater infrastructure is not available, toward the

                                                 street.

Hydraulics

(a) O2 Any change to the level of the land       No solution provided.                                          O2 Complies

    does not have an adverse flooding impact
                                                                                                                The proposal will comply where required
    on the flooding and drainage

    characteristics off-site

Geotechnical considerations

Page 119

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                              ASSESSMENT

(b) O3 Earthworks do not result in                For assessable development—                                     S3.1-S3.2 Complies

    geotechnical instability on the premises or   S3.1 Filling works are undertaken in accordance with            Where filling works are required, the
    nearby premises                               Section 2.8- Filling of Site of Council’s PSP5 - Engineering    development will comply with council’s
                                                  Design Standards- Roads and Drainage & Earthworks AND           standards.
                                                  S3.2 Where the filling is for residential commercial or

                                                  industrial purposes the works comply with Sections 3 to 6 of

                                                  AS 3798 - Guidelines for earthworks on commercial &

                                                  residential development.

Local amenity


O4 Earthworks do not cause disturbance to         S4.1 The following control measures are implemented—            S4.1-S4.1 Complies

the amenity of the neighbouring land.                 a) regular water spraying of exposed areas to               The development will comply as required.
                                                          suppress dust;

                                                      b) provision of dust stabilised or sealed internal roads;

                                                      c) protective covering of exposed areas that are left

                                                          for more than 2 weeks; and

                                                      d) if there is no valid development permit for the site,

                                                          disturbed areas are revegetated using species

Page 120

SPECIFIC OUTCOMES                            PROBABLE SOLUTIONS                                                 ASSESSMENT

                                                     identified in PSP3 - Landscaping Plants and

                                                     Guidelines; AND

                                             S4.2 Earthworks are undertaken only during the hours of

                                             7am to 6pm, Monday to Friday and 7am to 6pm on

                                             Saturday. No work is undertaken on Sunday or public

                                             holidays.

Vegetative Waste


O5 Vegetation cleared from a development     S5.1 Cleared vegetation is transported offsite for disposal in     S5.1-S5.3 Complies

site is disposed of in an environmentally    an approved green waste disposal facility; OR
                                                                                                                The   development     will   comply   where
responsible manner.                          S5.2 Cleared vegetation is mulched on-site and reused for          applicable
                                             landscaping of the finished development; OR

                                             S5.3 Cleared vegetation is disposed of for the purpose of
                                             firewood. (Note: Disposal of vegetative waste by burning off

                                             is not an acceptable method of disposal)

Managing contamination risk


O6 Materials used as fill are suitable for   S6.1 The fill material is solid clean earth, free of putrescible   S6.1- S6.2 Complies

development of the land and filling or       or refuse material, vegetation, acid sulfate soils, building or

Page 121

SPECIFIC OUTCOMES                            PROBABLE SOLUTIONS                                               ASSESSMENT

excavation works do not result in the        construction material or other material or contaminants;         The   development    will   comply   where

contamination of land.                       AND                                                              applicable

                                             S6.2 The site is not on the contaminated land register.



Haulage activity and amenity


O7 Haulage of material to and from a site    No solution provided                                             O7 Complies

ensures—
                                                                                                              Will comply as required
a) minimal disturbance to neighbouring

    properties and properties along the

    haulage route; and

b) Council’s road infrastructure including

    pavements is not adversely affected.

O8 Extent of earthworks Earthworks are       S8.1 All earthworks, including cut and fill batters, retaining   S8.1 Complies

contained within the subject property        walls etc are contained within the subject site
                                                                                                              The development will comply as required.


Sloping sites                                                                                                 Not Applicable

Page 122

SPECIFIC OUTCOMES                            PROBABLE SOLUTIONS      ASSESSMENT

Environmental protection


O10 Earthworks minimise any adverse impact   No solution provided.   O10 Complies

upon groundwater, watercourses, drainage                             The appropriate measures will be
lines, wetlands, and native vegetation                               undertaken as part of the development.

Dams                                                                 Not Applicable

Page 123

EROSION AND SEDIMENT CONTROL CODE

Table 14-53 —Erosion and sediment control


SPECIFIC OUTCOMES                           PROBABLE SOLUTIONS                                               ASSESSMENT

14.125 Effects of works

Erosion and sediment control

O1 Development minimises erosion and        S1.1 Site disturbance is limited to building areas, their        O1 Complies
                                                                                                             The proposed development and Erosion
transport of sediments off-site             surrounds and other use areas; AND
                                                                                                             Management Plan avoid unnecessary soil
                                            S1.2 Sediment barriers are provided throughout and
                                                                                                             erosion or disturbance of natural land
                                            downslope of disturbed areas to prevent sediment washing         maintaining a healthy state during
                                            into gutters, drains and watercourses either on or off the       construction. This proposal includes a
                                            site;                                                            Storm Management Plan and Erosion and
                                                                                                             Sediment Control Plan both in accordance
                                            AND
                                                                                                             with Council requirements.
                                            S1.3 All stockpiles including sand, soil or building materials

                                            are within the premises and contained within individual

                                            sediment barriers; AND

                                            S1.4 Sediment basins are provided where the site contains

                                            fine or dispersive soils; OR

Page 124

SPECIFIC OUTCOMES                            PROBABLE SOLUTIONS                                                ASSESSMENT

                                             S1.5 A stormwater catchpit incorporating a stormwater

                                             catchpit protection device is installed so that all runoff from

                                             disturbed areas flows to the catchpit; AND

                                             S1.6 For buildings,

                                                 a) temporary or permanent downpipes are connected to

                                                     the stormwater system before laying the roof; or

                                                 b) localised erosion is avoided by directing flow from

                                                     downpipes over non-erosive areas.

Stormwater runoff

O2 Stormwater is diverted around disturbed   S2.1 Diversion drains or bunds are designed and                   S2.1- S2.2 Complies

areas.                                       constructed to drain upstream run-off around the disturbed
                                                                                                               Diversion drains will be constructed to avoid
                                             site; AND
                                                                                                               upstream overland runoff come into the
                                             S2.2 Discharge from the diversion drains do not cause run-        disturbed area. In addition, sediment fences
                                             off impacts to other properties; OR                               will be installed along the low side of the
                                             S2.3 Alternative methods, as described in the Institution of      disturbed areas preventing sediment to
                                             Engineers Australia (Queensland Division) Soil Erosion and        runoff the site.
                                             Sediment Control - Guidelines for Queensland Construction

Page 125

 

SPECIFIC OUTCOMES

PROBABLE SOLUTIONS

ASSESSMENT

 

 

 

Sites, are used.

 

 

 

Page 126

EXISTING SERVICES CODE

Table 14-54 Existing Services


SPECIFIC OUTCOMES                             PROBABLE SOLUTIONS                                               ASSESSMENT

Setbacks and easements

O1 Development near a sewer, water main,      S1.1 The footing of any structure or building is located clear   S1.1 Complies
                                                                                                               All buildings and structures are located
stormwater drain, overland flow path or       of the zone of influence but no closer than 1.5m (measured
                                                                                                               further than 1.5m from any easement on
associated structure does not—                horizontally) from infrastructure including sewers, water
                                                                                                               site, existing or proposed.
    a) adversely affect the function of the   mains and stormwater structures; AND

        service;                              S1.2 No building or structure overhangs the zone of              S1.2 Complies

    b) place an additional load on the        influence; AND                                                   S1.3 –S1.5 Complies
                                                                                                               Where levels are required to be altered and
        service; and                          S1.3 Finished surface levels maintain a minimum of 600mm
                                                                                                               existing services are required to be
    c) unduly increase future maintenance     of cover, but no greater than 3m of cover to the
                                                                                                               relocated, they will be done in accordance
        costs.                                underground infrastructure; AND
                                                                                                               with PSP6 –Engineering Design Standards
                                              S1.4 If the existing surface level is altered, surface level     — Water and Sewerage and Section 4 of

                                              services including manholes and inspection points are            PSP5 –Engineering Design Standards –
                                                                                                               Roads, Drainage and Earthworks
                                              altered to match the new surface level; AND

                                              S1.5 Alterations are constructed in accordance with PSP6 –

Page 127

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS                                             ASSESSMENT

                                                 Engineering Design Standards — Water and Sewerage and

                                                 Section 4 of PSP5 –Engineering Design Standards –

                                                 Roads, Drainage and Earthworks; OR

                                                 S1.6 Existing services are relocated and the design and

                                                 construction of the relocated services is in accordance with

                                                 PSP6 – Engineering Design Standards — Water and

                                                 Sewerage and Section 4 of PSP5 – Engineering Design

                                                 Standards – Roads, Drainage and Earthworks.

O2 Maintenance access is provided to all         S2.1 A registered easement in favour of Council is created     S2.1-S2.3 Not Applicable

sewers, water mains, stormwater drains,          over all underground infrastructure located in private

overland flow paths and associated structures.   property; AND

                                                 S2.2 The width of the easement is the greater of 3m or the

                                                 width of the zone of influence; AND

                                                 S2.3 The easement is centred over the centreline of the

                                                 infrastructure

Page 128

TRANSPORT, ROADS AND DRAINAGE CODE

Table 14-58 — Strategic transport network


SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS (if code assessable)                                  ASSESSMENT

14.145 Strategic Transport Network

O1 Traffic generation from the development is   S1.1 Where the development leads to the need to increase                 S1.1 Not Applicable
                                                                                                                         The proposed development does not
considered in a localised and a Shire wide      transport infrastructure in the Shire, the development
                                                                                                                         require an increase in transport
context to ensure that—                         contributes to the transport network in accordance with the
                                                                                                                         infrastructure in the Shire.
    a) the transport network has the capacity   requirements of the applicable infrastructure charging

        to safely and efficiently accommodate   instrument and the Priority Infrastructure Plan in Part 15;

        projected movements; and/or             and where developments requires infrastructure not

                                                included in the priority infrastructure plan, the development
    b) the development includes measures to
                                                upgrades the infrastructure at no cost to Council.
        upgrade the transport network to meet

        the imposed demands.
                                                Advisory note Council may for some development require the preparation
                                                of a Transport Impact Assessment Report. Planning Scheme Policy PSP1

                                                details matters to be addressed in the Report.


O2 The street network has high street           S2.1 Road planning and development design facilitates as                 S2.1 Complies
                                                                                                                         The proposed development does not
connectivity, both within the development and   many pedestrian and cycle movements as possible and

Page 129

SPECIFIC OUTCOMES               PROBABLE SOLUTIONS (if code assessable)                       ASSESSMENT

to the surrounding local area   provides for future connectivity and integration with         compromise existing cyclist and pedestrian
                                adjoining sites; AND                                          movements.

                                S2.2 Arterial and sub-arterial roads are designed so they
                                                                                              S2.2- S2.13 Not Applicable
                                can operate with high volumes of traffic during peak times;
                                                                                              No roads are proposed.
                                AND

                                S2.3 Collector and local streets are provided to support

                                short trips for local traffic moving in and between

                                neighbourhoods. Local traffic is channelled towards

                                collector streets to ensure that traffic volumes on local

                                street are kept low; AND

                                S2.4 Collector and local streets are designed to discourage

                                through traffic; AND

                                S2.5 A collector street is provided parallel to arterials

                                particularly where they pass through town centres; AND

                                S2.6 Appropriate width of road and verge is provided to

                                allow streets to perform their designated functions in the

                                street network; AND

                                S2.7 A network of local streets focused towards an activity

Page 130

SPECIFIC OUTCOMES   PROBABLE SOLUTIONS (if code assessable)                          ASSESSMENT

                    centre or school is provided for safe and efficient pedestrian

                    and bike access to the school, safe conditions for school

                    buses, setdown facilities, with on-site parking where

                    practical; AND

                    S2.8 Passive surveillance is maximised by designing

                    streets to enable development to front all streets and roads,

                    including arterials; AND

                    S2.9 Streets near Public Passenger Transport facilities are

                    orientated to optimise the walkable catchments within 800

                    metres walking distance; AND

                    S2.10 The street network has no more than 15 percent of

                    lots fronting cul-de-sacs. The maximum cul-de-sac length is

                    120 m; AND

                    S2.11 Street stubs to adjacent future development areas

                    are provided at spacings of 200 m or closer to enable future

                    street connections to be made; AND

                    S2.12 Street block lengths are not more than 240 m long,

                    and predominantly around 150-180 m long. Street block

Page 131

SPECIFIC OUTCOMES                              PROBABLE SOLUTIONS (if code assessable)                        ASSESSMENT

                                               lengths are generally shorter closer to town and

                                               neighbourhood centres; AND

                                               S2.13 Direct, safe and attractive pedestrian and cycle

                                               routes are provided within and through the development

                                               and connect to bus stops

O3 Development is designed –                   S3.1 Higher density development is concentrated along          S3.1-S3.5 Not Applicable
                                                                                                              No change is proposed to existing public
   a) To encourage travel by community         public transport Routes; AND
                                                                                                              transport routes, pedestrian or cycle
       transport, walking and cycling rather   S3.2 There is provision for bus routes through development
                                                                                                              pathways.
       than by private car; and                sites; AND

   b) To maximise accessibility via existing   S3.3 Bus routes are located to maximise patronage

       and planned community transport         catchment and to consider personal safety, lighting and

       facilities                              traffic management; AND

                                               S3.4 At least 90 percent of all residents are located within

                                               400 metres of an existing or planned bus route; AND

                                               S3.5 Pedestrian and cycle movement is provided within

                                               local streets to and through development; AND
                                                                                                              S3.6 Complies
                                               S3.6 Attractive and safe pedestrian and cycle connections
                                                                                                              A pedestrian path is proposed form Walter
                                               are provided with shade trees, graded walking and cycle        Hay Drive to the subject site. This pathway

Page 132

SPECIFIC OUTCOMES   PROBABLE SOLUTIONS (if code assessable)                         ASSESSMENT

                    paths and lighting; AND                                         is suitably landscaped for visual appeal and
                                                                                    safety.


                                                                                    S3.7 Complies
                    S3.7 Buildings and pedestrian entrances are oriented to the     The petrol store building is orientated
                    street; AND                                                     towards Eumundi- Noosa Road, the
                                                                                    entrance to the site.


                    S3.8 Pathways have ramps at all kerb corners for                S3.8- S3.9 Complies
                    wheelchair and pram access; AND                                 Wheelchair and pram access is provided
                                                                                    for.

                    S3.9 Every development has convenient and prominent

                    pedestrian entrances that cater for all pedestrians including

                    older people, children and the mobility and vision impaired;

                    AND
                                                                                    S3.10 Complies
                    S3.10 Expanses of ground level blank walls along street

                    frontages, and large driveways and entrances to carparks

                    are avoided; AND

                    S3.11 Bus routes are not be located away from activity          S3.11 Not Applicable

Page 133

SPECIFIC OUTCOMES   PROBABLE SOLUTIONS (if code assessable)                        ASSESSMENT

                    centres; and AND
                                                                                   S3.12 Not Applicable
                    S3.12 Facilities for boarding and exiting community

                    transport facilities are incorporated into developments; AND



                    S3.13 Pedestrian and cycle routes within or adjacent to the    S3.13 Complies

                    development are overlooked by adjoining buildings, make        The proposed pedestrian pathways will
                                                                                   comply as required.
                    use of views and attractive sights, have lighting and are

                    signposted; AND



                    S3.14 Suitable car restraint measures are adopted within       S3.14 Complies
                                                                                   The development will comply where
                    the development such as lower speed limits or traffic
                                                                                   applicable.
                    calming measures to support greater pedestrian and cycle

                    movement; AND



                    S3.15 Traffic management devices on potential bus routes
                                                                                   S3.15 Not Applicable
                    are provided in accordance with the Self-assessable code

                    for undertaking road works on local government roads,

                    under the Transport Planning and Coordination Regulation

Page 134

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS (if code assessable)                         ASSESSMENT

                                                  2005; AND

                                                  S3.16 Streets identified as potential bus routes are—
                                                                                                                  S3.16 Not Applicable
                                                      a) collector streets and subarterial/arterial roads which

                                                           provide highly accessible and relatively direct

                                                           routes wherever practical;

                                                      b) those that provide for the shortest and most direct

                                                           route for an efficient public transport service; and

                                                      c)   those that can efficiently service adjoining

                                                           development areas

O4 Development access does not                    No solution provided.                                           O4 Complies
                                                                                                                  The proposed development does not
compromise the functions of particular roads
                                                                                                                  compromise the existing road hierarchy.
as indicated in the road hierarchy, and does
                                                                                                                  Safety and road operations will not be
not adversely impact on the safety, capacity
                                                                                                                  worsened by the development. All
and operations of the road system.                                                                                Australian Standards and Council
                                                                                                                  provisions will be applied where applicable.
14.146 Pedestrian and Cycle Path Infrastructure


O5 Pedestrian and cycle path infrastructure is    S5.1 Consideration is given to existing and future pathway      O5 Complies
                                                                                                                  Existing pathways will be maintained and

Page 135

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS (if code assessable)                       ASSESSMENT

provided –                                       linkages and pathways link to the Local and Regional Cycle    upgraded where required.

   a) to form an integrated component of         Network and to the Priority Infrastructure Plan in Part 15.

        the movement network and the open

        space system;                            S5.2 Direct and accessible linkages are provided into the

   b) to encourage walking and cycling;          site.

   c) to add variety and visual interest;

   d) to conserve street trees, vegetation       S5.3 Pathway and landscape works are provided to a high

        and other significant features;          standard to Council specifications and assessed for

   e) to allow equitable access to public        compliance with local government cycling facility design

        areas and community facilities;          standards.

   f)   with adequate lighting where subject

        to high night time usage;                S5.4 Pathways are provided to cater for shared use and

   g) in locations where there is casual         cater for both commuting and recreational usage and

        surveillance;                            exceed minimum standards.

   h) or widened at potential conflict points;

   i)   to incorporate—

   j)   street tree planting to enhance the

Page 136

SPECIFIC OUTCOMES                                PROBABLE SOLUTIONS (if code assessable)                          ASSESSMENT

        streetscape;

    k) directional signage that is visible

        under all conditions.

O6 Pedestrian and cycle path infrastructure is   S6.1 Pedestrian and cycle path infrastructure is designed        S6.1 Complies
                                                                                                                  Pedestrian and cycle infrastructure exists,
designed and constructed to –                    and constructed –
                                                                                                                  where upgrades are required, they will
    a) provide a stable, smooth surface,             a) in accordance with AUSTROADS Part 14 -
                                                                                                                  comply with the relevant provisions.
        including across driveways, sections             Bicycles, Section 6;

        and joins;                                   b) to comply with local government design standards.

    b) be easily maintained;                         c) to have navigational signs in accordance with

    c) a width and longitudinal gradient to              Council ‘Wayfinding’ signage specifications.

        cater for projected usage, including         d) to incorporate –
        nearby—
                                                         i.      kerb ramps at all intersections and
        i.      high activity nodes;                             designated crossings;

        ii.     public transport;                        ii.     refuge islands on all roads with median

        iii.    centres;                                         strips;

    d) provide clear sight-lines for safe use;           iii.    holding rails for cyclists at the intersection

        e) be free of any obstructions such as                   of trunk collector, subarterial and arterial

Page 137

SPECIFIC OUTCOMES                    PROBABLE SOLUTIONS (if code assessable)                                         ASSESSMENT

     fences, signage and bollards.                        roads that are positioned in accordance

                                                          with – A. Australian Standard 1742.9: 2000

                                                          - Manual of Uniform Traffic Control Devices

                                                          - Bicycle Facilities; and B. AUSTROADS

                                                          Part 14 - Bicycles - Section 9; and C.

                                                          AUSTROADS Part 13 – Pedestrians.

                                     Advisory Note All pathways are considered shared use pathways, which
                                     Cyclists can legally use, unless bicycles are specifically prohibited through
                                     signs or markings (such as in town centres).

Page 138

Table 14-59 — Roads and drainage


SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS (if code assessable)                     ASSESSMENT

14.147 Road and drainage design and construction

O7 Roads and pedestrian and cycle paths are       S7.1 Road planning and design supports the hierarchy and    S7.1 Not Applicable
                                                                                                              No new roads are proposed.
planned and designed to support the hierarchy     functional aspects identified in Sections 2 and 3 of PSP5

and functional aspects identified in Sections 2   Engineering Design Standards – Roads, Drainage and

and 3 of PSP5 Engineering Design Standards        Earthworks; AND

– Roads, Drainage and Earthworks and to           S7.2 Road and pathway planning and design is in             S7.2 Complies
ensure that—                                      accordance with, in order of precedence—                    The proposed pedestrian pathway on site

    a) design and alignment of the roads,                                                                     will comply with the relevant provisions.
                                                      a) Noosa Integrated Local Transport Plan;
        intersections and all associated
                                                      b) Queensland Transport’s Shaping Up;
        works—
                                                      c) Queensland Design Code for Residential Streets;
        i.      provides a safe environment
                                                      d) AUSTROADS Guide to Traffic Engineering
                for all users;
                                                           Practice;
        ii.     is adequate for the design
                                                      e) Sections 2 and 3 of PSP5 Engineering Design
                speed environment;
                                                           Standards – Roads, Drainage and Earthworks; or
        iii.    is adequate for predicted
                                                      f)   the Noosa Cycling and Walking Network
                traffic volumes; and
                                                           Development Plan; OR

Page 139

SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS (if code assessable)                      ASSESSMENT

       iv.    maintains the safe and                g) A combination of the principles in these documents.

              efficient functioning of the               AND
                                                                                                             S7.3 –S7.4 Not Applicable
              road network without the use      S7.3 On-road cycling treatment is utilised to provide safe
                                                                                                             Not proposed as part of this development.
              of traffic signals;               and continuous movement of cyclists along a roadway,

       v.     is compatible with existing       such as—

              roads;                                a) sealed shoulders;

       vi.    is easily maintained by               b) wide kerbside lane;
              Council equipment; and vii.
                                                    c) exclusive or peak period bicycle lane;
              where appropriate, has the
                                                    d) advisory treatments such as Bicycle Awareness
              ability to accommodate public
                                                         Zone;
              transport services;
                                                    e) shared parking / bicycle lane;
  b)    road pavement surfaces—
                                                    f)   contra flow bicycle lane; and
       i.     are durable enough to carry
                                                    g) bus/bicycle lane.
              estimated wheel loads of
                                                S7.4 The provision of bicycle lanes at intersections is
              travelling and parked vehicles;
                                                generally in accordance with AUSTROADS Part 14, section
       ii.    provide for the safe passage
                                                5 and the Manual of Urban Traffic Control Devices
              of vehicles, pedestrians,
                                                (MUTCD) Part 9.
              cyclists, and discharge of

Page 140

SPECIFIC OUTCOMES                              PROBABLE SOLUTIONS (if code assessable)   ASSESSMENT

             stormwater run-off from

             contributing catchments and

             the preservation of all weather

             access;

  c) kerb and channel—

     i.      controls vehicle movement by

             delineating the carriageway

             for all users;

     ii.     conveys road pavement run-

             off to stormwater drainage in a

             manner that allows the road to

             be trafficable in Q100 ARI

             local rainfall events; and

  d) verges and footpaths provide—

     i.      safe access for pedestrians

             and cyclists clear of

             obstructions;

     ii.     an access area for vehicles

Page 141

SPECIFIC OUTCOMES                                   PROBABLE SOLUTIONS (if code assessable)                    ASSESSMENT

                  onto properties;

        iii.      a corridor allocated for

                  services and utilities; and iv.

                  additional amenity for minor

                  roads.

O8 Stormwater drainage infrastructure is            S8.1 Stormwater drainage planning, design and              O8 Complies
                                                                                                               The proposed Stormwater Management
planned, designed and constructed to—               construction is in accordance with Section 4 of PSP5
                                                                                                               Plan complies with the PSP5 Engineering
    a) be accessible, cost effective and            Engineering Design Standards – Roads, Drainage and
                                                                                                               Design Standards – Roads, Drainage &
        easily maintainable;                        Earthworks; AND
                                                                                                               Earthworks and the Queensland Urban
    b) protect downstream capacity;                                                                            Drainage Design Manual.

    c) protect downstream water quality;            S8.2 As Constructed data is submitted in accordance with

                                                    Section 6 of PSP5 Engineering Design Standards – Roads,
    d) maximise on-site stormwater retention
                                                    Drainage and Earthworks; AND
        and retardation; and

    e) convey run-off to stormwater drainage

        in a manner that allows roads to be         S8.3 Stormwater drainage planning, design and

        trafficable in Q100 ARI local rainfall      construction is in accordance with the Queensland Urban

        events.                                     Drainage Design Manual.

Page 142

SPECIFIC OUTCOMES                              PROBABLE SOLUTIONS (if code assessable)                       ASSESSMENT

O9 Roads and stormwater drainage               S9.1 Roads and stormwater drainage infrastructure is          O9 Complies
                                                                                                             The construction of the proposed
infrastructure is constructed—                 constructed in accordance with—
                                                                                                             development will comply with the PSP5
    a) in accordance with appropriate              a) Sections 2, 3 and 4 of PSP5 Engineering Design
                                                                                                             Engineering Design Standards – Roads,
        engineering standards; and                      Standards – Roads, Drainage and Earthworks;          Drainage & Earthworks, the Queensland
    b) to minimise adverse environmental           b) Queensland Design Code for Residential Streets;        Design Code for Residential Streets,

        impacts, including from run-off and                                                                  AUSTRAROADS and the Erosion and
                                                   c) AUSTROADS; or
                                                                                                             sediment control guidelines of Engineers
        erosion.
                                                   d) A combination of the principles in these documents;    Australia (Queensland Division)
                                                        AND

                                               S9.2 Erosion and sediment control measures are designed

                                               and implemented in accordance with the Institution of

                                               Engineers Australia (Queensland Division) Soil Erosion and

                                               Sediment Control - Guidelines for Queensland Construction

                                               Sites.

Environmental Protection


O10 Roads and stormwater drainage              S10.1 Roads and stormwater drainage follow the edge of        S10.1 Complies
                                                                                                             The proposed Stormwater Management
infrastructure are located and aligned so as   existing disturbed areas, or alternatively, these works are
                                                                                                             Plan is based on the Water Sensitive Urban
to—                                            co-located within a combined utility corridor; AND
                                                                                                             Design (WSUD) approach. This approach

Page 143

SPECIFIC OUTCOMES                              PROBABLE SOLUTIONS (if code assessable)                       ASSESSMENT

  a) minimise disturbance to native            S10.2 Roads avoid native vegetation and provide for fauna     minimises negative impacts in the
      vegetation and/or other habitat areas;   underpasses and associated fencing where appropriate;         environment and considers the civil,
                                                                                                             landscape and ecological aspects of the
  b) protect and maintain wildlife corridor    AND
                                                                                                             site when assessing stormwater solutions.
      movements and the safety of native

      fauna;                                   S10.3 Road infrastructure within or adjacent to native

  c) minimise changes to the hydrological      habitat incorporates fences which allow for protected         S10.2- S10.5 Not Applicable

      regime, including drainage patterns,     wildlife movement and controls unrestricted access of         No new roads are proposed. Further, the
                                                                                                             site does not adjoin or contain any native
      run-off and water quality;               domestic cats and dogs; AND
                                                                                                             vegetation.
  d) avoid crossing watercourses, drainage

      lines and wetlands, but where such       S10.4 Native vegetation is protected from clearing or
      crossings are unavoidable, disturbed     construction activities by—
      areas are reinstated and revegetated
                                                   a) clearly marking vegetation to be retained with
      on completion of works; and
                                                       flagging tap;
  e) minimise bulk earthworks.
                                                   b) installing protective fencing around the dripline of

                                                       vegetation; and

                                                   c) ensuring stock piling, storage and vehicle parking

                                                       occur outside the areas of vegetation to be

                                                       retained; AND

Page 144

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS (if code assessable)                       ASSESSMENT

                                                  S10.5 Low impact construction techniques are used around

                                                  areas of vegetation to be retained to minimise interference

                                                  with the vegetation.

O11 Roads and stormwater drainage                 No solution provided                                          O11 Complies

infrastructure is proven to be suitable for its
                                                                                                                Appropriate tests will be performed to the
use prior to Council accepting the dedicated                                                                    stormwater drainage before final
asset                                                                                                           completion.

O12 Alignment of stormwater drainage              S12.1 The location, design and construction of stormwater     O12 Complies

infrastructure is to allow for easy access for    drainage structures is in accordance with Sections 4 and 5
                                                                                                                The proposed Stormwater Management
the ongoing maintenance by Council.               of PSP5, Engineering Design Standards - Roads, Drainage       Plan complies with sections 4 and 5 of the
                                                  and Earthworks; AND                                           PSP5 Engineering Design Standards –
                                                                                                                Roads, Drainage & Earthworks.

                                                  S12.2 Where infrastructure is located on private land an

                                                  easement is dedicated over the infrastructure in accordance

                                                  with Section 4 of PSP 5, Engineering Design Standards –

                                                  Roads, Drainage and Earthworks.

14.148 Frontage works

Page 145

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS (if code assessable)                          ASSESSMENT

O13 Development is provided with external         S13.1 The following infrastructure components already exist      S13.1 Complies
                                                                                                                   The development will comply where
roadworks along the full extent of the frontage   at the frontage of the site or are provided at the developer’s
                                                                                                                   infrastructure is required.
of the site to an appropriate standard having     expense—

regard to the specified function of the road.         a) full width sealed road;

                                                      b) concrete kerb and channel where appropriate;

                                                      c) forming and grading to footpaths;

                                                      d) vehicular kerb and footpath crossings;

                                                      e) a constructed bikeway;

                                                      f)   a constructed footpath;

                                                      g) a constructed carriageway;

                                                      h) required alterations to public utility mains, services

                                                           or installations;

                                                      i)   construction of any required alterations to public

                                                           utility mains, services or installations;

                                                      j)   stormwater drainage works; and

                                                      k) installation of electrical conduits; AND

Page 146

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS (if code assessable)                         ASSESSMENT

                                                   S13.2 Road and drainage design and construction is in

                                                   accordance with Sections 3 and 4 of PSP5 Engineering

                                                   Design Standards – Roads, Drainage and Earthworks.

14.149 Road and rail corridors                                                                                     Not Applicable


14.150 Staged development                                                                                          Not Applicable


14.151 Alterations to services and utilities


O16 Any alterations or repairs to infrastructure   S16.1 Any alterations or repair to infrastructure as a result   S16.1 Complies
                                                                                                                   The development will comply where
as a result of the development are made at no      of the development are completed at the developer’s
                                                                                                                   applicable.
cost to Council.                                   expense.

Page 147

WASTE MANAGEMENT CODE

Table 14-60


SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                              ASSESSMENT

Waste separation

O1 Development that generates several             S1.1 Construction, operational and demolition works are         S.1.1 Complies
                                                                                                                  The proposed development will comply with
classes of waste is designed so waste is          planned and managed in accordance PSP1131; AND
                                                                                                                  PSP1131 as required.
collected, stored and disposed of in a safe and

ecologically sustainable manner.
                                                  S1.2 Adequate area is provided for on-site for the collection   S1.2 – S2.1 Complies
                                                  and separate storage of recyclable, non-recyclable,             The development will comply as required.

O2 Waste storage areas provide for adequate       vegetative and hazardous materials in their specific waste

separation of all recyclable and non-recyclable   streams during construction, operational and demolition

materials.                                        works; AND

                                                  S2.1 Waste storage areas allow for the separate storage of

                                                  different waste materials for reuse or recycling by—

                                                      a) providing sufficient area to store all recyclable

                                                          material and recycling containers required; and

                                                      b) sign posting the types of waste stored.

Page 148

SPECIFIC OUTCOMES                               PROBABLE SOLUTIONS                                             ASSESSMENT

Design and location of waste storage areas

O3 Waste storage areas are located so that      S3.1 Waste storage areas are designed and maintained in        S3.1- S3.3 Complies

they are convenient and safe to use and         accordance with PSP 9; AND
                                                                                                               The refuse storage area will be located at
provide for convenient and safe collection by
                                                                                                               the eastern boundary adjacent to the petrol
service vehicles; AND
                                                S3.2 Waste storage areas are designed and located so           building and will be suitably screened with
                                                they—                                                          barriers and will be set back from adjoining
O4 The location and methods of waste            a) are easily accessed and convenient to use;                  uses, the refuelling forecourt area and
storage minimises any adverse impacts on                                                                       areas of high pedestrian activity.
                                                b) have unobstructed access for the collection of the
adjoining or nearby properties;
                                                     waste by service vehicles;
                                                                                                               Waste collection and fuel delivery vehicles
AND
                                                c) provide for sufficient space for safe entry and exit and    can conveniently access the site, stand
                                                     servicing by Council’s contractor without the need for    wholly within the service bay area whilst
O5 Waste storage areas are designed for              manual handling;                                          undertaking their operations and then exit
ease of maintenance and ease of access for      d) are clear of carparking bays, loading bays and similar      the site in a forward gear.
cleaning; AND                                        areas;

                                                e) are clear of footpaths and pedestrian access;

O6 Waste storage areas provide a safe and       f)   are capable of being serviced by the collection vehicle
secure environment for users through–                without impeding traffic flow; and

Page 149

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                           ASSESSMENT

  a) appropriate siting and access;               g) have a level area provided for the storage of waste and

  b) the provision of lighting; and                   recyclable materials in standard waste containers; AND

  c)   restricting access to the general public
                                                                                                               S3.4 Not Applicable
       by making the area clearly identifiable    S3.3 For uses that do not comprise a caretaker’s residence

       as private space (eg. through              or central management, the maximum distance between          Not    applicable     to   the   proposed
       landscaping, change of paving              waste storage areas and the kerbside is—                     development.
       material or fencing, rather than locking   a) for Multiple housing Type 3 – 40m;
       the area.
                                                  b) for other uses – 70m; and
                                                                                                               S4.1 Complies

                                                  S3.4 Pathways used to transport bins—                        The refuse storage area is in line with the

                                                  a) have a maximum grade of 1:15; and                         main building line and is setback 2m form

                                                  b) are free of steps, stairs or other impediments; AND       the proposed side boundary.




                                                  S4.1 Waste storage areas are—

                                                  a) integrated with the building design, where possible;

                                                  b) setback a minimum of 2m from side and rear property

                                                      boundaries;

Page 150

SPECIFIC OUTCOMES                          PROBABLE SOLUTIONS                                            ASSESSMENT

                                           c) screened so that bins are not visible from neighbouring    S5.1 Complies
                                               properties or passing vehicular and pedestrian traffic;

                                               and

                                           d) not located directly adjacent to dwelling units on the

                                               site on neighbouring properties; AND
                                                                                                         S5.2 Complies


                                           S5.1 Waste storage areas are constructed of impermeable,

                                           durable and non-textured materials and surfaces so that

                                           they are easily cleaned; AND
                                                                                                         O6 Complies


                                                                                                         The refuse storage area will comply with all
                                           S5.2 A minimum distance of 0.5m2 distance is provided
                                                                                                         required standards.
                                           between and around waste storage bins to allow for

                                           manoeuvring and washing of bins. AND



                                           S6.1 No solution provided.



Water management for waste storage areas

Page 151

SPECIFIC OUTCOMES                              PROBABLE SOLUTIONS                                             ASSESSMENT

O7 Waste storage areas are designed to         S7.1 The waste storage area —                                  S7.1 Complies

contain and appropriately dispose of leakage      a) is bunded and graded so that washwater and bin           The proposal will comply where applicable.
from bins and wastewater from bin washing.            leakage are drained to the sewer or an on-site

                                                      effluent disposal system via a gully within the

                                                      storage area;

                                                  b) has a bund wall with a maximum height of 100mm;

                                                  c) is serviced by a conveniently located hosecock and

                                                      backflow prevention device, and connected to a

                                                      water supply; and

                                                  d) is roofed or otherwise covered if the storage area

                                                      is—

                                                      i.      more than 1m2 ; or

                                                      ii.     storing wet waste; or

                                                      iii.    storing other waste with a high potential to

                                                              cause pollution if washed or leaked from

                                                              the bins, including waste oil or putrescibles

Page 152

WATER SENSITIVE DESIGN CODE

Table 14-61


SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                              ASSESSMENT

Water reuse

O1 Development uses a combination of               S1.1 Development complies with the water quality                S1.1 Complies
                                                                                                                   The development complies with water
detention and retention systems to capture         standards in Table 2 of the SEQ Regional Plan
                                                                                                                   quality standards for Water Sensitive Urban
run-off from areas on the site; AND                Implementation Guideline No. 7 for Water Sensitive Urban
                                                                                                                   Design.
                                                   Design;

O2 Water storage devices must have sufficient

capacity having regard to local rainfall pattern   S2.1 No solution provided                                       O2 Complies
                                                                                                                   Will comply where required.
and the catchment area of roof or other hard

standing surface; AND

                                                   S3.1 Captured water is plumbed to be available for all          S3.1- S3.2 Complies

O3 Captured water is utilised for all non-                                                                         Will comply where applicable.
                                                   external uses including gardening, irrigation, ponds, filling
potable uses on site; AND                          swimming pools and outdoor cleaning, as well as all ground

                                                   floor toilet cisterns and washing machine cold taps; AND

Page 153

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                                ASSESSMENT

                                                  S3.2 Where the captured water is used for toilet flushing

                                                  and/or laundry use, an automatic or manual interchange

                                                  device that allows alternate use of captured water or the

                                                  reticulated water supply is installed to ensure that there is a

                                                  continual supply of water for sanitary flushing and laundry

                                                  use.


O4 On-site detention does not adversely                                                                             O4 Complies
                                                  S4.1 No solution provided
impact on water requirements downstream of                                                                          The proposal will comply as required.

the site where the water is required to sustain

the ecology and hydrology of downstream

systems (environmental flows); AND



O5 Within the Shire Business Centre site, as      S5.1 No solution provided                                         05 Not Applicable
                                                                                                                    The site is not within the Shire Business
shown on Map SBC, on-site detention
                                                                                                                    Centre.
measures are contained within the developed

areas of the site, clear of drainage lines and

Open Space Precincts

Page 154

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS                                              ASSESSMENT

Run-off treatment

O6 Run-off that leaves the site is treated so as   S6.1 & S7.1 Development complies with the water quality         S6.1 - S7.1 Complies

not to adversely impact on the ecology and         standards in Table 2 of the SEQ Regional Plan
                                                                                                                   The development complies with water
hydrology of downstream environmental flows;       Implementation Guideline No. 7 for Water Sensitive Urban
                                                                                                                   quality standards for Water Sensitive Urban
AND                                                Design.
                                                                                                                   Design.
O7 Within the Shire Business Centre site, as

shown on Map SBC— a) run-off treatment

occurs within the site ; and b) drainage lines

are only used for final polishing of run-off

Town water supply connections


O8 Backflow devices or similar systems             S8.1 A suitable backflow prevention device is installed to      S8.1 Complies

ensure water reuse facilities have no impact       protect the potable water within the reticulated water supply
                                                                                                                   The   development      will   comply   where
on the quality of the town mains water.            in accordance with AS/NZS 3500:2003 Plumbing and
                                                                                                                   applicable.
                                                   Drainage

Use of natural treatments and systems


O9 Natural treatment strategies, including         S9.1 & S10.1 Development complies with the water quality        S9.1 Complies

grass swales and bio-retention systems,            standards in Table 2 of the SEQ Regional Plan

Page 155

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                         ASSESSMENT

vegetated filtration strips and gross pollutant   Implementation Guideline No. 7 for Water Sensitive Urban   The development complies with water

traps, are used wherever practicable; AND         Design.                                                    quality standards for Water Sensitive Urban

O10 Within the Shire Business Centre, as                                                                     Design.

shown on Map SBC— where necessary,

drainage lines are ecologically enhanced to

ensure that the water quality polishing

functions are of high standard.

Page 156

WATER SUPPLY AND SEWERAGE RETICULATION CODE

Table 14-62 Water Supply


SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS (if code assessable)                      ASSESSMENT

14.164 Design and construction (water)

O1 Water supply infrastructure—                    S1.1 Water supply infrastructure is designed in accordance   S1.1 Complies
                                                                                                                The proposal complies with the best
    a) meets the needs of the users;               with PSP6 – Engineering Design Standards — Water and
                                                                                                                practice techniques as recommended in the
                                                   Sewerage and As Constructed data submitted in
    b) is designed to be compatible with                                                                        PSP6 – Engineering Design Standards —
                                                   accordance with PSP6 – Engineering Design Standards —
        existing infrastructure; and                                                                            Water and Sewerage.
                                                   Water and Sewerage.
    c) is designed using materials that are

        suitable for the use, durable, easy to

        maintain and cost effective, taking into

        account the whole of life cycle cost

        and Council’s maintenance inventory.

O2 Water supply infrastructure is                  S2.1 Water supply infrastructure is constructed in           S2.1- S2.2 Complies

constructed—                                       accordance with PSP6 – Engineering Design Standards —
                                                                                                                The construction drawings will be designed
    a) in accordance with appropriate              Water and Sewerage; AND
                                                                                                                in accordance with the PSP6 – Engineering
        engineering standards; and                                                                              Design Standards — Water and Sewerage

Page 157

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS (if code assessable)                          ASSESSMENT

    b) to minimise adverse environmental           S2.2 Erosion and sediment control measures are designed          and     Erosion       and     sediment          control

        impacts                                    and implemented in accordance with the Institution of            measures       -     Institution    of   Engineers

                                                   Engineers Australia (Queensland Division) Soil Erosion and       Australia     (Queensland           Division)       Soil

                                                   Sediment Control - Guidelines for Queensland Construction        Erosion and Sediment Control - Guidelines

                                                   Sites.                                                           for Queensland Construction Sites.


O3 Water supply infrastructure is proven to be     No solution provided.                                            O3 Complies

suitable for its use prior to Council accepting
                                                                                                                    Appropriate tests will be performed to the
the dedicated asset.
                                                                                                                    water       supply      system       before         final

                                                                                                                    completion.


O4 Water supply infrastructure is provided         No solution provided.                                            O4 Complies

with all supporting technical documentation.
                                                                                                                    All the documentation regarding testing and

                                                                                                                    material quality certificates and standards

                                                                                                                    will be provided to Council for their records.


O5 Where buildings or other structures are in      S5.1 The footing of any building or structure is located clear   O5 Not Applicable

proximity to State or Council’s water supply       of the zone of influence but no closer than 1.5m (measured
                                                                                                                    The     proposed       structures     are     not     in
infrastructure, provision is made to protect the   horizontally) from infrastructure including sewers, water
                                                                                                                    proximity to State or Council’s water supply

Page 158

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS (if code assessable)                           ASSESSMENT

infrastructure from physical damage and to        mains and stormwater structures; AND                              infrastructure.
allow ongoing maintenance by Council.             S5.2 A registered easement in favour of Council is created

                                                  over all underground infrastructure located in private

                                                  property; AND

                                                  S5.3 The width of the easement is the greater of 3m or the

                                                  width of the zone of influence; AND

                                                  S5.4 The easement is centred over the centreline of the

                                                  infrastructure.

O6 Alignment of water supply infrastructure       S6.1 Infrastructure is designed and constructed on the            S6.1 Complies

allows for easy access for the ongoing            preferred alignments in accordance with PSP6 Engineering
                                                                                                                    Construction drawings will be designed in
maintenance by Council.                           Design Standards – Water and Sewerage.
                                                                                                                    accordance with the PSP6 – Engineering

                                                                                                                    Design Standards — Water and Sewerage


O7 Any alterations or repairs to infrastructure   S7.1 Any alterations or repair to infrastructure as a result of   S7.1 Complies

as a result of the development are made at no     the development are completed at the developer’s expense.
                                                                                                                    The developer will accept the responsibility
cost to Council.
                                                                                                                    if external infrastructure is damaged as a

                                                                                                                    result   of       the   construction   of   the

Page 159

 

SPECIFIC OUTCOMES

PROBABLE SOLUTIONS (if code assessable)

ASSESSMENT

 

 

 

 

development.

 

 

Page 160

Table 14-63 Sewerage reticulation


SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS (if code assessable)                       ASSESSMENT

14.165 Design and construction (sewer)

O8 Sewerage reticulation infrastructure—           S8.1 Sewerage reticulation infrastructure is designed in      S8.1 The proposed development complies
                                                                                                                 with PSP6 Engineering Design Standards –
    a) meets the needs of the users;               accordance with PSP6 Engineering Design Standards –
                                                                                                                 Water and Sewerage.
                                                   Water and Sewerage.
    b) is designed to be compatible with

        existing infrastructure; and

    c) is designed using materials that are

        suitable of the use, durable, easy to

        maintain and cost effective, taking into

        account the whole of life cycle cost

        and Council’s maintenance inventory.

O9 Sewerage reticulation infrastructure is         S9.1 Sewerage reticulation infrastructure is constructed in   S9.1 The construction drawings will be

constructed—                                       accordance with PSP6 – Engineering Design Standards —         designed in accordance with the PSP6 –

                                                   Water and Sewerage and As Constructed data submitted in       Engineering Design Standards — Water
    a) in accordance with appropriate
                                                   accordance with PSP6 – Engineering Design Standards —         and Sewerage and Erosion and sediment
        engineering standards; and
                                                   Water and Sewerage; AND                                       control measures - Institution of Engineers
    b) to minimise adverse environmental
                                                                                                                 Australia   (Queensland    Division)   Soil
        impacts                                    S9.2 Erosion and sediment control measures are designed

Page 161

SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS (if code assessable)                       ASSESSMENT

                                                  and implemented in accordance with the Institution of         Erosion and Sediment Control - Guidelines

                                                  Engineers Australia (Queensland Division) Soil Erosion and    for Queensland Construction Sites.

                                                  Sediment Control - Guidelines for Queensland Construction

                                                  Sites

O10 Sewerage reticulation infrastructure is       No solution provided.                                         O10 Appropriate tests will be performed to

proven to be suitable for its use prior to                                                                      the sewer system before final completion.

Council accepting the dedicated asset.

O11 Sewerage reticulation infrastructure is       No solution provided.                                         O11       All the documentation regarding

provided with all supporting technical                                                                          testing and material quality certificates and

documentation.                                                                                                  standards will be provided to Council for

                                                                                                                their records.


O12 Where buildings or other structures are       S12.1 The footing of any structure or building is located     O12 The proposed structures are not in

developed adjacent to Council’s sewerage          clear of the zone of influence but no closer than 1.5m        proximity to State or Council’s sewer

reticulation infrastructure, satisfactory         (measured horizontally) from infrastructure including         reticulation infrastructure.

provision is made to protect the infrastructure   sewers, water mains and stormwater structures; AND

from physical damage and to allow ongoing         S12.2 A registered easement in favour of Council is created
maintenance by Council.                           over all underground infrastructure located in private

Page 162

SPECIFIC OUTCOMES                                  PROBABLE SOLUTIONS (if code assessable)                         ASSESSMENT

                                                   property; AND

                                                   S12.3 The width of the easement is the greater of 3m or the

                                                   width of the zone of influence; AND

                                                   S12.4 The easement is centred over the centreline of the

                                                   infrastructure.

O13 Alignment of sewerage reticulation             S13.1 Infrastructure is constructed on the preferred            O13 The construction drawings will be

infrastructure is to allow for easy access for     alignments in accordance with PSP6 –Engineering Design          designed in accordance with the PSP6 –

the ongoing maintenance by Council.                Standards — Water and Sewerage.                                 Engineering Design Standards — Water

                                                                                                                   and Sewerage


O14 Any alterations or repairs to infrastructure   S14.1 Any alterations or repair to infrastructure as a result   O14     The     developer     accept    the

as a result of the development are made at no      of the development are completed at the developer’s             responsibility if external infrastructure is

cost to Council                                    expense.                                                        damaged as a result of the construction of

                                                                                                                   the development.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.