09/1058 Request to Change Existing Approval and/or Extension to Relevant Period 1320009.1058.03 · 132009.1058.03
1-^2o09.JoS'.02-_
Sunshine Coast 2011/12 Regional Strategy and Planning
Council Request to Change Existing Approval and/or Extension to Relevant Period
Sustainable Planning Act 2009
ALL questions MUST be completed unless the form indicates otherwise.
SCRC CORRESPONDENCE
This form must be submitted to Council accompanied by the applicable fee.
Attach extra pages if there is insufficient space on the form.
If Council was the Assessment Manager for the existing approval, and the approval was issued by the Court, tnen:
(a) a request to change the development approval and/or conditions is made to the Court; and
I B0407042
I
(b) a request to extend the relevant period for the approval is made to Council.
All terms used on the form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation
2009.
1. Details of person making the request
Full name - individual or company S`^•^crrct^.
Contact Name - for company
Postal address
Suburb ^--,,t,a State Q Postcode +S-7-13
Business phone 54`^ ^ 303'5 A/H phone Mobile ocrSc\ MZ \3\
Email address ^Gr@ Spam a ^ ^ - ^^„^ Fax
2. Details of existing approval
Type of approval (please tick ALL applicable categories) Which entity issued approval?
Q" Development Permit 2Sunshine Coast Council
q Preliminary Approval q Other entity - please specify
G Compliance Permit
[?' Material Change of Use
^.. ~ r;tGA r
q Reconfiguring a Lot r
q Operational Works
IT Building Works
Z SEP 20 11
Q- Plumbing or Drainage Works
q Compliance Certificate 'it'l
T evvvi
k
q Environmentally Relevant Activity
Application number/council reference I'S 2009 . I 0 5 . Date issued
Is the approval for a mobile and temporary ERA? f' No q Yes - complete below
Insert the name o` each local government area in which the mobile and temporary ERA is proposed to operate/operating
Privacy
Council will use any personal information provided for the intended purpose only and for remaining in contact with you. Council is
authorised to collect this information in accordance with the Local Government Act 2009 and other Local Government Acts. Your
personal information is only accessed by persons authorised to do so. Your personal information is dealt with in accordance with
council's privacy policy.
www.sunshlnec oastgklgov.au I [email protected] ( T 07 5475 7272 F D7 5475 72T7
Locked Bag 72 Sunshine Coast Mail Centre Qid 4580 ABN 37 876 973 913
Cakwndra office I Omrah Avenue Caloundra Qki 4551 Maroochydore office 11-13 Ocean Street Marooch
Nambour office Cnr Currie and Bury $treeta Narnbour Old 4560 I Tewantin office 9 Pelican Street Tewa
1 of 4 2011/12 Regional Strategy and Planning Request to Change Existing Approval and/or Extens
LtV^
_
l) c . 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 9 pages
Page 2
3. Nature of request (please tick ALL applicable categories)
Cd' To change the development q To change the development q To extend the relevant period
approval conditions before lapsing
Please attach documentation outlining the detail of and the reasons and justification for the requested change or
extension.
4. Location of the premises
Unit No. Street No $ Street
Suburb ^^ State Q Postcode 41-s-N.S
Lot no. Plan type & plan no.
b5
5. Concurrence Agencies
Was there one or more concurrence agencies involved in the original approval?
q Yes-provide details below
Note - Under s372 of the Sustainable Planning Act 2009 the person making the request is required to give a copy of this request to all
concurrence agencies -.
Concurrence Agency copy given
6. Pre-request response notice
Has a pre-request response been given by a relevant entity (e.g. a concurrence agency) for this request?
[? Jo D Yes
If yes, please attach a copy of the notice.
7. Owner's consent
Is the owner's consent required for this request? q No
2/Yes- complete either Table A or Table B below
Note - If more than one owner of the land all owners' details are required
Table A - owner's consent provided on form
V"', C l_, { C L_^.?•i
Owner's namels ^`
Table A - owner's consent provided on form
I/1Ne, the above-mentioned ownerls of the land, consent
to the making of this rgquest. Owner's name/s
Signature/s q The owner's written consent is attached.
2 of 4 2011112 Regional Strategy and Planning Request to Change Existing Approval and'o- Extens!on to Relevant Period FM401
Page 3
NOTES: For question 7
Under section 371 of the Sustainable Planning Act 2009, if the person making the request is not the owner of the land to which the
approval relates, the request must be accompanied by the owner's consent.
However, owner's consent Is not required if the approval:
- relates to land the was acquisition land to which section 263(2)(d) of the Sustainable Planning Act 2009 applied when the
application for the approval was made; or
- is for building work or operational work for the supply of community infrastructure on land designated for the community
infrastructure: or
- the consent of the owner would not be required under section 263(1) of the Sustainable Planning Act 2009 if a development
application were made for the requested change.
Also, owner's consent is not required if the Assessment Manager is satisfied that:
- the number of owners of the land make it impractical to obtain owners' consent, and the requested change does not materially
affect the owners' land; or
- having regard to the nature of the proposed change, the owner has unreasonably withheld consent and the requested change
does not materially affect the owner's land.
8. Does the request involve a State resource prescribed under the SustainablePlanning Regulation 2009,
Schedule 14?
E q Yes - complete below details
Nature of State owned resource:
Nature of Evidence required:
q Evidence of allocation of / entitlement to, the resource q Evidence the chief executive has agreed to the request
Attach a copy of the evidence required above
NOTES: For question 8
Section 370(3) and (4) of the Sustainable Planning Act 2009 requires that if an application for the development approval were made at
the time of making this request arid evidence under section 264(1) of the Sustainable Planning Act 2009 would be required to support
the application, this request must be accompanied by the written agreement of the chief executive from whom evidence would be
required under section 264(1).
Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a State resource, a regulation may require
the application to be supported by certain evidence prescribed under regulation. Schedule 14 of the Sustainable Planning Regulation
2009 prescribes the State resources for which evidence is required to be given, and the evidence required, to support the application.
9. Declaration of applicant
I/We, the applicant, declare that the above information is correct in all respects, at the time of lodgement of this
application with the Sunshine Coast Regional Council. Should any of the details given in relation to this application be
changed in the future, the applicant shall advise the Sunshine Coast Regional Council in writing prior to any such change
being implemented
Signaturels Date 22. <=<\. \\
3 of 4 2011/12 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM401
Page 4
OFFICE USE ONLY
Application no. Amount paid Date paid Receipt no. Initial Date stamp
Receiving Officer
Payment options
In person Customer service centres: 8.30 am to 4.30 pm Monday to Friday (excludes public holidays).
By mail Cheque or money order to be made payable to: Sunshine Coast Regional Council.
q Cheque q Money order q Mastercard q Visa
Card number Expiry date Amount $
Name on card Signature of cardholder
Phone Is a receipt required? q Yes q No
4 of 4 2011112 Regional Strategy and Planning Request to Change busting Approval and/or Extension to Relevant Period FM401
Page 5
mate Issued Details
A 1702.10 L N Various changes
Construction
8.0
A*
driveway cross over in
accord a nce wnh l ocal
council requirements
m
N
a
0
9. 7
"ifau lr ":T111ll ^ MU 5.355
TR a,air
777
Tlrppol4edsic
9.5
Lot 405
1
531.1 m2
635
C
"ililr-i'llll I
10.0 1.5msetback c,
extent of existing residence, shown
small dashed, to be removed
New Residence Score 1200 ®A3
sparks architects^^ _ 8 Pifer Street Peregion Beach Doug and Porn McTaggorl 025 DS STE PLAN WD1.1
no no g
own - ^ fru urq
Page 6
CIVILCAD
SOFTWARE TOTALSTATI ON
0 1 2 3 4 5 10 20
I PA & FP KASS
A
Irod.ng as
SCALE 1:200
DRL 14.00 8UL' Ll^
MRL 14.12
GRL 6.60 Philip Hass. Registered Surveying Associate
Diff 7.52
241 Gumboil Road
DRL 14.60 Lake MacDonald,
MRL 14.73 COOROY. 4563.
GRL 6.9
Diff 7.83
Phone 5442 6065
Mobile 0421 039204
DRL 15.65
MRL 16.37 MRL 16.37 EMAIL
GRL 5.80 FGL 7.18 pohass©bigpond.com
Diff 10.57 DiffB 9.19
DRL 15.00
MRL 15.70
1 1
GRL 6.8
Dill 8.90 111LE
NORTHERN ROOF
Roof Height Report
SOUTHERN ROOF
Lot 405 on P93116
DRL 15.05
MRL 15.02 8 Piper Street
GRL
Diff
8.5
6.52
Peregian
SCALE
DRL 15.65
MRL 15.60 datum AHO 1:200
GRL 8.42 (® A3 Size)
origin OPM 37166
Diff 7.18 SURVEYED
LEGEND rl 7.725 PAH
DRL = Approx Design RL Scaled
DRL 14.87 MRL = Measured RL
MRL 14.97 GRL = Ground RL from detail survey H09002A
GRL 9.2
Diff 5.77 GRL = Ground RL from detail survey H09002A FIELD BOOK CIVILCAD FILE AUTOCAD FILF7
DiffB= MRL-FGL XXXXX-XX PIPERB.DWGI
LOCAL AUTHORITY
DRL 14.30
MRL 14.43 Sunshine Coast Regional
GRL 10.40 PARISH COUNTY
Diff 4.03
CUENT
ALTUM
)k AiJN(
PIPERS
Page 7
Page 8
-
Page 9
Page 10
HASS SURVEY (Phillip Hass Registered Surveying Associate)
A.B.N. 76 944 662 979
241 Gumboil Road
Lake MacDonald QLD. 4563
TEUFAX: (07) 5442 6065
MOBILE: 0421 039 204
SURVEY REPORT
DATE: 6.9.20 ,1 1
PROJECT: 8 Piper Street, Peregian
Report on Roof Heights
DETAILS:
refer to attached plan PiperB dated 5.9.2011
The roof heights of the 2 pavilions of the new house were measured at their four
corners and compared with levels shown on the detail survey done by Hass
Survey, Plan H09002A. The results are shown on Hass Survey Plan PIPERB.
Finish ground levels have not been taken under all the corners.
To note.
-The SE corner of the southern pavilion roof exceeds 8m in difference between
the detail ground level and the finished roof height.
-The NE corner of the southern pavilion roof exceeds 8.69m in difference
between the detail ground level and the finished roof height. It also exceeds 8.69
in difference between the finished ground level and the finished roof height.
Observations.
-design heights for the roof were scaled from the building plans provided to me at
time of construction. WD2.1 -4 dated 20.11.10.
These scaled levels appear to be generally in accordance with the finished levels
measured except for the NE & SE corners of the southern pavilion. The
calculated slope of the roof of the southern pavilion appears to be approx twice
that of design.
-Design Plan WD1.1 shows contours in the area of the NE & SE corners of the
southern pavilion. These contours do not agree with the contours shown on Plan
H09002A.
Used in these records
09/1058 Request to Change Existing Approval and/or Extension to Relevant Period 1320009.1058.03Related documentApplication case desk ↗