Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS ASSESSMENT
Advisory note PSP24 – Effluent Disposal details requirements for the
design and siting of effluent disposal systems where located outside a
sewerage service area.
Compliance with PSP24 will be considered as part of Council’s
assessment of the plumbing and drainage application.
S17.1 Components of the infrastructure that are likely to fail S17.1 Complies
O17 Essential public utilities are available and
The site is not subject to a defined flood
or may result in contamination are—
maintain their function during flood events up event however infrastructure will comply
to a 1% AEP (1:100 year ARI) flood event. a) located above the level of a 1% AEP (1:100 year where required.
ARI) flood event; or
b) designed and constructed to exclude water
inundation or infiltration and resist hydrostatic and
hydrodynamic forces as a result of inundation
Electricity supply infrastructure S18.1 Building footprints are situated clear of any power S18.1 Complies
Buildings and structures are not located on
O18 Uses and works maintain a safe distance easements on-site; AND
any existing easements.
from electrical infrastructure including
substations, overhead power lines, power S18.2 Building footprints are not less than 50m from an S18.1 Complies
poles and transformers. existing fenced electricity substation The proposed building is located more than
50m from the adjoining substation
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.