Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Extension to Currency Period - Approved MCU21 0182 01 {As Published} · MCU21/0182.01

of 18

Text shows just the words. Original shows the document exactly as it was published.

                 5.     Certification must be submitted to Council from a Licensed Surveyor which certifies that
                        the building does not exceed the maximum height requirement of this Decision Notice.
                        Performance Bond
                 6.     Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
                        must be submitted to Council, to secure performance of all conditions of this approval,
                        prior to pre-start meeting. The cash bond or trading bank guarantee will be returned on
                        performance of the conditions of approval less any costs incurred by Council in respect
                        of enforcing performance of this permit. Council reserves the right to call upon the bond
                        or guaranteed sum to effect compliance with conditions.
                        Street Identification
                 7.     The street address of the development must be clearly visible and discernible from the
                        primary frontage of the site by the provision of a street number and, where appropriate,
                        the building name.
                        Water & Sewer Connections
                 8.     An underground connection to reticulated water and sewerage must be provided to the
                        development site in accordance with the standards and requirements of Northern SEQ
                        Distributor–Retailer Authority (Unitywater).
                 9.     A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
                        (Unitywater) must be submitted to Council that certifies an underground connection to
                        reticulated water and sewerage has been provided to the development site.
                        Building Appearance
                 10.    All air conditioning units or other mechanical equipment must be fully enclosed or
                        screened such that they are not visible from the street frontages nor adjoining properties.
                        Clothes Drying Areas
                 11.    Each dwelling unit must be provided with access to an outdoor clothes line which is
                        screened from public view.
                        Fencing and Walls
                 12.    Any street fencing must be set back an average of 1 metre from the front property
                        boundary. Any fencing on the front boundary must either:
                        a.      not exceed a maximum height of 1.2m
                        b.      be of open construction.
                 13.    Any street fencing must be articulated by stepping the design at a maximum of every
                        5m.
                 14.    The area of land between any street fence and the front property boundary must be
                        densely landscaped to screen any fencing from the street.
                 15.    Both side and rear fencing must not exceed a maximum height of 1.8m.
                        Landscaping Works
                 16.    The development site must be landscaped in accordance with PSP3 – Landscaping
                        Plants and Guidelines and generally in accordance with the approved plans.
                 17.    All landscape works must be established and maintained in accordance with the
                        approved design for the life of the development, and in a manner that ensures healthy,
                        sustained and vigorous plant growth. All plant material must be allowed to grow to full
                        form and be refurbished when its life expectancy is reached.




Document Set ID: 23016595
Version: 3, Version Date: 14/05/2024                                                                     Page 3 of 18

Used in these records

About this file

File size
212 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Extension to Currency Period - Approved MCU21 0182 01 {As Published}.pdf · 212 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.