Council archive · source document
Development Proposal Plans · MCU17/0559.04
Plans and drawings: the text below has words only, no drawings.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
SITE NOTES:
1. GENERAL
N
W
WIN
Do not scale off plan, figured dimensions take TE
RS
SE
preference. UN
T
PA
Builder to verify all dimensions and levels on plan prior Dri
ve
TH
to commencement of construction, and no responsibility RL way
21 Lev
|72 el
is taken after commencement. Dri
ve
All services and manholes must be located and RL way
22 Lev
|40 el SET RISE
identified prior to construction.
Contours and levels shown on the plan are indicative
Dri
only and are suppied by contour surveyor. No ve
RL way Dri
responsibility is taken for accuracy of levels. 20 Lev ve
RL way CO
Telstra U/G - Shown from Records
|85 el
Water U/G - Shown from Records
E
22 Lev
2. SITE SETOUT
|70 el
MM
ON SU
RIS
Location of boundaries to be confirmed by MM
PR ER
E
Dri BU SU
surveyor/builder prior to setout. It is recommended that a O NP
S
ve P1
licenced surveyor be engaged to setout the building. RL way
22 Lev
1 03 PE AT
H
All boundary clearances shown to be verified by builder
|59 el 9
RT
prior to commencement of construction. Any variation to
Y
setout dimensions must remain with Council
requirements. 6570 SETBACK 21210 7002 SETBACK
Ad
Gr joinin
3. EARTHWORKS ou g
RL nd Le Lot
Cut and fill indicated on plan may vary at construction 22 v
|89 el
Concrete path
stage and builder shall verify and adjust as required.
All earthworks shall comply with Building Code of BU
CP
61°48'10" 34.782m
10 10 10
06 05 04 11
P8
20 20 20 05
.3 .3
.5 KL 90 25
Australia (BCA) Part 3.1 and relevant Council legislation.
KI03 69 01 KI02 64 10
03 .7
20 PA 31
76
.4 G01
KI01 87 11
31
PROPERTY BOUNDARY
10 0.00
0
10 50
44 20 TR 0
20 .7 0.40
.6 EP 78 05
EP 90 01
8U
01 10
61°48'10"
54 NKN
20 OW
.9
SETBACK
BB 80 N
10 10 01
45
20 20 46 11 11 11
.691.710 42 43 11 70 12 12
4. SEWERAGE AND STORMWATER
EP EP 1647 23 23 11 60 12 20 19
01 012010 10 .4 .7 58 24 24 21 25 26
.F .748 49 FE 14 FE 37 23 .4 .8 25 .7 .2 12
10
51 EP20 20 03 .7 FE 91 FE 61 .1 FE 18 FE 56 18
20 03 FE 81 FE 99
34|782
10 10 20 01.7 .7 11 03 03 04 04 27
07 20 08 EP .L10 CO 03 45 04 .0
.6 EP 70 FE 44
2050
0.00
20 .3 PP 70 01 01 R PA 04
.3 TR 0
Garden
KL 72 KI02 38 01 LIN 11
SL
PA 0.40 68 11
27.0
G 11
26.0
01 KI01 G01 41 11 24 69
All sewerage and stormwater drainage shall comply with
PA 0.00 04 67 .3
23 TR 86 24 1166
18 .817
G02 TR 0 .8 W TR23.8
20
EU
SL
BR 32 01
26.5
11 0.50 CAL W0199
BR
S
36 W01 TIM
0.00 03 YP W01TI
.54
T BE M
Sewer U/G - Shown from Records
TR 0 6 PO 11 R BE
S S
20
0.20 46 1111R
INC 11 0.00
11 11 7565
03 IAN 72 73 74 2323.7
BCA Part 3.1.2, AS 3500 and relevant Council legislation.
AW 0
.7
23
20.5
10 A 23 23 .6 .7
.5 .631 BR 2627
10 JA CO 01 CO 88 CO
S
CO 97
1
55 CAR .U 02W01
21 02 02 PA 02
.0 AN TIO
BB 17 DA
01
25
90
02
23.5
23
22.5
Stormwater to be discharged to Council approved
.6
.5 L2
ST 24
25
21.5
N 11
23.0
22.0
TE 76
MP 23
7.0
.7
.0
21.0
10 10 CO 37
13 20 See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Proposal Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.