Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS ASSESSMENT
S1.5 A stormwater catchpit incorporating a stormwater
catchpit protection device is installed so that all runoff from
disturbed areas flows to the catchpit; AND
S1.6 For buildings,
a) temporary or permanent downpipes are connected to
the stormwater system before laying the roof; or
b) localised erosion is avoided by directing flow from
downpipes over non-erosive areas.
Stormwater runoff
O2 Stormwater is diverted around disturbed S2.1 Diversion drains or bunds are designed and S2.1- S2.2 Complies
areas. constructed to drain upstream run-off around the disturbed
Diversion drains will be constructed to avoid
site; AND
upstream overland runoff come into the
S2.2 Discharge from the diversion drains do not cause run- disturbed area. In addition, sediment fences
off impacts to other properties; OR will be installed along the low side of the
S2.3 Alternative methods, as described in the Institution of disturbed areas preventing sediment to
Engineers Australia (Queensland Division) Soil Erosion and runoff the site.
Sediment Control - Guidelines for Queensland Construction
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.