Original source · versioned page text
Appendix E - Local Code Response
Attached to the e-mail MCU15/0095 & REC15/0022 Traffic report, Code responses, , Meeting notes (3 of 3).
SPECIFIC OUTCOMES PROBABLE SOLUTIONS ASSESSMENT
O16 Within the Shire Business Centre Zone,
the maximum plot ratio for development within
the following precincts is —
a) Precincts B1 and B2 combined- 0.5:1;
b) Precinct B3- 0.8;
c) Precinct E1- 0.6;
d) Precinct E2- 0.6;
e) Precinct E3- 0.6;
f) Precinct E4- 0.6;
g) Precinct E5- 0.6
h) Precinct E6- 0.6;
i) Precinct E7- 0.6;
j) Precinct RES- 0.6; and
k) Precinct REC/MU- 0.1.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.