BUSINESS USES CODE

Table 14-8 For all Business Uses


SPECIFIC OUTCOMES                                 PROBABLE SOLUTIONS                                               ASSESSMENT

14.16 Effects of use

Electricity infrastructure

O18 The development does not adversely            S18.1 No solution provided                                       O18 Complies
                                                                                                                   The development will have no effect on
impact on existing or future electricity supply
                                                                                                                   existing infrastructure.
infrastructure; AND

O19 All uses and works maintain an adequate                                                                        O19 Complies
                                                  S19.1 Development for uses adjacent to or within 50m of an
safe distance from electrical infrastructure                                                                       The proposed service station building,
                                                  existing electricity substation incorporates noise attenuation
including substations, overhead powerlines,                                                                        associated structures and works are an
                                                  measures to mitigate noise impacts; AND
power poles and transformers.                                                                                      adequate distance from the adjoining
                                                                                                                   substation. All relevant measures will be
                                                  S19.2 Buildings and structures (including swimming pools,        taken to ensure that electrical infrastructure

                                                  sheds, tennis courts and outbuildings) are not constructed       will not be compromised.

                                                  under overhead electricity transmission lines, or within

                                                  electricity easements.
Log in to download the original file

Appendix E - Local Code Response.pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.