Skip to the record
Accept no imitations.

Original source · versioned page text

Appendix J - Civil Engineering Report and SBSMP.pdf

of 86

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                                                                                                                                                                                         WORKPLACE AND HEALTH SAFETY
     WATER RETICULATION NOTES
                                                                                                                                                                                                                                                                                                         ALL WATER AND SEWER CONSTRUCTION WORK IS TO
                                                                                                                                                                                                                                                                                                         COMPLY WITH THE REQUIREMENTS OF QUEENSLAND WORK
     VEGETATION PROTECTION                                                                             EXISTING WATER MAIN                                                                                                                                                                               HEALTH AND SAFETY ACT 2011
                                                                                                       ·       EXISTING WATER MAINS SHOWN FROM DBYD INFORMATION AND                                                                                                                                      CONTACT YOUR NEAREST OFFICER OF THE DIVISION OF
     A.         TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED PRIOR TO                               SCHEMATIC RECORDS. EXACT LOCATION AND SIZES SHALL BE                                                                                                                                      WORKPLACE HEALTH & SAFETY FOR INFORMATION
                CONSTRUCTION, OR REPLACE IF DESTROYED.                                                         CONFIRMED BY UNITYWATER PRIOR TO ANY CONSTRUCTION WORK.                                                                                                                                   PHONE:1300 362128
     B.         WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD GIRDLES SHALL                      ·       ALL WORKS ON EXISTING ON EXISTING WATER MAINS TO BE
                BE CONSTRUCTED WITH 1.8m BATTENS CLOSELY SPACED AND ARRANGED                                   CARRIED OUT BY UNITY WATER AT THE DEVELOPERS EXPENSE
                VERTICALLY FROM GROUND LEVEL. GIRDLES SHALL BE STRAPPED TO TREES
                                                                                                                                                                                                                                                                                                                          NOTE FOR OWNER
                PRIOR TO CONSTRUCTION AND REMAIN UNTIL COMPLETION.
                                                                                                                                                                                                                                                                                                          SURVEY/BOUNDARY PEGS TO BE IN GROUND BEFORE
     C.         TREE ROOTS SHALL BE TUNNELED UNDER, RATHER THA.N SEVERED. IF ROOTS                     WATER MAIN NOTE                                                                                                                                                                                    WATER CONSTRUCTION
                ARE SEVERED THE DAMAGED AREA SHALL BE TREATED WITH A SUITABLE
                FUNGICIDE. CONTACT RELEVANT ARBORIST FOR FURTHER ADVICE.
                                                                                                       ·       WATER MAIN THRUST BLOCKS SHALL BE LOCATED AND INSTALLED
     D.         ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY AN APPROVED
                                                                                                               AS PER SEQ WATER STANDARD DRAWINGS AND/OR UNITYWATER                                                                                                                                                               TRAFFIC PLAN
                ARBORIST.
                                                                                                               STANDARD DRAWINGS. REFER UNITYWATER SUPERINTENDENT FOR
                                                                                                               PREFERRED INSTALLATION.                                                                                                                                                                    PRIOR TO COMMENCEMENT OF WORK, ARRANGE FOR
     SOIL                                                                                              ·       PLACE DETECTABLE MARKER TAPE OVER ALL WATER MAINS                                                                                                                                          APPROVED TRAFFIC PLAN AND SEEK APPROVAL FROM
                                                                                                       ·       LEVEL AND ALIGNMENT OF NEW MAIN TO SUIT LOCATION & DEPTH                                                                                                                                   PLANNING & TRAFFIC BRANCH. TELEPHONE 340 34180 FOR
     A.         TOPSOIL AND SUBSOIL SHALL BE STOCKPILED SEPARATELY.                                            OF EXISTING MAIN                                                                                                                                                                           DETAILS. WORK MAY BE REQUIRED TO BE CARRIED OUT
     B.         CARE SHALL BE TAKEN TO PREVENT SEDIMENT FROM ENTERING THE                                                                                                                                                                                                                                 DURING WEEKENDS AND/OR LATE AT NIGHT ONLY”
                STORMWATER SYSTEM. THIS MAY INVOLVE PLACING APPROPRIATE SEDIMENT
                CONTROLS AROUND STOCKPILES.
     C.         ACID SULPHATE SOILS EXIST IN THE WORKS AREA. THE OUTPUTS FROM THE RISK
                                                                                                                                                                                                                                                                                                                                DBYD **CAUTION**
                ASSESSMENT BASED ON THE QUEENSLAND ACID SULPHATE SOIL TECHNICAL
                                                                                                                                                                                                                                                                                                         Approx. location of public utilities only. Exact location and depth
                MANUAL REQUIRES THAT ACID SULPHATE SOILS BE MANAGED AS FOLLOWS.
                                                                                                                                                                                                                                                                                                         to be determined on site by relevant authority personnel prior to
                                                                                                                                                                                                                                                                                                         commencing work.
     CREEK CROSSINGS                                                                                                                                                                                                                                                                                            TELSTRA        - Ph 1800 653 935
                                                                                                                                                                                                                                                                                                                ENERGEX        - Ph 3664 5400
     A.         SILTATION CONTROL MEASURES SHALL BE PLACED DOWNSTREAM OF ANY                                                                                                                                                                                                                                     UW            - Ph 1300 086 489
                EXCAVATION WORK.                                                                                                                                                                                                                                                                                GAS            - Ph 3323 7684
     B.         APPROPRIATE SEDIMENT CONTROLS SHALL BE USED TO PREVENT SEDIMENT
                FROM ENTERING THE CREEK.
     C.         NO SOIL SHALL BE STOCKPILED WITHIN 5M OF THE CREEK.                                                                                                                                                                                                                                       DISCLAIMER
                                                                                                                                                                                                                                                                                                          WHILST EVERY EFFORT HAS BEEN MADE TO ENSURE THAT
                                                                                                                                                                                                                                                                                                          THE INFORMATION PROVIDED IN THIS DRAWINGS/DESIGN
     REHABILITATION                                                                                                                                                                                                                                                                                       WAS ACCURATE AT THE TIME IT WAS COMPILED, AS PART OF
                                                                                                                                                                                                                                                                                                          THE COUNCIL'S "AS CONSTRUCTED" RECORDS, IT REMAINS
     A.         PRE-DISTURBED SOIL PROFILES AND COMPACTION LEVELS SHALL BE                                                                                                                                                                                                                                THE RESPONSIBILITIES OF PROPERTY OWNERS AND THEIR
                REINSTATED.                                                                                                                                                                                                                                                                               CONTRACTORS, SUB- CONTRACTORS, EMPLOYEES,
     B.         PRE-DISTURBED VEGETATION PATTERNS SHALL BE RESTORED.                                                                                                                                                                                                                                      SERVANTS AND AGENTS AS APPROPRIATE IN THE
                                                                                                                                                                                                                                                                                                          CIRCUMSTANCES TO MAKE ALL REASONABLE EFFORTS TO
     GENERAL NOTES                                                                                                                                                                                                                                                                                        ASCERTAIN THE PRECISE LOCATION OF EXISTING
                                                                                                                                                                                                                                                                                                          INFRASTRUCTURE INCLUDING WATER MAINS, SEWERS AND
                                                                                                                                                                                                                                                                                                          DRAINS BEFORE UNDERTAKING EXCAVATION OR
     G1  ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT SOUTH
                                                                                                                                                                                                                                                                                                          CONTRACTION WORK.
         EAST QUEENSLAND WATER SUPPLY CODE SPECIFICATIONS AND STANDARDS
                                                                                                                                                                                                                                                                                                          USERS OF THE INFORMATION SHOULD BE AWARE THAT
     G2 UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL COMPLY WITH
                                                                                                                                                                                                                                                                                                          SINCE THE ORIGINAL RECORDING OF THE DEPTHS IN
         THE RELEVANT AUSTRALIAN STANDARDS.
                                                                                                                                                                                                                                                                                                          RELATION TO GROUND LEVELS, CHANGES MAY HAVE
     G3 ADOPT LIP OF KERB OR SHOULDER OF ROAD AS PERMANENT LEVEL.
                                                                                                                                                                                                                                                                                                          OCCURRED AS A RESULT OF SUBSEQUENT WORK OR
     G4 COVER ON MAINS FROM PERMANENT LEVEL TO BE AS SHOWN IN SEQ-WAT-1200-2
                                                                                                                                                                                                                                                                                                          ACTIVITIES INVOLVING FILLING OR EXCAVATION.
     G5 CONDUITS TO BE INSTALLED IN ACCORDANCE WITH THE STANDARD DRAWINGS.
                                                                                                                                                                                                                                                                                                          CONSEQUENTLY, QUU TAKES NO RESPONSIBILITY FOR ANY
     G6 A WATER METER SUPPLIED AT THE DEVELOPERS COST, IS TO BE INSTALLED AT
                                                                                                                                                                                                                                                                                                          APPARENT ERROR OR INACCURACIES THAT ARE SHOWN TO
         THE SERVICE POINT OF EACH LOT IN ACCORDANCE WITH THE STANDARD
                                                                                                                                                                                                                                                                                                          EXIST AS AT THE DATE INFORMATION WAS PROVIDED OR AT
         DRAWING FOR THE SEQ-SP.
                                                                                                                                                                                                                                                                                                          A LATER DATE.
     G7 ALL MATERIALS USED IN THE WORKS SHALL COMPLY WITH THE SEQ-SP'S
                                                                                                                                                                                                                                                                                                          THE ABOVE ALSO APPLIES TO LOCATION AND DEPTH OF
         ACCEPTED PRODUCTS AND MATERIALS LIST OR BE APPROPRIATELY SHOWN,
                                                                                                                                                                                                                                                                                                          OTHER PUBLIC UTILITIES.
         LISTED AND DEFINED IN THE ENGINEERING SUBMISSION SO THAT THE
         ALTERNATIVE PRODUCT OR MATERIAL CAN BE ASSESSED AND IF APPROPRIATE
         SEQ-SP.
     G8 TEST/CHLORINATION POINTS TO BE INSTALLED IN ACCORDANCE WITH STANDARD                                                                                                                                                                                                                                ALL ENVIRONMENTAL PROTECTION MEASURES SHOULD
         DRAWING NO.SEQ-WAT-1410-1                                                                                                                                                                                                                                                                          BE IMPLEMENTED PRIOR TO COMMENCING ANY
     G9 THE CONSTRUCTION OF THE WATER RETICULATION WORK SHOWN ON THIS                                                                                                                                                                                                                                       CONSTRUCTION WORK INCLUDING CLEARING.
         DRAWING MUST BE SUPERVISED BY AN ENGINEER WHO HAS RPEQ
         REGISTRATION. WORKS NOT COMPLYING WITH THIS REQUIREMENT WILL NOT BE
         PERMITTED TO CONNECT TO THE RETICULATION SYSTEM.
     G10 ALL WATER MAINS SHALL HAVE APPROVED DETECTABLE MARKER TAPE LAID ON                                                                                                                                                                                                                                                                  NOTE:
         TOP OF THE BEDDING.                                                                                                                                                                                                                                                                                                                 WATER METERS TO
     G11 FH TEE'S AND RISERS TO BE DN100
     G12 WATER MAINS ARE NOT PERMITTED TO BE CONSTRUCTED WITHIN THE ROAD
                                                                                                                                                                                                                                                                                                                                             BE MIN 600mm APART
         BOXING AND THAT ROAD CROSSING DESIGN IS TO ACCOUNT FOR CONSTRUCTION
         PHASE OF DEVELOPMENT
     G13 WATER MAIN DEPTH OR PIPE CLASS TO BE ADJUSTED UNDER ROAD CROSSING S                                                                                                                                                                                                                        CAUTION -
         TO TAKE INTO ACCOUNT CONSTRUCTION LOADINGS. WATER MAINS ARE NOT TO                                                                                                                                                                                                                         EXISTING SERVICES THE CONTRACTOR IS TO DETERMINE THE EXACT
         BE LAID WITHIN ROAD PAVEMENT.                                                                                                                                                                                                                                                              LOCATION OF ALL EXISTING SERVICES IN THE VICINITY OF THE
                                                                                                                                                                                                                                                                                                    PROPOSED WORKS PRIOR TO THE START OF ANY CONSTRUCTION.
                                                                                                                                                                                                                                                                                                    THE COST OF ANY RECTIFICATION WORKS DUE TO DAMAGE TO
                                                                                                                                                                                                                                                                                                    EXISTING SERVICES SHALL BE BORNE BY THE CONTRACTOR.




                                                                                                                                                                                                                                                                             PROJECT:                                                                     JOB NUMBER
REV DATE DESCRIPTION                                   BY   CHKD DRAWN
                                                                     I GDETAL
                                                                            IS                                                SCALE                                                       APPROVED                                                                           PROPOSED SUBDIVISION                                                            1856
 A   18-03-20     FOR APPROVAL                         MS     CL                                                                                                                                                                                                             AT NOOSA CIVIC, WALTER HAY DRIVE, NOOSAVILLE
 B   27-11-20     REVISED AS PER COUNCIL RFI MEETING   MM     CL   DATUM              AHD                                                                                                                                                                                                                                                           SHEET:    2   OF    17
                                                                                                 0             1.0            2.0             3.0            4.0              5.0m
                                                                                                                                                                                                                                                                             FOR STOCKWELL PTY LTD
 C   08-02-21     FOR CONSTRUCTION                     JP     TS   DESIGN            MM                                                                                                  .................                                                                                                                                         DRAWING NUMBER         REV
                                                                                                                                                                                                                                                                             DRAWING TITLE:
                                                                   DRAWN              MS                                                                                             Director: CAMERON LANDRETH
                                                                                                                            SCALE 1:100 A3
                                                                   DESIGN CHECK                                                                                                            (RPEQ 19358)           p 07 5443 8285                                             LOCALITY PLAN, SCHEDULE OF DRAWINGS                                         W02                 C
                                                                                         CL
                                                                                                                                                                                                                  e [email protected] w www.barlowshelley.com.au
                                                                   DATE              18-03-20
                                                                                                This drawing is not to be copied or amended without written permission from
                                                                                                Barlow Shelley Consulting Engineers                                                    FOR CONSTRUCTION           a PO Box 899, Maroochydore,4558 ABN 89 215 591 077         AND GENERAL NOTES

Log in to download the original (Appendix J - Civil Engineering Report and SBSMP.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.