Council archive · source document
2026 LGAQ CONFERENCE MOTIONS & COUNCILLOR ATTENDANCE (Referred from the General Committee Meeting dated 7 July 2026 - Item 7.7) · Attachment 8 - Future-proofing Qld's Water Supply
ATTACHMENT 8 2026 LGAQ Annual Conference –
Proposed Motion
Who is the key contact for Cr Amelia Lorentson
this motion?
Submitting council Noosa Council
(required)
Supporting ROC
(if applicable)
Council resolution # NA
(required)
Date of council resolution TBA
(required)
Does this motion have state-wide relevance?
Was this motion suggested by a third party? no
Title of motion (required) Future-proofing Queensland’s Water Supply – A Whole-of Water-
Cycle Approach to Climate Resilience
Motion That the LGAQ call on the Queensland and Federal Governments
(required) to take proactive action to secure long-term urban and regional
water supply by investing in a diverse, climate-resilient, and circular
water portfolio, spanning rainfall-independent sources, water-
sensitive and nature-based measures, and demand-side
management, and to provide dedicated funding and regulatory
reform to enable water utilities and local governments to plan and
deliver diversified water supply solutions before communities reach
crisis point.
What is the desired Governments should fund proactive water security planning in high-
outcome sought? risk communities, provide capital co-investment for diversified
(required) 200-word limit supply infrastructure, and require long-term planning in
communities vulnerable to drought and climate change. The time to
act is now - before the next crisis, not during it.
Background Queensland’s track record shows that by the time water crises hit -
(required) 350-word limit towns on Level 5 restrictions, communities carting water by truck -
the cost of response is vastly greater than the cost of preparation.
A drying and more variable climate demands that we act before the
next crisis, not during it. Local governments and water utilities are
on the front line but cannot plan and invest at the scale required
without State and Federal partnership.
A whole-of-water-cycle approach is needed across three areas:
1. Rainfall-independent supply - including purified recycled water
and aquifer recharge. These sources are drought-proof and already
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
2
proven in Perth and over 35 cities worldwide yet face regulatory
and funding barriers in Queensland that must be removed.
2. Water-sensitive and nature-based measures - including
stormwater harvesting, catchment-based nature-based solutions,
and recycled water for irrigation. These complement traditional
infrastructure and reduce pressure on drinking water supplies,
particularly in areas where local conditions favour distributed
solutions.
3. Demand-side management - including water efficiency and on-
site household rainwater capture. Reform to the Building Act and
Queensland Development Code should allow local planning
schemes to set localised demand-side requirements, such as
mandatory rainwater tanks, as allowable alternative building
provisions, removing the lengthy net-benefit Ministerial application
process so councils can opt in as of right.
Case study/ Example
(optional) 350-word limit
June 26
Wilson Crawley
Used in these records
2026 LGAQ CONFERENCE MOTIONS & COUNCILLOR ATTENDANCE (Referred from the General Committee Meeting dated 7 July 2026 - Item 7.7) · Attachment 8 - Future-proofing Qld's Water SupplyAttachmentsMeeting 964 · read item & discussion ↗
2026 LGAQ CONFERENCE MOTIONS & COUNCILLOR ATTENDANCE · Attachment 8 - Future-proofing Qld's Water SupplyAttachmentsMeeting 953 · read item & discussion ↗
About this file
- File size
- 189 KB (small file)
- File type
No other editions are linked here.