Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Appendix J - Civil Engineering Report and SBSMP

of 86

Page text read automatically using OCR, there may be inaccuracies

Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                          COMMENTS
 PO3                                                               AO3                                                          N/A This report is to accompany an
 For reconfiguring a lot or operational works, development is      Development areas are not filled to reduce flood risk.       MCU.
 undertaken in a manner that ensures:

              1. natural hydrological systems are protected from
                 erosion, scour or flood damage on the premises
                 or other premises;
              2. natural landforms and drainage lines are
                 maintained to protect the hydraulic performance
                 of waterways and flood plain; and
              3. development integrates with the natural
                 landform rather than modifying the landform to
                 suit the development as far as practicable.

 PO4                                                               AO4.1                                                        N/A Noosa Shire Council mapping
 For reconfiguring a lot, development does not compromise          Development provides an effective evacuation route that      indicates that the development is
 the safety of people resulting from the flood risk associated     remains passable, with sufficient flood warning time, to     outside flood effected areas.
 with events exceeding the DFE.                                    enable people to progressively evacuate to safe areas
                                                                   above the PMF in the face of advancing flood or waters for
                                                                   events that exceed the DFE.

                                                                   OR
                                                                   AO4.2                                                        N/A Noosa Shire Council mapping
                                                                   Development provides for an area of sufficient size and      indicates that the development is
                                                                   dimensions on site above the PMF that allows for safe        outside flood effected areas.
                                                                   congregation and refuge.




Page 2 of 9
June 2021

Log in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.