Skip to the record
Accept no imitations.

Original source · versioned page text

Appendix J - Civil Engineering Report and SBSMP.pdf

of 86

Page text read automatically using OCR, there may be inaccuracies

Noosa Shire Council – The Noosa Plan 2020
Water Quality and Drainage Code
Performance Criteria and Acceptable Solutions




 PERFORMANCE OUTCOMES                                   ACCEPTABLE OUTCOMES                                          COMMENTS
                                                        AO15
 Wastewater management and effluent disposal
                                                        Wastewater (non-sewage) generated from the
 PO15
                                                        development is collected and contained on-site, and is:
 Development does not discharge wastewater unless it
 can be demonstrated to not compromise environmental
                                                                 1. lawfully disposed to sewer; or
 values of waters and water quality objectives
                                                                 2. transferred off-site for treatment/disposal to
                                                                    an appropriately licenced facility;
                                                                 3. reused on-site in a closed-cycle irrigation
                                                                    scheme, industrial processes, washing or
                                                                    cleaning or other purpose; or
                                                                 4. treated to meet the drinking water supply
                                                                    environmental values prior to release.
 PO16                                                   AO16
 On-site effluent treatment and disposal systems are    An onsite effluent system and disposal area is:
 designed, constructed and managed to not compromise
 the environmental values of waters and water quality            1. not located on a slope greater than 1 in
 objectives.                                                        (10%);
                                                                 2. not located at or below the 1% annual
                                                                    exceedance probability (AEP flood event);
                                                                 3. not located within a riparian buffer
                                                                    area mapped on a Biodiversity, Waterways
                                                                    and Wetlands Overlay Map; and
                                                                 4. setback 400 metres minimum from the full
                                                                    supply level of Lake Macdonald.




Page 11 of 11
June 2021

Log in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.