06/2361 - MCU Multiple Housing Type 2 Duplex [As Published] · 132006.2361
INTEGRATED PLANNING ACT 1997
Fisheries matters
For more information refer to schedule 2of the [P
Regulation.
Unless you answered “none of the above" to Q21,
the application requires assessment by the
Department of Primary Industries and Fisheries
(DPIaF).
lf an agency other than DPI&F is the assessment
manager for the application, DPI&F is a concurrence
agency for the application in retation to itams (i} -
(iv) and an advice agency in relation to item (v).
21.
IDAS Assessment Checklist, Version 17.0, 2 October 2006
The application involves: (tick the applicable box/es)
CI(i) anassessable material change of use for aquaculture - complete Part 0; of Form 1;
[1 (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;
O (ii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;
[1 (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
L(y) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
EX] (vi) none of the above.
Integration of land use and public
transport
For more information refer to Guide 23, schedule 8A
of the PA, & schedule 2 of the IP Regulation,
Unless you answered ‘none of the above’, the
application triggers referral to QT as a concurrence
agency,
Railway safety and efficiency
For more information refer to Guide 23, schedule 8A
of the [PA & schedule 2 of the iP Regulation.
Unless you answered ‘none of the above’, the
application triggers referral to QT as a concurrence
agency,
22. The application involves: (tick the applicable box/es)—
C (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
(2 (ii) reconfiguring a tot—
(1 (a) onland that is completely or partly within a public transport corridor, and the
total number of lots increases;
(1 (b) _ onland that is completely or partly within a future public transport corridor or
an airport's public safety area;
[J (c) _ onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
(1d) _ for aresidential purpose within the 25 ANEF contour for an airport;
Le) _ for aresidential purpose resulting in 100 or more allotments.
O (it) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
(0 (a) __ is completely or partly within a public transport corridor or a future public
transport corridor;
(1 (b) _ will result in work that encroaches into an airport's operational airspace.
EX] (iv) none of the above.
23. The application involves: (tick the applicable box/es)—
Ci (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
O (ii) reconfiguring a lot—
(J (@)__ on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
[1 (b) _ on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m2 or
greater;
CJ (c) on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
[0 (d) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
Ce) onland that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(0 (f) _ for aresidential purpose resulting in 100 or more allotments.
C (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in {ii)
above, involving extracting, excavating or filling greater than 50mS, on land that—
C1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) is completely or partly within future railway land, or a railway tunnel easement;
(1 (©) _— abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
EX] (iv) none of the above.
Page7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2361 - MCU Multiple Housing Type 2 Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.