Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS ASSESSMENT
Run-off treatment
O6 Run-off that leaves the site is treated so as S6.1 & S7.1 Development complies with the water quality S6.1 - S7.1 Complies
not to adversely impact on the ecology and standards in Table 2 of the SEQ Regional Plan
The development complies with water
hydrology of downstream environmental flows; Implementation Guideline No. 7 for Water Sensitive Urban
quality standards for Water Sensitive Urban
AND Design.
Design.
O7 Within the Shire Business Centre site, as
shown on Map SBC— a) run-off treatment
occurs within the site ; and b) drainage lines
are only used for final polishing of run-off
Town water supply connections
O8 Backflow devices or similar systems S8.1 A suitable backflow prevention device is installed to S8.1 Complies
ensure water reuse facilities have no impact protect the potable water within the reticulated water supply
The development will comply where
on the quality of the town mains water. in accordance with AS/NZS 3500:2003 Plumbing and
applicable.
Drainage
Use of natural treatments and systems
O9 Natural treatment strategies, including S9.1 & S10.1 Development complies with the water quality S9.1 Complies
grass swales and bio-retention systems, standards in Table 2 of the SEQ Regional Plan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.