SPECIFIC OUTCOMES PROBABLE SOLUTIONS ASSESSMENT
and flood free habitable areas; a) for areas where minimum floor levels are available,
b) allow only minor, short term and not less than the specified level;
infrequent flooding of non-habitable b) for areas where flood modelling is available, a
areas; minimum of 500mm above the modelled flood level;
c) ensure drainage does not adversely and
impact upon other premises; and c) for areas where flood modelling is not available, a
d) ensure filling, excavation or retaining minimum of 500mm above the highest known flood
strctures do not adversely impact level; OR
upon other premises by— S2.2 For additions of not more than 50m2 gross floor area
i. causing ponding of water on to an existing building— floor levels of habitable rooms are
the site or nearby land; and ii. not less than the level of other habitable rooms in the
increasing flooding, which building; AND
adversely affects the safety or
use of any land upstream and S2.3- S4.3 Complies
S2.3 Filling, other than for accessways, does not extend
downstream; more than 1m beyond the footprint of any building, The proposal will comply as required.
ii. adversely affecting the flow of measured from outer walls of the building;
water in any overland flow
path; and iv. adversely
S3.1 No solution provided
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.