Original source · versioned page text
Att 3 - Landslide Risk Assessment
Original PDF page 30, section 1. The text section number identifies this passage in the reader.
www.awgeotechnics.com.au
Filled Ground Furthermore, there should be no in ground disposal or
Controlled Fill - Material that has been placed and storage of water, (i.e. soakage pits, rubble pits, rain
compacted in layers by compaction equipment within a gardens or similar), within eight (8) metres of a structural
defined moisture range to a defined density requirement in footing, without our prior written approval.
accordance with AS 3798-2007 Clause 6.4.2 of AS 2870- Where the proposed earthworks involve the establishment
2011 defines controlled fill. of cut/fill batters, advice concerning safe angles is beyond
Uncontrolled Fill - Fill that does not have sufficient the scope of commission in this report. AS 2870-2011,
documentation to be classified as controlled is by Clause 6.4.4 offer guidelines.
exclusion, uncontrolled. Where found we have offered Long Term Site Management
further advice within this report. It is the owner’s responsibility to ensure both tenants and
Topsoil/Estate Dressing future owners are aware of these responsibilities. The
In our soil log section, where we have logged “Topsoil” or referenced CSIRO sheets outline these responsibilities
“Estate Dressing” it is defined as per clause 1.2.15 of AS and if the builder does not give the owner a copy, they can
3798-2007 thus: be sourced from either the CSIRO (1800 645 051) or our
office.
“A poorly compacted superficial soil containing some
organic matter, usually darker than the underlying soils” The major danger to dwellings is allowing site conditions
to deteriorate to “abnormal” in the long term.
Good building practice dictates that all heavy organic
strata be scraped clear of the building envelope during the Where abnormal moisture conditions are allowed to
early stages of site preparation and we have assumed that continue or to develop, then not only will the above
this will be done. probabilities increase, but the damage will be greater.
Short Term Site Management The CSIRO sheets define both “normal” and “abnormal”
conditions.
This is the responsibility of the builder, and besides
ensuring that the site is handed over to the owner at The significant (not necessarily in order) abnormal
completion in accordance with accepted practice, the conditions that adversely affect the performance of AS
following should also be done: 2870-2011 type footings are:
§ Ensure all service trenches are back-filled as soon as § Trees growing or allowed to grow within the critical
possible in accordance with Clause 6.6 of AS 2870- zone of influence of the footings.
2011, including the clay plug where a service pipe § Poor site drainage
trench exits the building footprint. § Saturated service trenches (poor site drainage).
§ Ensure guttering is connected to the stormwater (via § Leaking service pipes
temporary pipes if necessary) as soon as the roof is The builder, owner/occupier and engineer should take
on. note that management of trees is the most difficult part of
§ Ensure that during construction and at the time of the site management procedures and trees present the
hand-over that the site is maintained as per Clause greatest risk to the future poor performance of the footing
5.2.1 of AS 2870-2011. system. Trees (existing or proposed) must not be allowed
If any of these practices are not carried out, the site may to grow without taking action to negate their effects within
develop “abnormal” moisture conditions, increasing the the critical zone of the footing system.
risk of damage above the AS 2870-2011 criteria. Class Normal ys Critical Zone
Other Construction Issues Class M < 41mm .75 times mature height
The builder must also ensure that other sub-trades such Class H1 41-60mm 1.0 times mature height
as plumbers, drainers and swimming pool contractors
Class H2 61-75mm 1.0 times mature height
don’t establish excavations within the critical zone of
influence of the footing system unless the footing is piered Class E 76-100mm 1.5 times mature height
below the influence of these excavations. This critical Class E >100mm 2 times mature height
zone varies from 20° (1V:2H) to 45° (1V:1H), depending These spacings must be increased for groups or rows of
on the nature of the strata. If this situation is considered trees.
possible, then once the proposal is known we can offer These distances are only a “rule of thumb” as the tree
further advice. These excavations include inground tanks. species and their root systems play an equally important
Unless we have specifically given written approval, no role. Refer Appendix H and/or CH or AS2870-2011.
inground tanks should be sited within 8 metres of any
structural footing.
AWT 77775 Site Classification Report
Page 13 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.