Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS ASSESSMENT
corridor; and
g) power easements; AND
S26.3 At least 10% of the total open space provision for
active parkland is exclusive of flood inundation below the
1% AEP (1:100 year ARI level or the highest recorded flood
level, whichever is the greatest; AND
S26.4 Recreational facilities (including playgrounds,
pergolas, barbeques etc.) are setback a minimum of 30m
from the top of the bank of any watercourse and 10m from
the top of the bank of any drainage line;
O27 Active parklands will provide a diverse 27.1 Active parkland in all areas except industrial areas will 27.1- 27.2 Not Applicable
The proposed development does not
range of recreational opportunities for all age contain embellishment in accordance with the Priority
include a park or public open space.
groups and are designed as attractive and Infrastructure Plan in Part 15 such as:
enjoyable, functional and safe places to a) children’s play facilities catering for various ages;
recreate and meet.
b) a soft fall surface where required;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.