                                                  (i)     the jetty is shared
                                                          between two unit
                                                          owners;
                                                  (ii)    the jetty straddles
                                                          the common
                                                          boundary of the
                                                          two units;
                                                 (iii) jetty heads and
                                                          pontoons are not
                                                          constructed; and
                                                 (iv)     fencing between
                                                          the two properties
                                                          is setback a
                                                          minimum 1 metre
                                                          from the revetment
                                                          wall to allow for
                                                          efficient access to
                                                          the jetty by both
                                                          owners (Refer
                                                          Figure 9.4.9.3G).
                                       Editor’s Note—Council is unlikely to
                                       support a jetty application for the
                                       exclusive use of one unit owner.

                                       AO19.8
                                       Walkways serving jetties have at
                                       least one rigid handrail fitted and the
                                       walkway is a minimum width of 750
                                       millimetres and a maximum width of
                                       1.5 metres where—

                                       (a) the walking surface of the jetty is
                                           constructed level with the top of
                                           the revetment wall;
                                       (b) water reticulation systems are
                                           fitted with a mechanical backflow
                                           prevention device; and
                                       (c) electrical reticulation systems
                                           carrying electricity in excess of
                                           24 volts are not to extend
                                           beyond the revetment wall.

                                       AO19.9
                                       Any lower-level platform, or siding,
                                       along the jetty walkway has a
                                       maximum width of 500 millimetres
                                       and does not exceed 2m² and does
                                       not interfere with the prolongation of
                                       boundaries as indicated by
                                       Acceptable outcomes AO15.1,
                                       AO15.2 & AO15.3.
PO20                                   No acceptable outcome provided            N/A
Pontoons and boat ramps are not
constructed within the Noosa Waters
Estate waterways.
PO21                                   AO21.1                                    N/A
Boat lifting devices are only          Boat lifting devices are only located
constructed in the absence of a boat   in conjunction with an approved jetty
ramp and are designed and located      where—
to—
                                       (a) the boat lifting device does not
    (a) ensure that unacceptable           extend into the waterway beyond
        risks to personal and public       the end of the approved jetty;
        safety are unlikely to be      (b) the boat lifting device is no
        caused;                            greater than 4 metres in width or
    (b) avoid cluttering of the            for a jetty hoist, 2 metres in
        waterway;                          width;


                                                                                       Page 83 of 89
Log in to download the original file

planning report Other Change.pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.