INTEGRATED PLANNING ACT 1997

Operational works in a tidal area or
coastal management district

For more information refer to Guide 18. For more
information about prescribed tidal work in local
government tidal areas refer to Guide 24,

Unless you answered “none of the above" to Q9, the
application requires assessment by the
Environmental Protection Agency (EPA).

if an agency other than EPA is the assessment
manager for the application, EPA is a concurrence
agency for the application in relation to this matter.
Local government is the assessment manager for all
prescribed tidal work,

IDAS Assessment Checklist, Version 17.0, 2 October 2006

9. The application involves operational work that is: ( tick the applicable box/es)

Ow

Dit
O iii)

(iv)

tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; Or

tidal work that is prescribed tidal work" other than in a canal’2 -complete Part P of Form 1; OF

carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) to {i) below are ticked.

[1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

constructing a canal’? intended to be connected to tida! waters;

constructing an artificial waterway;

reclaiming land under tidal water;

disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;

draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

constructing a bank or bund wall to establish a ponded pasture on land, oth
than State coastal land, above high-water mark; or

none of the above.

OD)
Oo)
O@
Oe
Of
Ov)

O(n)
Oi)

 

Operational work below high water
mark

For more information refer to Guide 18. For more
information about prescribed tidal work in local
government tidal areas refer to Guide 24.

Unless you answered “none of the above" to Q10,
the application triggers referral to Queensland
Transport (OT) {Maritime Safety Qid) as a
concurrence agency.

Local government is the assessment manager for all
Prescribed tidal work.

10, The application involves operational work that is: ( tick the applicable box/es)

Ov

tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

OO (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; oF
CO (iii) carried out within a coastal management district'® under the Coastal Act and for -

Riv)

Oa)

disposing of dredge spoil or other solid waste material in tidal water - complete Part
Mof Form 1;

reclaiming land under tidal water - complete Part M of Form 1; or

constructing a canal'®, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;

none of the above.

 

Coastal management

For more information refer to Guide 18.

Unless you answered “none of the above" to Q11,
the application requires assessment by the
Environmental Protection Agency (EPA).

if an agency other than EPA is the assessment
manager for the application, EPA is a concurrence
agency for the application in relation to this matter.

 

 

11.

The application involves: (tick the applicable box/es)

Oi
O (i)

O iii
Ot)
i)

a material change of use assessable under a planning scheme involving operation
work carried out completely or partly in a coastal management district!

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -

« the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?

reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

reconfiguring a lot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canal'® - complete Part M of Form 1

none of the above

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastaf Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Cana! means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regutation 2003 and includes certain tidal works completely or partly within a local government lidal area.

15 Coastal management district is defined in sch 10 of the IPA and maans a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

16 Canal means canal as defined under the Coastal Protection and Management Act 1995

17 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning schame against which the application is being assessed.

18 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the Operational works to construct the artificial waterway.

Page 4

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_2361 - MCU Multiple Housing Type 2 Duplex [As Published].pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.