Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2022-01-17 General Committee Meeting Agenda

of 72

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


         General Committee
              Meeting


             Monday, 17 January 2022

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2022-01-17 General Committee Meeting Agenda(PDF, 5MB).pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 71 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                   17 JANUARY 2022


TABLE OF CONTENTS

ITEM                                                                         PAGE

1      ATTENDANCE & APOLOGIES                                                    3

2      CONFIRMATION OF MINUTES                                                   3

3      PRESENTATIONS                                                             3

4      DEPUTATIONS                                                               3

5      ITEMS REFERRED FROM COMMITTEES                                            3

6      REPORTS DIRECT TO GENERAL COMMITTEE                                       4

       1.   CONTRACT NO. T000056 – CLEANING NSC BUILDINGS AND FACILITIES -
            TENDER AWARD                                                          4

       2.   MCU20/0143.01 & OPW20/0230.01 – APPLICATION FOR AN OTHER CHANGE TO
            DEVELOPMENT APPROVAL FOR DUAL OCCUPANCY AND ASSOCIATED
            OPERATIONAL WORKS TO INCLUDE SHORT - TERM ACCOMMODATION AT 6
            ANGLER ST, NOOSA HEADS                                           12

       3.   MCU19/0054 - PLANNING & ENVIRONMENT COURT APPEAL NO. 476 OF 2020 –
            REFUSAL OF APPLICATION FOR MATERIAL CHANGE OF USE FOR A MIXED
            USE COMMERCIAL DEVELOPMENT SITUATED AT 2-18 & 20 HOFMANN DRIVE,
            NOOSAVILLE                                                       24

       4.   FINANCIAL PERFORMANCE REPORT – DECEMBER 2021                        31

       5.   BUDGET REVIEW 2 (BR2) FOR THE 2021/22 FINANCIAL YEAR                45

       6.   2021 COMMUNITY SATISFACTION SURVEY RESULTS                          64

7      CLOSED SESSION                                                     72




                                                                       Page 2 of 72

Section 3

GENERAL COMMITTEE MEETING AGENDA                                      17 JANUARY 2022


1   ATTENDANCE & APOLOGIES




2   CONFIRMATION OF MINUTES

    The Minutes of the General Committee Meeting held on 13 December 2021 be received and
    confirmed.




3   PRESENTATIONS

    Nil.




4   DEPUTATIONS

    Nil.




5   ITEMS REFERRED FROM COMMITTEES

    Nil.




                                                                            Page 3 of 72

Section 4

GENERAL COMMITTEE MEETING AGENDA                                                    17 JANUARY 2022


6       REPORTS DIRECT TO GENERAL COMMITTEE


1.      CONTRACT NO. T000056 – CLEANING NSC BUILDINGS AND FACILITIES - TENDER
        AWARD

Author               Buildings and Facilities Coordinator, Chris Steel
                     Infrastructure Services Department

Index                ECM / Subject / Contracting / Council Properties
                     ECM / Project & Contract / T000056 Cleaning NSC Buildings & Facilities /
                     Reports to Council

Attachments          1.   Separable Portion 1 Evaluation
                     2.   Separable Portion 2 Evaluation
                     3.   Separable Portion 3 Evaluation

EXECUTIVE SUMMARY
This report provides a tender evaluation summary and recommendation for the tender award for
the external supply of cleaning services to Noosa Shire Council (NSC) Buildings and Facilities.
Council outsources cleaning services for its buildings and facilities. The current contract expired
on 19 June 2021; however, a rolling 30-day extension was granted while Council went to market
(tender) for a new agreement.
In accordance with Council’s procurement policy and procedure, an Invitation to Tender (tender)
was undertaken and attracted eighteen conforming (18) responses. Following a detailed
assessment by the evaluation panel it is proposed to award the contract for a one (1) year period,
from 31 January 2022, with a potential further three (3) terms of 12 months each, subject to the
contractor’s satisfactory performance.
The tender evaluation panel completed the evaluation process and consider Ecovia (R&R
McKindlay Trust) to be the most advantageous to Council, presenting the best value for money.

RECOMMENDATION
That Council note the report by the Buildings and Facilities Coordinator to the General Committee
Meeting dated 17 January 2022 and
A.      Award Contract T000056 Separable Portions 1, 2 and 3 for the provision of Cleaning NSC
        Buildings and Facilities to Ecovia (R&R McKindlay Trust) for a period of one (1) year
        commencing 31 January 2022; and
B.      Subject to satisfactory performance by Ecovia (R&R McKindlay Trust), authorise the CEO to
        approve each option to extend the contract upon expiry, with the availability of a total of three
        (3) extension options of up to 12 months each.

REPORT
1.      Background
Council’s historical expenditure for cleaning services is as follows:
     Calendar Year          Total Expenditure(excluding GST)
     2017/18                                       $ 127,241.50
     2018/19                                       $ 141,806.00
     2019/20                                       $ 162,490.00
     2020/21                                       $ 178,876.76

                                                                                           Page 4 of 72

Section 5

GENERAL COMMITTEE MEETING AGENDA                                                 17 JANUARY 2022


The current contract for cleaning maintenance (separable portions) is held by two separate
contractors (Contract No. 1617T097) which expired 19 June 2021; however, a rolling 30-day
extension was granted while Council went to market (tender) for the new agreement.
2.       Tender Process
In accordance with Part 3 of the Local Government Regulations and Council’s Procurement Policy,
Council invited written tenders for the provision of cleaning services under the following three (3)
separable portions:
•        Separable Portion 1 – Tewantin Administration Building, Doonella House, Pelican Place and
         Noosa Regional Art Gallery.
•        Separable Portion 2 – Noosaville Depot and Pomona Depot.
•        Separable Portion 3 – Waste Transfer Stations (Eumundi, Cooroy and Pomona).
Council invited written tenders via Council’s VendorPanel e-portal on 18 August 2021 and
advertised the tender within the Noosa Today publication on 20 August 2021. The tender closed
on 9 September 2021 with 18 conforming submissions received.
The tender was issued as a lump sum contract for all cleaning requirements, and a schedule of
rates was also included for tenderers to provide rates for additional works as may be required from
time to time, including consumables.
The tender identified that a contract would be established for an initial contract term of one (1)
year, plus three (3) extension options of up to twelve (12) months each, at Council’s sole discretion.
3.       Tender Assessment
The tender evaluation panel undertook an assessment of the following conforming submissions,
listed in alphabetical order, and in accordance with the tendered Separable Portion:
                                                 Separable         Separable           Separable
    Tenderers
                                                 Portion 1         Portion 2           Portion 3
    A Cleaner World                                 ✓                  ✓                   ✓
    Achieve Corporate Services                      ✓                  ✓                   ✓
    Advanced National Services                      ✓                  ✓                   ✓
    B2B Commercial Cleaning                         ✓                  ✓                   ✓
    Biniris (Aust.) Pty Ltd                         ✓                  ✓                   ✓
    CMBM Facility Services Pty Limited              ✓                  ✓                   ✓

    Command 51 Pty Ltd                              ✓                  ✓                   ✓
    DW Commercial Cleaning Services                 ✓                  ✓                   ✓

    Ecovia (R&R McKindlay Trust)                    ✓                  ✓                   ✓
    Hyperclean Services Pty Ltd                     ✓                  ✓                   ✓
    Pickwick Integrated Facilities Services         ✓                  ✓                   ✓

    Quad Services Pty Ltd                           ✓                  ✓                   ✓
    Quality Commercial Cleaning Pty Ltd             ✓                  ✓                   ✓

    SKG Cleaning Services Pty Ltd                   ✓                  ✓                   ✓
    Southern Cross Facilities Services Pty Ltd      ✓                  ✓

    Spick & Span Commercial Property                ✓                  ✓                   ✓
    Maintenance
    Total Building Maintenance Queensland           ✓                  ✓                   ✓




                                                                                        Page 5 of 72

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                17 JANUARY 2022


One additional submission was received and assessed as non-conforming and was not
considered, with another tenderer withdrawing their conforming submission during the evaluation
process.
The conforming submissions were evaluated against the following evaluation criteria and
weightings, using Council’s Weighted Attribute Evaluation spreadsheet.
 Criteria                                                                       Weighting
 Capability & Resourcing                                                           10%
 Contract Experience & Capacity                                                    10%
 Methodology                                                                       10%
 Quality                                                                           10%
 Health & Safety                                                                    5%
 Environment & Sustainability                                                       5%
 Contribution to Local Economy                                                     10%
 Price                                                                             40%

Note: Attachments 1, 2 and 3 present the evaluation outcome of the conforming submissions
against the above criteria.
The tender sought a schedule of rates for preventative maintenance, including COVID-19 cleaning
requirements, across all of Council’s facilities performed on an ad-hoc, monthly, quarterly or annual
basis; plus a schedule of rates for consumables. Additionally, tenderers were required to nominate
the number of hours and staff dedicated to complete the servicing each year.
A pricing scenario (excluding consumables) was applied to evaluate the respondent’s annual lump
sum pricing submission and schedule of rates, based on Council’s current cleaning services of
Noosa Shire Council Buildings and Facilities.
                                                                       Estimated Quantity Applied
 Separable Portion 1                             Pricing included
                                                                              (per annum)
                                                     Lump Sum                       1
                                                   Carpet Steam                     1
 Tewantin Administration Building
                                                   Cobweb Clean                     4
                                                   Window Clean                     1
                                                     Lump Sum                       1
 Pelican Place
                                                   Carpet Steam                     1
                                                     Lump Sum                       1
 Doonella House
                                                   Carpet Steam                     1
                                                     Lump Sum                       1
 Noosa Regional Art Gallery
                                                    Buff & Polish                  10
                                                                       Estimated Quantity Applied
 Separable Portion 2                             Pricing included
                                                                              (per annum)
                                                    Lump Sum                        1
                                                   Carpet Steam                     1
 Noosaville Depot
                                                   Cobweb Clean                     4
                                                   Window Clean                     1
                                                    Lump Sum                        1
 Pomona Depot
                                                   Cobweb Clean                     4
                                                                       Estimated Quantity Applied
 Separable Portion 3                             Pricing included
                                                                              (per annum)
 Waste Transfer Stations                             Lump Sum                        1
    - Eumundi
    - Cooroy
                                                   Cobweb Clean                      4
    - Pomona

                                                                                         Page 6 of 72

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                      17 JANUARY 2022


While the above pricing evaluation reflects the lump sum value of the contract, consumables were
requested as a Schedule of Rates.
The tender evaluation panel completed the evaluation process and consider Ecovia (R&R
McKindlay Trust) to be the most advantageous to Council, presenting the best value for money
across all three (3) separable portions.
Ecovia (R&R McKindlay Trust) tender submission is most favourable based on their tender
demonstrating the following:
•        High level of experience and capability to provide cleaning maintenance to Noosa Shire
         Council buildings and facilities.
•        Adequate resourcing with an acceptable quantity of hours and staff nominated (dedicated)
         to perform the services.
•        A detailed methodology demonstrating their understanding of the scope.
•        Contribution to the local economy with the business based in the Noosa Shire.
•        Very good ability to meet environmental requirements, including the implementation of
         company-directed environmental initiatives and performance targets; and the provision of
         Material Data Sheets meeting Council’s requirement for day-to-day requirements and
         COVID-19 cleaning requirements.
•        Overall best value for money benefit for Council.
4.       Next Steps
Once awarded, the contract will commence 31 January 2022.
Previous Council Consideration
Nil
Finance
The cleaning services contractor will be engaged under a lump sum contract, and a schedule of
rates for the provision of additional works as may be required from time to time, including
consumables. It is anticipated that expenditure under this contract will be approximately $175,000
(excluding GST) per year.
Risks & Opportunities
    Safety Risks                                       Mitigation
    The contractor fails to ensure the work is         Prior to commencement of services, Ecovia (R&R
    conducted safely and in accordance with minimum    McKindlay Trust) management plans, Safe Work
    standards.                                         Method Statements, Job Hazard Analysis (or
                                                       similar) and other documentation will be submitted,
                                                       reviewed, and accepted by Council.
                                                       Council will undertake surveillance, regular safety
                                                       audits and inspections throughout the construction
                                                       period.
    Resource Risks                                     Mitigation
    Quality, safety, and service are affected due to   Ecovia (R&R McKindlay Trust) have nominated a
    resource shortages.                                highly capable team for this project and can add
                                                       additional and appropriately skilled resources as
                                                       required.
                                                       Council can engage the services of other cleaning
                                                       contractors in the event of Ecovia (R&R McKindlay
                                                       Trust) is unable to supply services. Council will
                                                       regularly monitor and review the services as per
                                                       the conditions of contract.

                                                                                             Page 7 of 72

Section 8

GENERAL COMMITTEE MEETING AGENDA                                                    17 JANUARY 2022


Consultation
External Consultation - Community & Stakeholder
Nil

Internal Consultation
Corporate Services (Procurement), Infrastructure Services (Building & Facilities), and Executive
Services (Customer Service & People and Culture – Workplace Health & Safety).

Departments/Sections Consulted:

      Chief Executive Officer       Community Services                      X   Corporate Services
      Executive Support             Director                                    Director
                                    Community Development                       Financial Services
                                    Community Facilities                        Fleet
                                    Libraries & Galleries                       ICT
                                    Local Laws                              X   Procurement
                                    Waste & Environmental Health                Property
                                                                                Revenue Services

 X    Executive Services            Environment & Sustainable Development   X   Infrastructure Services
      Director                      Director                                X   Director
      Community Engagement          Building & Plumbing Services                Asset Management
 X    Customer Service              Development Assessment                  X   Buildings and Facilities
      Governance                    Economic Development                        Civil Operations
 X    People and Culture (Safety)   Environmental Services                      Disaster Management
                                    Strategic Land Use Planning                 Infrastructure Planning,
                                                                                Design and Delivery




                                                                                             Page 8 of 72

Section 9

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022


 ATTACHMENT 1




                                       Page 9 of 72

GENERAL COMMITTEE MEETING AGENDA               17 JANUARY 2022

    ATTACHMENT 1
                                                                   Final Evaluation

      NOOSA SHIRE COUNCIL Weighted Attribute Evaluation Spreadsheet - Final Evaluation
                  Gesning of NSC Buildings & Facilities
| omametns      fm
    ——                    (excl of GST)
     2 [Totml Building Maintenance-Queensiand 098.420)
     a
         Commercial P
     7 [Sines [Aust
     8 [QuaityCommercaiOesning Ptyltc
     9 |QuedSenacesPtyits 5822 888       Free + Suoeetted onnaa! Sati ac memetooier
        [REA Mckomciey Trust) 5888858
     11/828 CommercelCesnms 580.887]
    42 |HypersiennServicesPtyitd 0 8
    13 |5kG Cleaning Services Prytts 5 1
    14 |ACesner Works        86,780
    AS |CMBM Faciity Services PtyLtes 52S
    16 |Pictweck integrates Facies Services 5356.86
     7
      SS          =         SSE SEES Sle                                                          S-E-E eee
                                                    ITTSIOa ea
                                                                                                             A Geaner Works

     Sao       Se ee                                        SSS ESE ESE                                               | =~ | = | oe | o | ae
     capacity Resourcing =|                                                                  EEE ESSE
     em            ew ee | | ew |       | om | me | ow | | | | om | ef ew | iw | | | om | om | om | ow | om | | om | es | om | ow | ow | | sm | | om | | om |
                 pom fee | cs | os | owe | oo | ew | | em | & | ew | & | ew | s | eo | s | so | = | om] s | peso | = | so | = | eo [| « | eo {| = |e |e | ew | x |
     pee      | | | om | ws | om | os | om | res | am | we | om | oo | oe | mes | aw | os | os | oo | om | | om | om | om | oo | oe | om | om | os | oe | oo | oe | os | om | os | 20 |
                                                                                      ee ee ee ee ee ee ee
                    ee   = | os | as | se | es | es | ms | sm | mes | om | ms | om | ms | cs | os | em | | ome | | ef ms | ee | oe | es | ne | os | oe |
       Techmacal Score

                                                    —————————_—                                                           —_—_—__—__—
                         ms                                                                                  AGeaner Works
      Average Fees (Pav) $__          eee ee eee eee
       Fees (Pc)        a
      Price Score
      Normalised Price Score (Pn} pe |      pos | eT                                     po   |      | Ce Te             pos |
      Weighted Price Score (Pw)

                ee ee                     ee    =
                                                   and weightings
           Assesment Panel Member 2
                                                |___ Contract Administrator's signature: | a/Delivery Coordinator, Infrastructure Services |

                                                     Page 9 of 72

Section 10

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022


 ATTACHMENT 2




                                      Page 10 of 72

GENERAL COMMITTEE MEETING AGENDA                17 JANUARY 2022

     ATTACHMENT 2
                                                                     Final Evaluation

       NOOSA SHIRE COUNCIL Weighted Attribute Evaluation Spreadsheet - Final Evaluation
     a
                   rooooss
     pfcmemeeenemn |       (exci of GST}
      12 [Commands1 Pty Lid —————
         REA Mckinley Trust)
       ine tg tetas Gene     fa
       aed Retna Se      | —— srry        Price + Suteeed anewel coety’ no conmaabler
      30 |Ravances Wationalserdaes
       Spi B Spun Commancl Propo Wseaansnss | si
      n Cees Sendces Pay lid
                          —
       [OW Commercial Clewsity Services 00883382]
      [Pickwick tntegreted Faciities Servers 00 T585.955]
     SS             =       SEE ES-ES                               ES EPS                    e- Eee             e- Ele               7
                                                                                      —_—_—_—_——

      Soo        pe         pe pe pee pe ee ep pe                   pee pe       pepe pee pepe peep e te pete pepe pepe pe
       capabitey & Resourcing =
       eee                  |   | ow | ee le ow fe      ow     ee   fo    | ee | co     ew i | ow               fe      fw | | el     |
                  terme) © | om | w | sm | ow | om | @ | om | ow | co] ow | om] | ow | | | | | | co] | om | | | ew | ow i | cw | | | |   |
                Le ms | ome | os | am | ws | ee | ow | om | os | cw | os | se | es | ow | os | om | os | ame | | seo | ms | ome | os | oe | me | om | os | oe | | es | ws | oe | os | oe |
       enemas sunananany | | | om | we | om | ow | aw | mw | so | ow | sm] mo | rm | o@ | om | oo | ow | o@ | ow | @ | sm | oo | cm | o | am | oo | om | @ [oo | o | am | oo | oo | o | om |
       conitriontoicaitonomy | aow | tw | sso | ees | ce | ms | a | os | oo | oo | am | ws | ss | us | os | co | om | as | ss | sas | ses | os | ss | wm | om | i | to | as | oss | os | om | us | oe | ms | ae |

                                     ee ee                                           Se eg ae] oa               ae   | ceningryisd | Cooning serees | oct eraces
       Total Fees {Pc}    a       a a                                   i                        a
            |
       Price Score                               cc
       Normalised Price Score (Pn)
          ‘Price Score (Pw)

pAceemetranet ete                                preemies |
  | cement Panel Member? | A Buiiding & Facilities Coordinator, Infrastructure Services |
 | Attesment Panel Members | Caistomer Service Manager, Executive Services |
       [|   ttesment Pane Memberds | Workplace Health and Safety Adviser, Executive Services |

                                                      Page 10 of 72

Section 11

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022


 ATTACHMENT 3




                                      Page 11 of 72

GENERAL COMMITTEE MEETING AGENDA                 17 JANUARY 2022

  ATTACHMENT 3

                                                                   Fina! Evaluation

    NOOSA SHIRE COUNCIL Weighted Attribute Evaluation Spreadsheet - Final Evaluation
              ees              UU
  pe feemrsn              {excl of GST)
    CMBM Fi Services Pty Umited
    —— pd ———
   7|Biniris(Aust) Pyles Cd
        jf              PCS 163}
                                           Price dows not include cost: of corummabies
    Guatty Cone cal Cea eT

                                                                          Hyperclean Services                Quad Services Pty Lid
                                        Services

        ee                                                                                                          |  | se |
    ee) nw ee wm                           se fs | ee | | te | | om | | em | | oe | ms | oe | om | | oe  | ow  |       low | oo | |  |
    Se) = ee                               tm  es fae | | te | |      | cw | | ee | | | cw |      | cw i | cw | | me | | om | i | cw | | oe
    eee                  = |e | ws | aw | os | sm | es | nee | aes | nee | | om | ces | om | | om | me | om | os | om | ces | oe |e | oe | ms | ome | es | om | wm | me | es | oe |
    eee) 3 | ee                          eo ee                 | me    | | ow | ee  |  |      | |        eo ef oe |              |   |
     eeemrerewene   ae) as | cw |e |e | ms | se |e | see | ms | ow | me | om | me | ow | we | om | | om | oss | oe | nos | see | os | cs | | ome | ss | sm | es | nee | ms | ae |
                   ee, se Te                     ce     se  i      i      i      i le                  le      ce   ie     ls      ls

                        a a                   a             i                                                wen Services Pry Ltd | es peseety |
                                                                                                                           a a      a aT
    Total Fees (Pc)
    | Awerage Fees (Pav) $—....eecccseee
    Price Score            a
    Nermaied Price Score (Pn)
    Weighted Price Score (Pw)

———               EE                    eee       The Contract Administrator covfirms the above scores
      a                     (Delivery | _—_—AfDelivery Coordinator, Infrastructure Serves | infrastructure Services end weightings of this evaluation
 ———————

                                                    Page 11 of 72

Section 12

GENERAL COMMITTEE MEETING AGENDA                                                 17 JANUARY 2022


2.      MCU20/0143.01 & OPW20/0230.01 – APPLICATION FOR AN OTHER CHANGE TO
        DEVELOPMENT APPROVAL FOR DUAL OCCUPANCY AND ASSOCIATED
        OPERATIONAL WORKS TO INCLUDE SHORT - TERM ACCOMMODATION AT 6
        ANGLER ST, NOOSA HEADS

Author                 Development Planner, Will Koschade
                       Environment and Sustainable Development Department

Index                  ECM/ Application/ MCU20/0143.01

Attachments            Nil


     APPLICATION DETAILS

     Applicant                     The Macky Group Pty Ltd

     Proposal                      Other Change to a combined Approval for Dual Occupancy and
                                   Associated Operational Works to include Short-Term Accommodation

     Properly Made Date            25 August 2021

     Information Request Date      17 September 2021

     Information Response Date     16 November 2021

     Decision Due Date             8 February 2022

     Number of Submissions         29 Properly Made

     PROPERTY DETAILS

     Property Address              6 Angler St Noosa Heads Qld 4567

     RP Description                Lot 30 RP 92522

     Land Area                     607m2

     Existing Use of Land          Dual Occupancy under construction

     STATUTORY DETAILS

     SEQRP Designation             Urban Footprint

     Zone                          Medium Density Residential

     Precinct                      Not applicable
     Local Plan Area               Noosa Heads

     Overlays                      Not applicable

     Assessment Type               Other Change to Approval Impact

EXECUTIVE SUMMARY
This application seeks approval to permit the use of an approved dual occupancy (currently under
construction) for short term accommodation. The application is recommended for refusal as the
proposal would further erode the permanent housing and diversity of housing types in the area and
there is no need for additional accommodation for visitors to the area. The proposal is contrary to
the scheme’s requirements to maintain the area as predominantly home to permanent residents,
and the use is not proposed within a well-established resort or holiday units and has the potential
to impact on the amenity of permanent residents.

                                                                                      Page 12 of 72

Section 13

GENERAL COMMITTEE MEETING AGENDA                                                 17 JANUARY 2022


RECOMMENDATION
That Council note the report by the Development Planner, to the General Committee Meeting dated
17 January 2022 regarding Application No. MCU20/0143.01 & OPW20/0230.01 for an Other
Change to a Development Permit for Dual Occupancy and Associated Operational Works to
include Short-Term Accommodation, situated at 6 Angler St Noosa Heads and:
A.    Refuse the application for the following reasons:
      1.    The proposal is not consistent with 3.2.4 Housing to meet diverse needs of the
            community and 3.3.3 Housing Choice (n) of the Strategic Framework, as it will further
            erode the dwelling units available for permanent housing in the area, impacting
            permanent resident amenity.
      2.    The proposal is not consistent with 7.2.2.2 Purpose and Overall Outcome (2)(o), (p)
            and (u) and Performance Outcome PO2 of the Noosa Heads Local Plan Code as:
            a)    The proposal will contribute to the erosion of diversity in housing types in the
                  area.
            b)    Additional visitor accommodation in the area is likely to result in detrimental
                  impacts on the residential neighbourhood and amenity of permanent residents.
      3.    The proposal is not consistent with 6.3.2.2 Purpose and Overall Outcomes (2)(a) and
            (h) of the Medium Density Residential Zone Code as:
            a)    The proposal is located in medium density residential neighbourhood that is
                  predominantly used for short term accommodation. The introduction of additional
                  short term accommodation within a duplex unit is not consistent with the zone’s
                  outcome to maintain the area as predominantly home to permanent residents.
            b)    The proposal seeks to establish a new short-term visitor accommodation facility
                  within a recently approved dual occupancy and is not located within a well-
                  established resort or holiday units.
      4.    The proposal is not consistent with 9.3.5.2 Purpose and Overall Outcomes (1) and
            (2)(f) of the Visitor Accommodation Code as:
            a)    The proposed visitor accommodation is not appropriately located and integrated
                  with permanent residents in the area given the number and density of properties
                  currently being used for visitor accommodation and/or permitted for use as visitor
                  accommodation.
            b)    The proposed visitor accommodation is likely to detract from the amenity enjoyed
                  by residents nearby and in the surrounding area.
      5.    There is no need for additional short term accommodation in the area.
B.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
1.    PROPOSAL
This application seeks an Other Change to a Development Permit for a Material Change of Use
(Dual Occupancy and Short-Term Accommodation) to introduce Short-Term Accommodation to
permit both units to be used interchangeably for short-term and permanent residential purposes.
The site was recently approved for a Dual Occupancy under the Noosa Plan 2020. The Basement
floor includes 2 covered car parking spaces per dwelling unit, 1 visitor car parking bay, 1 motorcycle
space, 1 bicycle space, storage areas, lift and lift lobby, and waste storage.
Level 1 comprises Apartment 1, which includes 3 bedrooms, 1 ensuite, 1 bathroom, living, dining,
kitchen, study nook, laundry, a balcony, pool and terrace area. Level 2 comprises Apartment 2,

                                                                                      Page 13 of 72

Section 14

GENERAL COMMITTEE MEETING AGENDA                                              17 JANUARY 2022


which includes 3 bedrooms, 1 ensuite, 1 bathroom, living, dining, kitchen, study nook, laundry and
a balcony. The applicant has not confirmed how many people are proposed to be accommodated
within each dwelling.




                                        Figure 1 – Locality




                                        Figure 2 – Site Plan




                                                                                   Page 14 of 72

Section 15

GENERAL COMMITTEE MEETING AGENDA                         17 JANUARY 2022




                       Figure 3 – Basement Floor Plan




                        Figure 3 – Level 01 Floor Plan



                                                            Page 15 of 72

Section 16

GENERAL COMMITTEE MEETING AGENDA                         17 JANUARY 2022




                        Figure 4 – Level 02 Floor Plan




                             Figure 5 – Renders



                                                            Page 16 of 72

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                 17 JANUARY 2022


2.    SITE DETAILS
2.1   Background
MCU20/0143 & OPW20/0230 - On 19 February 2021, Council issued a Development Approval for
a Material Change of Use to establish a Dual Occupancy and associated Operational Works.
The subject development application was lodged on 25 August 2021 and Council issued an
Information Request on 17 September 2021. The applicant responded on 15 November 2021.
Council requested the applicant to provide some analysis around the ratio of permanent residences
and short term uses within the neighbourhood. A summary of the applicant’s response is provided
below.
“The site is surrounded by a number of different zonings, with majority of the Short-Term
Accommodation uses being concentrated within existing unit developments, as well as some within
the Low Density Residential zone along Nairana Rest.
We note that Short-Term Accommodation uses exist on 6 of the 23 (26%) residential properties on
Angler Street. Of the 62 residential sites (including 6 Angler Street - the development site) within a
150m radius, 46 sites are for permanent accommodation uses (74.2%). Particularly when
considering the development site and its surrounds, it can be seen in the analysis provided that
Medium Density Residential zoned land is not overrun by Short-Term Accommodation. The
proposal offers diversity in the housing market and can accommodate short-term accommodation
or permanent residential living within an appropriate low density built form (not mass resort /
apartment type accommodation). The proposal is considered to comply where the Medium Density
Residential zoned land (after the development is established) still predominantly accommodates
permanent residential accommodation.”
2.2   Surrounding Land Uses
The subject site is located in a residential area, comprised of a mix of dwelling houses, dual
occupancies and multiple dwellings. The site is within the Medium Density Residential zone and is
adjoined by a dual occupancy to the north and residential dwelling to the south and east.
3.    ASSESSMENT
3.1    Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
•     State Planning Policy;
•     South East Queensland Regional Plan;
•     Planning Regulation 2017;
•     Noosa Plan 2020.
3.2   State and Other Statutory Instruments
State Planning Policy
Noosa Plan 2020 is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is consistent
with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The proposal is for urban activity within the Urban Footprint and is consistent with the assessment
benchmarks contained in the Planning Regulation 2017 for the SEQ Region.



                                                                                      Page 17 of 72

Section 18

GENERAL COMMITTEE MEETING AGENDA                                              17 JANUARY 2022


3.3   Statutory Instruments – Planning Scheme
The application must be assessed against the whole of Noosa Plan 2020 to the extent the
provisions are relevant to the development.
Strategic Framework
The Noosa Plan 2020 includes Strategic Outcomes which seek to protect neighbourhoods of
permanent housing from short-term visitor accommodation that would impact on the amenity
enjoyed by residents. The planning scheme also seeks to protect areas for visitor accommodation
with a range of accommodation styles envisaged to support the local tourism industry.
The subject site is not located in a designated visitor accommodation area being zoned Medium
Density Residential. The area includes a significant amount of visitor accommodation that is
eroding the supply of permanent housing and adversely impacting resident’s residential amenity.
Locality Provisions
The subject site is located in the Noosa Heads Local Plan Area and is zoned Medium Density
Residential. The proposed use is identified as a consistent use within the zone and is required to
follow an impact assessable application process.
Notably Part 1, section 1.5 of the Noosa Plan 2020 states local plan codes (i.e. Noosa Heads Local
Plan Code) prevails over zone codes (i.e. Medium Density Residential Zone Code), use codes and
other development codes to the extent of any inconsistency. This provides for different
requirements to be established for different areas of the Shire but which may be zoned the same.
The Noosa Heads Local Plan Code, the Medium Residential Zone Code and Visitor
Accommodation Code all contain requirements for short term accommodation. The relevant
provisions are:
Noosa Heads Local Plan Code
7.2.6.2 Purpose and Overall Outcomes
(o)   Development in the Medium Density Housing zones accommodates a greater diversity in
      housing types including dual occupancies, multiple dwellings, retirement facilities and
      residential care facilities.
(p)   Residents of Noosa Heads enjoy high levels of residential amenity and convenience to urban
      services and recreational opportunities.
(t)   Noosa Heads is the principal focus for visitor accommodation and services in Noosa Shire
      as demonstrated by:
      (i)    Hastings Street serving as a major visitor centre; and
      (ii)   Resorts located at Morwong Drive, Noosa Drive, Quamby Place, Serenity Close,
             Sanctuary Drive, Little Cove, Noosa Hill, Noosa Springs and Noosa Sound.
(u)   Development in the Tourist accommodation zone is for visitor accommodation and
      associated uses that serve visitors concentrated in areas close to Hastings Street and Noosa
      River and in designated resorts.
PO2
Development contributes to the lifestyle and amenity of residents of Noosa Heads and its
surroundings and services coastal communities to the south-east.
Medium Density Residential Zone Code
6.3.2.2 Purpose and Overall Outcomes
(a)     Medium density residential neighbourhoods are predominantly home to permanent
        residents.
(b)     The character of medium density residential neighbourhoods varies due to factors such as

                                                                                   Page 18 of 72

Section 19

GENERAL COMMITTEE MEETING AGENDA                                              17 JANUARY 2022


       proximity to beaches, the Noosa River, recreation spaces, centres, topography, availability
       of views, the established vegetated character, the presence of visitor accommodation and
       the age of development
(h)    Short-term visitor accommodation is predominately provided through well-established
       resorts and holiday units.
6.3.2.3 Assessment Criteria
Role and function
        PO6                                               AO6.2
        Visitor accommodation is limited to formats Short-term accommodation does not:
        compatible with the character and use of the
        area so as not to cause unreasonable loss of a. constitute a party house;
        residential amenity, having regard to:       b. create noise that would unreasonably
        a.    the privacy of residents on the subject        impact on the residential amenity
              property or adjoining properties;              enjoyed by the adjoining or
                                                             surrounding properties.
        b.    any likely increase in noise to adjoining
              properties;
        c.    the scale of the use and its
              compatibility with the character and
              uses within the property or surrounding
              area;
        d.    retention of the primary residential
              function of an area;
        e.    the    residential function     and
              arrangement of common property;
        f.    the impact on the safety and efficiency
              of the local road network;
        g.    the impact of waste storage areas on
              the visual amenity of the area;
        h.    the location of waste storage areas in
              relation to sensitive land uses; and
        i.    any impact on shared vehicular access
              or parking.
Visitor Accommodation Code
9.3.5.2 Purpose and Overall Outcomes
(1)   The purpose of the Visitor Accommodation code is to ensure visitor accommodation is
      appropriately located, designed and operated in a manner which meets visitor needs,
      protects and enhances landscape values, protects the amenity of surrounding premises and
      avoids conflicts with surrounding uses.
(2)   The overall outcomes sought for the Visitor Accommodation Code are:
      (a) Visitor accommodation is compatible with and benefits from Noosa Shire’s natural
          environmental values.
      (b) Visitor accommodation offers a wide range of experiences for guests both in coastal
          areas and in the hinterland.
      (c) Visitor accommodation is located and designed in a manner which sensitively responds
          to site characteristics.


                                                                                   Page 19 of 72

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                  17 JANUARY 2022


     (d) Visitor accommodation does not detrimentally impact upon the biodiversity and natural
         landscape values of its setting.
     (e) The density and design of visitor accommodation integrates with the urban or landscape
         fabric of its particular locality.
     (f) Visitor accommodation located near permanent residents does not detract from the
         amenity enjoyed by residents.
     (g) Visitor accommodation does not impact on the ability of rural land owners to carry out
         agricultural pursuits.
     (h) Visitor accommodation provides high quality amenities and facilities commensurate with
         its setting, the types of accommodation supplied and the length of stay accommodated.
     (i)   Visitor accommodation forms a key element of the local tourism industry.
     (j)   Visitor accommodation provides for a wide range of visitors.
9.3.5.3 Criteria for assessment
The planning scheme prioritises the preservation of medium-density residential neighbourhoods
for predominantly permanent residential dwelling units and seeks to protect the amenity of
surrounding residential areas from the impacts of short term accommodation.
The Medium Density Residential neighbourhood relevant to the subject site is defined within figure
6 below. All of these areas are considered to form part of the same neighbourhood, as residents
in these areas would generally have a sense of association/community across these areas.




                           Figure 6 – Medium Density Zone Residential Neighbourhood.

The following image details those properties within the Noosa Heads Neighbourhood being utilised
for short term accommodation.



                                                                                       Page 20 of 72

Section 21

GENERAL COMMITTEE MEETING AGENDA                                                    17 JANUARY 2022




        Figure 7 – All Short-term accommodation properties within Sunshine Beach neighbourhood

The following image details those properties within the Medium Density Residential neighbourhood
which are being used for short-term accommodation.




   Figure 8 - Medium Density properties (depicted with Aerial photo) used for short term accommodation


                                                                                          Page 21 of 72

Section 22

GENERAL COMMITTEE MEETING AGENDA                                                     17 JANUARY 2022


Historically the Noosa Heads area, has contained a significant number of holiday houses and
holiday units. However, over time properties used for short term accommodation has continued to
increase and this has eroded the supply of dwellings available for permanent residents. More
recently the ease and popularity of on-line booking platforms has further incentivised property
owners to make properties available for short term accommodation which has further disrupted the
supply of dwellings for permanent accommodation.
Whilst the proposal is in part consistent with the Noosa Heads Local Plan in that it contributes to
the provision of tourist accommodation, the code does not seek to increase visitor accommodation
in the Medium Density Residential area and seeks to provide multi-unit accommodation for both
permanents and visitors. As demonstrated by the above figures 6 & 7 the medium density
residential neighbourhood contains a significant number of properties being used for short-term
accommodation. The area also includes properties with a development approval which provides
for the dwellings to be used interchangeably for permanent or short-term accommodation.
Based on the Tourism accommodation carrying capacity data (April 2020) 45% of residential
dwellings in Noosa Heads, including houses and units were in use as Short Term Accommodation
or for home hosted.
The proposal for additional short-term accommodation within the Medium Density Neighbourhood
that is already largely characterised by short term accommodation does not comply with the
Purpose and Overall Outcome (a) of the Medium Density Residential Zone Code. In addition, as
the proposal is for the use to establish within new dwellings, it does not comply with the Purpose
and Overall Outcome (h) of the Medium Density Residential Zone Code, which seeks to ensure
Short-term visitor accommodation is predominately provided through well-established resorts and
holiday units.
The proposal is also not consistent with the Purpose and Overall Outcomes (1) and (2)(f) of the
Visitor Accommodation Code and is likely to detract from the amenity enjoyed by residents given
resident’s reasonable expectations for the area. Increasing visitor accommodation in this area is
likely to further impact on the amenity of remaining permanent residents and impact on the
availability of dwelling units for permanent residents.
3.4   Public Notification
The application was publicly notified for fifteen (15) business days in accordance with the Planning
Act 2016. Twenty nine (29) properly made submissions were received. The following table provides
a summary and assessment of the issues raised by submitters.
 Matters Raised                                    Comments
 Noise                                             Agree. The dual occupancy is within close proximity to
                                                   other units/dwellings nearby and has the potential to
                                                   cause adverse amenity affects.
 Issue arise when holiday makers and               Agree. Visitors have different expectations to that of
 permanent residents reside in a complex.          permanent residents and issues are known to arise
                                                   from the mix of these uses onsite.
 There is already a plethora of short term         Agree. There is no further need for short term
 accommodation in the surrounding area and         accommodation in this area.
 therefore sufficient short term accommodation
 in the area.
 This has the potential be a loss of revenue for   Loss of revenue is not a planning matter.
 other short term accommodation businesses.

4.    CONCLUSION & REASONS FOR DECISION
The application seeks approval to utilise an approved dual occupancy (currently under
construction), situated within the Medium Density Residential Zone, for the purpose of short-term
accommodation. The planning scheme seeks to prioritise the preservation of medium density
residential neighbourhoods for predominantly permanent residential dwellings and seeks to protect
the amenity of surrounding residential areas from the impacts of short-term accommodation.


                                                                                           Page 22 of 72

Section 23

GENERAL COMMITTEE MEETING AGENDA                                                  17 JANUARY 2022


Whilst acknowledging that short-term accommodation has been identified as a consistent use
within the applicable zone, the area already accommodates a significant number of dwellings being
used for short term accommodation and the proposal will further erode the supply of dwellings for
permanent residents. This is of great concern given the current housing crisis, including lack of
supply of housing and additional accommodation for visitors to the area is not needed. Accordingly,
the application is recommended for refusal.

Departments/Sections Consulted:
     Chief Executive Officer          Community Services                      Corporate Services
     Executive Officer                Community Development                   Financial Services
     Executive Support                Community Facilities                    ICT
                                      Libraries & Galleries                   Procurement & Fleet
                                      Local Laws                              Property
                                      Waste & Environmental Health            Revenue Services

     Executive Services           x   Environment & Sustainable Development   Infrastructure Services
     Community Engagement             Building & Plumbing Services            Asset Management
     Customer Service             x   Development Assessment                  Buildings and Facilities
     Governance                       Economic Development                    Civil Operations
     People and Culture               Environmental Services                  Disaster Management
                                      Strategic Land Use Planning             Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 23 of 72

Section 24

GENERAL COMMITTEE MEETING AGENDA                                                17 JANUARY 2022


3.   MCU19/0054 - PLANNING & ENVIRONMENT COURT APPEAL NO. 476 OF 2020 –
     REFUSAL OF APPLICATION FOR MATERIAL CHANGE OF USE FOR A MIXED USE
     COMMERCIAL DEVELOPMENT SITUATED AT 2-18 & 20 HOFMANN DRIVE,
     NOOSAVILLE

Author           Manager Development Assessment, Kerri Coyle
                 Environment & Sustainable Development Department

Index            ECM/ Application/ MCU19/0054/ Case/ Spotlight Pty Ltd

Attachments      Nil


EXECUTIVE SUMMARY
This report reviews a recent judgement received for a Planning & Environment Court appeal
regarding a primarily retail proposed development at 2-18 & 20 Hofmann Drive, Noosaville and
notes Her Honour’s findings which:
•    supports Council’s decision to refuse the application
•    recognises the important role planning schemes have for the Noosa community; and
•    reinforces Noosa’s built form requirements and the importance of the Noosa Business centre
     for economic development and higher value employment over retail.

RECOMMENDATION
That Council note the report by the Manager Development Assessment to the General Committee
meeting dated 17 January 2022 regarding the Judgement for Planning & Environment Court appeal
No. 476 of 2020 which supports Council’s decision to refuse the application.


REPORT
On 16 January 2020, Council at its Ordinary meeting, resolved to refuse an application for a mixed
use commercial development, including showroom, offices, health care service, indoor sport and
recreation, low impact industry and food and drink outlet with a total gross floor area of 13,185m 2
at 2-18 & 20 Hofmann Drive, Noosaville due to a number of reasons including that:
•    It was contrary to the long term planning strategy for the Noosa Business Centre for a mixed
     use employment centre, with the proposed retail uses impacting the ability for business uses
     to locate on the site.
•    The proposed built form was characteristic of a standard retail commercial design and lacked
     the architectural features sought for Noosa, with insufficient landscaping in the car park.
•    The proposal was significantly deficient in car parking and had not demonstrated that
     stormwater could be appropriately managed. Vegetation clearing was also proposed in the
     site’s environmental covenant areas.
•    The proposed uses are clearly defined by The Noosa Plan 2006 and Noosa Plan 2020 and
     the applicant’s proposed use definitions are unnecessary, inappropriate and have the
     potential to cause confusion.
•    There was no significant need demonstrated that would benefit the community which would
     warrant approval of the application.
As a result of Council’s decision to refuse the application for the mixed use commercial
development, the applicant lodged an appeal to the Planning & Environment Court. During the
course of the appeal mediation was attended by officers and changes were made to the plans to
address the stormwater management and vegetation clearing issues raised. On day one of the trial
in August 2021, the applicant made some further minor changes to the proposed development

                                                                                     Page 24 of 72

Section 25

GENERAL COMMITTEE MEETING AGENDA                                                   17 JANUARY 2022


including reducing building 4 from 3 to 2 storeys, reducing some tenancy areas (to a total of
11,434m2 with 8225m2 retail) and making provision for landscaping and car parking spaces. These
changes addressed the car parking issues raised but did not address the primary issues including
that the proposed retail uses were not appropriate.
The appeal was dismissed by the Planning & Environment Court on 16 December 2021, with the
judgement being a comprehensive win, with Council’s grounds of refusal well supported by Her
Honour. The judgement is significant as it showed great support and recognised the important role
that planning schemes have to protect and plan for the future needs of the Shire and are generally
accepted as an articulation or reflection of the outcomes sought by the community and not for the
court to override. Importantly to approve a development that is contrary to the planning scheme
there must be relevant grounds in the community’s best interest and not solely an applicants.
The judgement also acknowledged that there is a particular Noosa style of development sought for
Noosa reflected in its planning scheme requirements for built form and landscaping and recognised
there is a considered long term vision for the Noosa Business Centre for a multi-function
employment centre and employment growth focus.
Her Honour summarised the grounds in dispute as being the following:
Issue One:      To what extent is there a planning, community and economic need for the proposed
                development?
Issue Two:      Is the proposed development an appropriate land use for the Land in the Shire
                Business Centre?
Issue Three: Is the built form, design and layout of the proposed development appropriate?
Issue Four:     In the event that the Court gives weight to the Noosa Plan 2020, does that planning
                instrument support an approval of the proposed development?
Issue Five:     Are the outcomes intended for the subject land under Noosa Plan 2020 with respect
                to large format retail showrooms and employment based uses not soundly based?
Issue Six:      Do other relevant matters support an approval or a refusal of the proposed
                development?
The following includes direct quotes and summaries from the judgement under each of the issues
in dispute.
Need
Her Honour noted need (in terms of the betterment of the community generally) will not usually be
established unless it is demonstrated that the relevant community is relevantly lacking in the
provision of the facilities required. It follows that a mere improvement to services and facilities will
not of itself establish a requisite need.
Her Honour was not satisfied there is any real or appropriate level of planning, community and
economic need for the proposed development drawing generally from the following:
•      It is in the interest of the planning scheme to maintain the hierarchy by directing such need
       to Gympie and Kawana. In any case, the soon to be opened Maroochydore Spotlight will be
       available to service any residual need.
•      The proposed development in this case is not being underpinned by an outlet providing the
       necessities of life such as Woolworths or Coles.
•      The community is reasonably supplied already with the products intended to be sold from
       the proposed outlets committed to this development. Members of the public who prefer these
       outlets have available opportunities within a reasonable travel distance from anywhere in the
       Sunshine Coast, presently at Birtinya and soon at the PRAC at Maroochydore.
•      The issue of convenience does not amount to the existence of a need given that it is entirely
       appropriate and expected given the type of goods on offer, that consumers may have to
       travel to access them. The proposed retail uses are for non-essential, infrequently purchased
       goods.

                                                                                        Page 25 of 72

Section 26

GENERAL COMMITTEE MEETING AGENDA                                                  17 JANUARY 2022


•    There will always be, by virtue of the type of goods involved and the nature of the Sunshine
     Coast, escape expenditure beyond the Shire.
•    The appellant has not demonstrated that any employment benefits to the community arising
     from the proposed development are above those that would arise from use of the land in the
     manner encouraged by the scheme.
Appropriateness of Land Use
What emerges from a plain reading of the relevant provisions of the planning schemes is that there
is no scope in the 2006 Scheme and only limited scope in the 2020 Scheme (at 3,500m2 GFA) for
Showroom floor space on the land. Otherwise, the land is designated for a range of other ‘non-
retail’ uses, with the intent of generating employment activities for the benefit of the Noosa Shire
that are not dependent on retailing.
Her Honour quoted and accepted the following from the expert planners in this regard concluding
that the proposed development is not an appropriate land use for the land in the Noosa Business
Centre:
•    It is entirely legitimate to plan a hierarchy of centres through the regional plan, (as has been
     done for this region by the State Government in the regional plan and as done by any
     planning authority). To that end, Maroochydore and not Noosa is the designated Principal
     Regional Activity Centre for this region, with Maroochydore therefore serving the needs of
     the people of Noosa in that role;
•    The Shire Business Centre should accommodate a full range of uses and it was the task of
     the planning authority to promote the Shire Business Centre in that way;
•    It is entirely legitimate for a planning authority to allocate locations and GFAs for various uses
     within the Shire Business Centre;
•    Creating the Shire Business Centre with all of the requisite elements will take decades,
     including the lifetime of many planning schemes and it was legitimate to protect strategic
     parts of the Shire Business Centre whilst that development was occurring, which is precisely
     what the planning scheme for this Shire Business Centre provides for;
•    There will always be differences in terms of people’s proximity (and convenience) to higher
     order centres like Maroochydore;
•    The scheme, in its terms, talks about some needs being met at Maroochydore and… I
     suppose, by exclusion, the balance needs being met locally, and… there’s no doubt the
     proportion of higher order and regional uses will always go to Maroochydore, because there’s
     a critical mass there that accommodates it;
•    The 2020 Scheme addressed a need for further Showroom space ‘as defined’ via the
     inclusion of an addition 4,200m2 of GFA in the Shire business Centre. This decision (and this
     specific amount) was consistent with the advice Council received from Mr Brown in preparing
     the Scheme. The 2020 Scheme also took account of a need for, and provided for, additional
     retail space in the Shire Business Centre (but did not provide for it on the subject land). These
     were both examples of the planning scheme evolving;
•    It is the Council’s responsibility to gauge community expectations in preparing a planning
     scheme, like it did with the 2020 Scheme. Moreover, the Council must take into account a
     broad spectrum of issues in preparing a planning scheme, not just issues of need or
     perceived need (for a particular type of retail);
•    The Masters Approval, whilst for the same land, involved elements of a hardware store and
     a garden and lifestyle centre that was a consistent use on most of the land, being a key
     distinguishing feature from the present case;
•    There is no support for shops on the Land in either the 2006 Scheme or the 2020 Scheme;
     and
•    It is relevant to consider, in the context of community need, whether (or not) the community
     is already reasonably well served (which Mr Duane confirmed it was).

                                                                                       Page 26 of 72

Section 27

GENERAL COMMITTEE MEETING AGENDA                                                 17 JANUARY 2022


Acceptability of built form, design and layout of the proposed development
There are aspects of the built form, design and landscaping that go some way towards adequately
addressing the requirements as envisaged by both planning schemes. But on balance overall, the
proposed development is not an acceptable visual amenity and architectural response to the
planning scheme provisions under either the 2006 Scheme or the 2020 Scheme. Overall, the
proposed development is not appropriately categorised as being one in the Noosa style.
The impact (if any) of Noosa Plan 2020
Her Honour concluded that considerable weight ought to be afforded the 2020 Scheme for three
main reasons:
a)   First: It embodies the most recent planning revisions which respect to the ongoing and
     “evolving” development of the Shire Business Centre;
b)   Secondly: It demonstrates that the planning authority (consistent with Shaping SEQ) has
     maintained its emphasis on the Shire Business Centre being a true activity centre, rather
     merely a retail centre; and
c)   Thirdly: It demonstrates that the Council has directed its attention, and made decisions as
     the duly elected planning authority, with respect to the provision of:
     i.     further retail floor space in the Shire Business Centre (some 7,500m² in the Village
            Mixed Use Precinct); and
     ii.    a further 4,200m² of showroom (as defined by the 2020 Scheme, which definition is
            sourced, from the Planning Regulation 2017) in the Shire Business Centre including
            3,500m² of GFA on the subject land in the Showroom Precinct (with the balance of
            700m² added to the Showroom Precinct land to the east).
The provisions of the 2020 Scheme confirm in a more contemporaneous form, what was already
the case under the 2006 Scheme - the proposed development is inappropriate when compared to
the Council’s planning for the Land, the locality and the Shire more generally as reflected in both
the 2006 and 2020 Planning Schemes.
Is the 2020 Scheme misconceived or not soundly based
The planning of uses within the Shire Business Centre is the product of much foresight, time and
long-term vision and “to permit the proposed development to go ahead would effectively defeat a
clear and long-standing statement of planning intent”.
Other Relevant Matters
Her Honour was not satisfied that any other relevant matters support an approval of the proposed
development with the Council identifying the following two other relevant matters as supporting a
refusal of the proposed development:
a)   First: The proposed uses are clearly defined by 2006 Scheme and the appellant’s proposed
     use definitions are unnecessary, inappropriate and cause confusion;
b)   Secondly: Any economic or planning need is not sufficient to outweigh the substantial
     planning and community need:
     i.     to maintain land, in the Shire Business Centre, available for the development of the
            Centre as planned;
     ii.    to provide for a multifunction employment node that forms the Shire’s business and
            employment growth focus; and
     iii.   to maintain the planning scheme provisions which seek to protect the Shire Business
            Centre for development over time for the full functions of a Major Regional Activity
            Centre, and not to lose the limited land available to satisfy the short-term private gains
            associated with largely retail development.


                                                                                      Page 27 of 72

Section 28

GENERAL COMMITTEE MEETING AGENDA                                               17 JANUARY 2022


Previous Council Consideration
Ordinary Meeting Minutes, 19 March 2020, Item 3, Page 5
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 11 February 2020 regarding Planning & Environment Court
Appeal No. 476 of 2020 and agree to defend the appeal.
Ordinary Meeting Minutes, 16 January 2020, Item 3, Page 4
That Council note the report by the Development Planner to the General Committee Meeting dated
13 January 2020 regarding Application No. MCU19/0054 for a Development Permit for Material
Change of Use for undefined uses – Showroom, Office, Health Care Service, Indoor Sport and
Recreation, Low Impact Industry and Food and Drink Outlet, situated at 2-18 and 20 Hofmann
Drive Noosaville and
A.   Refuse the application for the following reasons:
     1.    The proposed development being predominantly retail, does not comply with the SEQ
           Regional Plan’s Elements, Strategies and Outcomes relating to Goal 2 – Prosper as it
           is contrary to:
           1.1. Element 1 Strategy 1 as it fosters retail employment rather than employment in
                the export oriented and high-value sectors;
           1.2. Element 1 Strategy 7 as it is using land set aside for non-retail employment which
                inhibits the ability of Noosa Shire to meet employment planning baselines;
     2.    The proposal does not support the Economic Vision for the Shire to create the strong
           viable niche economy articulated at 1.4.3 of Division 2 Part 1 of Noosa Plan thereby
           protecting and enhancing the Noosa brand as the proposal introduces a small second
           shopping centre into the Noosa Business Centre limiting available land for growth in
           identified priority focus areas of wellness industries, knowledge-based businesses,
           education and service industries, heritage and creative arts industries.
     3.    The proposal, being predominantly retail, is contrary to the Desired Environmental
           Outcomes 3.1.3 b) i, ii & iii of the Noosa Plan as:
           3.1.   Further large format retail is not envisaged for the centre with a proportion of
                  Noosa’s Shire’s higher order needs intended to be fulfilled by the Principal
                  Regional activity Centre of Maroochydore; and
           3.2. It will impact on the long term viability of the Noosa Business Centre, as the
                principal business, retail and administrative centre.
     4.    The development application proposes uses which are inconsistent in the Shire
           Business Centre zone precincts B3 and E5.
     5.    The proposed development is contrary Overall Outcomes 11.7.2 tt) ii, x, xi B & C of to
           the Noosaville Locality Code as the proposed extent of retail is not planned and
           significantly exceeds the retail caps set by the Noosa Plan; and
           5.1. will not support the growth of the Noosa Business Centre as being a multi-
                function employment node which provides for a wide range of business uses;
           5.2. will not retain the development capacity within the centre in the longer term to
                take advantage of potential new employment opportunities.
     6.    The proposed built form, design and layout does not comply with Overall Outcomes
           11.7.2 tt iv, v & viii of the Noosaville Locality Code as:
           6.1. the proposal has the characteristics of a standard retail commercial design
                without the architectural features unique to Noosa;
           6.2. overall the built form is more suited to retail uses than to the other uses proposed
                such as low impact industry;


                                                                                    Page 28 of 72

Section 29

GENERAL COMMITTEE MEETING AGENDA                                                17 JANUARY 2022


           6.3. the applicant has not demonstrated that some buildings will be sufficiently
                screened from Council’s major road network;
           6.4. building 4 exceeds the maximum building height for the area and has a reduced
                building setback from Hofmann Drive; and
           6.5. pedestrian connectivity and access is poor.
     7.    The proposal does not satisfy Specific Outcome O28 of the Landscaping Code and
           O17 of the Driveway and Carparking Code as the car parking area is deficient in
           landscaping with unsatisfactory provision for shade trees.
     8.    The proposal is significantly deficient in car parking and does not comply with Specific
           Outcome O7 of the Noosa Plan’s Driveways and Car parking Code.
     9.    The applicant has not satisfactorily demonstrated that the development will not
           adversely impact on the external traffic network contrary to Overall Outcomes tt) ix of
           the Noosaville Locality Code and 14.142.2 a) of the Transport, Roads and Drainage
           Code.
     10.   The applicant has not demonstrated that stormwater management can be successfully
           and appropriately integrated into the current development layout consistent with
           14.157.2 of the Water Sensitive Design Code and Specific Outcome O8 of the
           Transport, Roads and Drainage Code.
     11.   The proposal includes clearing of significant vegetation as part of the proposed
           measures for stormwater management contrary to the purpose of current
           environmental covenants registered over the site and the Noosaville Locality Code
           requirements for Precinct OS3 Specific Outcomes O218 to O222 and Precinct OS6
           Specific Outcomes O224 & O225.
     12.   The proposal does not comply with the draft Noosa Plan as:
           12.1. the quantum of retail proposed is not envisaged on the site and does not advance
                 nor assist in preparing for a transitioning or changing economy contrary to
                 Strategic Intent 3.2.6 - A diverse and resilient economy and Strategic Outcomes
                 3.3.5(r) and (s)(i)(B);
           12.2. the proposal is not contributing to the key priority sectors identified in Strategic
                 Intent 3.2.6;
           12.3. the proposal does not comply with PO1 of the Transport Code and PO6 of the
                 Driveways and Parking Code as carparking is grossly deficient and the applicant
                 has not demonstrated there will not be adverse effects on the surrounding traffic
                 network;
           12.4. the development does not comply with Overall Outcomes 6.4.1.2 (3)(c) (iii) & 3(f)
                 of the Major Centre Zone Code as it does not reflect appropriate subtropical
                 design and is not distinctively recognisable as being Noosa Style; and
           12.5. the stormwater management of the site does not comply with the Water Quality
                 and Drainage Code Outcomes PO7 and PO11.
     13.   There is no significant need for the proposed retail and the proposal fails to advance
           the priority sectors envisaged by Noosa’s Local Economic Plan.
     14.   The proposed uses are clearly defined by The Noosa Plan and the applicant’s
           proposed use definitions are unnecessary, inappropriate and have the potential to
           cause confusion.
     15.   There are no discretionary matters which would warrant approval of the development
           proposal.
     16.   For the aforesaid reasons, approval of the development proposal would not advance
           the purpose of the Planning Act 2016.
B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
                                                                                     Page 29 of 72

Section 30

GENERAL COMMITTEE MEETING AGENDA                                                  17 JANUARY 2022


Finance
The total of cost of the appeal as of November 2021 was $426,000.

Risks & Opportunities
At the time of writing this report the appellant has the ability to appeal the decision of the Planning
& Environment Court to the Court of Appeal. Council’s planning solicitor for the matter considers
this unlikely.

Consultation
External Consultation - Community & Stakeholder
Thynne Macartney Solicitors – Tim Quirk
Internal Consultation
Departments/Sections Consulted:
    Chief Executive Officer       Community Services                          Corporate Services
    Executive Support             Director                                    Director
                                  Community Development                       Financial Services
                                  Community Facilities                        Fleet
                                  Libraries & Galleries                       ICT
                                  Local Laws                                  Procurement
                                  Waste & Environmental Health                Property
                                                                              Revenue Services

    Executive Services        x   Environment & Sustainable Development       Infrastructure Services
    Director                      Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                              x   Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 30 of 72

Section 31

GENERAL COMMITTEE MEETING AGENDA                                                                    17 JANUARY 2022


4.        FINANCIAL PERFORMANCE REPORT – DECEMBER 2021

Author                Financial Services Manager (Acting), Pauline Coles
                      Corporate Services Department

Index                 ECM/ Subject / 22.09 – Monthly Financial Performance Report

Attachments           1.    Statement of Income and Expenditure (Profit & Loss and Capital)
                      2.    Statement of Financial Position
                      3.    Statement of Cash Flows
                      4.    Summary of Materials and Services Expenditure

EXECUTIVE SUMMARY
Year-to-date (YTD) performance against current budget as at 31 December 2021 is positive with
operating revenues outperforming forecast and operating expenditure slightly under forecast YTD.
Capital revenues are in line with forecast with capital expenditure slightly behind due to the timing
of project delivery.
Budget Review 2 (BR2) which is detailed in a separate report included in the January 2021 General
Committee meeting agenda, includes a number of proposed adjustments which will be
incorporated into next month’s financial performance report once adopted.

     YTD Financial Performance Summary
                                       Budget            Actual        Variance      Variance
                                                                                                         Status
                                          $m                $m              $m             %
     Operating Revenue                    $52.7           $56.0              $3.3           6.3%        On Track
     Operating Expense                    $51.6           $51.3              $0.2           0.4%        On Track
     Operating Position                      $1.1           $4.7             $3.6      324.4%
     Capital Revenue                         $9.4           $9.9             $0.6           6.0%        On Track
     Capital Expenditure*                 $18.2           $15.3              $3.0           16.2%     Below Budget
* Reflects constructed assets and intangibles only (excludes contributed)

Financial statements including Statement of Income & Expenditure, Statement of Financial
Position (balance sheet), and Statement of Cash Flows are included as attachments for information
for Council.
Figure 1: Actual Performance Compared to Budget

  $60                                $56.0
                       $52.7
                                                                        $51.6       $51.3
  $50

  $40

  $30

  $20

  $10

     $-
                      Operating Revenue                             Operating Expenditure
                                  YTD Budget ($m)          YTD Actual ($m)



                                                                                                        Page 31 of 72

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                      17 JANUARY 2022


Council’s performance against key measures of financial sustainability have been calculated as at
December 2021. These indicators enable the reader to assess Council’s success in managing its
budget, cash and debt as well as undertaking sustainable asset management. The table below
contains a snapshot of a number of key measures, with full detail included in the report.

 YTD Measures of Financial Sustainability
                                                     Current
                                     Target                       Actual YTD            Status
                                                     Budget
 Operating Surplus Ratio             0-10%            -0.6%           8.3%             On Track
 Net Financial Liabilities Ratio      <60%            -4.9%          -54.6%         Above Target
 Cash Cover Ratio                  3 months         6.8 months    10.8 months       Above Target
 Asset Sustainability Ratio          > 90%           121.9%          31.6%             On Track


RECOMMENDATION
That Council note the report by the Financial Services Manager (Acting) to the General Committee
Meeting dated 17 January 2022 outlining December 2021 year to date financial performance
against budget, including changes to the financial performance report with the inclusion of key
financial sustainability indicators.

REPORT
Operating Revenue (YTD Benchmark 50.0%)
Council has received 52% ($56.0 million) of its operating revenue budget ($107.2 million).
Commentary on each revenue category is provided below.

 Category             Summary                   Comments
 Rates and Levies     $37.4 million (50%) of    •   Waste utility charges $318k above YTD budget (52%
                      the annual budget of          or $6.7 million of $12.9 million budget earned)
                      $74.6 million has been    •   General rate (net of discounts) $101k below YTD
                      earned                        budget (50% or $28.0 million of $56.3 million budget
                                                    earned)

 Fees and             $5.2 million (72%) of     •   Development assessment fees $692k above YTD
 Charges              the $7.2 million annual       budget (82% or $1.5 million of $1.8 million budget
                      budget has been               earned)
                      earned                    •   Plumbing application fees $396k above YTD budget
                                                    (81% or $841k of $1.0 million budget earned)
                                                •   Building application fees $107k above YTD budget
                                                    (59% or $469k of $791k budget earned)

 Sale of Goods        $6.5 million (63%) of     •   Waste management sale of recoverable materials
 and Services         the $10.2 million             $492k above YTD budget (106% or $911k of $855k
                      budget has been               budget earned).
                      received                  •   Waste management disposal fees $352k above YTD
                                                    budget (54% or $2.0 million of $3.7 million budget
                                                    earned)
                                                •   Holiday Park sales $474k above YTD budget (69.5%
                                                    or $1.9 million of $2.8 million budget earned) – offset
                                                    by higher operating costs
                                                •   Community Facilities (NAC, NLC and The J) $160k
                                                    above YTD budget (55% or $1.4 million of $2.6 million
                                                    budget earned) – offset by higher operating costs



                                                                                            Page 32 of 72

Section 33

GENERAL COMMITTEE MEETING AGENDA                                                                  17 JANUARY 2022


 Category               Summary                     Comments
 Interest               $376k (56%) of the          •      Interest revenues on cash invested will continue to be
 Received               $670k annual budget                monitored given low interest rates and impacts on term
                        has been earned                    deposit / cash fund rate returns
 Other Revenue          $1.3m (43%) of the          •      Other revenue is in line with budget expectations at this
                        $3.1 million budget                stage
                        has been earned
 Operating              $3.0 million (53%) of       •      Operating grants are in line with budget expectations
 Grants,                the $5.8 million budget            at this stage.
 Subsidies              has been received           •      50% ($1.2 million) of the financial assistance grant was
                                                           again prepaid in June 2021 and may impact on
                                                           Council’s 2021/22 final operating position if the
                                                           prepayment approach is discontinued by the
                                                           Australian government.
 Unitywater             On track                    •      Unitywater distributions are fixed each year so little
 Distributions                                             budget variance risk

Figure 2: Operating Revenue Position by Type (Excluding Rates)

  $7.0
                                             $6.5
                                                                           YTD Budget ($m)
  $6.0
                 $5.2                                                      YTD Actual ($m)
                                      $5.0
  $5.0
         $3.7
  $4.0
                                                                                    $2.9 $3.1
  $3.0
                                                                                                $1.9 $1.9
  $2.0
                                                    $1.0 $1.1
  $1.0                                                                $0.6 $0.5
                        $0.4 $0.4

  $0.0
                                                                                                  Unitywater
                                                        Income




                                                                          Other




                                                                                      Grants
             Charges




                                       Goods &
                                       Services
                                       Sales of




                                                         Rental
                           Interest
             Fees &




                                                                                                   Share of




Operating Expenditure (YTD Benchmark 50.0%)
Actual operating expenditure is currently 48% ($51.3 million) of full year budget ($107.9 million).
Detailed commentary for each expenditure category is provided below.

 Category               Summary                                   Comments
 Employee Costs         $18.2 million (48%) of the                •   Under expenditure for permanent staff salaries
                        annual budget of $37.7                        and wages ($1.6 million) partially offset by
                        million has been expended                     additional spend on casual staff and external
                                                                      labour hire ($933k)
 Materials and          $22.7 million (46%) of the                •   Waste Management $357k below YTD budget
 Services               $49.3 million annual budget                   (46% or $5.1 million of $11.1 million budget
                        has been expended.                            spent)
                                                                  •   Mayor and Councillor Support costs $77k above
                                                                      YTD budget ($81k of $8k budget spent) –
                                                                      subscription for Council joining the SEQ Council
                                                                      of Mayors




                                                                                                               Page 33 of 72

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                                                  17 JANUARY 2022


 Category                   Summary                                          Comments
                                                                             • CEO’s Office $210k above YTD budget
                                                                                (132.6% or $402k of $303k budget spent) – Kin
                                                                                Kin Quarry legal appeal costs
                                                                             • Holiday Parks $415k above YTD budget (73%
                                                                                or $1.1 million of $1.4 million budget spent) –
                                                                                offset by additional revenue.
 Finance Costs              On track                                         Nil
 Depreciation               On track                                         Nil
 Other Expenses             On track                                         Nil

Figure 3: Operating Expenditure Position by Type

$25.0
                                  $22.7 $22.7
                                                                               YTD Budget ($m)
$20.0       $18.4 $18.2                                                        YTD Actual ($m)

$15.0

                                                                                        $9.8 $9.8
$10.0

 $5.0
                                                          $0.6 $0.6                                             $0.1 $0.1
 $0.0
                                                             Finance Costs
                                       Materials




                                                                                           Depreciation
                Employees




                                                                                                                   Other

Tourism and Economic Development Investment Summary
Council resolved to report on a monthly basis, investment details for tourism and economic
development. Expenditure as at 31 December 2021 is outlined below, which includes the first
instalment payment to Tourism Noosa under the funding agreement.
 Expenditure                                       Annual Budget                   YTD Budget             YTD Actual       YTD Variance
                                                             $m                           $m                     $m
 Payment to Tourism Noosa                                  $2.52                        $1.26                  $1.26                   -

 Economic Development                                      $0.95                        $0.33                  $0.43              ($0.1)

 Total                                                     $3.47                        $1.59                  $1.69              ($0.1)

The payment of the second instalment to Tourism Noosa for 2021-22 ($1.26m) is in February 2022.
YTD Economic Development expenditure is below budget due to lower employee costs ($44k) as
the Branch Manager was acting as Director of Environment & Sustainable Development for the
first four months of the financial year 21/22 without additional backfill resourcing. There has also
been a delay in the delivery of initiatives under the Local Economic Plan ($94k).
Tourism and economic development activity is funded through the general rate, with 5.8% ($3.47
million) of the annual $59.7 million general rate committed towards tourism and economic
development. Actual year to date general rate revenue received is 0.36% ($101k) below budget
overall. When apportioned to the 5.8% share for tourism and economic development, this equates
to a $6k shortfall. To ensure full funding remains in place for these activities and contractual
commitments are met this shortfall funded through Council’s other general revenue and reserves.

                                                                                                                           Page 34 of 72

Section 35

GENERAL COMMITTEE MEETING AGENDA                                                      17 JANUARY 2022


Legal Cost Summary
Council requested an update on legal costs and associated expenditure. Expenditure as at 31
December 2021 is outlined below.
Legal and associated costs are $206k above YTD budget (58.2% or $914k of $708k budget spent),
this is due largely to costs associated with the Kin Kin Quarry. These additional costs will be
addressed as part of budget review 2 (BR2).




It should be noted legal costs are primarily driven by emergent issues and therefore prior year
expenditure may not be an appropriate comparison for projecting future costs.
Capital Revenue
YTD capital revenue of $9.6 million received comprises cash contributions from developers ($1.6
million) and capital grants ($7.6 million). Note that the timing of capital grant receipts are generally
dependent on the timing of grant conditions and also capital delivery performance, and that the
timing of the receipt of developer contributions (both cash and contributed) is unpredictable.
Figure 4: Capital Revenue by Type

  $9.0
                                                $7.3               $7.7
  $8.0
                                                                          YTD Budget ($m)
  $7.0
                                                                          YTD Actual ($m)
  $6.0
  $5.0
  $4.0
  $3.0
                 $1.5                   $1.6
  $2.0
                                                                               $0.6                 $0.7
  $1.0
  $0.0
                        Contributions




                                                       Subsidies




                                                                                      Contributed
                                                        Grants /




                                                                                        Assets
                           Cash




Capital Program
Actual capital expenditure (excluding commitments) is $15.3 million (YTD budget $18.2 million).
Detailed discussion of progress in the delivery of the capital works program is provided through a
separate quarterly report by the Asset Planning Manager.




                                                                                                    Page 35 of 72

Section 36

GENERAL COMMITTEE MEETING AGENDA                                                     17 JANUARY 2022


Figure 5: Capital Program Delivery Performance

 $18.0
                $15.7
 $16.0
                          $13.4
                                                                        YTD Budget ($m)
 $14.0
                                                                        YTD Actual ($m)
 $12.0
 $10.0
  $8.0
  $6.0
  $4.0
                                              $1.9       $1.2
  $2.0
                                                                              $0.6     $0.6
  $0.0
                 Capital works                 Other capital               Loan redemption



Cash Management and Investment Performance
Total cash on hand at the end of December was $79 million. Included in this balance are funds
held in trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid grants
including the financial assistance grant and other capital works grants, July rates payments
received, and unspent monies committed for funding capital projects which are underway and will
continue during the financial year.
The following pie charts present the mix of cash held at December 2021 by agency (graph on the
left) and by credit risk rating (graph on the right). All funds have been invested in accordance with
the Investment Policy and in consideration of the principles of ethical investment, preservation of
capital, return on investment and counterparty thresholds
Figure 6: Closing Cash Held by Agency and Credit Rating


                         CBA
                         6%                                        A1 +
                                                                (Commercial
                                                                  Banks)
                                                                    6%




                                                                           A1 +
                                  QTC                                     (QTC)
                                  94%                                      94%




The following chart monitors the 12 month trend on total cash and the agencies invested. Cash
balances will decline between September and January as cash from the bi-annual issue of rates
and levies in July are utilised to fund Council operations.




                                                                                         Page 36 of 72

Section 37

GENERAL COMMITTEE MEETING AGENDA                                                                                            17 JANUARY 2022


Figure 7: 12 Month Trend of Cash Invested by Agency
 120,000,000



 100,000,000



  80,000,000



  60,000,000



  40,000,000



  20,000,000



           -
               Jan-21     Feb-21       Mar-21     Apr-21       May-21    Jun-21     Jul-21    Aug-21     Sep-21   Oct-21   Nov-21    Dec-21

                Bendigo TD               Westpac TD               NAB TD            Suncorp TD           CBA TD       QTC           CBA Operating



Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current emerging risks regarding
performance noting the early stage of the financial year.

 Category                                                                                                     Comments
 Operating Surplus Ratio                                                                                      • Intent: Identifies the extent to
     90%   82.6%
                                                                                                                which revenues cover
     80%                                                                                                        operational expenses, to
     70%
                                                                                                                ensure community equity is not
                         60.9%
     60%
                                                                                                                degraded
     50%
                                44.5%                                                                         • Target: 0 – 10%
     40%                                30.5%                                                                 • Result: 8.3%
     30%
                                                18.3%                                                         • Comment: The slowly
     20%                                                                                                        declining ratio reflects the
                                                        8.3%
     10%                                                                                                        levying of 50% of rates in July
      0%                                                                                                        and gradual utilisation of these
    -10%                                                                                                        monies as expenditure occurs
               Jul      Aug     Sep     Oct     Nov     Dec     Jan     Feb   Mar     Apr    May   Jun
                                                                                                                on operations through the next
                                                                                                                rate run in January 2022 and
                              Actual                       Budget                      Target
                                                                                                                then through to the end of the
                                                                                                                financial year at 30 June 2022




                                                                                                                                     Page 37 of 72

Section 38

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                              17 JANUARY 2022


Category                                                                                                                                                                          Comments
Cash Expense Cover                                                                                                                                                                • Intent: Indicates how long
                                     14.0                                                                                                                                           council can continue paying its
                                                         12.5                                                              12.8       12.5
                                                                    12.2                                                                         11.9                               day-to-day expenses from
 Months (Cash to Cover Operations)




                                                                               11.6                                                                         11.8
                                     12.0                                                 10.9                                                                         10.8         cash at bank without needing
                                                                                                     10.1       10.4
                                               9.7
                                     10.0                                                                                                                                           additional cash flows
                                                                                                                                                                                  • Target: > 3 months
                                      8.0
                                                                                                                                                                                  • Result: 10.8 months
                                      6.0
                                                                                                                                                                                  • Comment: Council is forecast
                                      4.0                                                                                                                                           to remain above target for the
                                                                                                                                                                                    financial year. Business as
                                      2.0
                                                                                                                                                                                    usual expenditure through to
                                          -          -          -          -          -          -          -          -          -          -          -          -          -     30 June 2022 will continue to
                                              Jan        Feb        Mar        Apr        May        Jun         Jul       Aug        Sep        Oct        Nov        Dec
                                                                                                                                                                                    diminish Council’s cash
                                                          Actual                                                                  Minimum (>0 months)                               holdings, albeit not below the
                                                          Target (3 months)                                                       Maximum (6 months)                                target range of 3 – 6 months.

Asset Sustainability Ratio                                                                                                                                                        • Intent: Measures the extent to
                                     140%                                                                                                                                           which assets are being
                                                                                                                                                                       121.9%       replaced as their condition
                                     120%
                                                                                                                                                                                    degrades to ensure service
                                     100%                                                                                                                                           potential is maintained
                                                                                                                                                                         90%      • Target: 90% of depreciation
                                     80%
                                                                                                                                                                                    budget spent on renewals
                                     60%                                                                                                                                            annually
                                     40%
                                                                                                 31.6%
                                                                                                                                                                                  • Result: In line with budget
                                                                                26.3%
                                                                           17.2%                                                                                                  • Comment: It is expected that
                                     20%
                                                     6.5% 10.1%                                                                                                                     the ratio will progressively
                                              0.9%
                                      0%                                                                                                                                            increase each month as
                                              Jul        Aug        Sep        Oct        Nov        Dec        Jan    Feb         Mar       Apr        May        Jun              expenditure on renewals
                                                                                                                                                                                    occurs as part of the capital
                                                 Actual Renewal Spend (%)                                  Target (%)                    Renewals Budget (%)
                                                                                                                                                                                    works program.

Net Financial Liabilities Ratio                                                                                                                                                   • Intent: Outlines the level that
                                                                                                                                                                                    net Council debt can be
               80%
                                                         60%
                                                                                                                                                                                    serviced by operating
               60%                                                                                                                                                                  revenues. A ratio below zero
                                                                                                                                                                                    implies that liabilities are less
               40%                                                                                                                                                                  than cash (and other current
               20%
                                                                                                                                                                                    assets) and there is adequate
                                                                                                                                                                                    borrowing capacity available if
                                     0%                                                                                                                                             needed.
                                                     Target                                          Budget                                 YTD Actual                            • Target: less than 60%
   -20%
                                                                                                      -5%                                                                         • Result: -55%
   -40%
                                                                                                                                                                                  • Comment: Council has low
   -60%
                                                                                                                                                                                    debt levels and strong cash
                                                                                                                                                 -55%                               holdings. Cash received from
   -80%                                                                                                                                                                             the July rates revenue also
                                                                                                                                                                                    inflates the YTD actual
                                                                                                                                                                                    position.




                                                                                                                                                                                                    Page 38 of 72

Section 39

GENERAL COMMITTEE MEETING AGENDA                                                                                                                      17 JANUARY 2022


 Category                                                                                                                                 Comments
 Investment Return                                                                                                                        • Intent: Ensure appropriate
                                                                                                                                            return on investment yield for
                                                                                                                                            cash at bank.
                                                                                                                                          • Target: 0.25% above current
                                                                                                                                            Bloomberg commonwealth 10-
                                                                                                                                            year bond rate yield (0.06%)
                                                                                                                                          • Result: 0.44%
                                                                                                                                          • Comment: Regardless of the
                                                                                                                                            current levels of low long-term
                                                                                                                                            bond and interest rates (due to
                                                                                                                                            current economic conditions),
                                                                                                                                            Council’s investment return still
                                                                                                                                            remains above target. QTC at
                                                                                                                                            call rate currently 0.6%.
                                                                                                                                            Closest comparable term
                                                                                                                                            deposit rate from other
                                                                                                                                            institutions is 0.55% and is for
                                                                                                                                            longer investment terms at 12+
                                                                                                                                            months

 Rates in Arrears                                                                                                                         • Intent: Ensuring that the
                                                                                                                                            amount of unpaid rates
                                           12.0%
                                                                                                                                            remains sustainable & does
   Percentage of Annual Rates in Arrears




                                                                                                             10.2%
                                           10.0%                 9.5%                                                                       not negatively impact cash
                                                                                                                                            flows
                                            8.0%                        7.4%                                         7.3%
                                                                                                                            6.5%
                                                                                                                                          • Target: 5% industry
                                                                               6.2%                                                6.0%
                                                   5.7%                                 5.7%                                                benchmark
                                            6.0%          5.0%                                 5.2%
                                                                                                      4.6%                                • Result: 6.0%
                                            4.0%                                                                                          • Comment: Rates arrears
                                                                                                                                            continue to decline from the
                                            2.0%
                                                                                                                                            high point in the cycle however
                                            0.0%
                                                                                                                                            they remain slightly above
                                                   Jan    Feb    Mar    Apr    May      Jun    Jul    Aug     Sep    Oct    Nov    Dec      target. Reminder notices were
                                                                                                                                            issued in October. Recovery
                                                                               Actual           Target                                      action may be considered
                                                                                                                                            where appropriate.

Previous Council Consideration
Nil.
Finance
As above.
Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial
sustainability.
Some examples of identified risks within the register that could have potential impact on Council’s
operational performance, capital program delivery, cashflow and cash reserves include:
• Substantial damage to or failure of Council infrastructure due to natural disaster or other
  emergent issue that may require significant unplanned investment
• Closure of council facilities due to ongoing Covid 19 restrictions
• A prolonged IT system failure affecting Council’s ability to deliver services or issue rates notices
• Economic conditions affecting ratepayers’ ability to pay rates
• Market driven increases in construction and operational costs significantly above estimates
• Labour and material shortages and delays

                                                                                                                                                           Page 39 of 72

Section 40

GENERAL COMMITTEE MEETING AGENDA                                                     17 JANUARY 2022


Actions to manage and mitigate financial risk on these factors include monthly ongoing financial
reporting to identify and address issues, conservative budgeting and compliance with the Financial
Sustainability Policy, regular budget reviews, effective liquidity management to ensure sufficient
fiscal flexibility, as well as the Reserves and Restricted Cash policy requiring both a disaster
management reserve and 3 months cash cover reserves to fund emergent matters.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.

Departments/Sections Consulted:

 X     Chief Executive Officer   X   Community Services                      X   Corporate Services
       Executive Support             Director                                X   Director
                                     Community Development                   X   Financial Services
                                     Community Facilities                        Fleet
                                     Libraries & Galleries                       ICT
                                     Local Laws                                  Procurement
                                     Waste & Environmental Health                Property
                                                                                 Revenue Services

 X     Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                            Page 40 of 72

Section 41

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022


Attachment 1




                                      Page 41 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                       17 JANUARY 2022

Attachment 1

  Profit and Loss Statement

  Revenue
     Recurrent Revenue
     Rates, levies and charges                            74.591          37.152         37,381                       50%
     Fees and charges                                      7.185           3,724          5.193           1469        72%
     Interest received                                      670             375             376               1       56%
    Sale of Goods and major services                      10,224          4.961           6481            1,520       63%
     Sale of contract and recoverable works                  23               -               0              0         1%
     Rental & lease income                                 1.885           1,050          1,050               1       58%
     Other income                                          1,224           551             522             (30)       43%
     Grants, subsidies, contributions and donations        5.797           2.942          3,081             149       53%
     Unitywater Distributions                              5,650           1.919          1.919               -       34%
                                                         107,248         52,674         56,014            3,340       52%
  Expenses
     Recurrent Expenses
     Employee benefits                                    37,701          18,398         18,217             182       48%
     Materials and services                              49.303          22.723          22.674             49        48%
     Finance costs                                         1,114           559             568             (10)       51%
    Depreciation                                          19,589           9.795          9.796             (1)       50%
     Other expenses                                         233             101             95               6        41%
                                                         107,941         51,575         51,350             225        48%
Operating Result,                                          682)            099 aS
  Summary of Capital Expenditure and Funding
  Capital Funding
    Capital cash contributions and infrastructure charges  1,397           1453           1,600             147       115%
     Contributed assets                                    1,500           637             677              40        45%
     Capital grants and subsidies                        24.984            7,286          7.665            379        31%
     (Cash / revenue                                     (24.954           9.505          6.893          (2,611)      28%
     New loan borrowings                                  2.360               -               -               -        0%
    Other capital revenue                                      -              -               -               -        0%
Total CapitalFunding =                                   85S              188016885208)
  Capital Expenditure
     Contributed assets                                    1,500           637              677             40        45%
     Capital works - constructed assets                   47,605          15,712         13,409         (2,303)       28%
     Capital works - other capital                         4.792           1,883          1,235           (648)       26%
     Loan redemption                                       1,297            648            648                -       50%
    Other oie ponditure                                        -               -           866             866         0%

                                                                                                             Page 41 of 72

Section 42

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022


Attachment 2




                                      Page 42 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                    17 JANUARY 2022

Attachment 2

  Current Assets
       Cash and cash equivalents                                     49,747                  78,744                 68,895
       Trade and other receivables                                    10,137                  7,693                  7 467
       Inventories                                                      181                    154                     144
       Contract Assets                                                     -                  487                     487
       Other current assets                                           2,912                   3,634                  4,955
                                                                     62.978                 90,712                  81,948
       Non Current Assets held for sale                                    -                      -                      -
  Total Current Assets                                              62,978                  90,712                  81,948
  Non Current Assets
       Trade and other receivables                                   49,593                 49,468                  49,468
       Other non current Assets                                            -                      -                      -
       Investments                                                   88,040                  92,434                 92,434
       Investment property                                             3,000                  2,900                  2,900
       Property, plant and equipment                               1,009,996               957,422                 952,579
       Right of Use Assets                                              161                    89                       89
       Intangible assets                                               8.128                  2.839                  3,036
  Total Non Current Assets                                         1,158,317              1,105,151              1,100,506
  Total Assets                                                     1,221,895              1,195,863              1,182,454
  Current Liabilities
       Trade and other payables                                       7,151                  10,055                 10,468
       Contract Liabilities                                                -                  4.377                  4,377
      Borrowings                                                        848                    586                    955
       Lease Liablities                                                    -                    25                     25
      Provisions                                                      7,582                   5,052                  4,947
      Other                                                           4.780                   3.157                  2,898
  Total Current Liabilities                                         20,361                  23,252                  23,669
  Non Current Liabilities
      Borrowings                                                     21,989                 20,258                  20,258
       Lease Liabilities                                                110                     66                     66
      Provisions                                                      15,307                 16,555                 16,555
  Total Non Current Liabilities                                      37,406                 36,879                  36,879
  Total Liabilities                                                 57,767                  60,131                  60.549
  Net Community Assets                                            1,164,128              1,135,732              1,121,905
  Community Equity
       Asset Revaluation Surplus                                     121,483                108,561                108,473
       Retained Surplus / (Defeciency)                                     -                      -                      -
       Shire Capital                                               1,042,645              1,008,596              1,004,202
       Current Year Net Earnings                                           -                 18,576                  9,230
  Total Community Equity                                          1,164,128              1,135,732              1,121,905

                                                                                                          Page 42 of 72

Section 43

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022


Attachment 3




                                      Page 43 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                    17 JANUARY 2022

Attachment 3

  Cash flows from operating activities
       Cash Flows from Operating Activities
       Receipts from Customers                                               92.622             53,703              93,975
       Payments to Suppliers and Employees                                   (87.376)           (44.433)           (84,528)
                                                                               5,246              9,270              9,447
       Investment and Interest Revenue Received                                3,270               880               3,401
       Rental Income                                                           1,874              1,050              1,365
       Non Capital Grants and Contributions                                    5,765              3,091              6,085
       Income Tax Equivalent Received                                          1,200               785               1,450
       Income from Equity Investments                                          1,850               630               1,600
       Payments:
       Borrowing Costs                                                             -                  -             (2.499)
       Interest Expense                                                         (516)              (78)               (131)
      ‘Net Cash Inflow/(Outflow) from Operating Activities ==                 18.690            15,629             20,719
  Cash Flows from Investing Activities

       Proceeds of Sale of Property, Plant and Equipment                           -               103                 217
       Grants, Subsidies, Contributions and Donations                        26.381               9,265             13,679
       Payments:
       Payments of Property, Plant and Equipment                             (51,568)           (14,373)           (22,721)
       Payments for Intangible Assets                                           (829)              (273)            (1,385)
       Net Movement in Loans and Advances                                          -               125                 125
      Net Cash Inflow/(Outflow) from Investing Activities ==                (26,017)            (5,153)           (10,085)
  Cash Flows from Financing Activities
       Receipts:
       Proceeds from Borrowings                                                2.360                  -              2,500
       Payments:
       Repayment of Borrowings                                                 (736)               (626)            (1,263)
      ‘Net Cash Inflow/(Outflow) from Financing Activities =                  4,628                626)              8,287

       Cash and Cash Equivalents at the beginning of the reporting period    55.451            68,894               57,023

                                                                                                          Page 43 of 72

Section 44

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022


Attachment 4




                                      Page 44 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                        17 JANUARY 2022

Attachment 4

     Materials and services
    Advertising and Marketing                               227              124             123               1        54%
    Administration Supplies and Consumables                  751            354              336              18        45%
    Audit Expenditure                                        174              11              12              (1)       T%
     Communications and IT                                  684             409             448              (39)       66%
     Commission Paid                                        1,079           541              761            (220)       70%
   Consultancy Services                                     1,166           508              610            (103)       52%
     Contract Services                                    23,482           10,569          10,130            439        43%
     Contributions, Donations, Sponsorship and Prizes      3.471            1,739           1,661            78         48%
    Electricity                                             1,729           860              819              41        47%
     intemal Fleet Costs and External Plant Hire            1,668           797              922            (125)       55%
     Grants Paid to Community Organisations                 1,934           961             1,060            (99)       55%
     Insurance                                              690             654             642               12        93%
     Legal Expenses                                         1,272           558              762            (204)       60%
     Operating Leases and Rentals                           292              146             145               1        50%
     Software and Maintenance                              2.166            1,129           1,134             (4)       52%
     Subscriptions and Registrations                        291              199             290             (91)       99%
    Waste Levy Payments                                     1,460           730              771             (42)       53%
    Water and Sewerage Charges                              1,084            451             429             22         40%
    All Other Materials and Services                       5.684            1,983           1,619           364         28%
                                                          49,303          22,723          22,674             49         46%

                                                                                                               Page 44 of 72

Section 45

GENERAL COMMITTEE MEETING AGENDA                                                   17 JANUARY 2022


5.     BUDGET REVIEW 2 (BR2) FOR THE 2021/22 FINANCIAL YEAR

Author             Manager Financial Services (Acting), Pauline Coles
                   Corporate Services Department

Index              ECM/ Subject/ 7.29 – 2021-2022 Budget

Attachments        1.   Proposed Operating Budget Submissions
                   2.   Proposed Capital Budget Submissions
                   3.   Revised Capital Program
                   4.   Revised Statement of Income and Expenditure
                   5.   Revised Budget Financial Statements


EXECUTIVE SUMMARY
The Local Government Act 2009 and Local Government Regulation 2012 require Council to
undertake regular reviews of the adopted budget to ensure it remains reflective of planned activities
to be funded through the financial year. This second budget review for the 2021/22 financial year
(BR2) incorporates any new or emergent actions arising from Council resolution, Executive Team
or Capital Works Executive Committee action, reallocation of funds or realised revenue variance
since the adoption of the current BR1 budget in August 2021.
In summary the budget review is proposing a net improvement of $61k to Council’s operating
position, resulting in the operating deficit decreasing from $692k to a $631k deficit. This includes
a range of emergent costs that have been funded through additional revenue and grants received
year to date. The capital expenditure program has decreased from $53.7 million down to $48.1
million.

Item                                        Current Budget           Proposed      Revised Budget
                                                     (BR1)         Adjustments              (BR2)
                                                    ($’000)             ($’000)            ($’000)
Operating Revenue                                  107,248               $2,282          $109,530
Operating Expenditure                               107,941             ($2,221)          $110,161
Operating Result                                       (692)                $61             ($631)
Capital Grants and Contributions Revenue            $24,984             ($6,020)           $18,963
Capital Works Expenditure                           $53,694             ($5,615)           $48,079


RECOMMENDATION
That Council note the report by the Manager Financial Services (Acting) to the General Committee
Meeting dated 17 January 2022 and approve the proposed changes to the budget for the 2021/22
financial year as outlined in the revised Budget Financial Statements attached to the report.

REPORT
Section 170(3) of the Local Government Regulation 2012 allows Council, by resolution, to amend
the budget at any time before the end of the financial year. Consequently, formal budget reviews
are scheduled to occur at least twice annually during August and December, and a third in April if
required, using the latest financial information available as the basis to revise the budget forecast.
The key criteria for budget reviews include:
1.     Council must target compliance with its financial sustainability policy.
2.     The eligible capital or operating projects must be delivery-ready with a commitment to
       complete the project during the year.

                                                                                      Page 45 of 72

Section 46

GENERAL COMMITTEE MEETING AGENDA                                                17 JANUARY 2022


3.      Capital submissions will be reviewed and authorised by the Capital Works Executive before
        inclusion as a budget review submission, where the group will consider justification for the
        request, deliverability as well as organisational and community priorities before endorsing
        any capital works.
4.      All operating and capital submissions for additional spend, reallocation of savings or
        additional revenue will be confirmed by the Executive Team based on a business risk
        assessment.
The revised statement of comprehensive income, included as Attachment 4, identifies the financial
statement line items that have been affected by the proposed budget adjustments. The budget
financial statements, included in Attachment 5, also identify the impact of the proposed budget
adjustments to Council’s financial sustainability indicators.
1.      Proposed Operating Budget Adjustments
A proposed 35 operational budget adjustments will result in a $61k improvement to the operating
deficit. The following table summarises the operational submissions by type of funding, with a
detailed list contained in Attachment 1. The financial statements in Attachments 4 and 5 outline
the revised budget position as a result of these proposed adjustments.

    Type                                  Submissions        Revenue         Expense              Net
                                                              ($’000)          ($’000)        ($’000)
    Grant Funded                                6              ($129)            $165             $37
    General Revenue and Reserve Funded          12                    $-       $1,439         $1,439
    Increased Revenue (Net)                     11            ($1,184)           $240         ($944)
    Levy and Waste Funded                       6               ($969)           $377         ($592)
    Total                                       35                  $383       $1,127          ($61)

2.      Proposed Capital Budget Adjustments
A total of 41 budget review submissions were received for capital works, with a proposed decrease
of $5.6 million to the 2021/22 capital works program. All capital submissions have been reviewed
by the Capital Works Executive. The following table summarises the proposed revised 2021/22
capital budget.

Total Capital Budget                                 Amount
                                                     ($'000)
Original Budget                                          $46,897
BR1 Adjustments                                            $6,797
Current Capital Expenditure Budget                       $54,694
Proposed BR2 Adjustments                                 ($5,615)
Revised BR2 Capital Expenditure Budget                   $48,079

The following table summarises the budget submissions by program and categorised as:
•     Emergent Works: Initiation of new capital works items which have arisen since BR1.
•     Variation: Acceptance of tender, change in scope, reallocation of funds or savings realised
      upon completion with project being under budget.
•     SEQCSP Grant: Council has been successful in being funded a three year $4 million grant
      under the South East Queensland Community Stimulus Package (SEQCSP). Budget review 2
      includes those projects scheduled for completion during 2021/22.
•     Timing Adjustment for Multi-year Projects: Where timing of design and construction works
      for major projects straddle multiple financial years, or commencement has been delayed, and
      the budget has been moved to the 2022/23 financial year to reflect revised timing.


                                                                                     Page 46 of 72

Section 47

GENERAL COMMITTEE MEETING AGENDA                                                            17 JANUARY 2022


The full list of submissions is contained in Attachment 2.
The following table summarises the proposed revised 2021/22 capital budget by program, with the
full program contained in Attachment 3.

Program                               Current       Emergent    Variations        SEQCSP Timing Delay    Proposed
                                      Budget          Works                         Grant   to 2022/23 BR2 Budget
Capital Works
 Bridges                               $7,595              $-        $1,616           $35      ($4,304)     $4,943
 Coastal Canals and Waterways          $1,830              $-            $-            $-      ($1,196)      $634
 Cemeteries                                $180            $-            $-            $-             $-     $180
 Community Facilities                  $6,144            $140         ($22)          $170      ($1,485)     $4,947
 Corporate Buildings                         $20           $-            $-            $-             $-      $20
 Environmental Assets and              $1,700              $-            $-            $-      ($1,100)      $600
 Trails
 Gravel Road Network                       $410            $-            $-            $-             $-     $410
 Holiday Parks                               $40           $-            $-            $-             $-      $40
 Libraries & Galleries                     $822            $-            $-            $-             $-     $822
 Parks & Playgrounds                   $4,705              $-            $-            $-             $-    $4,705
 Pathways & Boardwalks                 $3,574              $-        ($281)          $103        ($291)     $3,106
 Public Amenities                             $-           $-            $-          $200             $-     $200
 Public Transport Infrastructure           $352            $-            $-            $-             $-     $352
 Sealed Roads Network                 $14,476             $86         $176             $-      ($2,000)    $12,739
 Sports Grounds                              $50           $-            $-            $-             $-      $50
 Stormwater Drainage                         $26           $-         $100             $-             $-     $126
 Transport Infrastructure              $1,218              $-         ($88)            $-             $-    $1,217
 Waste Management                      $2,560              $-        $2,673            $-        ($270)     $4,962
Other Works
 Fleet - Plant Replacement             $2,763              $-            $-            $-             $-    $2,763
 Asset Management                      $1,200              $-            $-            $-             $-    $1,200
 Information Technology                    $669            $-            $-            $-             $-     $669
 Strategic Planning                        $160            $-            $-            $-             $-     $160
 Other                                 $1,297              $6            $-            $-             $-    $1,303
Grand Total                           $53,694            $226        $4,465          $508     ($10,815)    $48,079


Previous Council Consideration
The 2021/22 original budget was adopted by Council Resolution on 30 June 2021 (Ref. Special
Meeting Minutes, 30 June 2021, Item 3, Page 3.
The 2021/22 budget review 1 (BR1) was adopted by Council resolution on 19 August 2021 (Ref.
Ordinary Meeting Minutes, 19 August 2021, Item 9, Page 17).

Finance
The financial sustainability ratios for asset sustainability and net financial liabilities are forecast to
meet the benchmark targets under the revised BR2 budget for 2021/22; however the operating
surplus ratio will continue to fall below the target range.

Ratio                              Target          Original Budget        BR1                BR2
Operating Surplus                  0 – 10%              0.3%             (0.6%)             (0.6%)
Net Financial Liabilities          < 60%               (8.1%)            (4.9%)             (12.7%)
Asset Sustainability               > 90%               107.8%           121.9%              130.1%




                                                                                                Page 47 of 72

Section 48

GENERAL COMMITTEE MEETING AGENDA                                                     17 JANUARY 2022




Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial
sustainability. Effective budget management and reporting is an important risk mitigation tool.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
Financial Services have been in contact with all Council branches. Directors of each department
have reviewed endorsed all submissions received. The Executive Team has also reviewed and
endorsed all submissions received.

Departments/Sections Consulted:

 X     Chief Executive Officer   X   Community Services                      X   Corporate Services
       Executive Support             Director                                    Director
                                     Community Development                       Financial Services
                                     Community Facilities                        Fleet
                                     Libraries & Galleries                       ICT
                                     Local Laws                                  Procurement
                                     Waste & Environmental Health                Property
                                                                                 Revenue Services

 X     Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                            Page 48 of 72

Section 49

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022


Attachment 1




                                      Page 49 of 72

GENERAL COMMITTEE MEETING AGENDA                                          17 JANUARY 2022
   Attachment 1
     2021/22 Budget Review 2 - Operating Submissions
    IGrantFunded TT
     a fname | ka                                                                 wad
    Sl i                   a
     a da                                                             es
    REGS Cone Sapper        AS aE  ng ea DE                              ==      Sa
                          «(get appeves zr war eamove                    eee             seas
     aor Gariveiow wes)  —*(RAGFasaionatgertnarg                     |S]         aBOEL
     GrantFunded Total                                                          128,718] 36.728)
Sc
   Sans aiFasiiee        ‘aur cages recovery sows bape YI                [RTS]
    fonmuntj Faaiies NAC,NLG, Tred) [FaciesrevrweabowbuspeteperatereyTO ||         oo   To no0
     Perm LarausePemas|WasingpernisrevenaeaiovesugelmresssyTo [Same
    senescence I            ech    ceeneneiecention ices                         a         de
   fcuasyeans ———=*( aay Fans aon rveronsetby read opertoraicoss         aaa] aaTvel
       AAS (TSN SOCEM ECAVIS                                          | |        aaa]    aaa
    Pansandtaraccase     —=(emengandpemifessreverurovebuagettreaetyTO |S
     T_____————————C«* RR SOY OVE DTTC VPS                                       aaa
    Rewmuceves ((Gereraimiesyrorevnveneownamet || coo|                                  Ta no0
                            an i thgesiccr teint     1S                               a
    Aamitional Revenue Tota                                              289.718] 1184165] 944,448)
    GeneralRateFunded
     ewlangs Facies        *([TewartinAmin Bulag feurpan ua scares easing capacly costars | vonso] | Waab0
                                       COSC SRTETONS            |R|ae
     P«*acneiaesccates win nenGuamy appease]                                            aa
     A Tn Scee                                                     | am             |   Fey
     PSST CESS NERQERERT   (FR OPTSEONS ESSE Tawa MNS sougaedpecuenerTapuons |" Yauaoa] | Taaoo
                              advice for a oF commercial and      lease
                          ris        BE ESE             oe
    oe                      ety                                      | TT
                           Short Stay Local Law
                          «(RSVR asin Gereopmewapessegmceds        | Sass]        [sams
 ic                         icc ld a
     airs Cour Suppor      | SECTCHTo Wave AG HERDESP SOO SSI coowen |r              |      9
     aes                 lee                                     ee       ee
   RS                       Analysis
     Sustanabiny Programs  Part year value of moving Council's existing elecsicity contacts to 100% 64,000
                           further progressing zero emission priorties.
    GeneralRateFundedTotal =|                                             BS]          1.498.885)
    lLevySWasteChargeFunded |
     P«(NS RLS pantera ctnetparungevense                          [eno] —taaon|          0.00
    Nase Waragenet         «(Lange Re andeae otrecovrsiesreven stovenayerercanyro [| Ssc0o| Sen t00
     [ras umiycrarges-vrDrevrmewmece                                       | ares]      ate
     Pe eee le
                            approval
     P____rereasacecjecis proceesng coe ioertemaiconmactvey              Waser]   | aa7
    Laoy E Wests Compo Femmes Tey cee

                                                                                  Page 49 of 72

Section 50

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022


Attachment 2




                                      Page 50 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                                         17 JANUARY 2022

 Attachment 2
  Noosa Shire Council
  2021/22 Budget Review 2 - Capital Submissions

  Tomes                                               es
 \Cooran Tablelands Road Bridge Renewal                  768,650                                                            1,179,361 Tender and additional cost approved at August Council meetings, with additional
                                                                                                                                    grant endorsed to part fund variation
                                                                                                                                     e)          to part fund variati
 |\Cooroy Belli Creek Road Bridge Renewal                879,835                                                                    Realignment of multi-year project timing from 2021/22 to 2022/23.
                                                                                                                                     Tender proposed to commence in January 2022 with construction forecast
                                                                                                                                     2022/23
pe                                            Pee                                                                                                    ee
  Black Mountain Lawnville Road Bridge Renewal         1,453,980                                              (1,330,960)                     of multi-year project timing from 2021/22 to 2022/23.
                                                                                                                                     Planning and design underway.
  \Cooroy Gumtree Drive Pedestrian Bridge                 130,000                                                (95,000)            Realignment of multi-year project timing from 2021/22 to 2022/23. Planning,
                                                                                                                                    approvals and tender underway in 2021/22, with construction in 2022/23
  rotalpridges                                              ZA                    ,615,966       35,000      (4.303.702)     842493

       eee                                                                                                                                ead    gn cneay th cncin eer 20273
                                                                                                                                     Planning and design underway, with  i         for 2022/23
         eee                                                                                                                                      mnaneyeinion to movenber oe sheng sen,
                                                                                                                                      Project delivery wi is to        due to fish     E     -
  Noosa Waters Revetment Wal
 Noosa Heads Main Beach Sand Recycling System Pipework  100000                                                s—<—~sSS~—iO                  nn                                O—™—OTCSC‘(S
 INoosa Main Beach Shower & RockWallSeatng              185.00, OONOCOC—OSOOOCOC“‘“CSCNSC(‘(NNNN.CCdi
 [Total Coastal Canalsandwaterways                 8303196000) BIS
  [Corey Cemetery Piant &Equpment Shed                   180.00
 [fotalCemeteries                                      BOD                                                                    80000
  Rufous St-Stage 3 Community House, CarPark&Landscape, 348.103
 [Rufous St-Stage 3 Civil Works (WaterMain)        OSS |
 [Rufous St-Stage 3Digial Hub Expansion =          C—CiSOSSSCs‘“Ss™sSSSCSSSSS |
 [Rufous St- Stage 3 Project Management
 JNAC Replacement of Light Pole Fittings                                                                                       850
  Pomona School of Arts Hall-Amenities Upgrade      SS113600—SSa2.a8)                                          SS. 202 Works complete with savings realised as actual costs under budget estimate
 |Legal and Procurement Advice, Ricon Insolvency
                                                                                                                                  Page 50 of 72

Section 51

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022




                                      Page 51 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                                17 JANUARY 2022

  Noosa Shire Council
 2021/22 Budget Review 2 - Capital Submissions

[Shire Community Halls and Facilites Renewals
|Tewantin Sports Complex -Navy Cadets                                                                                       2088
 Living Fire Tech Lab                                  1,934,908                                             (1,484,908)     450,000 Realignment of multi-year project timing from 2021/22 to 2022/23.
                                                                                                                                    Tender proposed to commence in January 2022 with construction forecast
                                                                                                                                    2022/23
|Peregian Beach Rufous StPublic Ar                9 8
 FTewantin ReGen Wellbeing and CommunityHub FeasabiltySi 100000                                               —~—SsS~—“‘ OW OOSO—SSC“C“S*s~S™SC“‘C‘“CS*s~S~S

[Quamby Park Council Tennis court-Fencingrenewsl                     20,000                                                  «20,000 Emergent works to replace rusted fencing at the Quamby Park Tennis Court
 [TotalCommunity Facilities                                          140,000      (22.488)     170,000      (1.484.908)      847.0500

 [Tewantin Emergency Generatorroof                                                                                           85900

[Trails Master Pian and Implementaton Pixma
 Trail 5 Upgrade                                       1,634, 165                                            (1,100,000)           Realignment of multi-year project timing from 2021/22 to 2022/23.
                                                                                                                                   Tender proposed to commence in January 2022 with construction forecast 2022/23
[Total Environmental Assets, Bushland, Tracks and Trails 1.699.718                                                000)      599.718

 fotalGravelRoad Network                                8.0000
 [Boren Point Campground Upgrade Works            382888829
 TotalHolidayParks 8982988
 [Whole of Shire Mobile Library Service Soluton         886.806                                                              86988
 New Regional Art Gallery Pre-Feasibility Study   a
 Total Libraries &Galleries                             NS
 Minor CapitalAcquisitions aa
 fotalMinorcapital,
[Parks 8 Playsrounds TT
                                                                                                                       Page 51 of 72

Section 52

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022




                                      Page 52 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                             17 JANUARY 2022

        Noosa Shire Council
       2021/22 Budget Review 2 - Capital Submissions

       [Sunshine Beach Skate Park New Shade Structure 0      80.95T                                                          888
      [Replace Shade Shelters atNoosa Banks                                                                                   8B
      [Sunshine Beach Metal SkateRampRenewal                80.000, 8OOOC—C—CSSCSC‘“‘(‘SNCCC*dC
       Total Parks& Playgrounds                              OKT
      |Noosa Heads Noosa Parade Road ComdorUpgrage          BATT                                                            88
       [Coorey Maple Street Raised PedesinanCrossng ss S8S4OTSC~—sSSCS™SSSCSC“‘COCSC™C‘isA, OC™—™OTCOCOCSCSCSCSC*Sd
       [Wallace Park Pathway 586
       INoosavile Sea Eagle Drive & Shire Drve Pathway Upgrades «176.418 =—=SSS*~*~CS*~« TRS) SSS*~<“<~*‘“‘*S*S*S*SCSCS*C*~*C«        sR reallocated tothe reseal program. Project completed     |
       [Peregian Beach Boardwalk 00                                                     so)                                    5.321 Works complete with savings realised as actual costs under budget estimate _|
       [Sunshine Beach BelmoreTce PathwayRenewal            00.000                                              f20,000)            Construction delayedto 2022/23,
       (Cooray Maple St Pathway OverianderAv BruceHwy       10,000                                              ato 000)            construction delayedto 2022/23.     OOOO™~<“Cs*~*‘“‘s*~*~*~*~*~*~*

      [TewantinEmest_Goodchap StPath Linkage                                                                                  25,000 SEOESP 3-year grant project committed for delivery in 2021/22
       Peregian Beach Plover StPatwayPpertoJacrna                                       S888 8,000 SECS 3-year grant project committed fordelivery in 2021/22
      [fotal Pathways &Boardwalks                          TTT,                     280,074)      103,000       (290.500)   3.106.201                                             C—C“‘“‘CNC‘idCN
       Public Amenities RenewalProgram                                                            0,000                |(200,000|SEQCSP 3-year grant project committed for delivery in 2021/22,
      [fotalPublicamenities                                                                       200.0000
       [Shire Bus Sheer Disabled Compliant ProgramAnnual    362.901                                                        8B
       [Total Public Transportinfrastructure          SAB
     paanesmen                                            ae                       es                             |             ee
                                                                                                                                     Eagle Drive respetive’
       Tewantin Bypass Stage 1                                                       400.000                   {2,000,000}          Works underway. Some costs rescheduled to 2022/23 based on project timing,
                                                                                                                                    and associated pavement work on Cooroy Noosa Rd reallocated from the reseal
penom em                                                                                  ||                                                  tena nananememcm                                  |
      [TotalsealedRoadsNetwork                             ATES          86.231      176.418                  (2.000.000)  12739140                                                     C—C‘“‘CSCisCS
       Sports Ground and Facilities
                                                                                                                         Page 52 of 72

Section 53

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022




                                      Page 53 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                                  17 JANUARY 2022

  Noosa Shire Council
  2021/22 Budget Review 2 - Capital Submissions

 Detaled Design Redevelopment Cooray Sports Complex        80.000
[otal SportsGroundandFaciiies                              0.000,
 JGympie Terrace Stommwster 8g
 Noosaville, Project Ave Stormwater Drainage Easement Upg                           282,098                                    498,404 Tendered cost to undertake works significantly higher than original budget
                                                                                                                                     estimate due to factors including site constraints and inflated market
  [Sunrise Beach Sobraon Steet ope Stbilsaton —SOOUETFsC“~*~s*s*sS™S*~*~“s*S*sS™*~étéOOSC ns                                                                              —SOCOC‘<S
 ee                                                                                                     |                               rung n 2/2 wh nso heed                       20223
                                                                                                                                      desig   c     in 2021/22, with construction scheduled in 2022/23
frotal stormwater Drainage                SSSCSC~SCSC~C‘ OSC
 Noosa Junction Sueetscape                                20.                       200,000 S_—«26,087 Progress stage 1A design works. Tobe funded through levy infiture years.                       |
  Total Streetscape Road Corridors                        26,047            o       100,000            0               o       126.047

  [Tewantin, Hilton Tce & Emest St intersection Upgrade —=ss—s=itiSsS*~<i*é‘sRSYSCOC*‘CS™#O#*‘C‘C*“‘«U9;9686 Projectcomplete. Minor savingsrealised =
  Transport Strategy, Walking & Cycling Strategy &CNLG Grant 42.05 8
  INoosa Heads, Noosa Drive Halse Lane to Sunshine SeachRd 270.00, COC™~—SSC“‘cRTOOOSCOC~—CSCSC“‘“C*CSC*“‘“‘S™S™S*™S™S™S™C™C™C™C~C™C~C~C~CCC~*YS
  Total Transport and Infrastructure Management         1,217,908           0         (888)            0               0     1.217.020
 INoosa Heads The
5	1	1	1	19	4	461	1575	88	65	58	Woods’
5	1	1	1	19	5	548	1575	44	65	58	Bin
5	1	1	1	19	6	591	1575	88	65	46	Storage
5	1	1	1	19	7	683	1575	126	65	46	Enclosure
5	1	1	1	19	8	819	1575	44	65	48	=
5	1	1	1	19	9	1035	1575	88	65	46	40078
5	1	1	1	19	10	1788	1575	99	65	26	26,000)
5	1	1	1	19	11	1924	1575	147	65	0	—=—«N5,076
5	1	1	1	19	12	2070	1575	71	65	0	Delay
5	1	1	1	19	13	2140	1575	28	65	0	of
5	1	1	1	19	14	2167	1575	34	65	77	of
5	1	1	1	19	15	2200	1575	82	65	7	project
5	1	1	1	19	16	2281	1575	142	65	7	construction
5	1	1	1	19	17	2427	1575	50	65	25	until
5	1	1	1	19	18	2487	1575	98	65	25	2022/23
4	1	1	1	20	0	249	1631	2735	30	-1	
5	1	1	1	20	1	245	1627	127	46	84	[Masterplan
5	1	1	1	20	2	371	1627	93	46	89	Landfill
5	1	1	1	20	3	471	1627	24	46	75	SW
5	1	1	1	20	4	501	1627	105	46	75	Controls
5	1	1	1	20	5	609	1627	16	46	0	&
5	1	1	1	20	6	628	1627	89	46	0	Design
5	1	1	1	20	7	1038	1627	47	46	43	8.
5	1	1	1	20	8	1981	1627	78	46	37	888
4	1	1	1	21	0	249	1665	2735	68	-1	
5	1	1	1	21	1	315	1661	197	94	24	eee
5	1	1	1	21	2	699	1661	142	94	31	eee
5	1	1	1	21	3	1788	1665	102	68	51	|
5	1	1	1	21	4	2148	1661	424	94	47	eee
4	1	1	1	22	0	2100	1708	363	25	-1	
5	1	1	1	22	1	2100	1716	69	17	36	pproac
5	1	1	1	22	2	2219	1708	28	17	69	Ening
5	1	1	1	22	3	2271	1704	32	32	96	to
5	1	1	1	22	4	2303	1704	46	32	96	site
5	1	1	1	22	5	2351	1704	75	32	95	master
5	1	1	1	22	6	2442	1715	21	7	67	plz
4	1	1	1	23	0	249	1736	2735	65	-1	
5	1	1	1	23	1	305	1732	138	91	20	ee
5	1	1	1	23	2	1905	1732	365	91	25	ee
4	1	1	1	24	0	2089	1781	91	18	-1	
5	1	1	1	24	1	2089	1781	91	18	41	2022/23_
4	1	1	1	25	0	242	1804	2690	34	-1	
5	1	1	1	25	1	242	1804	127	33	9	Noosaville
5	1	1	1	25	2	369	1804	96	33	94	Eumundi
5	1	1	1	25	3	470	1804	59	33	95	Road
5	1	1	1	25	4	531	1804	91	33	79	Landfill
5	1	1	1	25	5	622	1804	113	33	96	Expansion
5	1	1	1	25	6	734	1804	31	33	96	of
5	1	1	1	25	7	770	1804	105	33	95	Resource
5	1	1	1	25	8	1011	1804	106	34	92	268,727
5	1	1	1	25	9	2071	1807	89	33	96	Project
5	1	1	1	25	10	2159	1807	86	33	96	delayed
5	1	1	1	25	11	2244	1807	97	33	96	aligning
5	1	1	1	25	12	2341	1807	29	33	96	to
5	1	1	1	25	13	2374	1807	121	33	96	completion
5	1	1	1	25	14	2497	1807	26	33	96	of
5	1	1	1	25	15	2528	1807	50	33	97	site
5	1	1	1	25	16	2577	1807	131	33	94	masterplan.
5	1	1	1	25	17	2712	1807	78	33	96	Design
5	1	1	1	25	18	2789	1807	96	33	96	2022/23
5	1	1	1	25	19	2885	1807	48	33	96	and
4	1	1	1	26	0	244	1833	2072	44	-1	
5	1	1	1	26	1	244	1833	111	44	96	Recovery
5	1	1	1	26	2	2081	1848	136	19	95	construction
5	1	1	1	26	3	2223	1848	93	22	95	2023/24
4	1	1	1	27	0	250	1877	1821	39	-1	
5	1	1	1	27	1	250	1885	58	19	96	Total
5	1	1	1	27	2	313	1887	73	17	96	Waste
5	1	1	1	27	3	392	1887	150	25	96	Management
5	1	1	1	27	4	993	1877	120	36	90	2,559,506
5	1	1	1	27	5	1283	1887	15	17	39	o
5	1	1	1	27	6	1363	1877	118	39	92	2,672,653
5	1	1	1	27	7	1651	1887	15	17	32	0
5	1	1	1	27	8	1780	1878	105	38	94	(269,719)
5	1	1	1	27	9	1960	1887	111	25	91	4,962,440
4	1	1	1	28	0	245	1945	2746	39	-1	
5	1	1	1	28	1	1036	1923	97	77	0	eS
4	1	1	1	29	0	249	2125	2735	33	-1	
5	1	1	1	29	1	245	2106	66	66	76	[Shire
5	1	1	1	29	2	316	2106	61	66	87	CCTV
5	1	1	1	29	3	377	2106	110	66	79	Drainage
5	1	1	1	29	4	487	2106	99	66	67	Condition
5	1	1	1	29	5	597	2106	143	66	95	Assessment
5	1	1	1	29	6	740	2106	193	66	50	ProgramAnnual
5	1	1	1	29	7	1009	2106	111	66	0	20000
5	1	1	1	29	8	1785	2106	187	66	0	S—S—~—SS—i
5	1	1	1	29	9	2016	2106	50	66	0	OO
5	1	1	1	29	10	2610	2106	374	66	0	OOCOSSCSCS
4	1	1	1	30	0	249	2196	2735	32	-1	
5	1	1	1	30	1	234	2177	81	64	67	JAsset
5	1	1	1	30	2	314	2177	150	64	71	Management
5	1	1	1	30	3	463	2177	92	64	73	Systems
5	1	1	1	30	4	559	2177	182	64	40	implementaton
5	1	1	1	30	5	927	2177	17	64	16	|)
5	1	1	1	30	6	937	2196	2047	32	0	20000CSOSC~“—‘t
5	1	1	1	30	7	2021	2177	75	64	56	ONS
5	1	1	1	30	8	2463	2177	518	64	0	OCO—C—SOOCOCOC“(NNCNC#C*@d’
4	1	1	1	31	0	240	2232	1830	38	-1	
5	1	1	1	31	1	240	2234	72	36	96	Total
5	1	1	1	31	2	312	2234	66	36	96	Asset
5	1	1	1	31	3	384	2234	150	36	96	Management
5	1	1	1	31	4	1005	2232	107	34	94	1,200,000
5	1	1	1	31	5	1283	2236	14	20	83	0
5	1	1	1	31	6	1467	2236	14	20	77	0
5	1	1	1	31	7	1651	2236	14	20	79	0
5	1	1	1	31	8	1872	2236	14	20	84	0
5	1	1	1	31	9	1963	2236	107	22	85	1,200,000
4	1	1	1	32	0	1918	2289	289	44	-1	
5	1	1	1	32	1	1918	2289	105	44	96	Page
5	1	1	1	32	2	2039	2289	48	35	96	53
5	1	1	1	32	3	2103	2289	42	35	96	of
5	1	1	1	32	4	2159	2289	48	34	96	72

Section 54

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022




                                      Page 54 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                   17 JANUARY 2022

  Noosa Shire Council
  2021/22 Budget Review 2 - Capital Submissions

 [VHF Vehicle Installation                                                                                           86
Total Fleet - Plant Replacement                     2,763,192          0           0           0              0    2,763,192
 implementation of ClAnywhere Functionality forTechnologyOn 668.000                                                      OO    ee                      —(‘“CS™S*S™*™*™*™”™”C”C”C™C™C“‘(‘(CSC(‘(C‘*C
Total information Technology                        669,000            0           0           0              0       669,000
 |QTC CapitalDebtRedempton 8 —“—™sSCSC—t                                                                                OD     ee                     —“—‘“‘“‘“SOWTTTTTUUUUTCd
 Total Other                                        1,297,000          0           0           0              0     1,297,000

Total Strategic Planning                             160,000           0           0           0              0       160,000
 Grand Total                                     53,694,391     226,231    4,465,230     508.000     (10,814,823) 48,079,023

                                                                                                         Page 54 of 72

Section 55

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022


Attachment 3




                                      Page 55 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                                       17 JANUARY 2022

  Attachment 3
  Noosa Shire Council
   2021/22 Capital Budget Review 2 - Capital Program
  Renewal Projects
  Program                              Pee ie a)                                                                       Per oe Bar)               Loans Levy Reserves  General Rates      oe |
   Capital Works

 _Sroges                           Nail Al LOWES         Fark Pedesinian Edge                                                                                                           38,000 |
  |__Coastal Canais and Waterways     [Noosa Heads Main Beach Sand RecyclingSystemPipeworkRenewa                                                                  GJ                   100,000)
  |_Coastal Canais and Waterways     | Noosaville Noosa Waters Lock & Weir Annual Renewal Program               OF 5,000
  |_Coasial Canalis and Waterways =   |NOosa Waters Revetment Wal TTC S78 78)
  __Sommuniy Facies                   uns ine Seach NAC - Dosing Coniroser enews                                                                                                        TF   |

  | Community Facies                 | Quay Park CounciiTenniscout-Fencingrenewal                                                                                          20 GT_20,000
  |_GravelRoadNetwork                [Shire Gravel Resneeting Program                                                                                                       0,000]     410,000)

  |_Pathways & Sosrdwalis             NOS. Heads Noosa Parade Comidor Upgrade                                                                                                 ET      1,847,167)
  |_ Pathways & Soardwalis            Sunshine Seach Selmore Terrace Pathway Renewal                                                               TT                        CO
  | Pathways &Goardwalks =           PeregianBeacnSosrowa                                                                                                                               5521]
  |_ Pathways & Goardvalis            Park RO Boardwalk Renewal- Temporary Path Remove                                                                                        ST        38.557)
   __Paitways & Soardwalks           | Fewantin Srmesi_Goocchiap st Pat ge                                                                                                              28,000 |
  |_ Pathways & 5oardwalts           INS VEE Swan Si Pamway Koel Stiowyan St                                                              TTT 40,000)
 | Pathways &Sosrdwalts              | PeregianBeachPoverStPamwayPipertovacana                                                                                             8838, 000)
  |_ Public Amenities                 Pubic Amenities Renewal Program                                                                                                     200,000}     200,000
  |__ Public Transport in@assucure =  Shire Bus Shetter Disabled Compliant Program YearS                                                                                               S27 SST
 | StormwaterDramage                  JNO VEIE Gympie Terrace StormwaterRenewas                                                                                                SY      588,685
 [Stormwater Dranage                 Ci SHWE Bl@-Rtention Basin Renewals Program                                                                                            5.000]      75,000
 | Streetscapes and RoadComidos   ss |NoosaunctionStreetscape                                                                                                             100,000]      100,000)

   Cte)
  __Asset Management 0                 rire COT Drainage Progra                                                                                                          OY            200,000 |

   |_AssetManagement              Cri        and Recover Communiky Stimulus Package Revenue US                        SR
[Fleet Piant Repiacement       ——~=«counc Peet and tant Repacement Progam                                                    Yd                                   |   __ 2727000]    2.727000

                                                                                                                                Page 55 of 72

Section 56

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022




                                      Page 56 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                              17 JANUARY 2022

  Noosa Shire Council
  2021/22 Capital Budget Review 2 - Capital Program
   Upgrade, New and        Expansion Projects
   ates ta)                             Oe)                                                                               ee Maes      Bae           a)                                       Total
   Capital Works
 [Cemeteries                         CRO CemeteryPiantSEqupmertShed C800 (180,000)
  __Coastal Canals and Waterways       [Noosa Heads Dog Beacn SEM                                                                                                              100 SAT}     100,587)
   |_Coasisl Caras anc Waterways      | NOosa Heads Main Beach Removabie Sand Break Seating mucus I

  |_ Community Faciises               Rufus St- Stage 3 Digtat Hub Expansion                                                      OO                                       S34 703}
     Community Facies                  Pomona School Arts Hall-Amenities Upgrade                                                                                                TY           81, 102)
  |_ Community Facies                 | Peregian Beach Rufous St Public Ar                                                                                                                   88 8
   __Sommunry Facies                 sf fire Switchboard & Meter-box Upgrade                                        ee                                                      SY               S00

   __LranesS Gallenes                  NEw RegiONG Art Gallery Pre-FeasiDilty Study                                                                                                         T2000

  __ Pathways & Soardwalks             Noosaville Sea Eagle Drive & Shire Drive Pathway Upgrades
  |_Pathways & Sosrdwalks         Ss Teewantin Poinciana Awenue Pasay Upgrade                                                    tT                                               CO
[Pathways & Boarawans                ‘Castaways Beach Flagship Court Missing Patnway Link Expanson                 ||                       |  CC SOO]                                     20
 _ Pathways & Sosrdvalks              | Cooroy Maple Street Pathway Marara Street to Lowermi§ Road Upgrade                                                                         OTB, 407)
  |__ Pathways & 5oardwalks            NOS ville Bluebell Cour Missing Pathway Link Expansion,                                                                                SGT            13,000)
    Pathways &Soaravalks               Pomona Stan TopperPark PathwayLmk New                                                                                                       GF        12,000
  |_ Pathways & Soarcwalts            | Tewaantin Tinaroo Place Missing Pathway Link Expansion 0                                                                         012,000
 | Public Transport in@assucure =      [Tewantin Furness DriveBus Stop PatmwayOOAAccess                                                                                      8G              25,000)
 _Seaied Roads Network                 Tewantin Seckmans Road Bypass Stage 1-Rouncapout                                              80                                        815573]     7,313,579)
[Sports Ground and Facies             | fewantin ReGen Wellbeing and Community Hub Feasabilty Study    SSSCS~—SCSSSSSCSCSCSCSC~SCSCSC‘“‘CSNCCCL.._*'Y.| 100,000]                            700,00)
    Stormwater Dranage —~«(NOOSavile Project Avenue Stormaater Drainage Easement Upgrade] CCSC~SSCC*C«w A]                                                                                  8 8
   __siormweier Drainage               SUSE Dean Sobraon  SOR SIOPE STSONSSDON SR BBS ET
   |__Sireetscapes and Road Comidors = |NoosaJunction Streetscape                                                                             TT 26,0847)

 _Environmenta Assets, Busniand. Tracks and |Noosa Hinteriand recreation tras upgrade (Pomona Section) 00000                                                                    650], 18
   CT

   Otter Capital Total                                                                                                                                                        T7000        2,77E,000)
   Grand Tot                                                                                                              RO SB           B00000 0   SNS OOD        S000       NASA        33,815,576
                                                                                                                       Page 56 of 72

Section 57

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022


Attachment 4




                                      Page 57 of 72

GENERAL COMMITTEE MEETING AGENDA                                                 17 JANUARY 2022

Attachment 4

  Revenue
     Recurrent Revenue
     Rates, levies and charges                            74,591                189            74,780
     Fees and charges                                      7,185              1,075              8,260
     Interest received                                     3,270                  -              3,270
     Sale of Goods and major services                     10,224                870             11,094
     Sale of contract and recoverable works                   23                  -                23
     Rental & lease income                                  1,885                 -              1,885
     Other recurrent income                                 1,224                19              1,244
     Grants, subsidies, contributions and donations        5,797                129              5,925
     Unitywater Distributions                              3,050                                 3,050
                                                         107,248              2,282           109,530
  Expenses
     Recurrent Expenses
     Employee benefits                                    37,701                433             38,134
     Materials & services                                 49,303              1,788             51,091
     Finance costs                                         1,114                  -              1,114
    Depreciation                                          19,589                  -             19,589
     Other expenses                                          233                  -               233
                                                         107,941              2,221           110,161
 OperatingResut                                             692)                                 631)

                                                                                      Page 57 of 72

Section 58

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022


Attachment 5




                                      Page 58 of 72

GENERAL COMMITTEE MEETING AGENDA                     17 JANUARY 2022

Attachment 5

     Re  sg         ar me aE    has          meme i Sona      ii    .

          Ml NOOSA COUNCIL                      <a           7

                                     2021/2022                       |
                            BUDGET REVIEW 2 (BR2)
                            FINANCIAL STATEMENTS

                                                        Page 58 of 72

Section 59

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022




                                      Page 59 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                           17 JANUARY 2022

      Noosa Shire Council
      2021/22 Budget Statements
      For the period ending 30 June
     Se                                                      a
                                                   Flys       live)    Fly        Pla)     2023      FIT       Ply       Ply       Play      PIT        Ply)      Py        2031
      Statement of Comprehensive Income            $.000    $.000      PS        PR         PT       $.000      PA        BT        $.000     PS        PA        PT        .A UH)
     Income                                     pT
     Revenue
       Operating revenue
       Net rates, levies and charges             $ 69,168|$ 74.591/$ 74.501|$ 74,780|/$ 76.723 $ 78,717 $ 80,763 $ 82862 $ 85,015 $ 87.225 $ 80492 $ 91817 $ 94,203
      Fees and charges                           $   7504|$    7,185/$   7.185/$   8260/$    8495 $    8757 $    9027 $    2305 $    9502 $    9888 $    10162 $   10444 $   10,733
       Rental income                             $   1365|/$   1885/$    1885/$    1885/$    1922 $    1961  $   2000 $    2040 $    2081  $   2122 $    2165 $    2208 $    2,262
       Interest received                         $    s801/S    669/$     G667/S    715|/$    708 $     685 $      TO $      07 S$     71 $      74 $5     689 $   70 $        #723
       Sales revenue                             $  11.557|$  10.246/$  10.246/$  11,116]$  11.432 $  11,785 $  12,148 $  12522 $   12,908 $  13306 $    13675 $   14054 §   14,444
       Other income                              $     -   |S   O74/$    1224/8    1,244/$   1002 $    1033 $    1,08 $    1098 $    1131  $   1.166 $   1199 $     1232 $   1,266
       Grants, subsidies, contributions and donations $ 6107|$ 5432)/$   5706/$    5025/$    5534 $    5638 $    5743 $    5851 $    50960 $   6072 $    6185 $    6301 $    6419
       Unitywater Distributions                  $   5 172|$   5650|$    5653/$    5606/$    5650 $    5650 $    5650 $    5650 $    5650 $    5650 $    5650 $    5650 $    5,650
       Total operating revenue                   $ 101.674 | $ 106,633 | $ 107.248 |$ 109,530] $ 111.467 $ 114.235 $ 117,096 $ 120,034 $ 123,052 $ 126,132 $ 129,226 $ 132411 $ 135,690
       Capital revenue
         Government subsidies and grants - capital $ 8025|$ 20562/$ 24.084/$      18963/$   12434 $    1312 $    2200 $    1022 $    1512 $    1812 $    1312 $     1012 $   1,012
          Contributions - Assets and othernon-nonetary |$ 1.730/$ 1500/$ 1.500/$   1.500/$   1500 $    1500 $    1500 $    1500 $    1500 $    1500 $    1500 $     1500 $   1,500
         Contributions - Monetary                $   2522|$    1397|$    1.307|$   1,307/$   1200 $    1,200 $   1200 $    1,200 $   1200 $    1.200 $   1200 §$    1200 $   1,200
       Total capital revenue                    a               ed ee                       15.134 $   4012 $    4900 $    3722 $    4212 $    4512 $    4012 $    3712 $    3.712
       Total revenue                                       $ 130,092 | $ 135,129 |$ 131.390 | $ 126,601 $ 118,247 $ 121,996 $ 123.756 $ 127,264 $ 130.644 $ 133,238 $ 136.123 $ 139,402
       Capital income
       Total capital income                                 $$   -]s       - |$      -    {S$  -    $    -    $    -    $    -    $    -   $$    +=   S$   =    S$   =    FS   =
    Total income                                           $ 130,092 | $ 135,129 |$ 131.390 | $ 126.601 $ 118.247 $ 121,996 $ 123.756 $ 127,264 $ 130.644 $ 133,238 $ 136.123 $ 139.402
     Expenses
       Operating expenses
       Employee benefits                         $ 35,692|$ 37,670|$ 37.676|/$ 38,124]$ 38928 $ 39.892 $ 40,880 $ 41,9802 $ 42930 $ 43.093 $ 45,083 $ 46200 $ 47,244
       Materials and services                    $ 43.821|$ 47,718/$ 40.328]/$ 51,001]$ 51.288 $ 52323 $ 53,780 $ 55308 $ 56,858 $ 58379 $ 50894 $ 61512 $ 63,633
       Finance costs                             $   4827/5    1114/$    1.114/$   1114]/$   1216 $    1346 $    1314 $    1282 $    1251  $   1272 $    1308 $     1268 $   1,228
       Deprecistion and amortisation             $  17431|$   19589/$   19.589]/$ 19,589/$  19.698 $ 20,188 $ 20,625 $ 21,061 $ 21,517 $ 21.973 $ 22434 $ 229002 $ 23,061
       Other expenses                            $    250/$     233|/$    233|/$    233|/$    238 $      22 $      m7 $      2825      27 $      23 $    28 $        23 $      279
       Total operating expenses                  $ 102,020 |$ 106,325                    $ 111,367 $ 113.992 $ 116,846 $ 119,796 $ 122,812 $ 125,879 $ 128,986 $ 132155 $ 135,445
       Capital expenses
       Total capital expenses                    $   4800/$      -                        $    -    $    -    $    -    $    +    S$   +    $    +    S$   +   $F$   -   $F$   =
       Total expenses                          | $ 106.820 | $ 106,325 | $ 107.041 | $ 110,161 $ 111,367 $ 113,002 $§ 116,846 $ 119796 $ 122.812 $ 125,879 $ 128,986 § 132.155 $ 135,446
    Net result                                   $   8,031|/$ 23,768           $ 21.229|/$  15234 $    4256 $    5150 $    3960 $    4452 $    4765 $    4251 $    3968 $    3,957
    Operating result
    Cynacliegpenene                                sonar |s sonaas | sr-2ea|s oasao|s 111.487 $ 114.235 $ 117,006 $ 120,034 $ 123,062 $ 126.132 $ 120.228 $ 122411 $ 126,600
      Operating expense                          $ 102,020 |$ 106,325 | $ 107.041 |$ 110,161]$ 111.367 $ 113,902 $ 116,846 $ 119706 $ 122812 $ 125.879 $ 128,986 $ 132.155 $ 125,445
      Operating result                          is _346)[$      309]     aga lis   eaty[$      100 $   244 $     251 $       238 $     240 $     253 $     239 $     256 $     245
                                                                                                                  Page 59 of 72

Section 60

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022




                                      Page 60 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                   17 JANUARY 2022

      Noosa Shire Council
      2021/22 Budget Statements
      For the period ending 30 June

                                                  ra        Pairs      Faire      2022       2023       2024       Fa Fa)    2026        Farad      rairs:)   Pat Fa     Pale)      Paley
      Statement of Financial Position             Ft         PT         PT         Bi        $.000      Ti         PT)        eB         ATi!       PAL        PT        PT         Th
     Assets                                   pT
       Current assets
       Cash and cash equivalents               $   70.028|$   53042) $   40747|$    65875|$   60.266  $  60432   $  60.858  $  61,772  $  57,068 $   53.089 $   54039  $   57,700 $  61,502
       Trade and other receivables             $    9484/$    10,087|$   10137]$    10,286)$   10488  $   10733  $  11,045  $  11,335  $  11632  $   11.005 $   12245  $   12562  $   12,836
        Inventories                            $      144] $    181] $     181] $     144] $     144 §      144  §     144  $     144  $    144  §     144  $     144  §     144  §     144
       Other current assets                    $    3425/$     2012|$     2912]}$   3425|/$    3425   $   3425   $   3425   $   3425   $   3425  $    3425  $    3425  $    3425  $   3,425
        Total current assets                   $   983,081/$  66222|$    62978/$    78730|$   74323   $  74735   $  75472   $  76675   $  72262  $   60442  $   60854  $   73840  $  77.957
       Non-current assets
        Investments                            $  144.801] $ 140,633] $ 140,633] $ 144,801] $ 144.801 $ 144,801  $ 144,801  $ 144,801  $ 144801  $ 144.801  $ 144.801  $ 144,801  $ 144.801
       Property, plant & equipment             $ 952.579 | $1,003,268 | $1,009,096 | $ 990,038 | $1,043,574 $1,065,880 $1,080,201 $1,111,551 $1,142484 $1,173,604 $1,198563 $1,220,507 $1,242,720
       Other non-current assets                $    3126/$     8219/$     8288/$    3015|/$    3020   $   2907   $   2945   $   2864   $   2753  $    2612  $    2442  $    1837  $    1,493
       Total non-current assets               | $ 1,100.505 | $1,152,120 | $1.158.017 | $1.146.853 | $1,191,305 $1,213,677 $1,237,047 $1,250,215 $1,200,038 $1,321,017 $1,345,805 $1,367,234 $1,380,014
        Total assets                          | $ 1,183,586 | $1,218,242 | $1,221,895 | $1,226,583 | $1.265.718 $1,288,412 $1,312,519 $1,335,891 $1,362,307 $1,390,459 $1,415,659 $1,441,074 $1,466.971
        —_—                                   pT
       Current liabilities
       Trade and other payables                $    7344/$     7018|$     7151)/$   733/$      7415   $   7559   $   7780   $   7989   $   8202  $    8391  $    8628  $    8853  $   9113
       Borrowings                              $     055] $     e4s|$      s48/$      0468/5    1210  $   1241   $   1272 $     1306   $   1418  $    1573  $    1612  $    1653  $    1,693
       Provisions                              $    8103/$     7582|/$    7582)/$   8103]/$    8103   $   8103   $   8103   $   8103   $   8103  $    8103  $    8103  $    8103  $   8,103
       Other current liabilities               $    8400/$     4780/$     4780/$    8400/$     8400   $   8400   $   8400   $   8400   $   8400  $    98400 $    8400  $    8400  $   8,400
       Total current liabilities               $   24.802/$   20.228|/$  20361/$    24783]$   25128   $  25303   $  25,556  $  25796   $  26.123 $   26467  $   26743  $  27,009  $  27,300
       Non-current liabilities
       Borrowings                              $   20.258/$   21.089)$   21,.089/$ 24300|$    20.351  $  28110   $  26837   $  25533   $  26215  $   27.642 $   26030  $  24377   $  22,685
       Provisions                              $   16.555/$   15307) $   15307|/$   16555/$    16555  $   16555  $  16555   $  16555   $  16555  $   16555  $   16555  $   16.555 $   16,555
       Total non-current liabilities         }$ 36.878) $ 37.406) $     37.406] $  41,011) $  45972   $  44731   $  43458   $  42154   $  428%   $   44263  $   42651  $  40.999  $  39,306
       Total liabilities                      '$ 61,681] $ 57.634] $ 57,.767|$ 65.794] $      71,099  $  70,033  $  69,014  $  67,950  $  68959  $   70.731 $   69.395 $   68,007 $  66,615
     Net community assets                     $1,121,905 | $1,160,708 | $1,164,128 | $1.160.790 | $1.194.619 $1,218,379 $1.243.505 $1,267,940 $1,293.48 $1,319.728 $1,346.264 $1,373,067 $1.400.356
     Community equity                         pT
       Asset revaluation surplus               $  108.473 | $ 121.483] $ 121,483] $ 126,129] $ 144,723 $ 164.227 $ 184,208  $ 204,679  $ 225.634 $ 247.250  $ 260534   $§ 202,360 $ 315,702
       Retained surplus                        $ 1,013,432 | $1,030,225 | $1,042,645 | $1,034,661 | $1,040,806 $1,054,151 $1,050,201 $1,063,262 $1,067,713 $1,072478 $1,076,730 $1,080,608 $1,084,655
        Total community equity                | $ 1,121,905 | $1,160,708 | $1,164,128 | $1,160,790 | $1.194.619 $1,218,379 $1,243,505 $1,267,940 $1,293,348 $1,319,728 $1,246,264 $1,373,067 $1,400,356

                                                                                                         Page 60 of 72

Section 61

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022




                                      Page 61 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                         17 JANUARY 2022

     Noosa Shire Council
     2021/22 Budget Statements
     For the period ending 30 June
 [AnnualResutt                               |    Actual | ae |              Rt | eRe
                                                               Original
                                                      Fa        Faire      ral r es    2022        rr]        2024       2025        2026        Farad      rair a.)   2023        2030        2031
     Fa ee Oe)                                      +R          PAL         Ti)        PT)         PS)        $.000       PSY        bi          ATi        A           Bi)        CPi         PT)
   Cash flows from operating activities         pT
      Receipts from customers                    $    95823/$     92418|$    92622|$    94649/$     97.422 $   100,056 $  102704 $    105502 $   108.362 $   111,322 $  114.200 $   117.243 $  120,335
       Payments to suppliers and employees       (S$ 85,062) |($ 985,803) |($ 87,376) |($ 90,066)|($ 90.070) ($ 92,012) (S$ 95,283) ($ 97,842) ($ 100.430) ($ 103,044) ($ 105,606) ($ 108,258) ($ 111.494)
      Dividend received                          S$    3431/$      3050|/$    3050/$     3050/$      3050 $      3050 $     3050 $     3050 $      3050 $     3050 $      3050 $      305 $      3,050
       interest received                         S$    3021/$      3260|/$    3270/$     3270/$      3308 $      3205 $     3300 $     3357 $      3314 $     3304 $      3209 $      3306 $     3,323
      Rental income                              S     1365/$      1875/$     1874/$      1873/$     1919 $      1958 $     1996 $     2037 $      2077 $     2119 $      2161  $    2205 $      2249
       Non-capital grants and contributions      S$    6225/$      5405|/$    5765|/$    5887/$      5566 $      5631  $    5733 $     5842 $      50951 $    6064 $      6174 $     6201   $    6,409
      Borrowing costs                            (s     133) |($   516) |(S    516)|/(S   516)/(S     618) (S    748) (S     716) (S    684) (§     652) (§    673) (S     710) ($    670) ($     630)
       Other cash flows from operating activities $      -    $     -    $      -    $     -    $      -    $     -    $      -    $     -    $      -    $     -    $      -    $     -    $      -
      Net cash flow from operating activities                pases mene me’                         19.677 $   20.330 $    20.786 $   21.219 $    21.672 $   22143 $     22569 $    23,067 $    23.242
    Cash flows from investing activities
       Payments for property, plant and equipment (S 20519) |($ 44,840) |($ 51,568) /($ 45,053) /($ 43,705) ($ 21,100) (S$ 22,154) ($ 20,884) ($ 29,506) ($  20.450) (S$ 23,043) ($ 19.096) ($ 20.009)
       Payments for intangible assets            ($     505)/($    760)/(S     820)/($    823)/($     350) ($§   357) (S$    364) (§    371) (§     378) ($§   386) (S     395)  §     -    $      -
      Grants, subsidies, contributions and donations [$ 13,678/$ 21,.950/$   26.381/$   20.360/$    1363 $      2512 $      3400 $     2222 $      2712 $     3012 $      2512 $     2212 $      2212
       Other cash flows from investing activities $      125| $     -    |$     -    |$    -    |$     -    $     -    §$     -    $     -    §$     -    $     -    $      -   §$     -    $      -
      Net cash flow from investing activities                ($ 23.641) |($ 26.017) |($ 26.422)]($ 30.511) ($  18.954) ($  19.119) ($ 19,033) ($ 27.172) ($ 26.824) ($ 20,926) ($   17.784) {$ 17.797)
    Cash flows from financing activities
       Proceeds from borrowings                  S$   21082/$      2360/$     2360/5     4850/$      6170   $     -    $      -   $§     -    $    2100 $     3000 §$       -    §     -    $      -
       Repayment of borrowings                   (S  24.844)|/($   736)|(S     736)/(S    736)|(S     946) (S$  1,210) (S   1,241) (S$ 1,272) (S   1,304) (S$ 1,418) (S   1,573) (S  1,612) ($   1,653)
      Net cash flow from financing activities essays ume vee                                    $    5224 ($    1240) (§   1.241) (§   1,272) $      796 $     1,582 ($  1,573) ($   1,612) ($  1,653)
     Total cash flows
    Net change in cash and cash equivalentheld [$ 13,004|($ 2.409) [($ 5,704) |($ 4,153) ]($        5.609) $      166 $      426 $       914 {$   4,704) ($   3.099) $       71 $    3670 $      3,792
    Opening cnth and cosh equiatents           }s s7.024]$ ssasi|$ ss.ast|$ 70,028 $                65.875 $    60.266 $   60,432 $   60,858 $    61.772 $   57.068 $    53,969 $   54039 $     57.709
    Closing cash and cash equivalents          1$ = 70,028]$ 53,042[$ 49.747[$                  65,875|/$ 60.266 $ 60432 $ 60858 $    61,772 $    57.068 $   53.969 $    54039 $    57.709 $    61,502

                                                                                                                Page 61 of 72

Section 62

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022




                                      Page 62 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                         17 JANUARY 2022

      Noosa Shire Council
      2021/22 Budget Statements
      For the period ending 30 June
    a ee
                                                   rai Fa      Faire      Pale        Pair        Pair x)    2024        2025        2026       rare        Pairs]      PFs]       Paik |       Paik),
      SFC      ele eee a                           PAY         +A          PPh        PB)         PT          BT         PA          PA          AA         PA          PT          +B         bi
     Asset revaluation reserve                  pT
        Opening balance                          $   86524/$    103738]$   103.738|$   108.473] $  126,122 $  144,723 $   164227  $   184.203 $  204,679 $   225,634 $  247.250 $   260.534 $§  292.360
       Change in asset revaluation surplus       $   21.940|/$   17.744|$   17.744]$    17.656/$    18,504 $   19504 $     10976 $    20475 $     20.956 $    21,616 $   22284 $     22835 $     23,332
       Closing balance                           $  108.473                         $  126,120|$   144.723 $  164,227 $   184,203 $  204.679 $   225,634 $   247.250 $  260.534 $   202.360 $   315,702
     Retained surplus
        Opening balance                          $ 1,003,273 | $ 1,015,457 | $ 1.015.457 | $ 1,013,432 | $ 1,034,661 $ 1,040,806 $1,054,151 $1,050,301 $ 1,063,262 $1,067,713 $1,072478 $1,076,730 $1,080,698
       Net result                                $   10,150|/$  23,768/$    27.188)$    21.220/$    152% $      4256 $      5150 $     3960 $      4452 $      4765  $    4251   $    3068 $      3,957
       Closing balance                                      $ 1,030,225 | $ 1,042.645 | $ 1.034.661 | $ 1.040.806 $1,054,151 $1,050,301 $1,063,262 $1,067,713 $1,072478 $1,076,730 $1,080,698 $ 1,084,655
      Total
        Opening balance                          $ 1,089,797 | $ 1,119,196 | $ 1.119.196 | $ 1.121.005 | $1,160,790 $1,194,619 $1,218,379 $1,243,505 $1,267,940 $1,203,348 $1,319,728 $ 1,246,264 $1,373,067
       Net result                                $   21,040/$   23768/$     27.188/$    21220/$     1523 $      4256 $      5150 $     3960 $      4452 $      4765  $    4251   $    3068   $    3,957
       Change in asset revaluation surplus       $   10,150|/$   17,744|$   17.744|$    17.656|$    18504 S$   19504 $     10976 $    20475 $     20,956 $    21616  $   22284 $     22835   $   23,332
       Closing balance                         | $1,121,905 | $ 1,160,708 | $ 1,164,128 | $ 1,160,790 | $1,194,619 $1,218,379 $1,243,505 $1,267,940 $1,293,348 $1,319,728 $1,346,264 $1,373,067 $ 1,400,356

                                                                                                                Page 62 of 72

Section 63

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022




                                      Page 63 of 72

GENERAL COMMITTEE MEETING AGENDA                                                                        17 JANUARY 2022

      Noosa Shire Council
      2021/22 Budget Statements
      For the period ending 30 June
                                                                                                                                              Forecast
                                     2021         Paired      Fairer      Faire                 2023       2024        2025        2026        Fair ad     Patra)      rai r      2030         2031
     Operating Surplus Ratio          7.5%        0.3%        0.6%        0.6%      0-10%       0.1%        0.2%       0.2%         0.2%        0.2%       0.2%        0.2%        0.2%        0.2%
     Net Financial Liabilities Ratio -19.9%       8.1%        4.9%       -12.7%     <60%        -2.9%       4.1%        5.5%       7.3%        -2.7%        1.0%       04%         44%        84%
     Asset Sustainability Ratio     83.4%         107.8%     121.9%      130.1%     >90%       198.3%      96.2%       103.0%      91.8%       133.2%      132.3%     98.7%       88.5%       83.6%
     Operating Surplus Ratio
     Measures the extent to which revenues raised cover operational expenses
     only or are available for capital funding purposes or other purposes.
     Calculation: Net operating result divided by total operating revenue, expressed as a % (excluding capital revenue or expenses).
     Target: between 0% and 10%.
     Net Financial Liabilities Ratio
    Measures the extent to which the net financial liabilities of Council can
     Calculation: (total liabilities less current assets) divided by
     total operating revenue, expressed as a %.
      Target: not greater than 60%.

      A    5    inability Rati
     This ratio reflects the extent to which the assets managed by Council
     are being replaced as they reach the end of their useful lives.
     Calculation: capital expenditure on the replacement of infrastructure assets
     (renewals) divided by depreciation expense, expressed as a %.
    This includes infrastructure as well as plant and equipment.
      Intangibles are excluded.
     Target: greater than 90%.

                                                                                                               Page 63 of 72

Section 64

GENERAL COMMITTEE MEETING AGENDA                                            17 JANUARY 2022


6.   2021 COMMUNITY SATISFACTION SURVEY RESULTS

Author           Director Executive Services, Debra Iezzi
                 Executive Services Department

Index            ECM/ Subject/ 27.80 Executive Branch Updates

Attachments      1.   Noosa Council Community Satisfaction Survey 2021 by Market Facts
                      Qld Pty Ltd (79 page attachment provided separately to this agenda)


EXECUTIVE SUMMARY
In June 2021 the Noosa Council commissioned Market Facts Pty Ltd to conduct its biennial
benchmarking survey of community attitudes measuring levels of satisfaction with 41 council
services grouped under the 5 Themes of: Qualities of Council; Customer Services and
Communication; Managing the Shire; Community Lifestyle Services; and Basic Services and
Infrastructure. This is the third community satisfaction survey that Council has conducted with
previous surveys undertaken in 2017 and 2019.
The Community Satisfaction Survey Report (attached) presents the survey findings and an
analysis of ratings and variances. In addition, it compares Noosa Council’s 2021 survey results
with Council’s previous 2017 and 2019 survey results allowing Council to benchmark our
performance. In the past Council was also able to benchmark performance against other
Queensland Councils through the LGAQ biannual survey which was undertaken in 2017 and 2019
however as the LGAQ survey has been discontinued this survey is no longer possible. For
comparative purposes the 2017 and 2019 LGAQ survey results are shown in the survey report.
When coupled with previous data, the 2021 survey provides a reliable historical source of the
community’s views since 2017. A selection of results from the last 5 years shows that Council
continues to provide services that meet the public’s expectations.
The information from the 2021 survey will be used to support strategic decision making and
improve service delivery.
In summary, the 20 21 survey findings show:
•    While Council is performing below the results of previous years, advice is that other
     Queensland councils have also recorded lower results in their community satisfaction
     surveys. Despite this, Council in most areas is perceived to be meeting expectations of the
     community it serves with 71.04% of respondents viewing Council’s overall performance as
     good and very good (compared to 75.8% in 2019 and 76.4% in 2017).
•    Noosa Council’s overall average Total Performance Index at 72.07% is below its previous
     2019 and 2017 survey results but above LGAQ state-wide and provincial averages for those
     years.
•    The best results were achieved in the following themes: Community Lifestyle Services,
     Qualities of Council and Managing the Shire.
•    The top 6 performing services relative to importance were: Disaster Management, Waste
     Management, Parks Playgrounds & Public Amenities, Customer Service, Environment
     Protection & Conservation and Community Safety.
•    Priorities for enhancement of overall performance are: Parking Facilities, Economic
     Development, Local Employment, Traffic Management, Responding to the Community, Road
     Maintenance, Consulting the Community, Road Construction, Building Control, Informing the
     Community and Quality of Councillors Dealt With.



                                                                                 Page 64 of 72

Section 65

GENERAL COMMITTEE MEETING AGENDA                                                 17 JANUARY 2022


RECOMMENDATION
That Council note the report by the Director Executive Services to the General Committee Meeting
dated 17 January 2022 regarding the results of the Noosa Council Community Satisfaction Survey
2021 as detailed in in Attachment 1 to the Report: the “Noosa Shire Council Community
Satisfaction Survey 2021” report prepared by Market Facts (Qld) Pty Ltd.

REPORT
The Community Satisfaction Survey undertaken by Market Facts (Qld) Pty Ltd in June 2021,
surveyed 400 Noosa residents aged 18 years and older from across the shire and from different
demographic groups including age, gender; home ownership status, neighbourhood and current
work status. The survey method included phone contact with residents (landline and mobile) and
the survey was available on Council’s website (156 people completed the on-line survey).
The objectives of the survey were to:
•    Provide measurements of residents’ attitudes and opinions and diagnostic information and
     analyses, regarding the extent to which the Council’s provision of works, facilities and
     relevant administrative services meets the community’s perceived priorities.
•    Compare the results against previous Noosa Council surveys undertaken in 2017 and 2019
     as well as the survey results of other similar sized Qld Councils (LGAQ’s biennial surveys of
     Qld. Councils undertaken in 2017 and 2019).
•    Provide number-based detail which can be used to calculate relative priorities between the
     41 primary service/policy areas for which Council is responsible according to the “weighted
     average” of community perceptions, after considering both existing Council performance as
     well as basic community priorities (i.e. ratings for importance).
The survey asked respondents to identify how important 41 Council services/responsibilities were
using a five-point scale (Crucial 5, Important 4, Nice to Have 3, Not Very Important 2, Quite
Important 1) and how well they believed Council is performing in those aspects (Very Good 5,
Good 4, Fair Only 3, Poor 2 and Very Poor 1). In addition, respondents were asked to provide an
overall rating of Council’s performance and to provide opinions on 5 additional questions developed
by Council. The questions related to preparedness for a disaster or emergency, the right balance
between providing services and financial means, contact with Council, lifestyle, and challenges to
be faced by the community in the next few years.
The primary services/responsibility areas are grouped under the following 5 Themes:
1.   Theme 1 - Basic Services and Infrastructure (road construction, road maintenance, footpaths
     kerbing & guttering, street lighting, traffic management, parking facilities, public transport,
     drainage & flood mitigation, waste management, community health).
2.   Theme 2 - Community Lifestyle Services (parks playgrounds & public amenities,
     environmental controls, Environmental protection & conservation, heritage protection,
     sporting & recreational facilities, cultural & entertainment facilities, libraries & other
     information access, community safety, community services, pet/animal control, shopping
     centres community development).
3.   Theme 3 - Managing the Shire (town planning, building control, economic development &
     local employment, development of tourism, financial management, revenue raising, staff
     management and disaster management).
4.   Theme 4 - Customer Services and Communication (customer service, information services,
     informing the community, consulting the community, responding to the community, providing
     leadership & advocacy).
5.   Theme 5 - Qualities of Council (qualities of elected council councillors dealt with, qualities of
     elected Council, managerial & supervisory officers, outdoor workers, indoor staff).


                                                                                      Page 65 of 72

Section 66

GENERAL COMMITTEE MEETING AGENDA                                                 17 JANUARY 2022


Methodology
The survey method used two different measurements of community perceptions of their level of
satisfaction with current Council performance - ‘direct’ and ‘calculated’.
Direct – The Unweighted Overall Performance Rating is obtained from asking a direct question
rating Council’s overall performance i.e. “Is Council delivering a level of services and displaying a
quality of performance in fulfilling all responsibilities, regarded as ‘value for money’ for the rates
and charges you pay”.
The 2021 overall rating of 3.57 is lower than the results in the previous surveys (i.e. 3.79 in 2019,
3.82 in 2017). A mean score of 3.57 translates to ¾ of respondents viewing Council’s performance
as good (55%) and very good (5.5%). It is also 71.4% (compared to 75.8% in 2019 and 76.4% in
2017) of the optimum score of 5 which means that Council is generally viewed as being effective
in delivering services to the community.
Table – Summary of tracking Surveys – Overall Performance Rating




Calculated – The Weighted Aggregated Total Performance Rating is calculated by summarising
all performance ratings of each of the 41 responsibility/service areas into one number weighted
by the relative importance of each area, the Average Total Performance Index (TPI). The Total
Performance Index (TPI) shows how the community judges Council performance as it makes
allowances for the relative importance of each activity. In 2021 Noosa’s TPI was calculated at
72.07% which is lower than the results for 2019 and 2017 however it is above LGAQ state and
provincial TPIs for 2017.
The following chart compares the Total Performance Index (TPI) for Noosa 2021, 2019 and 2017
including the 2017 LGAQ Community Satisfaction Survey state-wide and provincial averages. In
2021, Noosa is below overall average TPIs in all 5 Themes -
•     Customer Service and Communication TPIs experienced the greatest reduction (70.56% in
      2021 versus 75.41% in 2019).
•     Community Lifestyle Services, Qualities of Council and Basic Services and Infrastructure
      TPIs reduced on average by 2.4% (from 74.86% in 2021 versus 77.6% in 2019).
•     Managing the Shire TPI was stable or on par with 2019 result (73.23% in 2021 versus 73.25%
      in 2019).




                                                                                      Page 66 of 72

Section 67

GENERAL COMMITTEE MEETING AGENDA                                                 17 JANUARY 2022




Analysis of Key Results
Highest and Average Performers relative to importance
There are 14 responsibility/service areas (out of the total of 41) for which Council performed best
in relation to their judged importance. In this case, ‘best’ is defined as having an Importance rating
of at least 3.96 and Performance more than 1.5% above Average (72.07%). This list does not
include all the Areas where the “gaps are smallest”, as most of these do not have an Importance
score above ‘4’ (the borderline between ‘Important’ and ‘Nice to Have’).
In 2021, there are some additional responsibility areas that the community has judged Council to
be preforming better compared to 2019 and 2017, these include:
•     Park, Playgrounds & Public Amenities (least Important in 2019)
•     Environment protection & Conservation (Average in 2019)
•     Environment Controls (Average in 2019 and in 2017)
•     Revenue Raising (Average in 2019)
•     Community Health (Average in 2019 and Average in 2017)
•     Community Services (Average in 2017).




                                                                                      Page 67 of 72

Section 68

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022




                                      Page 68 of 72

GENERAL COMMITTEE MEETING AGENDA                                                 17 JANUARY 2022

                                          ‘Highest Performers.
                  ‘Libraries & other Information Access;                                    5a 90%
                               Disaster Management)                            Se sx:
                                ‘Waste Management;                            ran,    00:
                 : Parks, Playgrounds & Public AMENITICS : eS: 7655:
                                   ‘Customer Service!                     pein      sis"
                 ‘Evironment Protection & Conservation; === 75.50%)
                                  ‘Community Safety:                     dips 105
                  (Quality & Performance of indoor Stat!                 ere. 7 205
                             i Environmental Controls :                 | 75.8% |
                                    {REVENUC-TaISING : | eeeeemmmiemmnitiiiiden [75.7% |
                                ‘information services;           a rfdiiten (79 20%"
             (Quality & Performance of Outdoor Wore!                    er    72400:
                                ‘Community Services ummm, :7:10%'
                                                 | 66.0% 68.0% 70.0% 72.0% 74.0% 76.0% 78.0% 80.0% 82.0% 84.0% 86.0%:
                                  mi Noosa 2017: mNoosa 2019: mi Noosa 2021:

                                   ‘Average Performers:
        “Community Development)                                                           os.
                 (1 50           $<                                                    | 72-50% |
 : Providing Leadership & Advocacy :                                                   |. 73.20% :
 Seen cece          SAN                                                           ee: 72 35.
     : Drainage & Flood Mitigation :                                                   : 72.70%:
 Managerial & Supervisory Officers:                                               nnn 75>.

          ' Financial Management!                                                         95 4086:
       Quality of lected Counc)                                                     ee 3350
                          m Noosa 2017:   mNoosa 2019!    m Noosa 2021:

                                                                                      Page 68 of 72

Section 69

GENERAL COMMITTEE MEETING AGENDA                                              17 JANUARY 2022


There are only 8 Responsibility Areas (out of the total of 41) for which Council has received an
average score which is defined as having an Importance rating of at least 3.96 (on the borderline
of ‘4’ = ‘Important’) and Performance not more than 1.5% below or above Average (where Average
Performance is 72.07% - the (calculated) Average Total Performance Index). In 2021, two new
responsibility areas have moved from being Low Performers in 2017 to Average performers,
namely “Town Planning” and “Drainage & Flood Mitigation”.
Areas of Lowest Performance Relative to Importance which provide the greatest opportunity for
improvement
In 2021, most of the same responsibility areas continue to be rated as low performers as in 2017.
However, two new responsibility areas have been added, specifically “Informing the Community”
and “Quality of Councillor(s) Dealt With” which were both rated as average performers in 2019.
The chart below shows a list of targets for improvement where elements have performance ratings
1.5% or more below the average performance assessment of 72.07%, but which also have
relatively high (=/>4) levels of importance. These elements can be considered as priorities for
enhancement of overall performance. Attention to these elements will lead to the greatest overall
increase in the weighted performance indices for subsequent tracking surveys.
The challenge is now for Council to continue to address and prioritise these areas in future
planning, and use follow up tracking surveys to not only monitor ratings for individual areas, but
also to ensure overall performance, continues to increase or at least remain at comparative levels
with other councils.




                                                                                   Page 69 of 72

Section 70

GENERAL COMMITTEE MEETING AGENDA                                               17 JANUARY 2022


Public Opinion - Additional Questions developed by Council
Included in the survey were several additional Council specific questions relating to disaster
management, existing services, communication channels and customer requests, lifestyle,
challenges, sense of community and climate change. The findings from responses to these
questions are summarised as follows:
•    Preparedness for a Disaster or Emergency - Nearly two thirds (65.8%) of respondents in
     2021 are prepared for a disaster or emergency and have an emergency plan. In 2019, 66%
     of respondents had a disaster management plan in place for a flood or fire, compared to
     59.7% in 2017.
•    77.3% of respondents (compared to 88% in 2019 and 86% in 2017) indicated that they
     preferred that Council ‘leave things as they are’ when trying to strike a balance between
     providing the best possible service and operating within its financial means. While 14.5%
     indicated that they would be prepared to pay more through their rates for an
     improved/increased level of service, compared to 9.3% in 2019.
•    Satisfaction with service levels
     -     62.6% of respondents rated answering phone calls as good and very good
     -     45.3% rated contact with Council’s Tewantin Office as good or very good
     -     36.7% rated email and online enquiries as good or very good
     -     28.8% rated return of calls as promised as good or very good
     -     82% rated after hours emergency services as good or very good
     -     30.9% rated acknowledgement of written correspondence as good or very good
     -     43.1% rated handling complaints as good or very good
     -     55.4% rated effectiveness in responding to requests as good or very good.
•    Chosen method for communication – the most popular method to seek information from
     Council about a project or an issue was Council’s website (35.5%) followed by local
     newspaper (29.3%) and social media (Facebook) (25%).
•    Lifestyle and quality of community – The three most important things with regards to lifestyle,
     and the quality of the community were:
     -     access to amenities facilities/services, recreation (47%)
     -     environment clean, healthy, amenity, maintenance (35.5%)
     -     traffic/transport (roads, maintenance, access, safety) (12.8%).
•    A large proportion of respondents (88.8%) were either satisfied (29.3%) or completely
     satisfied (59.5%) regarding feeling part of their community, compared to 76.1% in 2019.

Conclusion
The 2021 community satisfaction tracking survey is a follow up to the 2019 survey and 2017
benchmark study for Noosa Shire Council. In 2021, Council is performing below the results for
2019. In 2021 the Average Total Performance Index (TPI) for the survey was calculated at 72.07%
(74.59% in 2019 and 73.24% in 2017) and community sentiment, compared to two years ago, is
generally considered less positive. As further evidence of this, other similar councils who have
recently completed community satisfaction surveys have also recorded fewer positive results. In
relative terms Noosa’s TPI of 72.07% is also quite high, so while in 2021 a lower result has been
achieved Noosa Council is continuing to achieve results above the Queensland norm for similar
sized provincial councils.
The 2021 survey results show that while the results are lower than previous years, the community
is satisfied with Council’s performance.




                                                                                    Page 70 of 72

Section 71

GENERAL COMMITTEE MEETING AGENDA                                                   17 JANUARY 2022


Previous Council Consideration
Ordinary Meeting Minutes 20 June 2019, Item 6, Page 19
That Council note the report by the Director Executive Services to the Services & Organisation
Committee Meeting dated 11 June 2019 regarding the results of the 2019 Community Satisfaction
Survey and the Community Satisfaction Survey 2019 Report prepared by Market Facts Qld. Pty
Ltd contained in Attachment 1 to the report and place on record its formal thanks for the efforts of
Noosa Council staff in achieving the continued improvement and significant positive result.
Ordinary Meeting Minutes 17 August 2017, Item 6, Page 8
That Council note the report by the Director Executive Services to the Services & Organisation
Committee Meeting dated 8 August 2017 regarding the results of the Community Satisfaction
Survey and the report prepared by Market Facts QLD Pty Ltd contained in Attachment 1 to the
report.
Finance
The conduct of the Community Satisfaction Survey was provided for in the 21/22 budget. The cost
of the Survey was $23,000.
Risks & Opportunities
The Community Satisfaction Survey of Noosa residents provides valuable information about the
quality of Council’s services, the community’s satisfaction with Council’s services and changing
community expectations. This information assists Council to not only identify areas where services
can be improved and how resources can be efficiently allocated, it also assists Council to better
understand changing perceptions of the community and emerging issues. The risk of not
undertaking the survey is that Council services are not aligned to the needs of the community and
valuable Council resources are not allocated effectively.
Consultation
External Consultation - Community & Stakeholder
The Community Satisfaction Survey surveyed 400 Noosa Shire residents and was also available
for completion on Council’s website.
Internal Consultation
The results of the Community Satisfaction Benchmarking Report prepared by Market Facts (Qld)
Pty Ltd have been reviewed by the Executive Leadership Team.
Departments/Sections Consulted:
 X   Chief Executive Officer   X   Community Services                      X   Corporate Services
     Executive Officer             Director                                    Director
     Executive Support             Community Development                       Financial Services
                                   Community Facilities                        ICT
                                   Libraries & Galleries                       Procurement & Fleet
                                   Local Laws                                  Property
                                   Waste & Environmental Health                Revenue Services

 X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
     Director                      Director                                    Director
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service              Development Assessment                      Buildings and Facilities
     Governance                    Economic Development                        Civil Operations
     People and Culture            Environmental Services                      Disaster Management
                                   Strategic Land Use Planning                 Infrastructure Planning,
                                                                               Design and Delivery




                                                                                          Page 71 of 72

Section 72

GENERAL COMMITTEE MEETING AGENDA   17 JANUARY 2022


7   CLOSED SESSION

    Nil.




                                      Page 72 of 72

GENERAL COMMITTEE MEETING AGENDA                            17 JANUARY 2022

7    CLOSED SESSION

     Nil.

                                                                Page 72 of 72

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.