Cover Letter

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Council Ref: MCU22/0082 & OPW22/0134


28th July 2023


The Chief Executive Officer
Noosa Shire Council
[email protected]


Dear Sir/Madam,


RE: MINOR CHANGE TO DEVELOPMENT APPROVAL (SETBACKS, ADDITONAL WINDOW AND BIO-RETENTION
BASIN RE-LOCATION) – MCU22/0082 & OPW22/0134 – 1 TAYLOR COURT COOROY QLD 4563 (LOT 1 SP324340)
Please accept this application made on behalf of the Applicant, Taylor Court Development P/L for a Minor Change to
MCU22/0082 and OPW22/0134 for an increase to the building’s southern setback, re-location of the bio-retention basin
and addition of a new window.



     1)   Minor Change Form (5)
     2)   Proposed Change Plans by Building Suncoast Green
     3)   Changed Landscape Plans by Bird Landscape Plans
     4)   Changed Civil Plans by BAX Engineering


For all queries relating to this application please contact Will Johnson on (07) 5448 8500 or
[email protected]


Kind Regards,




Will Johnson
Senior Planner BUrbDes&TownPlan(Hons) PIA.




                          Building Suncoast Green
                          building | design | town planning

                          6 Lorraine Avenue
                          Marcoola Beach, QLD, 4573
                          07 5448 8500
                          [email protected]
                          www.buildingsuncoastgreen.com.au
Log in to download the original file

Cover Letter.pdf · 864 KB (small file)

Full text of the other 5 pages

Page 2

Minor Change
Background Information

On the 8th of December 2022 Noosa Shire Council issued a Development Approval under reference MCU22/0082 and OPW22/0134 for
Low Impact Industry and associated Operational Work.
A Minor Change to this approval was granted on the 14th of April 2023 as the resulting height of the building with respect to the site levels
exceeded the height limit imposed by the Assessment Manager (albeit remained below the height limit for the site through the Planning
Scheme).
Currently the development is finalizing construction documentation for commencement of site works in the near future.
During this documentation stage it has been identified an easement boundary was not disclosed in the available survey information
resulting in the building being built over the easement line. Further, the approved SPEL system for site water treatment was positioned over
a water main. This has resulted in the requested changes detailed below in addition to a proposed new window northern wall of the
building.

Proposed Minor Change

As stated above, further survey information revealed the approved building design was partly over an easement (Figure 1), thus a change
has occurred to set the building back from this easement as depicted in the supplied Proposal Plans and per Figure 2 below.




Figure 1 - Approved building position relative to access frontage of the site.




Figure 2 - Proposed change for increased setback relative to easement BB.

A second change relates to the approved SPEL system which was approved in the southern landscape area of the site. It was discovered
this system was positioned over a water main which has resulted in a new location for a Bio-retention basin in the western landscape portion
of the site as per Figure 3.

Page 3

                                                                                 SPEL system moved from here to
                                                                                 western landscaped area of site.




Figure 3 - Proposed re-location of SPEL system and change to a Bio-retention basin.


A third change is proposed which affects the North-East elevation to include additional windows for natural light and ventilation into the
tenancy. These changes are best reflected in the comparison image below in Figure 4.




Figure 4 - Comparison of approved (top) north-east building elevation to proposed change (bottom) north-east elevation.

Page 4

It has been determined that no condition changes are needed to the Decision Notice. However, the following plans changes are required.

Plan No.                     Rev.     Plan/Document Name                                                     Date


2021-48 Sheet 01 of 07           Zg   Site Plan drawn by Building Suncoast Green                             25 July 2023


2021-48 Sheet 04 of 11           Y    Site/Roof Plan drawn by Building Suncoast Green                        30 March 2023


2021-48 Sheet 03 of 07           T    Floor Plans drawn by Building Suncoast Green                           25 Oct 2022


2021-48 Sheet 08 of 11           Zg   Elevations drawn by Building Suncoast Green                            25 July 2023


2021-48 Sheet 09 of 11           Y    Sections drawn by Building Suncoast Green                              30 March 2023


2021-48 Sheet 01 of 11           Y    3D Views drawn by Building Suncoast Green                              30 March 2023


2021-48 Sheet 02 of 11           Y    3D Views drawn by Building Suncoast Green                              30 March 2023




Plan No.                     Rev.     Plan/Document Name                                                    Date


228-001-100                      C    Site Layout Plan                                                      12 July 2022
                                      Prepared by BAX Engineering

228-001-200                      C    Earthworks Layout Plan                                                12 July 2022
                                      Prepared by BAX Engineering

228-001-201                      C    Earthworks Sections                                                   12 July 2022
                                      Prepared by BAX Engineering

228-001-202                      C    Retaining Wall Detail                                                 12 July 2022
                                      Prepared by BAX Engineering

228-001-300                      C    Grading & Drainage Layout Plan                                        12 July 2022
                                      Prepared by BAX Engineering

228-001-301                      C    Pavement Layout Plan                                                  12 July 2022
                                      Prepared by BAX Engineering

228-001-302                      C    Signage & Linemarking Layout Plan                                     12 July 2022
                                      Prepared by BAX Engineering

228-001-400                      C    Drainage Catchment Layout Plan                                        12 July 2022
                                      Prepared by BAX Engineering

228-001-401                      C    Drainage Longitudinal Section                                         12 July 2022
                                      Prepared by BAX Engineering




Plan No.                     Rev.     Plan/Document Name                                                    Date


LA-SF-2204-01- 001           E        Landscape Cover Page                                                  21 July 2023


LA-SF-2204-01- 101           E        Landscape Surface Finishes Plan                                       21 July 2023


LA-PP-2204-01- 201           E        Landscape Planting Plan                                               21 July 2023


LA-DT-2204-01- 300           E        Landscape Details                                                     21 July 2023

Page 5

LA-DT-2204-01- 301   E   Landscape Details     21 July 2023


LA-DT-2204—01- 400   E   Landscape Elevation   21 July 2023

Page 6

Minor Change Assessment
The Planning Act 2016 defines a minor change as a change to the approval that;
(i)          would not result in substantially different development;
In determining whether the proposed change would result in substantially different development, the assessment manager or
referral agency must consider the individual circumstances of the development, in the context of the change proposed.
A change may be considered to result in a substantially different development if the proposed change:
  involves a new use; or                                                The proposed change does not include a new use from what
                                                                        has been approved for the site.
  Results in the application applying to a new parcel of                The proposed change applies to the same land parcel.
  land; or
  Dramatically changes the built form in terms of scale,                The change is in keeping with the built form in terms of scale,
  bulk and appearance; or                                               bulk and appearance of that which has been approved. The
                                                                        additional window to the rear does not increase the
                                                                        appearance of bulk and scale whilst the increased setback at
                                                                        the front improves a desirable outcome.
  Changes the ability of the proposed development to                    No change incurred.
  operate as intended; or
  Removes a component that is integral to the operation of              No change incurred.
  the development; or
  Significantly impacts on traffic flow and the transport               No change incurred.
  network, such as increasing traffic to the site; or
  Introduces new impact or increased the severity of                    The proposed change does not increase the severity of
  known impacts; or                                                     known impacts, nor does it introduce additional impacts.
  Removes an incentive or offset component that would                   The proposed change does not remove an incentive or an
  have balanced the negative impact of the development;                 offset.
  or
  Impacts on infrastructure provisions.                                 The proposed change does not impact infrastructure
                                                                        provisions.


(ii) if a development application for the development, including the change, were made when the change application is made
would not cause –
  (a)   The inclusion of prohibited development in the                  The change does not include any prohibited development.
        application; or
  (b) Referral to a referral agency, other than to the chief            Not required.
        executive, if there were no referral agencies for the
        development, application; or
  (c)   Referral to extra referral agency, other than to the            Not required.
        chief executive, or
  (d) a referral agency, in assessing the application under             No additional triggers or aspects require referral assessment.
        section 55(2), to assess the application against, or
        have regard to, a matter, other than a matter the
        referral agency must have assessed the application
        against, or had regard to, when the application was
        made; or
  (e)   public notification      was not required        for the        Public notification was not required by original application.
        development application

We have determined that the application can be accepted as a Minor Change to the development approval.
As a result of the change, we kindly ask the Assessment Manager to amend the Decision Notice as implied within this report,
including approval of new Site/ Floor Plan.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.