Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS ASSESSMENT
O7 Waste storage areas are designed to S7.1 The waste storage area — S7.1 Complies
contain and appropriately dispose of leakage a) is bunded and graded so that washwater and bin The proposal will comply where applicable.
from bins and wastewater from bin washing. leakage are drained to the sewer or an on-site
effluent disposal system via a gully within the
storage area;
b) has a bund wall with a maximum height of 100mm;
c) is serviced by a conveniently located hosecock and
backflow prevention device, and connected to a
water supply; and
d) is roofed or otherwise covered if the storage area
is—
i. more than 1m2 ; or
ii. storing wet waste; or
iii. storing other waste with a high potential to
cause pollution if washed or leaked from
the bins, including waste oil or putrescibles
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.