Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS ASSESSMENT
level from ground level upward;
b) all flood lighting is hooded or baffled to direct
lighting downward or is of a type that gives no
upward component of light when mounted
horizontally;
c) all flood lighting is setback a minimum of–
i. 6m from the boundary to any frontage; and
ii. 2m to any other boundary; and
d) lighting structures are not more than 8m in height.
Environmental Protection
O19 The design, siting and construction of S19.1 Where there is an existing building envelope on the S19.1 Not Applicable
buildings and structures minimise the clearing lot that contains vegetation protection measures, clearing of
of vegetation and where there is an existing native vegetation and building works do not extend beyond
preliminary approval for the property that the building envelope, except for the purposes of a
contains vegetation protection measures, the driveway access; OR
proposal is consistent with those measures.
S19.2 Not Applicable
S19.2 Where there is no building envelope existing on the
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.