17481 SARA Pre-Referral
Attached to the e-mail Operational Works Application OPW20/0243 - DA Form 1 - Owners Consent - Plans - SARA Pre Referral - 27 Cooran Court NOOSA HEADS.
2011-19754 SER
To ensure the development is carried out generally in accordance with the plans of development
submitted with the application.
To facilitate the monitoring of the development works for compliance purposes.
To ensure that at times, all lights on or above the development site do not interfere with safe
navigation in surrounding waterways.
To ensure the development does not encroach on the navigable waterway in a way that impedes the
safe passage of vessels.
To ensure that the coastal resource (State land) is appropriately administered under the Coastal
Protection and Management Act 1995 and the Land Act 1994.
To ensure impacts on coastal values (water quality) are avoided or minimised.
To ensure importation of materials does not result in adverse impacts on coastal values. Chemical
and other contaminants have the potential to have an unacceptable impact on coastal values.
To ensure damaged structures do not impact on coastal resources and public safety.
Evidence or other material on which the findings were based
development application
SDAP, version 2.6, published by SARA
Planning Act 2016
Planning Regulation 2017
State Assessment and Referral Agency Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.