Original source · versioned page text
Cover Letter
SPEL system moved from here to
western landscaped area of site.
Figure 3 - Proposed re-location of SPEL system and change to a Bio-retention basin.
A third change is proposed which affects the North-East elevation to include additional windows for natural light and ventilation into the
tenancy. These changes are best reflected in the comparison image below in Figure 4.
Figure 4 - Comparison of approved (top) north-east building elevation to proposed change (bottom) north-east elevation.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original