boat ramps are not located within the
Noosa Waters Estate.
PO23                                     AO23.1                                  N/A
The flood detention and amenity          For premises adjoining a waterway
functions of the area adjacent to the    within the Noosa Water estate, no
revetment wall within Noosa Waters       building work, filling or excavation
Estate are retained and enhanced by      works within 4.5 metres of the centre
ensuring—                                line of the top of the concrete
                                         revetment wall.
(a) works do not protrude through a
    batter line of 1:4.5 measured        AO23.2
    from the centre line of the          A minimum of 25% of the area within
    revetment wall;                      4.5 metres of the revetment wall is
(b) there is no additional load placed   planted with shrubs and small trees
    on the revetment wall;               with a mature height of 3 metres or
                                         less.
(c) works do not pose a risk to the
    membrane adjoining the
    revetment wall;                      AO23.3
(d) amenity of the waterway and          The ground surface within the first
    surrounding land uses is not         metre of the revetment wall—
    adversely affected by
    development (building, filling or    (a) is grass or ground cover; and
    excavation) ensuring—                (b) does not include shrubs.
           (i)    the 4.5 metre          AO23.4
                  setback area is        Side boundary fences within 4.5
                  predominantly soft     metres of the revetment wall taper
                  landscaping;           down to a maximum height of 1.2
          (ii)    a maximum of 25%       metres at the revetment wall and no
                  of the area is         more than 1.5 metres at a distance of
                  impervious;            2.25 metres from the revetment wall.
         (iii)    dominant
                  impervious areas
                  and masonry
                  retaining walls are
                  avoided;
         (iv)     retaining structures
                  and the like are
                  light weight, low
                  rise and screened
                  by landscaping;
          (v)     natural materials
                  such as timber or
                  rock are used
                  rather than
                  manufactured
                  materials;
         (vi)     the acoustic
                  privacy and access
                  to sunlight of
                  surrounding
                  development is
                  protected; and
         (vii)    views are not
                  impeded.

PO24                                     No acceptable outcome provided          N/A
No shore side anchor points are
installed within 4.5 metres of the
centre line of the revetment wall.
PO25                                     No acceptable outcome provided          N/A
No mooring, anchoring, tying or
docking of vessels occurs adjacent to
the revetment wall.




                                                                                       Page 85 of 89
Log in to download the original file

planning report Other Change.pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.