Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Development Application for Operational Works (Driveway Crossover) - 8 Duke Street, Sunshine Beach

Attached to the e-mail Operational Works Application OPW26/0021 - DA Form 1, Cover Letter, Plans - 8 Duke Street_ Sunshine Beach.

of 4

Page text shows just the words. Original shows the document exactly as it was published.

    •   AO12 – The proposed driveway is not located within 1 metre of a stormwater catchpit;


In terms of compliance with Acceptable Outcome AO14 (including AO14.1 – AO14.4), it is noted
that whilst the proposed development does not satisfy AO14.1, due to the development providing
for more than one (1) driveway crossover, the proposed arrangement does not interfere with the
safe and efficient use of the road networks.


This is achieved due to the site being a corner lot, with each crossover achieving compliance
with the intersection separation distances and Deeper Street not containing existing traffic
hazards, or curves that would inhibit visibility to the driveway. It is also noted that the crossover
exists on the site and therefore does not technically result in the introduction of a new traffic
consideration.


On this basis, the proposed crossover does not impede the safe and efficient use of the road
network and the development satisfies Performance Outcome PO14. Therefore, the proposed
arrangement should be supported.




This Development Assessment Report has been prepared in support of a Development
Application for Operational Works for Engineering Works (Driveway Crossover) at 8 Duke Street,
Sunshine Beach (Lot 265 on RP48111).


This Development Assessment Report demonstrates compliance with all applicable Assessment
Benchmarks of the Noosa Plan 2020, and should be approved by Council, subject to reasonable
and relevant conditions.


Should you have any questions regarding the application, please don’t hesitate to contact me
direct. We look forward to progressing through the application process


Kind Regards,




Michael Lyell
Director
URBN Town Planning
Log in to download the original file

Development Application for Operational Works (Driveway Crossover) - 8 Duke Street, Sunshine Beach.pdf · 552 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.