09/0247 - Operational Works - Transport Type 5 - Domestic Marine (Jetty & Boatlift) [As Published] · 142009.247

of 17

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 Masch 2008

    
 
 

 

a

i a
Y XS panel 1 Development Application

Building &/or operational works assessable
against a planning scheme

4. Nature of work that requires assessment against a planning scheme:

 

 

[CJ Building work - Complete Table A {] Operational work - Complete Table B
Table B
e@ (i) What is the nature of the operational work?
(CJ Roadworks (C1) Stormwater (Water infrastructure LL] Sewerage infrastructure
(CI Landscaping (J Earthworks (7) Orainage Works (C] Signage
{Tj Clearing vegetation under the planning scheme [IX] Other - Specify below

 

 

New Timber Jetty and Pneumatic boat storage device

TE: if you have indicated multiple operational works in question {i) above and your answers {o this
Wk, it may be more appropriate to provide these details in an attachment to this form)

 

 

(ii), What type of approval is being sought? (vo
question would be different for diferent operational wo
[| Development Permit ([] Preliminary approval 7] Both (specify betow)

(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?

BI No [1 Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this applicati
a tot)
EXJNo — [[] Yes - Complete Table B(a)

jon? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring

 

 

 

 

@
$ 30000

2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour)

 

 

  
  
  

3. Confirm that the following mandatory information accompanies this application

 

over the counter

 

Pians, andspecifications ff applicable, showing the nature and location of the proposed works (including the
extent of any cut and (i)

 

 

OFFICE USE ONLY

 

 

Date Received Reference Numbers [

 

 

 

Advice for completing Part E

General advice
1s Part Amust also be completed for ail IDAS development applications.
. The applicant is responsible for answering all questions fully and correct!

 

ty, unless following a response there is a statement to go directly to another question.

 

 

Q1 ‘A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development fo occur’

 

 

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0247 - Operational Works - Transport Type 5 - Domestic Marine (Jetty & Boatlift) [As Published].pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.