SUPERSEDED - Decision Notice - Minor Change - 51993 564 01 [As Published] · 51993.564.01

of 6

Text shows just the words. Original shows the document exactly as it was published.

               7.     Payment of contributions in accordance with Council’s Policy on Water Supply and Sewerage
                      Headworks. An estimate only of the charges as at April, 1993 under the current policy is as
                      follows: -
                      Water Supply           $3176
                      Sewerage               $1944
                      TOTAL:                 $5120
                      Headworks contributions shall be calculated and paid in accordance with one of the following
                      alternatives: -
                      a.      Prior to the issue of a Building Approval, in the amount calculated under the Policy at
                              that date: or
                      b.      Deferred to the soonest of the following dates: -
                              i.       Prior to Council sealing plans of the development for titling purposes;
                              ii.      Prior to the issue of a Certificate of Classification for any building approved under
                                       this application; or
                              iii.     Prior to commencement of the approved use at the relevant premises.
                              Where the option of a deferred payment is used in accordance with b. above, the
                              following conditions shall also apply: -
                              A. Prior to the issue of Building Approval, a trading bank guarantee is to be submitted
                                 to the value of the headworks which are due, plus 20%.
                              B. The subsequent payment of headworks shall include interest charged at the rate
                                 set by the Queensland Treasury Corporation for Local Government borrowings as
                                 they apply to Noosa Shire and current at the time the trading bank guarantee is
                                 submitted.
                              C. Should the contributions not be paid at the due time, Council shall call upon the
                                 sum secured by the trading bank guarantee.
                              D. The trading bank guarantee will be returned on payment of the required
                                 contributions plus interest or on expiry of the relevant Building Approval, whichever
                                 is the sooner.
               8.     The footpath across the frontage of the site is to be upgraded by the provision of a 1.2 metres
                      wide concrete footpath and the forming, grassing and topsoiling of the remaining area to the
                      satisfaction of the Shire Engineer. The footpath is to be generally located 0.9 metres from
                      the property alignment and is to be integrated with any existing slopes and vegetation within
                      the road reserve.
               9.     The developer shall bear the cost of alteration of any public utility or other facilities
                      necessitated by the development of the land or associated construction works external to the
                      site.
               10.    Connection to Council’s existing water supply and sewerage reticulation systems at the
                      developer’s expense to the standards and requirements of the Shire Engineer.
               11.    The developer shall provided a metered water connection from the water supply system to
                      the proposed development, in accordance with Council’s standards and to the satisfaction of
                      the Shire Engineer.
               12.    Roof and surface water is to be collected on site and is to be discharged through a single
                      underground drain line into existing drainage in Sunseeker Close to the satisfaction of the
                      Shire Engineer. A Building Approval shall not be granted until the Shire Engineer has
                      approved of the drainage scheme.
               13.    Provisions of approved refuse containers in accordance with the requirements of the Refuse
                      Management Regulations of 1983 for the storage and collection of refuse to the satisfaction
                      of the Environmental Health Officer.


                                                                                                              Page 3 of 6
Document Set ID: 22535679
Version: 4, Version Date: 11/08/2023

Used in these records

About this file

File size
171 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED - Decision Notice - Minor Change - 51993 564 01 [As Published].pdf · 171 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.