Appendix J - Civil Engineering Report and SBSMP
Noosa Shire Council – The Noosa Plan 2020
Flood Hazard Overlay Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
PO3 AO3 N/A This report is to accompany an
For reconfiguring a lot or operational works, development is Development areas are not filled to reduce flood risk. MCU.
undertaken in a manner that ensures:
1. natural hydrological systems are protected from
erosion, scour or flood damage on the premises
or other premises;
2. natural landforms and drainage lines are
maintained to protect the hydraulic performance
of waterways and flood plain; and
3. development integrates with the natural
landform rather than modifying the landform to
suit the development as far as practicable.
PO4 AO4.1 N/A Noosa Shire Council mapping
For reconfiguring a lot, development does not compromise Development provides an effective evacuation route that indicates that the development is
the safety of people resulting from the flood risk associated remains passable, with sufficient flood warning time, to outside flood effected areas.
with events exceeding the DFE. enable people to progressively evacuate to safe areas
above the PMF in the face of advancing flood or waters for
events that exceed the DFE.
OR
AO4.2 N/A Noosa Shire Council mapping
Development provides for an area of sufficient size and indicates that the development is
dimensions on site above the PMF that allows for safe outside flood effected areas.
congregation and refuge.
Page 2 of 9
June 2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.