Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS ASSESSMENT
excavation works do not result in the construction material or other material or contaminants; The development will comply where
contamination of land. AND applicable
S6.2 The site is not on the contaminated land register.
Haulage activity and amenity
O7 Haulage of material to and from a site No solution provided O7 Complies
ensures—
Will comply as required
a) minimal disturbance to neighbouring
properties and properties along the
haulage route; and
b) Council’s road infrastructure including
pavements is not adversely affected.
O8 Extent of earthworks Earthworks are S8.1 All earthworks, including cut and fill batters, retaining S8.1 Complies
contained within the subject property walls etc are contained within the subject site
The development will comply as required.
Sloping sites Not Applicable
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.