Original source · versioned page text
OPW22-0251 - DA Form1 & 2 & owners consent
It appears that operational works for the proposed revetment wall and bank stabilisation may impact on marine plants. Under the Planning Regulation 2017, works involving the removal, destruction or damage of marine plants must be undertaken in accordance with the relevant accepted development requirements (ADR) or under a development approval (assessable development). The proposed works may comply with the ADR if the impact to marine plants can meet a prescribed work type. If the works cannot meet a prescribed work type, then a development approval will be required for assessable development that is the removal, destruction or damage of marine plant. Please refer the applicant to DAFs webpage, protection and management of marine plants for more information. Department of Environment and Science (DES) Department of Environment and Science advised that they have no objections to the issue of owners consent. The following additional advice is recommended to be submitted to the proponent for any subsequent development application: e Revetment walls are defined as an erosion control structure and considered as coastal protection works. e Submission of adequate documentation and compliance with the SDAP State code 8 will be a requirement for assessable development under the Planning Act 2016. Please refer to the Guideline: State Development Assessment Provisions, State Code 8: Coastal development and tidal works https://environment.des.qid.gov.au/coastal/development/pdf/state- code8-coastal-development-tidal-works.pdf in responding to State Code 8. The guideline provides background information and key concepts relevant for coastal processes and resources and coastal protection and management applicable to complying with the code. The guideline also contains information on how to respond to particular performance outcomes (PO) and specific information requirements. Revetment walls are generally only supported by the State under Performance Outcome PO11 & PO12 of the State code 8 when there is an imminent threat to significant buildings or infrastructure, and there is no feasible option for either: a. beach nourishment; or b. relocation or abandonment of structures; Revetments differ to other erosion control structures in that they are designed to protect a specific part of land, often defined by lot boundaries and provide a very high certainty of protection. A smooth alignment of revetments along a coastline and riverine system is important to ensure the impact on coastal processes is minimised. The preferred hierarchy of responses to erosion risk applies to revetments just as it does for other erosion control structures. Noosa Shire Council has endorsed a Shoreline Erosion Management Plan (SEMP) that has been supported by DES, the recommendations of that plan are the preferred approach for deciding the location and design of coastal protection works. Please check with Council’s SEMP regarding preferred methodology for erosion control structures along the Noosa River. Although owner's consent for the development or change application has been provided, your client is always required to comply with the purpose, terms and conditions of Term Lease 0/238031 — Lot 164 on CP907410 and undertake works only if and when the development has been approved by the assessment manager or responsible entity, and in accordance with the conditions of that approval. Page 2 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.