09/0247 - Operational Works - Transport Type 5 - Domestic Marine (Jetty & Boatlift) [As Published] · 142009.247
‘|Su nshine Coast Checklist - Applications Involving Land
Regional Council Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter. .
a
oe
4. APPLICATION-FORMS. -. 8 Re
1.1 Form’ PartA
1.1.1 Ensure that the form is fully completed and is a current version. Y
1.1.2 Inthe case of an MCU or Op Works below the. high-water mark, owner’s consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by
signatory) or Company Seal required.
4.2 Form1 Part B-R Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached. | ov
1.1.2.1
Ensure that each of Forms B-R which are attached are fully completed.
2.2 Ensure correct parts of Form 1 are provided where required (ie most common are Part J for
21 Ensure that relevant sections have been checked and/or completed with regard to referrals oof
Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works) |
30 “ENVIRONMENTALLY RELEVAN f
3.1. Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
‘ fee is paid and recorded on the application. (Refer Environmental Health for fees)
4:.. FORM2- REQUEST TO:
4.1 Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records.
If over multiple properties on one or more sites, consent of Body Corporate is required.
5. PLANS” , re : ue .
@ 5.1. Ensure that generally at least 6 sets of the Plan of Development a for Reconfiguration and Operational
Works) accompany the application. In addition ensure that each set is complete. Ye
5.2 . Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is , 1)
unbound.
6 ‘SUPPORTINGINEORMATION
6.1 Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfi iguration | —
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction. - _
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping a
7.4 Ensure that the application fee, as determined from the Council's adopted scale of fees, Y
accompanies the application or has been paid.
¢ and Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works, Operational
Work if Jetty or if including Landscaping.
e ' Land Development Lot Reconfiguration applications and Operational Work not including ‘Landscaping
Please DO:NOT leave the application at the counter and DO NOT deliver the application to Records.
NSC g:\anduse\administrative processes\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 16 pages
Page 2
Department of Main Roads (Concurrence or Advice)” e State Controlled Road Dept Natural Resources & Water e Acidsulphate soils (Advice) ee e Clearing of native vegetation on freehold land (Concurrence) Environmental Protection Agency (Concurrence) ¢ Environmentally Relevant Activity (for non-devolved Council as EPA) e Contaminated land * Environmental Management/Contaminated Land Register « UXO « Land recently used as a ‘notifiable activity’ « — Industrial land changed to sensitive uses (eg school) ¢ Coastal related development. e Koala habitat « Wetlands (Advice only) Queensland Transport (Concurrence) ‘ @ ° Railway ° Public Passenger Transport Energex or other responsible entity (Advice) . Electricity Easements/Substations DIP (Concurrence) . SEQ Regional plan VARIOUS < . Conservation estate (Advice) ise asi of Natural Resources and Mines EPA For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning. NSC g:\landuse \administrative processes\application checklist.doc
Page 3
pf
£
INTEGRATED PLANNING ACT 1997
Part A, Version 3.1, 3 March 2008
Common details
lH \ .
OTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice ete INS itp
: Coon ile wT Me
i au ; paibe (once
. Company/organisation name (if applicable)
. Individual applicant/Contact person (If there is more than one applicant, provide addtional applicant details on an attachment to this form)
e Title [ws | First name [Emma Lastname Reed vite
¢ Postal address [Po Box 299, Noosavile. QLD 4566 _|
4! Contact telephone number [07 5474 3480 Mobile phone number [oso 437 526
‘ Facsimile number [o7 5474 3480 e-mail address [email protected]
je C (ensure adequate information is given to identify the premises)
complete Table A only, Then go to Q2.
OR
TableB Street address for the
{) [CJ Street address / lot on plan for the premises (Appropriate for most applications inckiding building applications); OF
(ji) BQ Street address Aot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontoon etc) (Note: Loton plan details may be obtained fram title documents, a ‘Rate’ notice, or from the focal government.)
premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
ik
AND /OR
TableC Coordinates and/or a map of the premises (Appropia
te for development in remote areas, over part of a {ot, in water (e.g. channel dredging in Moreton
Tables D, E, or F. (Note: tn most instances, the premises will not involve any of
f these characteristics - complete only if applicable)
9. _ Identify if any of the following apply to the premises by completing
the following characteristics, however some applications may involve one of more o}
4
4
t
Page 4
AOL 2/09 WED 09:06 a
He Holds
p oldings (461 7 3302 0191 )0754743480
miTeGAaTel PLARAING ACT 1997 TAA emeniene an
Tables 0 Compiate i the premise ate
Senne aps
sels of the premiaes: feg. vocont ian.
§, Ara there any existing eggamnents on the premised? (0.9. fer venteutor occnss. elechichy. cveriaed’ Sow, weer eft)?
KI No (LI Yes « erm ‘pa type. ealion 208 mensions of each eosernent ave knckaded in plans aubmited wit me appicaoy!
7. Doee the popasel include new Buidings OF operational work (induding ay services) on the promises?
63 Yes - Ensure he nature, location and dimensions of te proposed works O78 included in plans, subatit
6. Does the appfeation involve taking oF Interfering with & State resource and therefore require a resoured entivement? (9. ne application
involves State land (eased ares reehoid), ctared Fish HeDtat arees. waking sraamry material tating of rtertering sen woe tar une ware! ACT 2000 EC)
63 Ne - G00 08 Cl Yes - Complete Tobie vrata te xara Mae SOUT Pa 9 Evidence of resowee
ae aren et sce WB You da not need io answer OS «got the next eC",
rg
ein ONS aes
not within canal oa definad uncer the Coastal Protection and Management Act 1995; or work on roll corridor tand defined under the
Transport Infrastructure Act 1204 - prot ss rear omer 2 HST aor ena aftacrrnt oi form op
a. Complete Teble H for appkcatons|
2
+ Qane’s Fgnet-ute COHN wo proved on toma t yovintanadta sube the cpp eaten ebectronically. Ovener’e consent met be Jo Ine asaessment manager on af
eitechmert cumtartang aepropriede ariien dour of the owners combat tt (ha ower ucompany, 0°27 ofthe Corporations Act 2001 (Cweastth) eiats now 8
onmenry may sgn ey OPN. en i cer TEN ae NS AS .
ya ee TT * “oo
ORPEbLPSLLS .
dey:ao 60 984 Zt
uepingAneresoony
Page 5
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)
Chee
RSIS IED
3, Indicate the total
ES Ea
area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)
Aes toul ated oF
m? []hectares (Tick appicable uni)
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
foe 1
5. Are there any existing easements on the premises? (e.. for vehicular access, electricity, overland flow, water etc.)?
KI No
[L Yes - Ensure the type, location and dimensions of each easement are inckuded in plans, submitted wih the application
oc ™ e
ade
6. _ Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)
New Timber Jetty and pneumatic boat storage device
7. Does the poposat include new buildings or operational work (including any services) on the premises?
(TJ No DX] Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
Bre Sparse . =
8. Does the application involve taking or interfering with @ State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quatty material, taking of interfering with water under the Water Act 2000, etc.)
& No - Goto Q9 oO Yes - Complete Table G - provide delails for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go ta the next section.
9. Complete Table H for applications involving a material change of use, reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995, or work on rail corridor tand defined under the
Transport infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.
= premises Owners: a ec omene at a
Table H ee i ostiradd ; se 2 ae
1 Richard James Mathews 45 Mermaid Quay, Noosaville QLD 4566 16/02/2009
* Owner's signature cannot be provided on {he form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website . : .
Table |
1 Part E f 14-Feb-2009 over the counter
2 Checklist : . 14-Feb-2009 | over the counter
Page 6
Part A, Version 3.1, 3 March 2008
INTEGRATED PLANNING ACT 1997
[14-Feb-2009 [over the counter |
(3 [John Norden Plans |
10. The Port
(CJ the application seeks a preliminary approval only;
LJ the application is not for building and construction work under the Building and Construction industry (Portable Long Service
Leave) Act 1991, section 3AA (eg. the application is only for a change of use, of for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);
[| all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(] the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-bullder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. Is payment of a PLSL levy applicable to this application? (Refer to Q10. and the Advice below for more information)?
[XK] No - Endof Part A
[Yes - Answer 12 below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
. Receiving officer's Reference
Fee ($) Date received name numbers or Ve¥
To: . ‘ouncil. | have been engaged as the private certifier for the building work referred to in this application.
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
fe
2 g ts
@ ee eee nie : Te donee Noses
1
Privacy Statement
The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal detaits will not be disclosed for a purpose outside of the IDAS process, except where required by legisiation {including the Freedom of Information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Advice for completing Part A
General advice
° Part A of IDAS Development Application Form 4 mustbe completed and accompany all development applications, The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not property made.
je The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and 8 only.
Applicant details
le if the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.
Page 7
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Details of the premises
The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other
structure is situated on the land). The term land’ is aiso defined to include the estate in, on, over oF under the land.
Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. instead complete
Table A.
The premises may be identified in a number of ways — .
« Street address and lot on plan are most common and wil apply to most applications.
+ Coordinates may provide the best means of accurately identifying the location of development proposed in waters, of on a relatively smail
development site distant from property boundaries on a large Jot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.
The definition of ‘water body and ‘watercourse’ can vary from Act to Act
StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortL and.
StrategicPortLandis declared under the Transport Infrastructure Act 7994. For further information go to IDAS Guide 14 (Development on
strategic port land) and the Queensland Transport (Ports) website.
“Tidal water’ is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary of a tidal area. Land betow high water mark is not within a local government's area unless
provided for under the Local Goverment Act 1993. Uniess otherwise provided for by legistation, a local government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection
Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the focal government tidal area, and the planning scheme may be applied to that
assessment {to the extent provided for in the code for prescribed tidal work).
Resource entitlement
Section 3.2.1(5} of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Regulation. Section 3.2.1(10){a){ii) states an application cannot be taken to be property made without the required evidence.
For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
For State-controlted roads, 4 resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.
Owner's consent
Section 3.2.1{3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport infrastructure Act 1994.
Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.
‘Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were fet to a tenant at a rent).
Templates are available from the PA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
Owners consent, if required, must be provided even if the applicant is the owner. Owners consent is not required for a mobile snd temporary
ERA.
°
Portable Long Service Leave (PLSL) Levy
The Building and Construction Industry Portable Long Service Leave Scheme provides tong service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL tevy) is collected on certain building and construction work carried out inQueensland.
The PLSL levy amount and other prescribed percentages and rates for catculating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy. :
The Building and Construction Industry (Portable Long Service Leave) Act 1997 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining fand.
The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before 2 development permit may
be issued.
The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the Qleave website at www.gleave.gid.coy.au. For further information contact QLeave (Tel: 4800 803 481 Web:
www. gleave.qid.gov.at )
Page 8
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 Masch 2008
a
i a
Y XS panel 1 Development Application
Building &/or operational works assessable
against a planning scheme
4. Nature of work that requires assessment against a planning scheme:
[CJ Building work - Complete Table A {] Operational work - Complete Table B
Table B
e@ (i) What is the nature of the operational work?
(CJ Roadworks (C1) Stormwater (Water infrastructure LL] Sewerage infrastructure
(CI Landscaping (J Earthworks (7) Orainage Works (C] Signage
{Tj Clearing vegetation under the planning scheme [IX] Other - Specify below
New Timber Jetty and Pneumatic boat storage device
TE: if you have indicated multiple operational works in question {i) above and your answers {o this
Wk, it may be more appropriate to provide these details in an attachment to this form)
(ii), What type of approval is being sought? (vo
question would be different for diferent operational wo
[| Development Permit ([] Preliminary approval 7] Both (specify betow)
(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
BI No [1 Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this applicati
a tot)
EXJNo — [[] Yes - Complete Table B(a)
jon? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
@
$ 30000
2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour)
3. Confirm that the following mandatory information accompanies this application
over the counter
Pians, andspecifications ff applicable, showing the nature and location of the proposed works (including the
extent of any cut and (i)
OFFICE USE ONLY
Date Received Reference Numbers [
Advice for completing Part E
General advice
1s Part Amust also be completed for ail IDAS development applications.
. The applicant is responsible for answering all questions fully and correct!
ty, unless following a response there is a statement to go directly to another question.
Q1 ‘A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development fo occur’
Page 9
IDAS Assessment Checklist, Version 21.3, 9 May 2008
AX
{/ received
Assessment Checklist, 2° *°
ee a
is ea
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your focal government or log onto the DIP website www.dip.qid.qov.au for help
For all DAS development applications (excep those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist
Does the application seek approval to materially change use of the premises? Ces |B2No
ifyes - complete Section 2 of this checklist
Does the application seek approval to reconfigure a lot? Yes |B2No
ifyes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the local government. -
Does the application seek approval to carry out operational work?
ityes - complete Section 4 of this checklist ayes |CINo
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? (Yes |pgNo
ifyes - complete Section 5 of this checklist
Have you received a referral agency response under section 3.3.2.0f the IPA, in retation to this development application?
ifyes - complete Section 6 of this checklist CYes |KINo
Does the application seek approval to carry out building work requiring assessment against a local goverment planning
scheme? fdYes |(JNo
ifyes - complete Part E of IDAS Application Form 1, Assessment is by the local government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. ClYes | No
Assessment is by a building certifier
141A ls any part of the proposal intended to be carried out on a Queensta
nd Heritage place under the Queensland Heritage Act 1992?
PJ No-cotoris ([[] Yes
IPA, schedule 8, part 1, table 5, item 2; 1P Regulation, schedule 2, ble t, tem 71, table 2, item 18: IPA, section 1.3.5 (Definitions for terms used in development).
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
1.4B Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered in
a Local Heritage Register under Part 11 of the Queensland Heritage Act 1992?
K No - Goto Q1.2 oO Yes - (Complete Form 1, Part CC} This application requires assessment by the relevant local government against the IDAS
Code in the Queensland Hentage Regulation 2003. If the development involves buiiding work and the locat
government is not the Assessment Manager for the application, the focal government has jurisdiction as Concurrence
Agency.
43,48 5:1P Reguiation, schedule 7, table 1, item 114 IPA, section 1.3.5 (Defintions for terms used in davelopmeni);
IPA, schedule 8, part 1, table &, item 2A, scheutte 9, tables 1,
Queensland Heritage Regulation 2003, schedule 2 (IDAS ©
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
DQ No-Gotoars [_] Yes
IPA, schedule 8, part 1, table 5, Rem 1; IP Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, item 2 (wild river area): Water Act 2000,
section 966C; Wild Rivers Act 2005, section 43A
pUEoss
13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
[XJNo-cotoars [(] Yes
IPA, schedule 8, part 1, table 2, item 1; IPA, schedule A, part 1, table §, dems 3 and 4; IP Regulation, schedule 2, lable 2. items 1 and 23; Environmental Proiection Act 1994, section
BAA (wild river area); Witd Rivers Act 2005, section 43A; relevant wild river dectaration; Wild Revers Code,
[] No - Goto a7.5
(Yes
IP Regulation, schedule 2, table 2, tems 15 and 16
6 ios
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
[J No - Goto. 01.6 .
(71 Yes - ff answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
K] No - Goto. 1.7
(Yes
IP Regulation, schedule 2, table 3, tem 7
es
17 Does the proposal invoive the establishment or expansion of a waste water disposal system?
Be] No - End of Section? [_] Yes
IP Regulation, schedule 2, table 3, tem 5
44 ts any of the proposed operational work assessable under a planning scheme?
| No - Goto 04.2 & Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.
Page 11
IDAS Assessment Checklist, Version 21.3, 9 May 2008
- EEE
State-controlled road?
EJ No
(Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
[XJ No - Goto. 04.1.2
Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
{P Regulation, schedule 2, table 3, tem 3; IP Regulation, schedule 2. table 3, item 10}
i eh sh
4.1.2 Is any of the operational work proposed in a local government area listed** in State Planning Policy 2/02: Planning and Managing
Development involving Acid Sulfate Soils
No -Goto 04.1.3 (1) Yes
41 purukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Cabooture, Cais, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cootoola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
IP Regulation, schedule 2, table 3, item 4; State Planning Policy 2/02: Planning and Managing Development involving Acid Suffate Soils, section 3. &
4.1.3 Is any of the proposed operational work for filling or excavation?
DK No -Gota4.74
(I Yes
JP Regulation, schedule 2, table 3 item 10(a): IP Regulation, schedule 2, table 3, item 10{b)
4.1.4 1s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No -Gotoa4.1.5 [_] Yes
IP Reguiation, schedule 2, table 3, item 17
4.1.5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
RX] No- Goto 04.1.6 (D1 Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 14
ep aaa ae:
416 — \s any of the proposed operational work listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
[X] No- Goto 04.1.7 (C1 Yes - This application must be referred to QueenstandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 15
44.7 ts any part of the premises in a koala conservation area or koala sustainability area?
No -Goi0aa2 [(] Yes
IP Reguiation, schedule 2, table 3, tem 19
Page 12
= Bes
4.2 Is any of the proposed operational work associated with reconfiguring a lot and thi
DXINo -coioass [_] Yes
IPA, schedule 8, part 1, fable 4, item 2: IP Regulation, schedule 1, part 2, table 5, item 1(c}
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial de velopment inside a designated urban
area}
43 is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
(XI No -Gotoass [_] Yes
IPA, schedule 8, part 1, table 4, items 1A-1G; IP Regulation, schedule 2, table 2 item 5 (vegetation clearing): IP Regulation, schedule 2, table 2, item 34 (koala
conservation); IP Regulation, schedule 7, part 3, table 4, item (vegetation clearing/wild river area); Vegetation Management Act 1999, section 22A {vegetation
clearing/wild river area); Wild Rivers Act 2005, sections JF and 43A
ere eRe
4.4 ts any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water, and other than under
the Water Act 2000, section 20(2), (3) or (5), or from a dam constructed on a watercourse or lake?
KK) No - Goto gas (1 Yes - Answer (a) and (b) betow
IPA, schedule 8, part 1. lable 4, tems Bia}; HF Reguéation, schedule 2, table 2, item 8; IP Reguiation, schedule 7, part 3, table 4, items Jaret 3A; Water Act 2000, section IGGA (wiltt river
area); Wild Rivers Act 2008, section 43A: relevant Wild river declaration: Wild Rivers Code
45 is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water}?
KX] No Gotoas6 LZ] Yes - (Complete Farm 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRW/is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 3(b): IP Regulation, schedule 2, table 2, item 8, {P Regulation, schedule 1, part 3, table 4, item 3
Wild Rivers code (Note: the code does not currently contain applicable provisions for taking or interfering with artesian water)
46 Is any of the proposed operational work for any thing constructed or instalted that allows, under the Water Act 2000, for taking
overland flow water (other than using @ water truck to pump water)?
[X] No - Gotoa4s7 (Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, item 3(c)(0; 1P Regulation, schadule 2, table 2, tem 8;1P Reguiation, schedule t, part 3, table 4, tern 3; Water Act 2000, section Y8GA (vald river area):
Wild Rivers Act 2005, section 43A; relevant wild tiver declaration; Wild Rivers Cate,
47 is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
[No -Gotoars [[] Yes
IPA, schedute 8, part 1, table 4, item 3(c}{ii); IP Regulation, schedule 2, table 2, item 8 IP Requtation, schedule 1, part 3, table 4, tem 3
Water Act 2000, section 966A (wild river area)(Note: no current Wild River declaration identifies taking or interfering with subartesian water as assessable}
Wild River code (Note: the cade does not currently contain applicable provisions for sub artesian water}
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
intesfering with overtand flow water (other than using a water truck to pump water]?
[XI No -Gotoa4g9 ((] Yes - Answer both (a) and (b) below
IPA, schedute 8, part 1, table 4, items 3(0@ and (ep, IP Regitation, schedule 2, table 2, item 9; IP Regutation, schedule 3, part 3, table 4, item 3A: Water Act 2000, section 966B (wilt
river area); relevant wikl river dectaration; Wild Faves Code.
49 is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 — No 0 Yes
(ii) To increase the storage capacity of a referable dam by more than 10% — No D Yes
if yes to either or both (1) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency. ,
IPA, schedule 8, part 1, table 4, item 4; IP Regulation, schedule 2, table 2. item 10
4.10 \s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
[i] No -Gotoastt [_] Yes - Answer (a) and (b) below . :
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
IPA. schedule 8. part 1, table 4, item 5; IP Regulation, schedule 2, table 2. tems 12, 14 and 17; IP Regulation, schedule |. part 3, table 4, items 4A and &
Coastal Protection and Management Act 1995, section 104A (wild river area)
No -Gotwas.i2 [_] Yes
IPA, schedule 8, part 7, table 4, item 5; IP Regulation, schedule 2. table 2, items 12 and 14; {P Reguiation, schedule 1, part 3, table 4, items 44 and 5
Rivers Act 2005, section 434
ement Act 1995 Act 1995, section 104A (wild river area); Wild
oe
4.12 |s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
[J No -Gotoas73 [Yes
IPA, schedtie 8, part 1, lable 4, item 6; IPA, schedule 8, part 2, table 4, item 2; Fisheries Regidation 1998 st13A (sell-assessable cates): IP Reguiation, schedule 2, table 2, Hem 28; IP
Regulation, schedule 7, part 3, table 4, item 6; Fisherles Act 1994, section 760 (wild fiver area); Wild Rivers Act 2005, section 43A.
RARE RRITAT ARE AGW ILEP RIV
413
s Lei b mak 3 t hit
Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
[J No - Goto 04.14
(Yes
IPA, schedule 8, part 1, lable 4, item 7; IPA, schedule 8. part 2, tabla 4, item 3; Fisheries Rogulation 1995 $1134 (self-assessable codes); IP Regulation, schedule 2, table 2, item 25; 1P
Regutation, schedule 1, part 3, table 4, item 7; Wild Rivers Act 2005, sections 434; Fisheries Act, section /6DC (vik! river atea).
HOV ON ORDA FRNIARINE DEAN WILD RIVER AREAS Ses eed ore okie Zon
14 1s any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
BK] No -Gotoas1s [_] Yes
JPA, schedule 8, part 1, lable 4, fle 8: IPA, scheuule 8, part 2, table 4, item 4; Fisheries Reguiauon 1995 113A (self-assessable codes); IP Regulation, schedule 2, fable 2, item 29: IP
Regulation, schedule 1. part 3, table 4, tem 8: Fishiories Act 1994, section 7GDB {wild river aica): Wild Rivers Act 2005, section 43A: relovant wild river declaration: Wild Rivers Code,
a Be
415 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2 105?
[KINo -cotoas1s [-] Yes
IPA, schedule 8, part 7, table 4, item 10: IP Regulation, schedule 2, table 2, item 37; Wild Rivers Act 2005, sections 42, 43A
shi eA
4.16 |s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
DX] No - End of section 4 CD Yes
IP Regulation, schedule 2, table 2, tem 3
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
To the full extent permitted by taw DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any loss {including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.
he.
Page 14
\-SZ/60__
Syd SNIMYOM ONIW Yd
snes i a /
maa) one wv NV 1d SLIS
G00e AWwrait NOLHBY & HOUWW ALNNOD ae
VYAASM HSRivd sft
aiva AVEO Lzzeee
warverepoweuse Ud ye yy 101 -
eee vows noususea0 ‘
902 ma Od srumy mad ALNSdOUd Tv3u
emeniug ubmeg HD | REQRAB
sajejoossy B
uepion uuor ff
SY3SLVYM YSOON
AWNDO ON enon)
SLON 2 .
vp 101 MH 1 ena 3
ALLAar GaSOdOud 1 |i
SM3IHLVW 1 34 , WT
ener s 8.
“eaeummen _ ‘wal Oreav4 TWALOIO a 8
1 Shaan me eae oetten i
f YSOON _ L
Paani 3Q0O ONMd - 6942 S¥ ' ;
JONVOYODOY NI CSTIVISN! 30 TIVHS S37id TIV R . | §
9 CuVZVH O1 Gal ONY ale | Armnoe Avedon |
COOMCRIVH GBNOREY 38 THE Fa NE hem a os —————
TT aman te | ewmomenaiasnoven |
7. i i om.
a
, | L NOILWAS 1A
, OHV 990 TY HALVM NONININ |
| OHV O°} TH OH 0°} TS 4930
TIVM 340 dOL TM 40 dOL
GHY 002 WY 1SAS1 00019 GSQH0038 WANN ©
Page 15
__| 2S2/60__ 980 ONIMYOM ZTLLOOPE £0 Od LELLS0 PS £0 eg 9007 © mee) 2B Od | SnuBAy suEpUnY aE Ue LOL OS esemgthag uyeeg pcD / mamenag 228 €9T O10 NOW SeJe|DOSSY P USPJON UYOr fF V/t QL) Aid MNTuEVY SYALVM VSOON AVWND AIVWYAN (SL"ON) vy 101 ALL3f GaSOdOud SM3HIVAN LY sy3qina ALLSr VWSOON av Coudvell fp AL LP “SONIMVO SHL WOds G3ITVIS 38 LON TIVHS STAAS1 ONY SNOISAGINIG °S “CGEONIN BO OBaHSV1d dv ATINA ONY OS TW3S 38 TIWHS Sad 40 dOl “Y “TAALS SSSINIVLS HO G2SINVATYS C3ddi0 LOH 38 TIVWHS “0.14 “STIVN "SMZUOS “SHSBHSVM ‘SLO “S.LNN SNIGNTONI YOMTAALS YBHLO TTY “OLE S0WHOS ANINVW C3aA0udd¥ 38 TIHS “5.13 "SCO *SL1I0E TEELS SSSINIVIS Tly « SAYOM TWOLL YO4 SOUVONVLS ONRIGANIDNS ONY ONKTHNG - ADIOd TWNOLLVHSdO ‘SADNSOV NOLLOALOUd TWLNSNNOMIANS SHE HLLIM A IdiNOD TIVHS NOLLOMALLSNOO Tiy SSIMYSHLO GALON SSSINN Z ‘NIN 913 3O SOVHS SSAULS V 3AVH ONY S3ID3dS$ GaA0NddY 40 | SSYTD ALMravend 36 TIVHS Y3e@NLL TTy SSIMYAHLO CALON SSSINN ‘$ “SALON 9eS/l S°0 - ALIDO TAA ONIHLYS8 WG - 1aSS3aA GayYOOW WANIXVAN Pedy 0'% - GVO1 SAM NOISSG WOILYSA MOS0 AVM TIVM SSADOV YVINOIHSA ON SLVAId 'YASN STIONIS -JSN ALLA (+N wh Ww /NOLLOSS OOS ONIN - OS5Z BY HLA Qwe4 92 1 001 AVENOO O14 $Id Th LW 310m ERNE Td OM SNRIVA 8H 008 2 $0 02y O euanns “Sus sea wivis a
Page 16
oo 1Su nshine Coast LAND USE SECTION FEES Regional Council . RECEIPT TYPE SALE OF DOCUMENTS : Superseded Planning Scheme Documentation - 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation : 111 APPLICATION FEES * Material Change of Use - Code/Impact : Consistent ; / . -. 521 Inconsistent 7 : 521 Assessment under Superseded Planning Scheme co a - $21 Modification to a Development Permit _ | 521 Extension of a Currency Period. ‘ 521 ’ Operational Works - Landscaping , Se : 521 | e@ Bldg’ Work assessable against the Planning Scheme oo _. _ $21 PRE LODGEMENT REVIEW . ‘ \ / Half Hour , , / . . $22, ; . } : . One Hour . : §22° ADVERTISING . . Purchase Advertised Applications : " §23 * JeTTIES TO ; : 7 . : hand Jetty Application Fee - . L370 524 . Jetty Bond oo . : Xoo. 51. < . . Loo : ot : . (Category 4) ‘BONDS . ‘ . ’ Performance Bond : . 51. : so 7 , . : (Category 9) . SIGNS : : . Registration Fee : : + 222 @arcur FEE Search of Land Use Section file. , . 112 Liquor Licensing Request mo. : : 443 TOTAL $ FTO _ NAME: £7. Matthavs . ADDRESS: _ ef Nbase teeth, Gvit her) fo Be w 23 NBOeS4 vie TTC - FILE NO: oal2u9 “DATE: 26/2/24 RECEIPT NO: ! 4 664 ___ Signature of TP Officer: AUTHORITY NO: = CG - a
Page 17
CALCULATION OF FEES .
APPLICATION FEE
TOTAL
ee eee -FEES:
MCU - CODE ASSESSMENT
Details of Development
Consistent 1.0
Inconsistent 3.0
FEE CALCULATION
MCU - IMPACT ASSESSMENT
Details of Development
Consistent 1.0
Inconsistent 3.0
FEE CALCULATION
€
{OPERATIONAL WORKS
Details of Development
|FEE CALCULATION —
TOTAL FEES
Used in these records
09/0247 - Operational Works - Transport Type 5 - Domestic Marine (Jetty & Boatlift) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.