planning report Other Change
Council, is cost effective across its
design life. AO4.2
Where infrastructure is located on
private land an easement is
dedicated over the infrastructure in
accordance with PSP6 Engineering
Design Standards - Roads, drainage
and earthworks.
AO4.3
Any alterations or repairs to
infrastructure as a result of the
development are made at no cost to
Council.
AO4.4
Development avoids stormwater
inflow and infiltration to the sewer
infrastructure network.
AO4.5
Stormwater infrastructure is designed
to minimise maintenance costs and
the requirement for specialized
equipment for maintenance
techniques.
PO5 AO5.1
Stormwater drainage infrastructure is Stormwater drainage infrastructure
aligned to avoid crossing waterways, avoids crossing waterways, wetlands
wetlands, drainage lines and drainage lines and ecologically
ecological important areas, or where important areas or follows the edge
it is demonstrated this is of existing disturbed areas.
unavoidable, disturbed areas are
reinstated and revegetated upon AO5.2
completion of works. Stormwater drainage infrastructure is
co-located with other infrastructure
within a combined utility corridor
where appropriate.
AO5.3
Temporary vehicular crossings of
waterways must be designed and
constructed to be consistent with the
current International Erosion Control
Association Best Practice Book
Series
Stormwater quality and protection AO6.1
of receiving waters Stormwater runoff discharging into
PO6 High Ecological Value waters as a
Development is located, designed, result of development causes no
constructed and operated to protect increase in gross pollutants, total
and enhance environmental values suspended solids, total phosphorous
and water quality of waterways, or total nitrogen compared to a pre-
wetlands, lakes, ground waters and development scenario.
drainage systems.
AND
Editor’s note: Environmental values
of waters and water quality objectives
are prescribed in Schedule 1 of the AO6.2
Environmental Protection (Water) All stormwater runoff is treated to
Policy 2009 and are identified on the achieve maximum removal of
State Planning Policy Interactive nutrients, gross pollutants and
Mapping System. suspended solids as determined by
cost to efficiency ratios. (e.g.
bioretention basins must be sized to
Page 71 of 89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.