Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS ASSESSMENT
c) maximise access to any prevailing
summer breezes; and
d) minimise exposure to prevailing winter
winds.
14.189 Infrastructure
O15 Each lot is capable of being serviced by S15.1 All lots are connected to power supply and S15.1 Complies
All services are available to the subject site.
appropriate levels of— telecommunications services; AND
a) water supply;
b) reticulated sewerage;
c) stormwater drainage;
d) power supply; and
e) telecommunications;
AND
S16.1 Not Applicable
O16 The design and provision of public S16.1 For lots in urban settlements—power supply and
Lots are not for residential development.
services and utilities, including sewerage, communications infrastructure are provided underground;
water, electricity, street lighting and OR
telecommunication services— S16.2 For lots elsewhere—power supply and S16.2 Complies
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.