JAMES WARREN & Associates Pty Ltd ‘LE"7 5 ENVIRONMENTAL CONSULTANTS Ver ay i | AE SITE REHABILITATION PLAN LOT 1 RP215933, EENIE CREEK ROAD NOOSAVILLE JUNE 2007 A REPORT TO KEN HICKS & ASSOCIATES PTY LTD Brisbane Office Head Office Sunshine Coast Office Suite 28 Cathedral Village PO Box 490 . Office 12 Caloundra City Centre 115 Wickham Street ALSTONVILLE NSW 2477 51-55 Bulcock Street FORTITUDE VALLEY QLD 4006 PH: (02) 6628 6778 CALOUNDRA QLD 4551 PH: (07) 3257 2703 Fax: (02) 6628 6779 PH: (07) 5437 8011 Fax: (07) 3257 2708 : Fax: (07) 5437 8022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 136 pages
Page 2
1. o eZ Site Rehabilitation Plan Table of Contents INTRODUCTION ......ccesccccceececceccesesccececteccscnsensenscassassecsensessessesseneessons 3 Background....... 3 Site Description........... 3 Open Space Designations....................068 4 Performance Objectives............c0:ceeeeeeee 5 REGENERATION STRATEGY ..... 6 Introduction.......... .6 TIMING «0... eee e cece eee 6 Personnel / Procedures .......... 7 Thinning of Dense Undergrowth............2..22.0068 7 Weed Control Methods ............csceseeseesereereees ..8 Primary Weeding ......... 9 Boundary Marking ..................eeeeeeee . -10 REVEGETATION STRATEGY ....--sseceessncvcesces wee 11 Introduction............ cc eece eee ese ee vee I Personnel, Procedures and Timing ..............2....e eee eee ee . 1 2.1 Revegetation PhaSeS.........cccccc cee sc ca ceaeeeceaeesenseecensesaee 97 2.2 Personnel..........0.. 12 2.3 Propagation ........ccsceceseereeeeee 12 2.4 Site Preparation (Weed Control) 2 13 2.5 Revegetation Works ...........0645 .. 13 2.6 Planting Program ... ..14 2.7 Fire Management ..... 15 2.8 Long term management. 015 MONITORING .....cccccceveccesecccescssccercecseosense 16 Introduction vee 16 Performance Targets ............. wee 7 Reporting of Monitoring Results.............ccccccceeeeeseeseseenceeeecensenes weed Completion of Reporting ..........cccceceecee ee eee eee eeeeneeeeeseteesseereeeene TIMING AND RESPONSIBILITIES ... SUMMARY .....ccccescscvescsccccnsccecssenscnsesesececsecssceeessecseccees Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 2
Page 3
a ® vase Site Rehabilitation Plan 1. INTRODUCTION 1.1 Background James Warren & Associates (JWA) have been engaged by Ken Hicks & Associates, on behalf of S & L Developments, to prepare a Site Rehabilitation Plan (SRP) for the proposed development site at Eenie Creek Road, Noosaville. The subject site forms a part of land envisaged to be developed as the Noosa Shire Business Centre (NSBC). The NSBC, including the subject site, is the subject of Master Plan Stage 2 (MP2), which sets out future land uses within the NSBC. Stage 1 of the NSBC occurs immediately to the east of the subject site and is currently under development. A number of vegetation surveys and management plans were completed as part of the Stage 1 development process and which are relevant to this VMP. These include: e WBM Oceanics (1999) - Eenie Creek Flora and Fauna Impact Assessment Study; e URS Australia Pty. Ltd. (2002) - Noosa Shire Business Centre Environmental Management Plan; URS Australia Pty. Ltd. (2003) - Concept Stormwater Management Plan; Chenoweth Environmental Planning and Landscape Architecture (EPLA) (2004) - Vegetation and Landscape Report; and e Landscape Assessment, Management and Rehabilitation Pty Ltd. (2004) - Flora Report (Planning and Environment Court report for Appeal no. 48 of 2003). 1.2 Site Description The subject site is located at Eenie Creek Road, Noosaville and is described as Lot 1 on RP215933, Parish of Tewantin, Shire of Noosa (FIGURE 1). The site is bounded by Eenie Creek Road to the north, industrial development to the west, Eenie Creek to the south and Stage 1 of the NSBC to the east. The subject site is approximately 21.47 hectares (ha) in area. The topography of the subject site is slightly undulating and generally slopes to the south towards Eenie Creek. Numerous depressions occur throughout the site, particularly within the lower-lying areas to the south. A drainage lines occurs within the eastern portion of the site, which joins to a drainage line within Stage 1 of the NSBC to the east, below the Q100 Average Recurrence Interval (ARI) level at RL 2.8 m level (URS 2006). After prolonged rainfall, ponding of water occurs within depressions along the drainage line, predominantly below Q100 (URS 2003). A small constructed dam is located in the central portion of the site. Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 3
Page 4
Lake Weyba Legend —] Subject Site LJ] Noosa Shire Business Centre 0 500m [Ss m CLIENT TITLE SGUREEs GrsbaretIBD Ken Hicks & Associates Pty Ltd FIGURE 1 ; PROJECT SCALE: 1: 20000 @A4 Site Rehabilitation Pian PREPARED: BW LOCALITY Lot 1 on RP215933 PLAN JAMES WARREN & ASSOCIATES PTY LIMITED Environmental Consultants Eenie Creek Road, Noosaville, QLD Noosa Shire Council LGA DATE: 06 June 2007 FILE: Q06030_SRP_Locality.cdr
Page 5
Site Rehabilitation Plan The vegetation within the site is composed of predominantly Swamp mahogany (Eucalyptus robusta) and Broad-leaved paperbark (Melaleuca quinquenervia) in the southern portion and Flooded gum (E. grandis) and Red mahogany (E. resinifera) occur in the northern portion. Much of the vegetation within the site was cleared during the 1970’s and subsequent regrowth vegetation has been subject to frequent fire events. An aerial photograph depicting vegetation coverage is presented in FIGURE 2. A child-care centre and other associated built infrastructure occurs within the northern portion of the site. In addition, numerous vehicle tracks occur throughout the site. The approved layout plan for the Subject site is shown in FIGURE 3. 1.3 Open Space Designations Vegetation will be retained within Open Space Areas in accordance with the Open Space Management Plan (OSMP) (JWA 2007) as follows: Open Space (Conservation and Waterway Protection): The OS2 (Conservation and Waterway Protection) area is to be retained in a near- natural state, therefore limited infrastructure is required within this area. Some clearing of vegetation may be required for fire trails/breaks. Public access to Eenie Creek will not be encouraged. Walking tracks and jetties will not be constructed. Playground and picnic facilities, rubbish bins and other facilities associated with recreational parkland will not be provided. Vehicle access will be kept to a minimum and limited to fire and emergency vehicles and Council maintenance vehicles, All unnecessary existing tracks and trails witl be closed off and rehabilitated and vehicle access points will be limited to as few as possible. The Fire Management Plan (JWA 2007) recommends that a fire break be created within this area to provide access for fire fighting vehicles and to ensure compliance with bushfire management objectives. This fire break will have a minimum width of ten (10) metres, which will involve the clearing of all vegetation. Other fire breaks will be created within this Open Space area, however these will require the clearing of vegetation to a four (4) metre width. The location of all fire breaks will take into account the requirement to retain habitat trees, where possible. Open Space (Preservation of Visual Amenity): The Open Space: 083 and OS6 areas will be retained primarily for screening purposes. Proposed works within these areas shall be limited to minimal landscaping and supplementary plantings of endemic species. Adjacent infrastructure such as footpaths, lighting and signage and stormwater control devices/measures may be Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 4
Page 6
0 100 200m pS! peng Ck) Legend Subject Site Noosa Shire Business Centre SOURCE: Google Earth 2006 Aerial Photograph SCALE: 1: 8000 @A4 JAMES WARREN & ASSOCIATES PTY LIMITED Environmental Consultants CLIENT Ken Hicks & Associates Pty Ltd PROJECT Site Rehabilitation Plan Lot 1 on RP215933 Eenie Creek Road, Noosaville, QLD Noosa Shire Council LGA FIGURE 2 PREPARED: BW DATE: 06 June 2007 FILE: Q06030_SRP_Aerial.cdr TITLE AERIAL PHOTOGRAPH
Page 7
B1 B2 B3 Ee E2 E3 E4 E5 E6 E7 os1 os2 OS3 Os4 oss OS6 OS7 RES Legend BUSINESS (Retail Centre & Business) BUSINESS (Car Parking & Offices) BUSINESS (Showroom, Offices & Business) EMPLOYMENT (Technology Based R&D Business Offices & Civic) EMPLOYMENT (Educative & Environmental R&D Business & Offices) EMPLOYMENT (Environmental R&D Business & Offices) EMPLOYMENT (Industry & Business) EMPLOYMENT (Industry & Business) EMPLOYMENT (Business Offices & Transit) EMPLOYMENT (Business & Offices) OPEN SPACE (Environmental) OPEN SPACE (Conservation & Waterway Protection) OPEN SPACE (Preservation of Visual Amenity) OPEN SPACE (Environmental Drainage & Conservation) OPEN SPACE (Preservation of Visual Amenity) OPEN SPACE (Preservation of Visual Amenity) OPEN SPACE (Environmental Drainage) RESIDENTIAL (Employment Support) REC/MU RECREATION MINOR MIXED USE (Minor recreation / minor mixed use or open space) Bicycle Path Walking Path RL 2.8 re tl.) [9 082 Conservation & Waterway Protection L_] OS3 Preservation of Visual Amenity HM 084 Environmental Drainage & Conservation GN «OSG Preservation of Visual Amenity co Subject Site Noosa Shire Business Centre 0 150m ce I 14: 5000 SOURCE: Hopgood Ganim Lawyers (05.04.04) | CLIENT TITLE (Ref: Stage2Masterplanv6.pdf); URS Flood aries & Associates Ply Ltd FIGURE 3 Inundation Line JECT OPEN SPACE SCALE: 1: 5000@A3 eee een PREPARED: BW AREAS JAMES WARREN & ASSOCIATES PTY LIMITED |}, DATE: 06 June 2007 Environmental Consultants ‘enie Creek Road, Noosaville, QLD Noosa Shire Council LGA FILE:Q06030_SRP_Open Space.cdr
Page 8
Hg Site Rehabilitation Plan included as part of the detailed design stage however, shall not adversely impact on the existing native vegetation. Open Space (Environmental Drainage and Conservation): All native vegetation in this area will be retained. No infrastructure is proposed to occur within the OS4 area as all stormwater will be treated prior to discharge into the drainage line. 1.4 Performance Objectives The aim of the SRP is to specify actions to be undertaken to restore the natural ecological processes and facilitate ecological sustainability of the areas OS2, 053, 0S4 and OS6. The objectives of this plan are: ° Overall enhancement of the current vegetation in the Open space areas; . To regenerate relevant areas through thinning of dense fire-induced undergrowth that has stalled natural regenerative processes; . To revegetate with reinforcement plantings of local species with a view to ameliorate structural deficiencies, biodiversity deficiencies or habitat deficiencies; ° To provide specific actions to be undertaken for wetland areas using species endemic to the site so that they become viable and efficient systems in terms of stormwater management, as well as self-sustaining ecosystems; To provide required visual screening; To improve the value of the subject site as habitat for fauna groups; To manage weeds using plantings of native species; and ‘To utilise endemic species to reduce nutrient and sediment toads and other potential impacts arising from the proposed development. Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 5
Page 9
Site Rehabilitation Plan 2. REGENERATION STRATEGY 2.1 Introduction Portions of the vegetation within Open space areas have experienced historical and current anthropogenic alterations (e.g. fire, grazing, slashing and clearing). This modification has provided a series of opportunities for weed species to invade the subsequently fragmented communities. Following natural regeneration, foreign species have persisted and competed with native species for limited resources (e.g. light, nutrients and water). Also in some areas, dense growth of native shrub species has resulted in a monoculture within the understorey and has stalled natural regenerative processes. This acts as a limiting factor to native regeneration. Therefore, in order to enhance the natural values of the site, thinning of dense fire- induced vegetation as welt as weed control and weed removal techniques are required in varying circumstances. The objectives of the site regeneration strategy are to: Thin dense fire-induced undergrowth; e Remove weeds utilising “best practice” protocols; e Conserve the current ecological values of areas containing habitat for identified significant species; and e Naturally regenerate vegetation. 2.2 Timing Regeneration will commence during the development phase or as soon as possible after development approval and when the area has been designated as suitable for regeneration. Thinning of dense undergrowth will commence as the initial stage of site regeneration. An ecologist in consultation with Council shall determine the need for thinning within Open space areas. Thinning works will occur in two (2) phases as described below: e Phase 1: Initial thinning works; and e Phase 2: Ongoing maintenance. The timing of each stage will: e Phase 1: commence as soon as possible after development approval; and e Phase 2: continue on an “as needs” basis. Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 6
Page 10
eS as Site Rehabilitation Plan Primary weeding will occur in two (2) phases as described below: e Phase 1: Primary Weeding; and e Phase 2: Ongoing maintenance. The timing of each stage will: 2.3 2.3.1 2.3.2 2.3.3 2.3.4 2.4 e Phase 1: commence as soon as possible after thinning works; and e Phase 2: continue on an “as needs” basis. Personnel / Procedures Suitably qualified site personnel, or an enterprise experienced in native bush regeneration, will be engaged for all regeneration works. The Bush Regeneration team will include suitably qualified Bush Regenerators, including a Regeneration Site Manager, who will be responsible for all project management and staff supervision and report directly to the Project Manager. The Bush Regeneration team will consist of a team consisting of a sufficient number of personnel, including the Regeneration Site Manager, for site works. The Regeneration Site Manager will have demonstrated expertise in successful project management, staff supervision and hold/gain all necessary licenses and approvals. Thinning of Dense Undergrowth Vegetation within Open space areas comprised of monocultures of dense understorey species will be thinned to allow for natural regeneration as follows: Shrub species will be thinned to allow a minimum 1m separation between canopies; Primary weeding will then be implemented where necessary as outlined in Section 2.6; On-going maintenance and monitoring of natural regeneration will be completed in accordance with Section 4; Where natural regeneration does not occur, reinforcement plantings will be provided and maintained as outlined in Section 3. Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 7
Page 11
2.5 2.5.1 uz ee Site Rehabilitation Plan Weed Control Methods The following are control techniques that are to be utilised during site regeneration works: Cut Stump Method (CS) - This method involves cutting plant stems as close to ground level as possible and immediately painting the cut stump with herbicide. This treatment can also be applied as a basal bark application to the first 15-20 cm (entire circumference) of an uncut stem if the adult bark has not yet developed. Chemical use with this application is dependant on the proximity of the weed to naturally ponding water or waterways and whether or not the chemical is registered for aquatic use. Basal Bark Method (BB) - This method involves applying a herbicide to the lower 35-45 cm bark around the entire stem using a hand-pump backpack sprayer fitted with a shut-off at the wand tip and an adjustable cone nozzle or a small, ATV (All Terrain Vehicle)-mounted sprayer with a shut-off at the wand tip and an adjustable cone nozzle. Ring Barking (RB) - This method involves removing the lower bark from the stem using a sharp implement to expose the phloem and xylem tissue to the outer environment thereby destroying it. Spray Method (SP) - There are two (2) types of spraying methods that will be employed where appropriate: o Selective blanket spraying: The area must initially be checked for the presence of any native species. Any weeds within 2 m of the drip zone of existing native species will be removed by hand. Alternatively, native species will be covered with impermeable material (e.g. a tarpaulin) for protection during spraying; o Spot spraying: The spray nozzle will be kept close to ground to avoid any overspray. Individual weeds will be spot-sprayed at the site. This method of spraying will be employed as native species are interspersed throughout the exotic grasses; and o Herbicides specific to each target species, where appropriate, will be identified prior to the implementation of any works. Herbicides will be applied in accordance with the manufacturer’s specifications and when environmental conditions are most preferred (e.g. wind and rainfall). Stem Injection (SI) - Herbicides may be applied directly to the plant via stem injection. This involves applying a herbicide to the plant directly through drilling a hole into the stem and inserting the chemical. Wick Wiping (WW) - This method employs vehicle-mounted (broad acre application) or hand-held equipment (small area/single plant application) Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 8
Page 12
Ee Se Site Rehabilitation Plan to wipe or brush concentrated herbicide onto weeds. The herbicide is applied from permeable rope that is permanently connected to a reservoir containing Glyphosate. For purposes of weed control where accessibility to the infestation is low, a hand held ‘wick wipe’ will be used. This will also be incorporated for the control of emergent species. This method is particularly safe to use in areas where weed species are interspersed within native plants as there is no spray drift of herbicide. e Hand Pulling (HP) and Chipping (CH) - Manual weeding may involve chipping, pulling, digging or slashing and is preferred, depending on the growth stage and situation as detailed: o where native plants are growing within a weed infestation and the use of selective herbicide is not possible; and o where inadequate foliage is present to allow for successful uptake of herbicide e.g. Mile-a-minute runners typically exhibit this trait. o When hand weeding, the stem must be grasped firmly at the base of the plant and pulled. A trowel, mattock or sharp knife may be needed to loosen the soil. Care must be taken not to leave behind stems or other plant pieces that may re-shoot. Hand weeding should also be undertaken at times when weeds are not seeding to reduce dispersal and spread. Hand pulling is not recommended for some weed species as they readily sucker if their roots are disturbed e.g. Lantana camara. This method will be employed when removing exotic grass species with retained vegetation. 2.6 Primary Weeding 2.6.1 Primary weeding will take into account all weeds within Open space areas. These species are to be treated simultaneously. 2.6.2 Primary weeding should commence at the start of.the active growing period (approximately November), or on an as needed basis. 2.6.3 Weed eradication will be undertaken on a progressive basis through localised treatment of grass species via mechanical removal (hoe/rake, hand pulling and/or slashing) or with Glyphosate. Woody weed species under 20 cm tall will be hand pulled or controlled using weed control techniques discussed above. 2.6.4 Preparation before spraying, in the form of manual clearing weeds from around native plants, must be carried out. Smalt plants less than 20 cm in height are to be marked with a stake. Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 9
Page 13
oot Site Rehabilitation Plan 2.6.5 Weed material will be disposed of at an approved waste disposal facility such as Council landfills or transfer stations. 2.6.6 All chemical users should be experienced and licensed in accordance with the Queensland Agricultural Chemical Distribution Act 1966. 2.7 Boundary Marking 2.7.1. The boundaries of regeneration areas will be marked with star pickets and tape and will be erected immediately before regeneration work commences. 2.7.2 Signage is to be erected stating: “No Entry - Native Plant Regeneration Area”. 2.7.3 All contractors are to be made aware of restrictions applying to the exclusion zones. Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 10
Page 14
Site Rehabilitation Plan 3. 3.1 3.1.1 3.1.2 3.1.3 3.1.3 3.1.4 3.2 3.2.1 REVEGETATION STRATEGY Introduction Portions of vegetated areas within OS2 and OS4 are suffering from structural deficiencies, and/or biodiversity deficiencies and/or habitat deficiencies. These areas should be revegetated with reinforcement plantings. Within disturbed areas, competition between native propagules and exotic weeds often favours the exotic pioneering. Thus, in order to enhance the ecological functioning of areas degraded by exotic species, revegetation works will provide a framework by which indigenous species may reclaim lost habitat via the processes of natural recruitment and succession. Therefore, the aim of the revegetation works is to restore the historical ecological values of the site through the use of weed removal techniques and the provision of indigenous canopy species. OS3 and O56 areas are to be planted with locally endemic tree species. Wetland areas should be revegetated using locally endemic species so that they become viable and efficient systems in terms of stormwater management, as well as self-sustaining ecosystems. Revegetation will commence during the development phase or as soon as possible after development approval and when the area has been designated as suitable for revegetation. Personnel, Procedures and Timing Revegetation Phases Site revegetation works within all revegetation areas will be undertaken in five (5) phases, these are: Phase 1: Site preparation; Phase 2: Initial planting; Phase 3: Growth and maintenance; Phase 4: Supplementary planting to replace dead seedlings; Phase 5: Additional plantings; and Phase 6: Ongoing maintenance. It is envisaged that all capital works associated with the proposed development will be completed within three (3) years of the development approval. Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 11
Page 15
Site Rehabilitation Plan e Phase 1 will commence as soon as possible after approval and when Open space areas have been designated as suitable for revegetation. e Phase 2 will commence as soon as the horticulturalist is satisfied that weed species have been successfully controlled. e Phase 3 will commence after planting and will be ongoing. e Phase 4 will commence within two (2) months of the initial planting in each area and replacement of any seedlings that have perished will occur. e Phase 5 works can commence where advanced canopy growth is evident and the Horticulturist determines that additional planting is necessary to satisfy the aims of the site rehabilitation plan. e Phase 6 maintenance will continue indefinitely on an as needs basis for a period not more than three (3) years from the completion of Phase 1. 3.2.2 Personnel A suitably qualified nursery (Horticulturist) and Revegetation Team will be engaged via a tender process. The Ecologist will consult with the appointed Nursery/Revegetation Team to finalise the list of species to be planted in relevant locations. The final list will depend upon the availability of species at the time required. If required species are not available provision will be made to secure and plant these species at a later stage. The Nursery/Revegetation Team will provide the Ecologist with a revegetation strategy which will include a program for the collection of material (seed and cuttings) to be utilised in vegetative revegetation. The strategy will discuss the following points; Collection proposal; Species mix and density; The source of seeds/cuttings to be utilised; Size of the cuttings/seedlings to be utilised; Date at which revegetation is to commence; and Strategies for early care and monitoring of the revegetation area. The Ecologist will review the strategy, programs and plans. The Ecologist should suggest amendments where required. The revegetation can commence when the strategy has been finalised and approved. . 3.2.3 Propagation Seed collected for propagation will come from the site and immediate surrounds as well as local provenance (i.e. from local stock within 20 km of the subject site). The following details will be collected from each source plant: e Location (GPS position); Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 12
Page 16
Ea oa Site Rehabilitation Plan Date of collection; Name of collector; Soil type; Health of plant; and Collection method. Whenever possible, seed will be removed directly from plants by shaking or cutting branches over a tarpaulin. Secateurs will be sterilised between each use. Seed will be placed in small envelopes with the collection details clearly marked. If the seed is extremely small it will be stored in glass or plastic vials to avoid undue loss. It is expected that during the seed collection program, a site will be visited on several occasions to ensure optimum seed ripeness. The seed collection program will be prepared in consultation with Council and Queensland Parks and Wildlife Service (QPWS) prior to the commencement. The program will be prepared by the Nursery/Revegetation team in consultation with the Ecologist. The amount of seed collected will not exceed 5% per plant. Seed will not be collected from isolated populations or rare plants. The seed will be cleaned, its viability checked and prepared for storage. Seed that has lost viability will not be used in the revegetation works due to the dangers of genetic aberration. If seed collection proves difficult or impossible, other forms of propagation, such as cuttings, may be attempted. 3.2.4 Site Preparation (Weed Control) Site preparation will be as per the Regeneration Strategy (SECTION 2.5). 3.2.5 Revegetation Works Seedlings will be sufficiently developed so as to have a significant chance of survival. Seedlings will be at least the sixth leaf stage and/or 20 cm in height. Tube stock seedlings would primarily be used for the plant-out. Tube stock should be sun hardened (plants should be held in full sunlight and systematically droughted to the point of wilting for at least two months prior to planting). Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 13
Page 17
uz ar Site Rehabilitation Plan 3.2.6 Planting Program Existing native trees and shrubs will be retained. These areas will be enhanced with plantings as deemed appropriate by the horticultural team and/or ecologist. Planting will occur at the optimum time of the year when there is high soil moisture (between January and May), unless irrigation is available and accessible. If required, the Horticulturist may make minor alterations to this revegetation plan depending on the site requirements. The following revegetation strategy will be employed: e Long grass will be slashed a maximum of two (2) weeks before the revegetation commences; e Seedling sites will be spot sprayed with Glyphosate one (1) week prior to commencement; All seedlings will be soaked in water overnight prior to planting; e All seedlings will be provided with a retentative agent such as rain-saver’ crystals; e Weed will be controlled through the application of suitable mulch around individual plantings and with spot applications of an appropriate herbicide. e All seedlings will be protected by a tree guard (commercial tubing or equivalent); and « Regular watering must be undertaken after the seedlings have been planted. Watering will be provided on an as needed basis via water tanker at the first signs of water stress. The plants growing medium would be soaked prior to planting and the plant cores should be buried to ca. 2cm deep. The seedlings would be planted on the same day as their transport from the nursery. No seedlings would be left unprotected on the site whilst awaiting planting. Planted seedlings would be marked with a piece of biodegradable tape. Fertiliser used should be only nitrogenous to avoid introduction of Phosphorous, Potassium and other micronutrients. Planting in areas exposed to full sun or westerly sun should be avoided in the peak summer months, where possible. " Rain-saver is a polymer water crystal that has been specifically developed for plants. The polymer absorbs and holds water and nutrients at a specific tension which makes it available to plant roots but does not release to the soil. Rain-saver has proven very successful in more difficult environments (eg Roadside plantings on the Pacific Motorway between Brisbane and the Gold Coast and in frontal dunes at Pottsville (R. Keene pers comm. 2000). Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 14
Page 18
Site Rehabilitation Plan 3.2.7. Fire Management Fire is an important component in maintaining the floristic composition and structure of native vegetation and some flora species. Some flora species rely on fire for seed germination and seedling recruitment. The objective of fire management within the regeneration and revegetation areas is to: e maintain fire regimes in native vegetation; and e reduce the potential for fire risk to surrounding areas (including residential areas, commercial buildings and the Sunshine Motorway). Fire management within Open space areas will be in accordance with the Fire Management Plan (JWA 2007). 3.2.8 Long term management The revegetation and regeneration areas will be subject to ongoing monitoring over a three (3) year period. Over that period, the foltowing management strategies will be employed: e Progressive weed control (as needed), determined during routine monitoring; Follow-up watering as required and determined by landscape contractors; Installation of erosion and sedimentation control measures prior to any construction activities, weed control or revegetation activities in adjacent areas, where necessary (e.g. if large areas of weeds are to be physically removed); « Maintenance of existing vegetation except where water sensitive urban design facilities/devices are required. Landscaping of infiltration drains, swales and other stormwater management facilities/devices will also be implemented to facilitate integration of these facilities/devices into the surrounding natural environment. Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 15
Page 19
a2 9 eee Site Rehabilitation Plan 4, MONITORING 4.1 Introduction Site management will inspect the revegetation zones before planting commences to ensure suitable preparation. Site management will also check that the proposed planting and revegetation works satisfy the aims and methods of this Plan. After planting, and revegetation works, the following is required from the Revegetation Team: e General maintenance of the revegetation areas (including the health of seedlings) on a monthly basis for a period of three (3) years. e Removal of weed regrowth and replacement of dead seedlings on a monthly basis for a period of three (3) years. The revegetation areas are to be formally inspected by the Revegetation Team at the following points of establishment: Immediately after the revegetation works; Three (3) months after the revegetation works; Six (6) months after the revegetation works; Twelve (12) months after the revegetation works; Two (2) years after the revegetation works; and Three (3) years after the revegetation works. Inspections will assess the health of the seedlings (growth rates, foliage status and survival rates) within revegetation areas to ensure that maintenance of planted individuals has occurred. Within both regeneration and revegetation areas, weed abundance, chemical usage, any significant problems are to be monitored. The Revegetation Team will report to site management within fourteen (14) days from each inspection period. Three (3) years after revegetation works, site management will determine if the stated objectives of this management plan have been achieved. If not, a report will need to be prepared by site management identifying the works and the time frames required to ensure that the Site Revegetation Strategy meets the stated objectives and that, most importantly, a self sustaining population is established within revegetation areas. Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 16
Page 20
AEA
Site Rehabilitation Plan
4.2 Performance Targets
Structural and floristic criteria are provided within this plan in order to measure the
success of the revegetation and regeneration works after 1, 2 and 3 years.
Average projected foliage cover (PFC) is. often used to measure the success of
revegetation programs however PFC is considered unsuitable in this context as a
parameter for measuring the success of revegetation/regeneration. This parameter is
subject to variables outside the scope of this plan (e.g. climatic variables,
unpredictable growth rates) and therefore has limited application in this context. The
measurement of average projected foliage cover is essentially a surrogate of plant
density. Therefore a suitable performance target would be that 95% of the plant
density will be maintained.
With regards to floristic diversity, a suitable performance target would be that 100% of
the floristic diversity of the original plant matrix is maintained.
Average canopy height is another measure often used to determine the success of
revegetation works. Again it is considered that this parameter is subject to variables
outside the scope of this plan. Regardless of the implementation of appropriate
maintenance regimes, the applicant has no control over plant growth rates, and can
not guarantee that plants will reach an arbitrary minimum height. {t is therefore
considered that canopy height is not a suitable measurement of the success of the
regeneration and revegetation and works.
Finally, with regards to survival rate a suitable performance target would be the
survival of 95% of the total number of trees planted.
TABLE 1 summarises the proposed Performance Targets for the Regeneration and
Revegetation of buffers on the subject site.
TABLE 1
PERFORMANCE TARGETS
Performance Indicator Target
Plant density Maintained at 95%
Floristic diversity Maintained at 100%
Canopy height n/a
Survival rate 95%
4.3 Reporting of Monitoring Results
Following each inspection by the Revegetation Team, a report will be prepared for the
Site Manager and Council. The report will discuss the following:
Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 17
Page 21
Site Rehabilitation Plan « Works undertaken; ' Progress of regeneration/revegetation areas. in accordance with Performance Targets; e Significant problems encountered (death of seedlings, vandalism etc.) and the effect of these on the plantings and aims of the revegetation strategy; e Success or failures of measures implemented to rectify previously identified problems; and . ® Measures to be taken to rectify new problems. 4.4 Completion of Reporting Three (3) years after the initial planting, site management will determine if the stated objectives and performance targets of the Site Revegetation Strategy have been achieved (or close to being achieved). If not, a report will be prepared by site management identifying the works and the time frames required to ensure that the vegetation in the buffer zone has been successfully established. Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 18
Page 22
G2 Site Rehabilitation Plan 5. TIMING AND RESPONSIBILITIES TABLE 2 PROPOSED REVEGETATION SCHEDULE All capital works associated with this Regeneration and Revegetation Plan would be completed over a one (1) year period following the development approval under the recommended schedule below (TABLE 2). i Description Timing Expected Duration | Responsibility Thinning of | commence as soon as| 1 week - 1 month Contractor understorey possible after development i (where approval as the initial stage @ required) of regeneration/revegetation works. i Weed Control Once the site preparation of | 1-2 months Contractor each section is complete Planting and Plants are sourced and the | 1 week - 1 month Contractor Fertilising planting plan is complete i Mulching and | Progress immediately after | 1-3 months (in | Contractor Watering planting to maximise the | conjunction with chance of seedling survival weeding) i Reporting and | Weekly for the first month and then three monthly | Contractor Monitoring thereafter for one year i Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 19
Page 23
Site Rehabilitation Plan 6. SUMMARY This plan contains a detailed set of directions and measurable performance criteria to guide the rehabilitation program of the Open space areas within the development site. The plan aims to improve the overall conservation and landscape values of the open space areas and to restore the natural ecological processes and facilitate ecological sustainability. Through implementation of the strategies to achieve the set objectives contained within this plan, all disturbed areas of vegetation will be revegetated or subject to regeneration works. This will provide improved and extended habitat for a variety of flora and fauna found within the locality and will inhibit the impacts of the development upon retained vegetation including invasion by weed and pest species, and will also control human access and reduce edge effects. Each of the Performance Objectives contains measures designed to allow the applicant to demonstrate that effective revegetation requirements are being achieved and for Council to sign off on the success of the implementation program. Ongoing monitoring of existing and planted vegetation will be carried out over a three (3) year period to assess the health and vigour of this vegetation and to identify and control any weed species that have resprouted or dispersed to the site over a three year period. Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 20
Page 24
LANDSCAPE MANAGEMENT PLAN
l_o
EXISTING VEGETATION
Al existing vegetation and particulary large
trees are to be retained, protected during
‘construction and incorporated in new
planting areas
As por Tabl
please note
\g planted swale and embankament to De
ined along road
LANDSCAPE CONCEPTS
0 Landscape Concepts for Development Approval for
Noosa Lifestyle Centre and Lot 2 - Noosa Corporate for
further site landscape detail, including Covenant area A - OS3
and Covenant area B - OS6. Refer to Lot Reconfiguration
Development Approval 2006) 1594 for details of all Open Space
Areas (OS
a minimum of
In accordance with 2006/1594 Condition 36
street tree will be provided
every 8m of street frontage
> oat
—
SS
- Landscaping under The Noosa Plan
jowing responses to Specific Outcomes and
Probable Solutions relevant to the Streetscape works. a
>)
Landscaped areas have deen provided to
‘enhance the natural landscape character 2
d).c) Natural features such as existing trees will be
ratained and including in buffer areas where
4). 0) f) ve been designed to a}
1ulk from the road and
selected for height and form
responsive to the duilldings and to screen and ®)
shade carparks and visable service areas
9).h)
improved through selective undergrowth dearing —*)
and reinforcement plantings to major roadways
and new buffering is to be installed where this
development interfaces with adjoining existing
developments
Landscaping has been designed and the
Indicative Plant Selection has 5een made from
the Woodlands / Open Forest Areas from PSP3
g).h).i)
s34
»)
tion
Plant species are appropriate to the biophysical
conditions and locality landscape character
Species have deen selected for the space
available, visual and climatic exposure, as a
functional component of the design and in
falation to the scale of the development
1@ appropriate levels of shade and
occupants and users of the
oadway access throughout the
seasons
The species selected will require minima
additional watering as they have deen selected
hetving on site naturally
vide effective canopy
the road reserve and
Road reserve
shade and be
relate to infrastructure
Street Trees species are consistent with the
locality and natural setting of this spectfic
species though will de low maintenance and
selected as appropriate for this area and
landscape character.
Species have Deen selected for specific
evelopment, such as
ings in Buffer/Open Space
Areas, Shade and Feature Planting. Each
species fulfills a specific function and Is not
suitable for all uses
planted near structur
and dangerous species
high pedestrian areas. Species in pedestrian
areas will be hardy plants able to tolerate high
levels of activity.
Plant species have Deen selected trom
Woodlands / Open Forest Areas form PSP3.
There are no undesirable species proposed
Safety and
There are no palm plantings proposed except for
some loose group plantings of Livistona species
species should b@ able to be transplanted from
existing healthy specimens on site
Root guards will not be required as any species
with potentially invasive roots will not 9e planted
near any paved or built areas that may be
damaged
secunty
Sate sight distances to and from road comers
and driveway entries wil be maintained
Street trees and trees in carpark areas will
achieve a maximum 0.9m dear trunk for a 20m
All underplanting to be a maximum of 0.7m from
finished road pavement level (not top of kerb).
Any landscaping adjacent to substations or
electricity transmission line easements are to be
less than 4m high at maturity and will not
encroach within 3m of any substation boundary
Any trees taller than 4m will be canted at least
as far aw: @ electricity transmission line
as they are expected to be high at maturtty
It is expected that all power connections to
buildings will be underground
However trees and large shrubs must fallow the
minimum locations as outlined in this section
Plantings will not intertere with trade access to
service meters
Species with invasive roots will not de located
near enough to services to cause damage
14.155 Open space areas and road reserves
Road reserves
oz
a) Landscaping enhances the streetscape quality
and natural landscape character of the area
b) Allows for buffering to adjoining uses
°) The functionality of the road reserve is
maintained for vehicles and for pedestrians and
bicycles through a shared pathway system and
some lawn areas
a) All suitable existing trees anc remnant vegetation
will be retained and incorporated into the overall,
streetscape sheme
®) Lawn and low planting allows for the opening of
cat doors along the roadway
f) Landscaping allows for maintenance and
emergency access to service corridors and
utilities
9) Sight distances are maintained to and from
corners. intersections, driveways and pedestrian
crossing points
h) Landscaping maintains overland stormwater flow
to avoid ponding to footpath, nature strips or
adjoining premises. Landscaping is also integral
to the treatment and of drainage devices.
A minimum of 1 street tree is provided for every
8m of frontage
Lawn and low planting only are within 500mm of
ursas and drainage lines
Landscaping works along watercourses and as
part of drainage solutions retains and enhances
existing riparian vagetation induding understorey
5 have been avoided at waterway and
drainage line edges to prevent mowing damage
and debris
3) Engineering solutions to drainage have been
avoided where
solutions Implemented (refer swale section)
e) Natural materials have Deen used where possible
In order to blend with the natural environment
protection
Landscaping retains and enhances habitats and
native wildlife comidors by replicating adjacent
remnant vegetation including understorey
vegetation
>) Landscaped areas have Deen sited to
complement ang integrate with existing
vegetation
°) Old trees including dead trees wil be retained
where possible to retain hollows for local native
fauna
4) Vegetation links will be created or enhanced
through garden planting between existing
habitats,
°) Adverse effects on koalas wil be minimised by
not planting koala food species near roadways
and facilitating movement in koala habitat areas
Water Management
ration and conservation of water is
opti through the selection of native plant
species from PSP3 Landscaping Plants and
Guidelines - Woodlands / Open Forest
>) Plants have been group in mulch garden beds
c) impervious surfaces have deen minimised in the
road reserve
®) Hard surfaces will be drained to landscaped
areas rather than tl eet drainage system
f Microphytes will be planted along driveways to
absorb hydrocarbons
9) Swales will be integrated as part of the overall
landscape scheme and use planting as a
stormwater filter
57 Carparking areas
reat car parks
A minimum of 500mm from back of kerb of low
planting of lawn has been allowed for along the
roadway to ensure adequate access from parallel
parked vehicies
S292
Street trees are planted a minimum of 1m from
back of kerb in the road reserve verge
FURTHER INFORMATION
Please refer to all documentation by James:
Warren & Assoc Pty Ltd Environmental
for this development |
LANDSCAPE DESIGN INTENT
Reter to sheet LMPO2 and LMPGS for
documentation of the Landscape Design
Intent to create an overall theme for the
entire 5 Lot Development
AMENDMENTS
a) ae | onctien sn |
mat
M38
as
e a rl
LaNnDGRAPHICS
5 LOT RECONFIGURATION
Eenie Creek Road, Noosaville
S&L Developments
Ken Hicks & Associates
ning Te
LANDSCAPE
MANAGEMENT PLAN
Overall Layout, Design Notes |
Last 1203 LMP on
Page 25
General Na
Wooc
SPECIES SELECTED FROM
TABLE 7.1 PRIMARY CHARACTER SPECIES
Botanical Name Common Name
Qld Biue Gum
or site derived!
SPECIES SELECTED FROM
TABLE 7.2 - SECONDARY CHARACTER - TREES AND LARGE SHRUBS
Botanical Name Common Name Min, Size
SPECIES SELECTED FROM
TABLE 7.3 - SECONDARY CHARACTER - SMALL / MEDIUM SHRUBS, VINES AND
GROUNDCOVERS
Botanical Name
Common Name
trunk neight
f site (re! Vegetation
in. dear trunk of 0.9m at planting
Honeyeater
NOTE : Plant
Incorporated.
be prapared
re availal
(grown on’ spec
ne selected species
KOALA FOOD SPECIES: Koala food tree species as denoted above are not to be planted near
roadways or in a way to encourage Koala crossing of roadways.
Backhousia myrtifolia
Fistaniopsis laurina
tree and flower detail
Hovea acut
usea floribunda
w A N
Refer to s for Landscaped Swale
and Section showing typical
Baumea rudiginosa
Juncus usitatus
fentifclia Cis:
Schoenoplactus validus
SUS al
of the Landscape Desigr
0 create an overal
ot Development
LaANDGRAPHICS
5 LOT RECONFIGURATION
Eenie Creek Road, Noo
S&L Developments
Ken Hicks & Associates
LANDSCAPE ~
MANAGEMENT PLAN
Planting Intent
LGSL 1203 | LMpo2 | 020F 03 8
Page 26
Op fj
Butfer planting
to embankments
This Landscape Managem
planning to de incorporate
A unique landscape c!
and hardscape eleme:
pinimum 2500mm wi
for the entire 5 Lot development.
be created through combinattion plantings
perform spec
Such as’
ning
w Shrubs and groun ad / pathway edge planting to maintain
casual surveillance and sight lines
~ Sedge and grass / tufting plants for swale planting
The planting intent is to rec
PAVEMENT
Feature Coloured Concrate with
vegetation imprinting
fe (CCS Mexico in Grey Cement)
Feature Colo. concrete with
vagetation imprinting in perspective
Clear trunk trees
and low placing to
central macian simp
plarting to maintain casual
Retention of all existing
vegetation and large tees
where possible —
General Areas Concrete (CCS Paperdark in Grey Cement)
General Areas Coloured Concrete
with light exposed finish
Botanical Name
Crinum pedunculat
Gahnia sieberana
Isoplectus nodosa
Juncus usttatus
Lomandra longifolia
Baumea articulata
Baumea rubiginasa
Schoenopiect
Schoenoplec:
Common Name
River Lily
Sawsedge Swordgrass
Knobby Club Rush
Common Rush
Tall Mat Rush 50mm
Jo Twig Rush TUBESTOCK
Soft Twig Rush
Shore Clup Rush
River Club Rush
In accordance with 2006/1594 Condition 36 swales are to be fully
established using endemic species and occasional grasses
AMENDMENTS -
in| ae | concn ian
: {ee
« [ve 8
3 [oe 8
i
az
LaANDGRAPHICS
5 LOT RECONFIGURATION
Eenie Creek Road, Noosaville
S & L Developments
Ken Hicks & Associates
LANDSCAPE
MANAGEMENT PLAN
Design Intent and Details
LGSL 1203 | LMPo3 | 03 OF 03 a
Page 27
STORMWATER MANAGEMENT PLAN PART A STORMWATER QUANTITY PROPOSED BUSINESS CENTRE DEVELOPMENT EENIE CREEK ROAD, NOOSAVILLE for KEN HICKS & ASSOCIATES M3048 April 2007 AES WES RA. B arnouPp (je? EARL OGEEGG AERA. member i www.vdmg.com.au
Page 28
STORMWATER MANAGEMENT PLAN TABLE OF CONTENTS 1.0 Imtroduction...........cscccssssccrssssesseccscssecsesscesestecesscessscnsecssesseccsencssecesssnccsscesscsseeseseene 3 2.0 Existing Conditions..... weed 3 3 3.0 Proposed Development..............00+ 3.1 Nature of Proposed Development... base 4.0 Site Stormwater Modelling..............cssscccscsscssssssscssssssersenscsesscessenseeseseessssreseasensvens 4 4.1 Methodology... eecsesesssssssesesssscsessnsesseseessssecsesseasesseesseaessseesessassseesanseesaseaeees 4 4.2 Selection of Modelling Parameters. wed 4.2.1 Impervious Areas..............4 v4 5 5 5 4.2.2 Manning’s ‘n’............ 4.2.3 Energy Loss Coefficients.. 4.2.4 Infiltration Characteristics vine 5.0 Pre-Development FIOWS............cccsscssscrsccescsssessessscsesssseesssscenssassersccousscssssseosooesonenee 6 5.1 Rationale... ccesescssesesecesseseseeeseseeseseenetsssavsceasssseeecsstsseeccsaseseseeesatesaeeesaeenenee 6 5.2 Results... 6.0 Post-Development Flows. 6.1 Rationale..........00.... . 6.2 Results.......ccceecscssseeesccesceesesetsseeeseesees 6.2.1 Post-Development Flow Summary . 6.3 Overland Q100 FIOW oo. esecessssesseessesstsreesssesceeeesessescseneeeescasesssnseersessedseseseneenees 8 7.0 Conclusion.........cccssesesrscesssereesecesecrecesseecerecesaseusssasenesnecenssansceasnecacsacasesenreaessseneesee 9 APPENDIX A...........0seceees Proposed Development Layout APPENDIX B...........00eeeceee XP-STORM Pre-Development Drainage Model Layout and Results APPENDIX C..........c0seeseeee XP-STORM Post-Development Drainage Model Layout and Results BARLOW GREGG VOM M3048 APRIL 2007
Page 29
STORMWATER MANAGEMENT PLAN 3 1.0 Introduction The purpose of this stormwater management plan is to determine general requirements for bulk stormwater management for the proposed business centre development at Eenie Creek Road, Noosaville. The specific objectives of this stormwater strategy are as follows: « Determine pre and post-development flows; + Identify how the non-worsening of stormwater flows will be achieved; 2.0 Existing Conditions The site of the proposed development is approximately 21.6 Ha in area and contains a child care centre in the northern part of the lot, with the balance characterised by bushland. Access to the child care centre is from Commerce Court, while maintenance access to the sewer pump station is from Rene Street to the West. The site slopes at an approximate gradient of 4% generally towards the south of the site and eventually into Eenie Creek. The south-eastern portion of the site is designated for Environmental Drainage under the Noosa Plan and as such no development works may be carried out in this area. 3.0 Proposed Development 3.1 Nature of Proposed Development The proposed development involves the reconfiguration of the proposed lot into 5 lots. This includes 4 lots suitable for business centre style construction. Access to the site will be provided from the proposed link road that skirts the east of the site, with a link road connection through to Rene Street. Lot 1 will maintain it's current access from Commerce Court. The proposed development layout is attached in appendix A. BARLOW GREGG VDM M3048 APRIL 2007
Page 30
STORMWATER MANAGEMENT PLAN 4 4.0 Site Stormwater Modelling 4.1 Methodology The hydrology and hydraulics of the pre and post development scenarios were analysed using the XP-STORM stormwater management model with storm patterns derived from Australian Rainfall and Runoff publication and rainfall intensities derived for the Noosa area. Due to the topography of the land and the layout of the site, it was determined that the site of the proposed development has an external upstream catchment of approximately 5.5 ha. This catchment consists of adjacent commercial/industrial properties whose stormwater should not discharge onto the subject site. However allowances will be made for any flow onto the site, and catch drains could be utilised to direct this flow away from any future construction on the subject site. Therefore to conform to the pre-developed drainage scenario it is proposed to also discharge post developed flows to the south. It is proposed to utilise five separate discharge points into the environmental drainage area to reduce the extent of construction of stormwater infrastructure required on the site. The five “sub-catchments” consist of lots 1, 2a, 2b, lot 3, and lot 4. This split up of discharges is due largely to the topography and proposed layout of the site. To accurately determine pre and post development flows, | in 2, 10, and 100 year storms were modelled. For each storm intensity, storm durations of 10, 20, 30 ,45, 60, 75, 90 and 180 minutes were investigated. 4.2 Selection of Modelling Parameters XP-STORM modelling parameters were assessed from layout drawings, contours, QUDM (Queensland Urban Drainage Manual) and considering the extent of proposed development within the catchment. 4.2.1 Impervious Areas In accordance with the current pre-developed situation, 0% of impervious ground area was used in the pre-developed model. In the post developed model the percent of impervious ‘ound area was increased to 90% to represent a commercial development. gr Pp BARLOW GREGG VDM M3048 APRIL 2007
Page 31
STORMWATER MANAGEMENT PLAN 5 4.2.2 Manning's ‘n’ Values for the dimensionless Manning’s ‘n’ coefficient for open channel and piped flows were assigned according to Table 4.1 in accordance with QUDM. Table 4.1: Study Manning’s ‘n’ Conduit condition Manning’s ‘n’ Grassed, Landscaped Swales 0.045 Reinforced Concrete 0.014 4.2.3 Energy Loss Coefficients Entrance and exit loss coefficients were utilised according to Table 4.2 in general accordance with QUDM. Table 4.2: Pipe Energy Loss Coefficients Energy Loss Loss Coefficient Entry Loss 0.5 Exit Loss 0.2 4.2.4 Infiltration Characteristics The Horton infiltration method was adopted for the drainage study and Manning’s ‘n’ for the impervious areas and pervious areas were left as the default values of 0.015 and 0.045 respectively. The values used for maximum infiltration rate, minimum infiltration rate and decay rate of infiltration were 10mnv/hr, 2.5mm/hr, and 0.00056/sec respectively. BARLOW GREGG VDM M3048 APRIL 2007
Page 32
STORMWATER MANAGEMENT PLAN 6 5.0 Pre-Development Flows 5.1 Rationale The proposed site is currently undeveloped, and therefore an impervious area of 0% was used. As the majority of the site contains no identifiable watercourses of concentrated overland flow, it is assumed that the pre development overland flow occurs as sheet flow. The pre- development model was set up so as that the stormwater runoff will drain to the southern environmental drainage area of the site. The peak flows for the pre development conditions were derived using a conservative method by utilising only the XP-STORM model hydrologic runoff layer. A node layout plan for the pre development scenario is included in Appendix B. 5.2 Results The peak flows for the pre development conditions are indicated in Table 5.1. These results are for the catchment of proposed lots 1-2. Table 5,1; Pre development Peak Flows ARI Design Storm (min) | Peak Flow (m?/s) 2 60 | 131 10 60 2.44 100 60 3.75 XP-STORM pre development model output is included in Appendix B for ARI 2, 10, and 100 year storms. BARLOW GREGG VDM M3048 APRIL 2007
Page 33
STORMWATER MANAGEMENT PLAN 7 6.0 Post-Development Flows 6.1 Rationale The peak flows for the design storms for the post development conditions were derived using the XP-STORM model set up in accordance with the proposed development layout. In accordance with the pre development scenario the post developed site was modelled with the discharge point being the southern environmental drainage area. Runoff from the allotments will generally be collected in open channel drains to run at the front of lots, prior to discharge into the environmental drainage area at selected locations. Runoff from the road will be collected and discharged separately from that collected on the allotments. This flow will be routed in an underground pipe system located within the road reserve. Details of this drainage system can be found in the accompanying operational works drawings. As a result of the increase in impervious ground areas and defined flow paths, detention of stormwater will be required to ensure that the development does not increase existing flow rates at the point of discharge. This storage volume will be achieved by a combination roofwater harvesting tanks and lots 3 and 4, and detention swales elsewhere. Roofwater is to be collected at a rate of 12 I/m? of roof area as specified by Noosa Shire Council. Additional storage will be provided in the open channels. An XP-STORM node layout plan for the post-development scenario is included in Appendix c. 6.2 Results 6.2.1 Post-Development Flow Summary Table 6.1 indicates the greatest peak flows for the post development model for the sub- catchment containing proposed lots 1-2. BARLOW GREGG VDM 43048 APRIL 2007
Page 34
STORMWATER MANAGEMENT PLAN 8 able 6.1: Post development pe lows ARI Design Storm (min) | Peak Flow (m*/s) 2 90 1.30 10 60 1.88 100 60 2.19 Table 6.2 represents the greatest peak flows for the pre and post development scenarios as well as the difference between the two. XP-STORM post development model output is included in Appendix C for ARI 2, 10, and 100 year storms. Table 6.2: Pre development and Post development Peak Flows ARI Pre-development Post-development Difference (m°/s) Peak Flow (m’/s) Peak Flow (m?/s)_ 2 1,31 1.30 -0.01 10 2.44 1.88 -0.56 100 3.75 2.19 -1.56 As shown in the above table the post-developed flows compare very well to that of pre- developed. This is due to the stormwater mitigation included in the development in the form of harvesting tanks and the open channels. le 6.3: Pre devel: t, Post development ws and Required Stora: Sub-catchment |Pre-development |Post-development | Approximate Storage ; 3 Peak Flow (m?/s) |Peak Flow (m’/s) Required (m’) Lot 3 0.58 1.26 590 Lot 4 0.21 0.49 212 Lot 3 and lot 4 will utilise roofwater harvesting tanks to mitigate stormwater flows. These tanks will be installed when the lots are built upon. 6.3 Overland Q100 Flow The swales to be constructed on site as detailed in the accompanying engineering drawings have been designed to fully cater for storm events up to a 100 year ARI. This means that flood free access to lots and roads will be maintained in storm events up to a 100 year ARI. BARLOW GREGG VDM M3048 APRIL 2007
Page 35
STORMWATER MANAGEMENT PLAN 9 7.0 Conclusion In conclusion it should be stated that the findings of this stormwater management plan are that it is possible to incorporate adequate stormwater detention as part of the proposed development, to result in non-worsening of both major and minor storm flows. It is also possible to direct Q100 flow through the site whilst maintaining flood free access to the lots and roads. BARLOW GREGG VDM M3048 APRIL 2007
Page 36
APPENDIX A PROPOSED DEVELOPMENT LAYOUT
Page 37
MEW ROAD
PUNING SPUIEND
2
SPITE
Bus
90°08 JO"
a6 say
aver
CHANGE LOT & KEEPING SAME AREA
wae
3s
Ke
|
AOELO.68
, oe a
ffs eee ETC EMTC
rail ROUSE PPDSIND
J uit —
&
§
g
98
as f.
fs
8f
Of
sh
. :
m3
OEE ge
2740886 avou M3N ea
tne te onistre in {
° WIE = NS, & g e 4
s¥99'25 . ~ x “le
8 * vA
~ N x
1 Se
ze ~N Ki
3 x
z N D
P ~ b908
=55.004012
= ——. ee od £89 EE LOVEE oneke 199 05) H £06 18
_ 85.0000 985.0000
NOR ~ 3 » & wy «8 wk] 8 : ws & 5 § mn & :
s >: 3 83 GQ : a z Qs as we x5 gs 23 93 Ss Ss ga 8 1 q
3 ™~ ™ x N N g NO N NE Nz g Rs Re 2 ms & R 3
g g & x 3 lly
hu & F ls
> \ &
2 QW lt
x C
zo mR '
. pe,
2 g88a LW
6 Ze2e
20
agatga ky
aoe bug ~
<I Zz
Brees. hy
SOzane Ge
YRS.
eg? oO
<g2>88
“onza
es kua
onlee
YootSa
FEEZS%
Notes LEVEL omc rsmesz7 * Associated Consultants Designed
i LEVEL DATUM AMD
ci =S & L DEVELOPMENTS ease seme KAJ
. K 98/02/07 CHANGE BOUNDARY OF LOT & SAME AREA
Project. PROPOSED RECONFIGURATION OF t 15/02/07 CHANGE COVERNANT B TO 2000ME?
Antondmenfie CHANGE LOTS 18 2 COMMON BOY Orawn AMR ay shan Surnamaihentacs can oy |
Mo. Bate Apandmants, .
OF LOT 1 ON RP215933 c we MARE LOTS 1-4 OM LOT ‘ SECT aon BATP RNAP Orawing No. Amend.
LOTS 1-5 cf ome cea owe 057 037 2007 srrvuernatsttt en hicks Sewing He
- pp | eee eas tee 1 KEN hick
PARISH OF TEWANTIN ® cartes foo mA rome Computer Fle +S00/A1 sean ts, AND ABBOCIATER Q60506E M
1 waver ‘Grance oad wot To 2a sheet 9, 1 oot 1 anes HAAubaCADNOAN OOOO BETO Peng tte 5] Scale 215 Deve banee USAT
d
Page 38
APPENDIX B XP-STORM PRE-DEVELOPMENT DRAINAGE MODEL LAYOUT AND RESULTS
Page 39
oe XP-Storm Genie Creek Road, Noosa - Pre-Development Node Layout Version 9.13 Comte (6) X7 Retware Licenced To: Barlow Gragg & Associates (68-910-0539} Page 1/1
Page 40
® Node - N1 - Pre-Development [Max Q2 Flow = 1.3075] ——— Rainfall Total Flow Hydrology Rates S88 oS —_ oo oO ° a Flow (cms) 0.4 0.2 0.0 i 1 Sun 3AM 6AM 9AM Jan 1995 Time
Page 41
Hydrology Rates 8 8 o g Flow (cms) an = oO _ ———) Rainfall Total Node - N1 - Pre-Development [Max Q10 Flow = 2.4356] 3AM 6AM 9AM
Page 42
Hydrology Rates Flow (cms) wy Nw S| = 388 ® Node - N1 - Pre-Development eE Rainfall Total 88 o 1.0 0.5 0.0 nm ia 1 Sun Jan 1995 [Max Q100 Flow = 3.7487] eS 9AM Time
Page 43
APPENDIX C XP-STORM POST-DEVELOPMENT DRAINAGE MODEL LAYOUT AND RESULTS
Page 44
L32 4.N31 L317 , ty L28 ie} ee i L4sN28 Vv Lanés in49 Version 9.13 Copyright (c) XP Sofware Eenie Creek Road, Noosa - Post-Development Node Layout Licenced To: Barlow Gregg & Associates [66-910-0339] Page 1/1
Page 45
Conduit culverts-e from N4 to N27
[Max Q2 Flow = 0.6775}[Max Velocity = 0.95]
a ——
Upstream Elevation Downstream Elevation
ae ———-
Flow Velocity
5.50 | 445
| 440
5.45 | 435
E e**
5.40 425
i
| 2
W535 W415
4.10
0.35
0.30
0.10
0.05
Conduit culverts from N9 to OUT
{Max Q2 Flow = 0.3867}{Max Velocity = 0. 76)
ae ——_- ———
Upstream Elevation Downstream Elevation
—_ oone
Flow Velocity
Jan 1995
Conduit culverts3 from N28 to N29
[Max Q2 Flow = 02389}{Max Velocity = 1.48}
oe — ———
Upstream Elevation Downstream Elevation
— eons
Flow Velocity
34
Se
| E
3.4
|
w 30
{ 29
|
28
0.25
le
|
0.20
06
| 05
| 0.15
|
| 048?
1 =
| 3*
los 0.10
|
| 02
| 0.05
01
|
'
y 0.00
1Sun 1AM = 2AM-—s 3AM AM SAM
Jan 1995 Time
1.4
Page 46
oun eet ver
ws oWeOWNWECOWNWZ——s«CSG eS
00 00
300
so
oro
sto
oF
E oro
j | |
= ; | sto
! t
! t
1 |
| | oc0
oz | |
|
\| seo
if!
a
i}
sz \ ovo
az
of
ze
re
9t
se
ARORA,
noid
Se ——
ORB WwRasUVOG uonenery weensdr
[zs 7 = AEOPA KANT P1Or 0 = “Ld 01D YPM]
67N © 8TN WOR ESHIATNS UNPUO
(w) Uogeasi3
S661 ver
ws wr Wve Wz wt uns ws wr Wve wz wh uns as
oo oo (00
f |
soo
40 | 1 60 |
oro
zo} gol
| sd svo
£0 £0
| . =
€0
oT v0 /
j —— | szo .
me n .
” gis |
90 | er) 2 1, i ccod
j Sal
40} 90 =6£0 oro
| | /
5 sro
*° | 20 90 | \ |
| oso
ee 60
7 t
ae \ \ sso
oF a \ .
60 090
we "
| oes ' y
| zy
ses | m
m ”
| 3 ev 3
| ows g | vr 8
| = | ,a
j _3 } sy 3
[ ows |
{ | oP
{
| oss Ly
| | sons ar
TN mold AORN
on re em om a = —
UORBAS Wee SUVOG uonenay weansdl UONRAD] WEARSLVOG uoReAa|A weesd)
= = Ox]
[90 1 = Anoop, xeWTOL88'0 = MoLd OID XeW] [£01 = Anoop XeW]OS6S 0 = MOLI O1
LZN 91 bN WO SSPAAINI WNpUoD NO 01 6N WOH SHaayns WNpUudy
Page 47
Velocity (a2)
3.0
25
2.0
1.0
Os
0.0
3.05)
f\
H
it
1 |
i |
if
I |
iy
i 4
i |
i
1 i
i 4
t {
i 1
'
1Sun 1AM 2AM 3AM 4AM SAM
Time
= 0.491 1){Max Velocity
Conduit culverts3 from N28 to N29
[Max Q100 Flow
9:28:33 3282 2 2 8 &8 §& 8&8 2# 2 8 8
o °o So o So So o So So So o
(wi) voReAs|3 (suo) Mois
Velocity (m/s)
“5 22282 nr @ © £€ 2 Y 5 8B
e@ i A at Sad So So o So So °o o o o o
1.23]
= 0.7088}{Max Velocity
Conduit culverts from N9 to OUT
[Max Q100 Flow
0.9946}{Max Velocity = 1.11]
Conduit culverts-e from N4 to N27
[Max Flow
Page 48
STORMWATER MANAGEMENT PLAN PART B STORMWATER QUALITY PROPOSED BUSINESS CENTRE DEVELOPMENT EENIE CREEK ROAD, NOOSAVILLE for KEN HICKS & ASSOCIATES M3048 April 2007 Fie ne ~ eB aeQrRouP [ie BARLOW GREGG EDI. member — www.vdmg.com.au
Page 49
STORMWATER QUALITY MANAGEMENT PLAN TABLE OF CONTENTS 1.0 Imtroduction............ccscocssssssesssssssensssarsscssssacssnssccscnsenssssssesesesessessscnssassasonseossnsesnsseeoes 3 2.0 Pollutant Export Modelling... 4 2.1 — Water Quality Objectives. wf 2.2 ~ Treatment Nodes........... 4 2.3 — Rainfall Data.............. 5 2.4 — Assessment of Results... 5 3.0 Background Water Quality 6 4.0 Conclusion...........ccccccsssssssessescsnsssssecronscsssescessceoessssssvessassecesssasesessnesnserscssenssesseones 7 APPENDIX A,.....ccceceececeene Proposed Development Layout APPENDIX B............0eceeeee MUSIC Output BARLOW GREGG VDM M3048 APRIL 2007
Page 50
STORMWATER QUALITY MANAGEMENT PLAN 3 1.0 Introduction Part B of this Stormwater Management Plan aims to outline stormwater quality objectives and how they will be achieved for the business centre development at Eenie Creek Road, Noosaville. The specific objectives of Part B are as follows: + Determine post-development water quality; « Identify relevant water quality objectives (WQO's); « Outline how the WQO's will be achieved. « Investigate background water quality (refer attached Golder Associates Report). The Model for Urban Stormwater Improvement Conceptualisation (MUSIC) has been utilised to model predicted pollutant export loads and concentrations, and assess the suitability of a range of treatment devices. The site of the proposed development is approximately 21.6 Ha in area and contains a child care centre in the northern part of the lot, with the balance characterised by bushland. Access to the child care centre is from Commerce Court, while maintenance access to the sewer pump station is from Rene Street to the West. The site slopes at an approximate gradient of 4% generally towards the south of the site and eventually into Eenie Creek. The south-eastern portion of the site is designated for Environmental Drainage under the Noosa Plan and as such no development works may be carried out in this area. The proposed development involves the reconfiguration of the proposed lot into 5 lots. This includes 4 lots suitable for business centre style construction. Access to the site will be provided from the proposed link road that skirts the east of the site, with a link road connection through to Rene Street. Lot 1 will maintain it's current access from Commerce Court. The proposed development layout is attached in appendix A. BARLOW GREGG VDM M3048 APRIL 2007
Page 51
STORMWATER QUALITY MANAGEMENT PLAN 4 2.0 Pollutant Export Modelling As previously mentioned the MUSIC modelling software was utilised to predict performance characteristics of the proposed water treatment train. Modelling parameters were set up in accordance with Brisbane City Council's recommendations as specified in “Guidelines for Export Pollutant Modelling in Brisbane Version 7” (October 2003). The node layout of the music model is provided in appendix C. 2.1 — Water Quality Objectives This model uses the water quality objectives set out by Noosa Shire Council. A summary of the key indicator standards is set out below in table 2.1. Table 2.1: Noosa Shire Council Water Quality Objectives Indicator Value Total Suspended Solids 15 mg/L Total Phosphorus 0.05 mg/L Total Nitrogen 0.5 mg/L 2.2 — Treatment Nodes The recommended BCC values for commercial source nodes have been used in MUSIC to generate predicted pollutant loads from the site. The following devices have been used in the treatment train to reduce these pollutant loads to an acceptable level. « Gross Pollutant Traps - The model has used a GPT for each individual lot before tunoff is discharged into swales. The locations of these GPT's is shown in Appendix B. These GPT's were modelled to remove 90% of gross pollutants for up to a Q3 month ARI storm. The GPT's to treat runoff from lots will be installed when construction on that lot commences. + Vegetated Swales — Runoff passes through vegetated channels as detailed on the accompanying engineering drawings. As the majority of stormwater infrastructure proposed for the site is of open channel construction, vegetated drainage channels will be used extensively throughout the site. The typical width of these channels is 3 metres. BARLOW GREGG VDM 3048 APRIL 2007
Page 52
STORMWATER QUALITY MANAGEMENT PLAN 5 + Bio-Retention Areas — These areas will be placed in-line with the vegetated swales at several locations as indicated on the engineering drawings. These areas will have an extended detention depth of 0.3m with a combined storage surface area of 790m’. The filter material will consist of a 0.15m deep sandy loam layer overlying a 0.15m deep layer of gravel. The total area of bio-retention is to be 790 m’. Perforated pipes in this bottom layer will carry flow to the outlet of the bio- retention area. Details and locations of proposed stormwater infrastructure can be found in the accompanying engineering drawings. 2.3 - Rainfall Data Rainfall data for the site was chosen to give the best representation of actual conditions to be expected. The meteorological data selected in the MUSIC program was the Cooroy 30/11/1980 — 31/05/1990 data provided by the Bureau of Meteorology, using a 6 minute time step. This period of data was used as requested by Noosa Shire Council. 2.4 — Assessment of Results The specified water quality objectives have been met on the subject site for total suspended solid (TSS), total phosphorus (TP), and total nitrogen (TN) concentrations through the use of gross pollutant traps, vegetated swales, and bio-retention areas. Appendix C contains the following MUSIC output: + Flow based sub-sample daily mean cumulative frequency graphs, + Treatment train effectiveness for the system, « Node Layout Table 2.2 below indicates the predicted export pollutant concentrations calculated by MUSIC; BARLOW GREGG VOM M3048 APRIL 2007
Page 53
STORMWATER QUALITY MANAGEMENT PLAN 6 ‘able 2.2: Predicted Post-Development ited _Wai wali Indicator Predicted Value Total Suspended Solids 1.25 mg/L Total Phosphorus 0.031 mg/L Total Nitrogen 0.487 mg/L The above results indicate that through use of the specified treatment train, the site will achieve a: « 96.4% reduction in total suspended solids « 75.4% reduction in total phosphorus + 52.8% reduction in total nitrogen 3.0 Background Water Quality Golder Associates have prepared a surface water quality monitoring program for the site. Some of the key indicators measured are listed below in table 3.1. Table 3.1: icted -Devi ie fr Indicator Measured | Measured | Measured Valuel | Value2 | Value 3 Total Suspended Solids 8mg/L | 16mg/L | 32 mg/L Total Nitrogen 1.5 mg/L | 4.4 mg/L | 1.8mg/L Total Phosphorus 0.03 mg/L | 0.03 mg/L | 0.11 mg/L These results show that existing pollutant concentrations are actually higher than the future concentrations as predicted by MUSIC. The entire surface water quality report by Golder Associates is included elsewhere in the application. An additional water quality program is proposed for the site, details of which can be found elsewhere in this application. BARLOW GREGG VDM M3048 APRIL 2007
Page 54
STORMWATER QUALITY MANAGEMENT PLAN 7 4.0 Conclusion Part B of this stormwater management plan has outlined the stormwater quality objectives for this development and how these will be achieved. Predictions from the MUSIC software have been used to measure the performance of the proposed stormwater treatment train. Modelling shows that Noosa Shire Council requirements can be met for total suspended solids, total phosphorus, and total nitrogen concentrations. BARLOW GREGG VDM M3048 APRIL 2007
Page 55
APPENDIX A PROPOSED DEVELOPMENT LAYOUT
Page 56
_ NEW ROAD
"PENDING SPI82EG0
NEW ROAD
8
“3 le
5 ale
° 2226, 565
WP See
$
SA
SK |
Ib
=06.10.081 3 + ——
tat TTC Te EMT C
P2194 P29)
em 4 a jz
a
ms,
af
X
\
gf of
S$: fs
So i;
a8
zePT
55.009 wf
(56a we
fs =
nists as* m §
17509 we
5
\ 2700886 avoy M3N |
z imines etd 2 ~ sly |
& “agNeo> aacee s 5 E
S o 8 z wh
2 ONS N Xe
“ E 2 oe ON ,
Wy 2 E BS Ne
& 2 N ad. 1 sy
x & = N he x5
¢ N wy 190 ¢ 3 is
“ yer 20 $5400... \Se £0615
l ee ett ser e
THE00-0
,
3 & g & & ® z & & 5 nxn 8 A
x3 a 3 zx 3 » 3 2s ps ze es 28 ws 33 Ss 3
. 3 aes 3 R < ws w xs ws sz 3 = & 5
@l-p tp ob Pee Lee | RG Se | Pe] Se) Ae) RP Re] Rep Re] Re | .
5 5 é g ~ & ‘l
g g uy & 3 i
5 ww a
a Oe
25 ~
oe
2 4985 ”
S zat z
fetus Ly
azetea
aoa =
2oguuZ WG
S2°ssi
g-Basa Ce
veau™ '
gye35- :
ew a’
«32728 |
Stata
4,2& 2
“foogaa
YesiGa
REZ2E2
- LEVEL OGM Psens4sz7 Associated Consultants Cesigneds
Notes ALEVE, Oa TUN ano KAJ
tint = S&L L ene severe
« 08/02/07 CHANGE BOUNDARY OF (OT ¢ SAME AREA.
it 15762797 CHANGE COVERNANT 8 TO 2000mE2
Project PROPOSED RECONFIGURATION OF A x dmenfi”? GUNGE LOTS 14 2 ComttoN BOY Drawn AMR Chr ynan Surmameibertchs com a ]
. mendments
OF LOT 1 0N RP215933 a ta a travegie [amma
: ene ote 057 037% 2007] mitiureien cover :
€ s90t06 ounce tor « sue ate Pig ner Te en hicks
LOTS 1-5 + | om | Searetatenr ces wifoaeote 060506 E M
‘ 206 50 8049 P05 Computer File LISOO/At cours, AWD aseociaree
P A R | S H 0 F T E W A N T | N , " CUNEE LOTS sheat no, Tot 1 heets Ranta aOeeneeesennneeyes Prop isis 5] Scale ° nia Baner US
1 7 CHANGE ROAD WiOTH TO 27m
L a 21701707 CHANGE LOT & KEEPING SAME anEA .
Page 57
APPENDIX B MUSIC OUTPUT
Page 58
oN,
Ss Rainwater Toe
Lot 2 Gross Pollutant Trap 1 pict 4
= Swale ia =
GU
Rainwater TaNyga
Bio-Retention 1 a Tank 4
= a 'e 5 lute Trap 4
S — Gross Pollutant Trap 2a
Lot 2b Swale 2a
Pa
Bio-Retention 4
= Bio-Retention 2 A
Rainwater Ta b io-Retention 2a ae
Bio-Retention 3 Se ~
2~, Gross Pollutant Trap 3 4 Ss
Gross Pollutant Trap 2b =
Rainwater Tank 3 Lot 3
Swale 2b
Bio-Retention 2b
Page 59
Treatment Train Effectiveness Sources [Residual Load |% Reduction Flow (MLi/yr) 83.4 63.5 23.8 Total Suspended Solids (kg/yr) 1.47E+004 632 96.4 Total Phosphorus (kg/yr) 44.9 11.1 75.4 Total Nitrogen (kg/yr) 256 121 52.8 Gross Pollutants (kg/yr) 1.76E+003 0 100
Page 60
Page 61
eyep je SuIeE}UOD smuoydsoyd [e}0L yNNC - L0-E-yLesoou
Page 62
Page 63
a eee y Golder Associates Pty Ltd A.B.N. 64 006 107 857 Unlt 1, Oaiton Centre, Newspaper Place Maroochydore, Qid 4558 Australia (PO Box 5569, Maroochydore BC, Qld 4558 Australia) Telephone (07) 5443 3511 Fax (07} 5443 6645 hitp:/Avww.golder.com ( JAN. Golder Ss Associates CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN COMMERCIAL DEVELOPMENT EENIE CREEK ROAD NOOSAVILLE QUEENSLAND 4566 Submitted to: BARLOW GREGG & ASSOCIATES P.O Box 200 Mooloolaba QLD 4557 DISTRIBUTION: 2 Copies — Barlow Gregg & Associates (1 hard copy; 1 electronic copy) 1 Copy - Golder Associates Pty Ltd October 2006 06683025 - 3000(AA) S OFFICES IN ADELAIDE, BRISBANE, CAIRNS, MAROOCHYDORE, MELBOURNE, PERTH, SYDNEY, NEW ZEALAND, INDONESIA, HONG KONG, CHINA, THAILAND, PHILIPPINES. The Aaveciation OFFICES ACROSS NORTH AMERICA, SOUTH AMERICA, EUROPE. ASIA, AUSTRALASIA, AFRICA, ‘frst
Page 64
ts Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development Rev: 000 Pagei Eenie Creek Road, Noosaville TABLE OF CONTENTS SECTION PAGE DEFINITIONS o..ccsssssssssscessececeeeeceserenseseeeuesceeenenceneessenseeneneneaeenaeeneeeeeee sire 000000009 0Ut gee EEE e e208 1 GLOSSARY on ecccsscsscscesesccseeecscenseeeesenesneneneseenseenes ses eeeeneenenaeeU ane ctSOUOS ESRD CDCR ERASERS gE MESES Sot e 2 1.0 INTRODUCTION .....csecsseceessesessessssneseenennesenacenesnaneneesennensenseneneen secs een eee sg c0e genes ete 3 2.0 PROPOSED DEVELOPMENT ......ccccceseesstesssesstessenssecnensnneteeacasarsteeeensnasasaneeng es re nett 3 3.0 OBJECTIVES ooccceccescecseccesssssssessessescenesncenssecuscneneessenesecaneaeeeensenenessenee snes gegg een gens eee stig 3 4.0 DOCUMENT REVISION........c:cceccceceseteeeeeereneerenenseseneneneeeensensnessnneneenennegnegnnnnenegeeee eee 4 5.0 ENVIRONMENTAL MANAGEMENT ORGANISATION CHART ......cccseresstsesenrees 5 6.0 CONTRACTOR MANAGEMENT .........cecsccssescssseesssnenerernssenensnsneneecenanennenennen ens ete 5 7.0 MONITORING AND INSPECTION. ........:ccecessssreessesersesaseeerenesensenesensneesnsnsannenensensns eres 5 8.0 NON CONFORMANCE......... 9.0 AUDITING OF THE EMP 10.0 COMMUNITY RELATIONS 11.0 DOCUMENTATION AND REPORTING FRAMEWORK 12.0 13.0 ENVIRONMENTAL LEGISLATION ........-:csseceesesesetenenneneinarertennenssnencanentnn en teesee gets 9 14.0 OVERVIEW OF ENVIRONMENTAL ISSUES.......sssssssssseeeeseeetsstresneeesntesecensnnnetines lL 15.0 REFERENCES j...cccsssessecseseesessessensssesseesenecsnensensevensanansneacisencnsensscaseacesesezaseneacnasentessenees 13 LIST OF FIGURES Figure 1 Site Location LIST OF FORMS Form 1 Concerns Register Form 2 Inspection and Monitoring Sheet Form 3 Site Induction (Attendance Sheet) Golder Associates
Page 65
Construction Environmental Management Plan Commercial Development Eenie Creek Road, Noosaville 06683025-3000(AA) October 2006 Rev: 000 Page ii LIST OF APPENDICES Appendix A — General Site Management Appendix B - Water Quality Management Appendix C — Noise & Vibration Management Appendix D — Air Quality Appendix E — Emergency Response Appendix F — Waste Management Appendix G — Acid Sulfate Soil Management Appendix H — Roadwork Works and Drainage Details Sediment & Erosion Control Plan Appendix I — Ken Hicks Associates Drawing 060506 D Golder Associates
Page 66
Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development Eenie Creek Road, Noosaville Rev: 000 Page | DEFINITIONS Environmental Harm - Environmental Nuisance - Material Environmental Harm - Serious Environmental Harm - any adverse effect, or potential adverse effect (whether temporary or permanent and of whatever magnitude, duration or frequency) on an environmental value, and includes environmental nuisance. is unreasonable interference or likely interference with an environmental value caused by (a) noise, dust, odour, light; or (b) an unhealthy, offensive or unsightly condition because of contamination; or (c) another way prescribed by regulation. “Material environmental harm” is environmental harm (other than environmental nuisance) (a) that is not trivial or negligible in nature, extent or context; or (b) that causes actual or potential loss or damage to property of an amount of, or amounts totalling, more than the threshold amount but less than the maximum amount; or (c) that results in costs of more than the threshold amount but less than the maximum amount being incurred in taking appropriate action to (i) _ prevent or minimise the harm, and (ii) rehabilitate or restore the environment to its condition before the harm. “Maximum amount” means the threshold amount for serious environmental harm. “Threshold amount” means $5000 or, if a greater amount is prescribed by regulation, the greater amount. “Serious environmental harm” is environmental harm (other than environmental nuisance) (a) that causes actual or potential harm to environmental values that is irreversible, of a high impact or widespread; or that causes actual or potential harm to environmental values of an area of high conservation value of special significance; or Golder Associates
Page 67
Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page2 Eenie Creek Road, Noosaville (b) that causes actual or potential loss or damage to property of an amount of, or amounts totalling, more than the threshold amount; or (c) that results in costs of more than the threshold amount begin incurred in taking appropriate action to (i) prevent or minimise the harm; and (ii) rehabilitate or restore the environment to its condition before the harm. “Threshold amount’ means $50,000 or, if a greater amount is prescribed by regulation, the greater amount. GLOSSARY ANZECC - Australian & New Zealand Environment and Conservation Council ARMCANZ~ - Agricultural and Resource Management Council of Australia and New Zealand NSC - Noosa Shire Council EMP - Environmental Management Plan DO - Dissolved Oxygen SS - Suspended Solids EPA - Environmental Protection Agency EAR - Environmental Assessment Report Golder Associates
Page 68
Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development . Rev: 000 Page3 Eenie Creek Road, Noosaville 1.0 INTRODUCTION This EMP has been prepared in order to manage and minimise the impact on the environment during construction of the commercial development on Lot | on SP182880, Eenie Creek Rd, Noosaville 4566. The location of the site is shown on Figure | (Site Location). 2.0 PROPOSED DEVELOPMENT 2.1 Site Description The real property description of the site is Lot 1 on SP 182880 and covers a total area of approximately 14 hectares. The northern boundary of the site adjoins Eenie creek road with a majority of the property currently covered in vegetation. A number of access tracks exist throughout the site and with a fire trail along the eastern boundary 2.2 Description of Development Plans provided by Barlow Gregg & Associates drawn by Ken Hicks Associates (Drawing No. 060506, 01/06/2006)) show details of the proposed lot reconfiguration. The proposed development consists of the reconfiguration of a lot to form a number of commercial sites as well as dedicating a proportion of the site to parkland. As part of construction during the operational works stage vegetation clearing, road construction, filling, and installation of underground services are to be undertaken. 3.0 OBJECTIVES The objectives of the EMP are to: ¢ Protect life, health and well being of human and other forms of life; e Protect the local amenity; e Base the environmental management of the development in accordance with the principles of Ecologically Sustainable Development (ESD); ¢ Inform staff, contractors and consultants of appropriate safeguards and control measures to be implemented to minimise the environmental impact, e Comply with relevant statutory environmental requirements, * Provide strategies aimed at minimising environmental harm during the construction stage; and e Provide an Environmental Management System, generally based on the key elements of the AS/NZS ISO 14001-1996 Environmental Management Systems — Specification with Guidance for use. A copy of the EMP and associated forms and registers will be kept at the site office during the construction stage of the development. Golder Associates
Page 69
Construction Environmental Management Plan Commercial Development Eenie Creek Road, Noosaville 06683025-3000(AA) October 2006 Rev: 000 Page 4 4.0 DOCUMENT REVISION The following table outlines revisions made to this document. Revisions to the document are made to reflect changes to environmental procedures, environmental management, or the findings of environmental monitoring. Date Nature of Revision Editor Any complete revision of the document will be accompanied by a new revision number (ie 001 in the upper right hand corner of reissued pages). A copy of the revisions to the EMP will be sent to site personnel, or a site meeting may be called to discuss the implications of the revision to all affected site personnel. The Project Manager is responsible for the updating of all revisions to the EMP, and information distribution to site personnel. Golder Associates
Page 70
Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page 5 Eenie Creek Road, Noosaville 5.0 ENVIRONMENTAL MANAGEMENT ORGANISATION CHART This section outlines the framework that will be used by the Project Manager to manage, document, and report on environmental issues for the development. Project Manager Site Manager CONTRACTORS Eg. Civil Landscapers Utilities Builders The Project Manager is ultimately responsible for Environmental Management during the construction phase of the development. The Project Manager will identify which actions are to be delegated to those responsible for managing environmental issues. 6.0 CONTRACTOR MANAGEMENT Contractors and their staff are required to comply with the provisions of the EMP at all times. An understanding of environmental responsibility will be documented by each contractor, or the nominated site representative, for each organisation on the Site Induction Signatory Form (Refer Section 11.1). Contractor’s environmental performance obligations shall be incorporated into the contractor’s conditions of work for the proposed development. 7.0 MONITORING AND INSPECTION Environmental inspections will be carried out by means of a weekly meeting of responsible personnel and a site walk through. This will be used to identify any areas of non- conformance or opportunities for improvement. Any non-conformances will be reviewed at the weekly meeting. Monitoring is to be documented as outlined in Section 11.2 and monitoring programs will be modified based on the findings of site inspections and/or results of testing. Golder Associates
Page 71
n Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page 6 Eenie Creek Road, Noosaville 8.0 NON CONFORMANCE Any non-conformance to the EMP must be addressed as soon as is practicable. The personnel responsible for the non-conformance must be notified immediately for purposes of issuing rectification instructions. Non-conformances are formally documented through an audit report (Refer Section 11.3). 9.0 AUDITING OF THE EMP 9.1 Responsibilities The construction activities at the development will be audited for compliance with the EMP and its procedures by the environmental auditor. The environmental auditor will be appointed by the Project Manager. It is the environmental auditor’s responsibility to: 1. Provide an independent assessment of compliance with the Environmental Procedures in Appendices A to F. 2. Report on observed activities that have, or may cause, an impact to the environment or non-conformance to regulation. 3. | Provide recommendations to the Project Manager regarding practical initiatives that can be employed to improve the effectiveness of environmental management at the development site. 4. Provide a copy of the Environmental Audit Report to the project manager. 9.2 Frequency The frequency of Environmental Audits from commencement of site construction activities will be as follows: ¢ Every fortnight until the construction phase is completed. 10.0 COMMUNITY RELATIONS Where concerns are made by the community or third parties to the Project Manager, or any contractors under its control, these will be forwarded to the project manager immediately. The process for dealing with concems is documented in Section 11.4. Golder Associates
Page 72
Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page7 Eenie Creek Road, Noosaville 11.0 DOCUMENTATION AND REPORTING FRAMEWORK The following documents relate to environmental performance and form part of the EMP: 1. Environmental Management Plan (EMP); 2. Environmental Procedures (Appendices to the EMP); 3. Site Induction Signatory Form; Inspection and Monitoring Records; Environmental Audit Reports; Concerns Register; and 2 an Ww Rectification Requests and Instructions. Items 3 to 7 are defined in the following sections. 11.1 Site Induction Signatory Form All contractors or employees of the Project Manager working at the proposed development site must undergo a Site Induction for Environmental Management. The inductee shall sign a form stating their attendance at the site induction. It is the responsibility of the Project Manager to verify the satisfactory completion of the form. The Site Induction attendance signatures shall be documented at the end of the site induction (Form 3). 11.2 Records of Inspection and Monitoring The outcome of the weekly meeting and site walk through will be recorded on the inspection form given in the List of Forms. Any monitoring that requires more frequent attention will be completed as required and recorded on the Inspection & Monitoring Sheet. The originals of these sheets shall be kept at the site office (Form 2). 113. —_ Environmental Audit Report The Project Manager will appoint an independent auditor to carry out audits of the implementation of the EMP. A copy of the independent environmental audit report shall be provided to the Project Manager. Golder Associates
Page 73
ue
Construction Environmental 06683025-3000{AA)
Management Plan October 2006
Commercial Development
Rev: 000 Page 8
Eenie Creek Road, Noosaville
11.4 Concerns Register
Complaints will be directed to the Project Manager who will issue the concern to the
appropriate personnel for action.
A hard copy record of all concerns will be kept at the Site office and filed for future
reference, if required. (Form 1).
The concerns register will record the following information:
1. Details: Name, address and phone number.
2. Nature of concern: Detail of issue, date of incident, people involved, and location.
3. Action taken or required: Any action proposed or undertaken to address the concern,
including time and date.
4. Response to Action: Was the complainant satisfied with the outcome of the actions
taken, if not, what else needs to be done, or is it outside the scope of the development
works.
5. Prevention or re-occurrence: What action has been taken by the nominated responsible
person to ensure the problem will not re-occur.
11.5 Rectification Requests and Instructions
Non-conformances will be documented on the Inspection and Monitoring Form. The form
states the nature of the non-conformance and the mechanisms implemented to rectify the
problem.
A copy of this form shall be undertaken by the Project Manager on a monthly basis,
immediately in the case of emergencies, or significant non-conformance.
12.0 TRAINING
All site staff of the Project Manager and contractors, will be required to undergo a site
induction covering all the elements of the EMP. The induction will aim to instil
environmental awareness in personnel and:
e Introduce and explain the duty of care required under the Environmental Protection Act
1994.
¢ Introduce the Environmental Management Plan (EMP) and responsibilities it places on
all contractors and consultants.
e Explain the various subordinate components of the EMP and the reporting and
monitoring procedures of the EMP and how they work.
Golder Associates
Page 74
Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development . Rev: 000 Page9 Eenie Creek Road, Noosaville e Explain how to use the environmental procedures and plans in the EMP. The content of the induction program will be endorsed and presented by the Project Manager, or delegate. 13.0 ENVIRONMENTAL LEGISLATION The construction activities must conform to the relevant Environmental Protection Policies and environmental regulations promulgated under the Environmental Protection Act 1994. A brief discussion of the key elements of each of the Acts and the relevant aspects of the Environmental Protection Policies is provided in the following sections. 13.1 Environmental Protection Act 1994 The principal legislative vehicle for environmental protection in Queensland is the Environmental Protection Act, 1994 (EP Act). General Environmental Duty Under the EP Act, all people have a general environmental duty to take all reasonable and practicable measures to carry out any activity in a manner that prevents or minimises environmental harm. Duty to Notify Environmental Harm While carrying out an activity, if a person becomes aware that serious or material environmental harm is caused or threatened by the person’s or someone else’s act or omission in carrying out the activity, that person MUST as soon as is reasonably practicable after becoming aware of the event causing the harm inform the employer, or if the employer cannot be contacted, give written notice to the Administering Authority of the event, it’s nature and the circumstances in which it occurred. 13.2 Environmental Protection Policies Environmental Protection Policies (EPPs) within the EP Act are used to control and reduce environmental pollution and harm and nuisance, They are briefly summarised below. Golder Associates
Page 75
Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page 10 Eenie Creek Road, Noosaville Environmental Protection Water Policy 1997 The purpose of this policy is to achieve the objectives of the EP Act in relation to Queensland waters. Under this policy, it is an offence to release or deposit the following into, or put in a place where it could reasonably be expected to move or be washed into a gutter, stormwater drain or water: a) rubbish; b) scrap metal, motor vehicle parts, motor vehicle bodies or tyres; c) building waste; d) sawdust; e) solid or liquid waste from an on-site domestic waste water treatment system, f) cement or concrete; g) a degreasing agent, paint, varnish or paint thinner; h) any manufactured product, or any by-product or waste from a manufacturing process, that has a pH less than 6 or greater than 9; i an insecticide, herbicide, fungicide or other biocide; and j) oil. It is also an offence to allow stormwater run-off into a roadside gutter, stormwater drain or a water that results in the build-up of sand silt or mud in the gutter, drain or water (Note: the offence also applies if a person deposits sand, silt or mud in a place where it could reasonably be expected to move or be washed into a roadside gutter, stormwater drain or a water body resulting in the buildup of sand silt or mud in the gutter, drain or water). Environmental Protection (Air) Policy 1997 The aim of this policy is to achieve the objectives of the EP Act in relation to Queensland’s Air Environment. The policy lists goals and air quality indicators for parameters including dust. Environmental Protection (Noise) Policy 1997 The aim of this policy is to achieve the objectives of the EP Act in relation to Queensland’s acoustic environment. The policy sets out an acoustic quality objective for an ambient level of 55 dB(A), Leg 24 hr OF less for the majority of Queensland’s population living in residential areas. : Golder Associates
Page 76
Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page 11 Eenie Creek Road, Noosaville Environmental Protection (Waste Management) Policy 2000 The aim of this policy is to achieve the objectives of the EP Act in relation to waste management. The policy lists the preferred hierarchical option for adoption of waste management practices as: Waste avoidance; Waste re-use; Waste recycling; Energy recovery from waste; and Waste disposal. 14.0 OVERVIEW OF ENVIRONMENTAL ISSUES This section provides a brief overview of environmental issues associated with the construction of the proposed unit development. 14.1 Noise As the construction site is situated within a commercial area, the noise generated by construction activities and transportation of materials creates a potential for noise impact. Adjacent land users include residential housing and commercial premises. 14.2 Dust Activities undertaken during construction create a potential for a reduction in air quality through the generation of dust. Best practice environmental management will be undertaken to reduce this impact. 14.4 Water Quality During rainfall events, uncontrolled runoff leaving the site could potentially cause turbid water to enter the stormwater system. Solid waste and soil stockpiles, unvegetated and unsealed carparks, concrete wastes and fertilisers are some sources with the potential to contaminate surface water. The water quality monitoring program for the development is contained in Appendix - B Water Quality Management. Performance criteria for surface water exiting the site have been established using the Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2000 for a “fresh” receiving environment. Golder Associates
Page 77
Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page 12 Eenie Creek Road, Noosaville 14.5 Solid Waste Solid wastes will be produced from a range of waste streams. Waste management practices will be to achieve, where possible, the adoption of the following waste management hierarchy: « Waste Avoidance; e Waste Reuse; e Waste Recycling; e Energy Recovery From Waste; and e Waste Disposal. 14.5.1 Storage and Disposal of Construction Waste Wastes would be sorted by type with each contractor being responsible for ensuring that wastes are placed in the appropriate bin or disposal location. Bins/skips would be colour coded or labelled according to the type of waste to be deposited with clear signage on each bin and around the construction site. Bins would be provided where appropriate depending on the stage of the development. In keeping with the waste hierarchy, the first step in the waste management process would involve reducing the production of wastes through efficient planning of resources. Secondly, those wastes produced would be reused on the site where possible. Where reuse is not possible the waste would be recycled via the colour coded bins/skips. For non-recycled wastes energy recovery methods would be employed before final disposal to landfill. 14.6 Dangerous Goods It is expected that during construction quantities of flammable and combustibles on the site will be less than the minor storage volumes listed in AS1940 — The Storage and Handling of Flammable and Combustible Liquids. 14.7. Control of Nuisances The management for the control of nuisances created during earthworks and construction phases, including dust and noise created by vehicular traffic on and off the site, is detailed in Appendices A (General Site Management), C (Noise Management), and D (Air Quality). Golder Associates
Page 78
ee — Construction Environmental 06683025-3000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page 13 Eenie Creek Road, Noosaville 14.8 Amenity The site, which is located within a commercial area, could potentially have an impact on the general amenity of the area. Temporary fencing would be erected on the northern boundary of the site, to improve site safety and reduce visual impacts. Any litter, dust and other materials emanating from the site, could potentially be detrimental to the amenity of the area. Temporary security lighting will be angled so neighbouring premises are not affected. 14.9 Flora and Fauna The sensitivity of the surrounding vegetation requires management of impacts on surrounding flora and fauna. During construction a number of issues may affect the viability of surrounding populations. Adequate care is to be undertaken for the protection of surrounding flora and fauna. 15.0 REFERENCES The EMP has been prepared based on information supplied by the following reports, and based on the requirements of the following legislation. Environmental Protection Act 1994 Environmental Protection Policy (Air) 1997 Environmental Protection Policy (Noise) 1997 Environmental Protection Policy (Water) 1997 Environmental Protection Regulation (1998) Environmental Protection (Waste Management) Policy 2000 Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2000, ANZECC/ARMCANZ. Institution of Engineers (Qld), Soil Erosion and Sediment Control Guideline (1996). 9. Brisbane City Council, Best Practice Guidelines for the Control of Stormwater Pollution from Building Sites (2000). 10. AS 1940-1993 The Storage and Handling of Flammable and Combustible Liquids. 11. AS 1055.2-1997 Acoustics — Description and Measurement of Environmental Noise. iD. NK NAWRYNT oe Daniel Joyce BSc(Env Science) Geoff Hurley MSc DIC C.Geol RPEQ 5716 Ecologist Associate Office Manager J\2006\Environmental\06683025\TASK_3000 EMP\00_CORRESPONDENCBIOUT\AA06683025-3000r.doc DINGAH Golder Associates
Page 79
Figures
Page 80
: - 2 Targed M =p 7 7 yd, 7 ~2CHON's 5 TT] OOUCHO lets at ~ ‘Subject Site | a Barlow Gregg & Associates. PROJECT Commercial Development Eenie Cr Road. DRAWN DJJ DATE 04/10/06 CHECKED ATE me Site Location “* 4:40000 (Approx.) PROJECT No 06683025 FIGURE No 1 NTASK_3000 EMP\03_FiGURES_DRAWINGS¥Ag 1
Page 81
Forms -_—s + . 2
Page 82
Commercial Development Eenie Creek Road CONCERNS REGISTER Complaint No. Complainant Details: Date: Name: Time: Address: Received by: Contact Phone No. Nature of Concern: Detail of Complaint: Concern Received By: Telephone: In Person: Location of Incident: In Writing: Date of Incident: Persons Involved: Action Taken or Required: Action Required (Y/N): Time/date of Action: Type of Action: Responsible Person: Follow Up Remedial activities performed 2 nummer Date : ; Performed by: Complainant Response To Action: a mmmennmnmmnmnnnnnnnttnnnninninninnnnnnne ne Further Action Required ? (Y/N) lf Yes, Details of Further Action Required: Prevention Of Re-Occurrence Preventative Action Required ? If Yes, Details of Further Action Required: October 2006 Golder Associates Form |
Page 83
Commercial Development Eenie Creek Road INSPECTION & MONITORING SHEET Environmental Procedure: Responsible Person: ¥ Date of Inspection: Weather durin edin. Personnel ent during inspection: D:MONITORING/ENVIRO! 1 ACTIMITNE 27: ge i | SECHECKED An Form 2 Golder Associates Octoberr 2006
Page 84
Site Induction Form (Attendance Sheet) October 2006 Form 3 Golder Associates
Page 85
Appendices le 4 14 i eee - i 4 :
Page 86
Appendix A — General Site Management Construction Stage Environmental Procedures Commercial Development Eenie Creek Road. Revision No: 000 October 2006 1 of 2. Al, A2. A3. ENVIRONMENTAL VALUES The overall protection of the surrounding environmental life, health and wellbeing of humans. OBJECTIVES To meet the requirements of the Environmental Protection Act 1994, all Queensland Environmental Protection Policies. Minimise impact on the environment, specifically on the amenity of The surrounding premises, from activities during construction. ENVIRONMENTAL CONTROL MEASURES The following provides a list of the environmental control general management of the site. measures for the Environmental Control Measure Responsibility 1. Ensure that all staff and contractors are aware of the potential environmental impacts and required minimum environmental control measures and their responsibilities before they commence any site works. Project Manager . Any dangerous areas of the site to be adequately sign posted indicating the danger. Project Manager Occupants of adjoining premises will be notified prior to the commencement of works of the nature and estimated duration of construction activity and environmental management controls to be implemented to limit potential nuisances. Project Manager Temporary security lighting of the site must be designed and located to ensure that there is no direct light spill that alters the amenity of the adjacent properties. Project Manager . General hours of work will be between 7.00 am to 6.00 pm Monday to Saturday, excluding public holidays, or as agreed with the Council. If approved by Council, work outside of the specified hours (7am to 6pm) may be carried out if suitable measures are undertaken to suppress noise and air emissions/dust from the site. Written warning must be provided to the neighbouring residents if the activity with the potential to emit excessive noise is to be undertaken outside the general hours. Project Manager All complaints received must be recorded in writing including investigations undertaken, conclusions formed and actions taken. This information must be made available to the administrating authority on request. Project Manager Maintain a high standard of housekeeping and ensure that materials that are likely to attract vermin are properly disposed of. Project Manager Dispose of any waste illegally dumped at the site. Project Manager Provide bins for contractors and staff at locations where they consume food. Ensure bins are emptied regularly. Project Manager 10.Sweep roads abutting the site at regular frequencies during construction periods or whenever inspections show signs of soil on access roads or the site entrance. Project Manager 11. Install and maintain a grate at the site entrance to reduce unwanted soil from leaving site via vehicle tyres. Project Manager Golder Associates 06683025 - 3000(AA)
Page 87
Appendix A — General Site Management Construction Stage Environmental Procedures Commercial Development Eenie Creek Road. Revision No: 000 October 2006 2 of 2 A4. AS. Environmental Control Measure Responsibility 12. All stockpiles to be watered or covered with tarpaulins to minimise dust emissions and not stored where soil could enter the stormwater system. Project Manager 13. All site personnel to report all non-conformances to the Project Manager within 1 hour of occurrence or observance. Project Manager 14. All dangerous goods (eg distillate and petroleum) to be stored in a bunded area. A distance of not Jess than 3 m from the storage site will be clear of combustible vegetation and refuse. No more than 2 500 L for class PG | or class PG Il liquids are to be stored on site during operation. No more than 5 000 L of PG Ill or 10 000 L of Combustible liquids (such as diesel) are to be stored on site during operation. Project Manager INSPECTION AND MONITORING The following inspection and monitoring program will be conducted at the site. The results of these activities will be recorded on the inspection/monitoring data sheets provided with the EMP. Activity Frequency Responsibility 1. Inspect signage at dangerous areas of | Weekly Project Manager the site. 2. Inspect security lighting. Weekly Project Manager 3. Inspect content and quantity of material | Weekly Project Manager in bins. 4, Inspect site for general tidiness and Weekly Project Manager illegal dumping of wastes. 5. Inspect roads abutting the site for soil, Weekly Project Manager sand, clay or stones originating from the construction activities on site. 6. Check all stockpiles are covered or | Daily Project Manager maintained moist when not in use. 7. Check for correct storage of all Weekly Project Manager dangerous good on site. PERFORMANCE INDICATORS Item Performance Indicator 1. Signage No incidences due to absence or adequacy of signage. 2. Lighting No community complaints regarding security lighting. 3. Hours of work No work conducted outside normal hours without evidence of measures taken to suppress noise and air emissions/dust. 4, Site Site remains tidy. No complaints from local community or Housekeeping relevant regulatory authorities. 5. Site No occurrence of illegal dumping of waste at site or in general Housekeeping site waste bins. 6. Public Roads No adjacent public roads contain soil, sand, clay or stones originating from the construction activities on site. 7. Dangerous Goods No sign of seepage or spills of dangerous goods stored on site. 8. Non conformances All non conformances are reported and rectified. Golder Associates 06683025 - 3000(AA)
Page 88
Appendix B — Water Quality Construction Stage Environmental Procedures Commercial Development Revision No: 000 October 2006 1of2 Eenie Creek Road. B1. ENVIRONMENTAL VALUES The protection of surrounding surface water and groundwater. B2. OBJECTIVES 1. Limit environmental impact on adjacent residential and commercial premises. 2. Control potential sources of contaminated stormwater. 3. Limit the quantity of soil lost during construction activities. 4. Manage all discharges of water from the construction site. 5. Comply with the Environmental Protection (Water) Policy 1997, and NSC local laws, codes and policies. 6. Use the Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2000 for the protection of environmental values. 7. Undertake Erosion and Sediment Control in accordance with the Institution of Engineers (Qld) Erosion and Sediment Control Guidelines (1996). B3. ENVIRONMENTAL CONTROL MEASURES The following provides a list of the environmental control measures for management of surface and ground waters at the site. Environmental Control Measure Responsibility 1. All stormwater will be managed in accordance with the | Construction Manager stormwater treatment plan (Appendix H). 2. The velocity of stormwater over the site will be teduced | Construction Manager where gradients exist by the installation of retarding structures, such as silt fences. 3. Stockpiles when not in use will be watered to minimise Construction Manager dust emissions and not placed on footpaths, or stormwater drains. B4. INSPECTION AND MONITORING The following inspection and monitoring program will be conducted at the site. Activity Frequency Responsibility 1. Inspect disturbed areas for signs of land erosion or deterioration. «Weekly * After each major rainfall event*. Construction Manager 2. Inspect location, design and stormwater protection of stockpiles so that sediment is not deposited into the stormwater system. «Weekly e After each major rainfall event. Construction Manager * > 25mm within a 24 hour period. Golder Associates 06683025- 3000(AA)
Page 89
Appendix B — Water Quality Revision No: 000 Construction Stage October 2006 Environmental Procedures Commercial Development Eenie Creek Road. 2of2 B5. PERFORMANCE INDICATORS Item Performance Indicator 1. Surface Water Control System All control systems are maintained in good working order. Surface water is separated from disturbed and undisturbed areas. 2. Stockpiles Location and design of stockpiles meets control measures in B2,. Stormwater protection of stockpiles is maintained, effective and in good working order. 3. Non conformance All non-conformances are reported and rectified. Golder Associates 06683025- 3000(AA)
Page 90
Appendix C - Noise & Vibration
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.
Revision No: 000
October 2006
tof 2
C1.
C2.
c3.
ENVIRONMENTAL VALUES
The protection of the surrounding acoustic environment.
OBJECTIVES
. Limit nuisance due to noise and vibration.
. Regulate noise from construction activities to limit nuisance to nearby noise
sensitive places.
ENVIRONMENTAL CONTROL MEASURES
. Comply with the Environmental Protection (Noise) Policy 1997.
The following provides a list of the environmental control measures for the
management of noise at the site.
Environmental Control Measure
Responsibility
1,
General hours of work will be between 7.00 am to 6.00 pm
Monday to Saturday, excluding public holidays, or as agreed
with Council. {f approved by Council, work outside of the
specified hours (7am to 6pm) may be carried out if suitable
measures are undertaken to suppress noise and air
emissions/dust from the site. Warning must be provided to the
neighbouring residents if activity with the potential to emit
excessive noise is to be undertaken outside the general hours.
Project Manager
Use hydraulic equipment in preference to pneumatic.
Project Manager
2
Fit manufacturer approved muffler to all mobile equipment,
Project Manager
. Ensure plant and equipment is maintained and serviced
regularly.
Project Manager
. No truck associated with construction or delivery activities
must be left standing with its engine operating in a street
adjacent to residential or commercial premises.
Project Manager
. All deliveries to and from the site must be made during the
scheduled working hours.
Project Manager
When requested by the Administrating Authority noise
monitoring must be undertaken to investigate any complaint of
noise annoyance. Monitoring must include:
Lao Lasor Lago, baer (1 5mins)' and background
measurements.
Atmospheric conditions including wind speed and
direction;
Effects due to extraneous factors such as traffic noise;
Location, date and time of recording and the method
of measurement and reporting of noise levels must
compty with the Environmental Protection Agency's
Noise Measurement Manual, Third Edition, 1 March 2000,
or more recent editions or supplements to that document
as they become available.
Project Manager
8.
If pneumatic breakers or blasting is required to excavate rock,
then vibration monitoring will be undertaken at the site
boundary.
Project Manager
Golder Associates 06683025 - 3000(AA)
Page 91
“ Appendix C - Noise & Vibration Construction Stage Environmental Procedures Commercial Development Eenie Creek Road. Revision No: 000 October 2006 2of2 c4. C5. INSPECTION AND MONITORING The following inspection and monitoring program will be conducted at the site. The results of these activities will be documented as they are completed. Activity Frequency Responsibility 1. Inspect the maintenance and servicing |} Bi Monthly records of plant equipment. Project Manager adjacent sites during site activities that are | Project Manager expected to result in noise levels that may exceed performance indicators. 2. Conduct noise monitoring surveys at! As judged by the Project Manager 3. Monitoring of noise in accordance with | On AS1055-1 Acoustics - Description and | more than measurement of environmental noise will | similar noise be undertaken in response to noise | complaint complaints. receipt of 1 Project Manager PERFORMANCE INDICATORS Item Performance Indicator 1. Working Hours 7.00 am to 6.00pm Monday to Saturday, excluding public holidays, except as agreed by Council and suitable measures are implemented to suppress noise emissions. 2. Noise Levels at Construction noise inaudible within a habitable room during: noise sensitive « 6.00pm to 7.00am Monday to Saturday place e Sundays & Public Holidays 3. Noise Noise measured at a “Noise Sensitive Place” Level Monday to Saturday Sundays and public holidays dB(A) Jam-6pm | 6pm- 10pm- Yam-6pm 6pm-10pm | 10pm-9am measured 10pm Jam as Laro-ddj, 65 60 50 65 60 50 1Omins Lavadj, 1Omins 70 65 55 70 65 55 Noise measured at a “Commercial Place” Monday to Saturday Sundays and public holidays Tam— 6pm-10pm | 10pm-7am | 9am-6pm 6pm-10pm | 10pm-9am 6pm. Lato-adj, 70 65 55 70 65 50 10mins La1.adj, 10mins 75 70 60 75 70 60 4, Complaints No complaints received regarding noise. Any complaints regarding noise are to be dealt with immediately and if necessary measures implemented to prevent recurrence. 5. Vibrational Energy Peak Particle Velocity <5 mm/s. Golder Associates 06683025 - 3000(AA)
Page 92
Appendix D — Air Quality Management | Fevision No: 000 Construction Stage October 2006 Environmental Procedures Commercial Development Eenie Creek Road. 1of2 D1. D2. D3. ENVIRONMENTAL VALUES The protection of air quality for the environment and life, health and well being of humans. OBJECTIVES 14. Minimise the health risk or reduction in air quality due to air emissions and dust to site workers, and nearby residences premises. 2. Minimise the creation of airborne dust and excessive vehicle exhaust emissions. 3. Minimise the quantity of soil lost during construction activities. 4. Comply with the Environmental Protection (Air) Policy 1997. ENVIRONMENTAL CONTROL MEASURES The following provides a list of the environmental contro! measures for air quality management at the site. Environmental Control Measure Responsibility 1. Exposed areas including stockpiles and unsealed internal Project Manager roads will be sprayed with water on a regular basis. Care will be taken not to over apply water. 2. Install dust screens during earth moving operations where | Project Manager water spraying is not practical. 3. Loads of material on trucks will be covered with tarpaulins or | Project Manager sliding covers prior to leaving the site. 4. Work schedules will be arranged so that the area of disturbed | Project Manager land is kept to a minimum. 5. Restrict. concrete dust emissions through the use of | Project Manager preventative measures such as water sprays. 6. Site vehicles will be maintained in an operable condition in | Project Manager accordance with manufacturer's specifications. 7. Exhaust emission effects will be minimised by ensuring that | Project Manager site vehicles and machinery are fitted with appropriate emission control equipment that is maintained and serviced to manufacturer's specifications. 8. Earth bunds to be covered or maintained moist (eg. tarpaulin | Project Manager or turf etc) when not in use. Golder Associates 06683025 - 3000(AA)
Page 93
Appendix D — Air Quality Management Construction Stage Environmental Procedures Commercial Development Eenie Creek Road. Revision No: 000 October 2006 2 of 2 D4. DS. INSPECTION AND MONITORING The following inspection and monitoring program will be conducted at the site. The results of these activities will be recorded on the inspection/monitoring data sheets provided. Activity Frequency Responsibility 1. Inspect the site for un-stabilised soil, | Weekly Project Manager stockpiles, dust risks. 2. Inspect transport vehicles for load coverage. | Per Truck Project Manager 3. Inspect adjacent sites for deposition of dust. | Weekly Project Manager 4. Inspect road frontage for dust deposition | Daily Project Manager and remove residual material relating to the site. Assess whether monitoring is required. PERFORMANCE INDICATORS item Performance Indicator 1. Soil Surfaces ¢ All bare earth areas stabilised and wetted where necessary. e All stockpiles stabilised and seeded where necessary. 2. Vehicles © Limited vehicular trafficking of unsealed areas. e All vehicles fitted with appropriate exhaust systems. 3. Complaints « No complaints regarding dust are received from residents and users of nearby public open space. 4. Dust At the boundary of an affected sensitive piace: ¢ Dust fallout less than 120 mg/m? day. ¢ PM, of 150 wg/m® over a 24 hour averaging time. 5. Non conformance | All non conformances are reported and rectified. Golder Associates 06683025 - 3000(AA)
Page 94
~~ Revision No: 000 Appendix E — Emergency Response Construction Stage Environmental Procedures Commercial Development Eenie Creek Road. October 2006 1of 2 E1. E2. E3. E4. ENVIRONMENTAL VALUE The protection of life, health and wellbeing of humans and the environment. OBJECTIVES Provide a mechanism to address and mitigate the impact of significant breaches of the environmental procedures, or resulting from unforeseen hazards. EMERGENCY RESPONSE PLAN The following provides a list of potential breaches, respective control measures and key contacts. HAZARD EMERGENCY ACTION CONTACT Excessive Dust Spray offending area with water. Project Manager Excessive Noise identify source(s) of noise and stop activity immediately. Project Manager Chemical spill onto soil Use spill containment equipment to mop up and contain spill. Conduct complete clean up of contaminated area and dispose to landfill as approved by EPA. Project Manager Chemical spill into stormwater drain Identify stormwater exit drain and isolate. Mop up spill and clean stormwater exit drain. Project Manager High sediment loads in stormwater exiting from site. Inspect all active areas of site for signs of erosion or uncontrotled runoff. Identify source. Rectify any non conformance. Project Manager Other Contact Project Manager as soon as possible. Contact the site environmental consultant for advice if required. Implement emergency procedure as advised. Project Manager CONTACT PROCEDURE The Project Manager must be immediately informed of the emergency such that action can be taken to mitigate any potential impacts. If environmental harm has occurred, notify Council and the Environmental Protection Agency (as soon as is practicable at least within 24 hours). Golder Associates 06683025-3000(AA)
Page 95
Appendix E — Emergency Response Revision No: 000 Construction Stage October 2006 Environmental Procedures . 2 of 2 Commercial Development Eenie Creek Road. E5. CONTACT NAMES AND NUMBERS Role Organisation Contact Number Project To be Manager advised Fire Qid Fire & Rescue _ 000 (Emergency only) Authority Environmental Environmental _ 1300 130 372 Emergencies Protection Agency (24 hours) Local Council Maroochy Shire _ 1300 366 695 Council E6. FOLLOW UP lf an emergency response action is initiated at the site, then the Project Manager or representative must prepare a follow up report that contains the following information: Date. Time. People present at the time, or responsible for emergency (if any). Location of incident. Cause of incident. Nature and extent of incident. People contacted. Measures taken to rectify the issue. Monitoring (if any) undertaken to assess any impact of incident. Preventative measures undertaken in order to prevent incident occurring again (if possible). Any changes to the Environmental Management Plan that may be required. The report must be submitted to the Directors of S & L Developments Pty Ltd for action and advice on nature of the works undertaken to rectify, clean up and prevent reoccurrence of the incident. Golder Associates 06683025-3000(AA)
Page 96
Appendix F — Waste Management
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.
Revision No: 000
October 2006
1of3
F1. ENVIRONMENTAL VALUE
The protection of life, health and wellbeing of people and the density of
ecological processes and associated ecosystem.
F2. OBJECTIVES
1. Ensure that the waste material on site is handled and disposed of in an
appropriate way.
2. Minimise any environmental impact on the quality of soil or groundwater.
3. Minimize waste discharge to the environment.
4. Comply with Environmental Protection (Waste) Policy 2000.
F3. ENVIRONMENTAL CONTROL MEASURES
The following provides a list of the environmental control measures for
management of waste at the site.
Environmental Control Measure
Responsibility
1. Implement good house-keeping measures, including:
staff training;
appropriate facilities to ensure satisfactory removal of
waste substances;
layout of work site; the designation of areas for certain
types of high risk activities;
collection of wind blown litter;
immediate clean-up of spills;
sediment traps will be installed at stormwater discharge
points;
maintain sediment traps ; and
remove waste so as not to produce a fire hazard.
Project Manager
2. Concrete wastes must be managed in the following manner:
mixing is to be conducted in designated areas to prevent
washings entering stormwater drainage systems;
excess wet concrete mix must be kept in designated areas
of the site so that runoff is prevented from entering
stormwater drains; and
washing of equipment and vehicles to be done in
designated areas of the site so that runoff is prevented
from entering stormwater drains.
Project Manager
3. Acrylic painting wastes must be managed in the following
manner:
equipment must be cleaned in designated areas of the site
so that washings are prevented from entering stormwater
drainage systems;
aqueous paint washings must be directed to a sump to
allow paint residues to settle out;
paint sludge must not be disposed of onto bare ground;
following sedimentation, supernatant {wash water) will be
directed to sewer under the conditions of a trade waste
permit from Council; and
paint containers must be placed into bins.
Project Manager
4. Solvent or oil based paint wastes must be disposed of into
dedicated bins as Regulated Waste’.
Project Manager
' Regulated Waste ~ as defined by the Environmental Protection Policy 2000.
Golder Associates 06683025-3000(AA)
Page 97
Appendix F —- Waste Management Revision No: 000 Construction Stage October 2006 - Environmental Procedures Commercial Development Eenie Creek Road. 2of 3 5. Provide dedicated bins for disposal of the following waste | Project Manager streams: Concrete, timber, plasterboard, steel, plastics, general waste, and Regulated Waste”, and dealt with according to the waste disposal table outlined below. 6. Waste disposal is to be undertaken according to the Identify | Project Manager recycling options for waste streams collected and implement procedures to ensure these waste disposal options are followed. 7. Educate staff and contractors as to the correct disposal of | Project Manager waste materials. 8. Follow the Waste Management hierarchy: waste avoidance, | Project Manager waste re-use, waste recycling, energy recovery from waste, waste disposal for all materials used on site. 9. Fence the site to prevent wind blown waste from leaving the | Project Manager site. F4. INSPECTION AND MONITORING The following inspection and monitoring program will be conducted at the site. The results of these activities will be recorded on the inspection/monitoring data sheets provided. Activity Frequency Responsibility 1. Monitor areas, such as wire fences, | Weekly Project Manager where litter may accumulate from sources external to the site. Remove any such litter and dispose of into bins. 2. Inspect designated concrete mixing and | * Weekly Project Manager wash up areas. e After each major rainfall event* 3. Inspect designated paint wash up areas.__| Weekly _ Project Manager 4. Inspect waste disposal bins for correct | Weekly Project Manager placement of waste materials 5. Sediment traps free of waste. Weekly Project Manager 6. Inspect fences for wind blown waste. Weekly Project Manager Remove Waste. *> 25mm within a 24 hour period. 2 Regulated Waste — as defined by the Environmental Protection Policy 2000. Golder Associates 06683025-3000(AA)
Page 98
Appendix F — Waste Management Construction Stage Environmental Procedures Commercial Development Eenie Creek Road. Revision No: 000 October 2006 3 of 3 PERFORMANCE INDICATORS Item Performance Indicator 1. Housekeeping No complaints from community or regulatory authorities tegarding litter or other wastes originating from the site. 2. Concrete Ail concrete mixing and equipment cleaning conducted in designated areas. 3. Paint « No paint sludge disposed onto bare ground. ¢ All paint wash waters directed to sewer. ¢ Atl paint wash up conducted in designated areas. 4. Regulated All regulated wastes placed only in dedicated bins. wastes 5. Gross Pollutants The site is free from wastes such as plastic bottles, glass bottles, food wrappers, papers etc. 6. Non conformance All non conformances are reported and rectified. OUTLINE OF RECYCLING FOR WASTE MATERIALS The following outlines the separation of wastes and disposal for reuse or refuse. Excavated Material Clean fill from site will be transported to Noosa Shire Council Refuse tip for reuse. Green Waste Transported to Noosa refuse tip for mulching. Bricks Concrete and brick is to be segregated on site and reused within Noosa Shire Council’s refuse site for recycling. Concrete Concrete and brick is to be segregated on site and reused within Noosa Shire Council’s refuse site for recycling. Plasterboard Separated on site and transported to Noosa refuse tip. Metals Roof sheeting is to be sorted separately and transported to Noosa Shire Council’s refuse site for recycling. Golder Associates 06683025-3000(AA)
Page 99
Appendix G — Acid Sulfate Soil Construction Stage Environmental Procedures Commercial Development Eenie Creek Road. Revision No: 000 October 2006 1of4 B1. ENVIRONMENTAL VALUES To avoid potential adverse effects on the natural and (including infrastructure) and human health. B2. OBJECTIVES 1. built environment Satisfy the requirements of the Guidelines for Sampling and Analysis of Lowland Acid Sulfate Soils in Queenstand 1998. Comply with the State Planning Policy 2/02, Planning and Managing Development Involving Acid Sulfate Soils. Comply with the Environmental Protection (Water) Policy 1997. Comply with the instructions for the Treatment and Management of Acid Sulfate Soils, 2001. B3. ENVIRONMENTAL CONTROL MEASURES The following provides a list of the environmental control measures for the management for potential acid sulfate soils at the site. Environmental Control Measure Responsibility 1. The Construction Manager is to appoint an Environmental Representative to supervise and report on environmental management of the development works. Construction Manager Training to be provided to all site staff and contractors engaged in earthworks or drainage activities on the site. An emphasis should be placed on the field recognition of PASS on the site. The scope of training should also include: An outline of the sensitivity of the area to environmental harm ¢ The potential for acid generation on the site and its potential impacts e Details of the management strategies in place for PASS « Responsibilities of individuals in the implementation of the management strategies « Descriptions of PASS and how to identify them on site * Steps to be taken if PASS are encountered © Details of reporting and monitoring responsibilities Construction Manager . Accurate and up to date records must be maintained for all monitoring. Records will consist of: ¢ Testing and treatment undertaken in the management of acid sulfate soils on the site. volumes of excavated soil pH testing results liming dosage rates location of placement of fill on or off-site surface water testing results (if required) groundwater testing results Construction Manager . All complaints, sightings of indicators of acid sulfate damage or other environmental incidents, to be recorded together with any resulting investigation or response and reported to CCC. Construction Manager Golder Associates 06683025-3000(AA)
Page 100
Appendix G — Acid Sulfate Soil Revision No: 000 Construction Stage October 2006 Environmental Procedures Commercial Development Eenie Creek Road. 2 of 4 B4. 5. Maintain a supply of not tess than 0.5 tonne (check against likely | Construction daily usage) of lime (CaCO) on site at all times. A supply of | Manager hydrated (slaked) lime shall be kept on-site for the treatment of acidic waters. Treatment rate of surface water will be in accordance with SPP’. The supplies should be stored in a covered and bunded area to prevent accidental release. 6. Site access and all records must be made available to Council or | Construction Departmental officers on official business at all times. Manager 7. All surface run-off and groundwater seepage within excavated | Construction areas to be directed to a treatment or detention basin for quality | Manager correction prior to off site discharge, or reuse on site. 8. Surface runoff from undisturbed areas of the site to be isolated | Construction from active work areas by drains or bunding and directed to an | Manager approved stormwater discharge point. 9. Lime treat exposed soils in any open excavation in accordance | Construction with Section B4 Lime Application Rate and Methodology. Manager 10.Wherever practical, earthworks handling is to involve transport | Construction directly from cut to treatment/fill area on site. Manager 11. Treatment pads on site are to be contained by bund walls, | Construction constructed with non PASS (Potential Acid Sulfate Soils) or fully | Manager lime treated soils. 12. Lime is to be added to expose excavated soils in accordance with | Construction Section B4 below. Manager 13. Subgrade soil under footings and slabs to be lime treated at a | Construction rate of 5 kg/m’. Manager 14. Subgrade soil to be lime treated at a rate of 5 kg/m? for each 1m | Construction height of soil under the base of any stockpile before placement. Manager 15. If groundwater pH change exceeds the performance criteria (refer | Construction Appendix A), then treat excavation batters with a surface | Manager application of lime at 5kg/m’, 16, Monthly water monitoring reports are to be maintained on site for | Construction review by CCC or EPA, at their request Manager LIME APPLICATION RATES AND METHODOLOGY The foliowing procedure applies to the treatment of excavated soils either to be exported from the site, or backfilled into the excavation. A number of key assumptions were considered in calculating liming rates from test results, viz: e Material dry bulk density of 1.8 t/m3; e Use of a minimum safety factor of 1.5; ¢ The neutralising value of the selected liming product 2 90%. Within 18 hours, all excavated soils are to be treated at a rate of 9 kg lime/m?. Lime treatment is to be undertaken in accordance with the attached flow diagram, Figure 1. 1 Planning & Managing Development Involving Acid Sulfate Soils, State Planning Policy 2/02. Golder Associates 06683025-3000(AA)
Page 101
Appendix G — Acid Sulfate Soil Revision No: 000 Construction Stage October 2006" Environmental Procedures Commercial Development Eenie Creek Road. 3 of 4 Figure 1 Lime Application for Potential Acid Sulfate Soils Soil Spreading Spread excavated soil in layers with a maximum 300mm loose thickness. ! (———_Wiethanical Mixing ——~S~«&@Y Mechanically tum the soil to promote thorough mixing through the full depth of the layer. ! Maintain Moisture Maintain soil moisture through:(i) controlled irrigation or (ii) covering with plastic (reduce evaporation) or (iii) application of lime soon after excavation of moist soils. These measures will improve the dispersion of lime throughout the soil profile Lime Application * Add and thoroughly mix time (again using lappropriate mechanical means eg. a disk lplough or harrows) using the calculated liming rate Maximum Exposure Time Before Treatment -18 hours (overnight). Golder Associates 06683025-3000(AA)
Page 102
Appendix G - Acid Sulfate Soil Construction Stage Environmental Procedures Commercial Development Eenie Creek Road. Revision No: 000 October 2006 4of4 B5. B6. INSPECTION AND MONITORING The results of the following activities are to be recorded. Activity Frequency Responsibility 1. Maintain regular photographic record of site | Daily Construction development works associated with PASS soil Manager movements. 2. Maintain records tracking of soil movements | As required Construction around the site including diagrams, volumes and Manager soil descriptions for stockpiles in temporary storage areas as well as final placement sites. 3. Inspect the condition of stockpile batters, drains, | Weekly or Construction open trenches and structure excavations. following Manager rainfall 4. Maintain record of lime dosing rates. Per dose Construction Manager 5. Field testing of ground water in accordance with | Weekly Construction Appendix A Section A4 and AS. Manager PERFORMANCE INDICATORS Item Performance Indicator 1. Soil pH No obvious drop in localized soil pH levels associated with excavations into natural soils. Compare results to Golder’s preliminary ASS Assessment for the site dated July 2006. 2. Verify lime Verify the effectiveness of lime treatment of PASS using the treatment SPOCAS suit or Chromium suit method at a rate of 1 test per 250 m? of treated soil. 3. Water and Refer Appendix B. groundwater 4, Photo record No obvious degeneration of the aesthetic value of the open- space that may be possibly attributed to acid leachate. 5, Non All non conformances are reported to the Construction Manager conformance and rectified as soon as is practical. Golder Associates 06683025-3000(AA)
Page 103
we “w>oa Appendix H Sediment and Erosion Control Plan
Page 104
°
a 7 NMOS S¥ #025 narg youl,
¥ O1/038/870EW N¥1d_10H1N09 Noise ganas wl "al = a cnn} une ieee wpe rns | nn ng [RDA | Sta s
“ev 970 SiIV130 3D¥NIVUd ONY SXXOMGYOY sn a en re et -aord eer
soe x ni E ee roman mee ome
a
SBLVIDOSSY SHDH NIM 40) JTWAYSOON ~ int te prem ae oosn| we
G¥Ou ¥33H) 3IN3I "ININGOTIAI0 GISOdOYd 930% | criyNNSsY CY SOR MOND pieineenenne = SITVEROY CVIOSSY eee tn | em ven] sory
Siw
TIS OL LM
SE9 WOU ya1 Sa) Wd
AHS SHU DVO ATS aD
ESVaAg WGHOTS OATS
01 .@ WOU MHD 70 OL .¥.
WAONS SY KONI. 40 HOLIOS
HL MEV 20 €79 W-BOL BML YT
dophe pasestes on pessys MIL WOT LTS
YeEVd £0 105 MYTRISWAOO HO CHNOLISOS 38 OL
‘$1504 “IDOLS 10 15 KO OMEN It
GL $1504 30 DHDVES LOVE) “F waKOCTH ENT 1Y
OUIVES 20 01 Tees sos wreMs / THIS
“Pr0s NOUVINaRS LEATES
DL gE AV PL TWN OnY YRKLIOL ADArY S1SOE JANG +
WONOWLL MOW LNIATES 01 NROHS S¥ SLSOd CYROAD -
Annod on $43 1s00
1804 30 01 onnoery
ORISIAL 38 OL 4008 171
195 0 JaSHVRSED
wo WAVED GaLI¥S40>
-ANONALNTORENS
ML AQ OTV7ONO
ms a WOUEY 30H
@ NOIISaS
WIS XO TOY WORE
“yUxa1039
|
“SSVdAR ANTHAIS LNIATUd
O1 8 NYHL HIHDH 30 OL VY.
SLM
NOWVAST3
2/4 St Hid30
FHOIIE 1NI8OIS:
ORLY WNNDIY IAOHTY
20VW WH
Page 105
“ye Z 302 133HS ” wey mt ier TUNER] 20 HSN HAOHS S¥ 81005 ve peo | | ¥ sosaRa/er0eW wwvg 79uINO) NoISOWS FNaMOIS| EES TRS F Ww] el sae wun] mee a erart ee ee ee ae S1V130 JDVNIVUO ONY SXHOMOWOY ae ES q re mend ome mast cond OY ag TAN su | ew orm i Sasa SRLVOOSSY 2 SHIH N3X 194 ITTAVSOON eee resists aa wearers, an oe CVO 39H) BINID “INIWdO13AIG ISOdOYd 1230%4 | SyLYDOSSY ONY SORE ATTVE sare SINVE TERT TLV seme aan | 17020 amen Iv Av ones 2185 a NV 1d INOAVT ij + Tp MVC OID TEAL * Ne, : “3UIS NO 2SNHY HOI OTNITIW 3B OL SI THYILYW F18VLINS “ANBONBLNAGENS FHL 9O TWAGKddY NALLMIA FHL LOCH NOLINUISNOD SINARBS BOF ABYSSIIIM IVIHM YO SHLOAHLEVI $0 ANGDC FAL GWOATA 10 Can) 39 TTVHS ONTEVITD ON RHI 9 HRV “SOOHLIW ROLY ddY NY SIKH CRIS HO NOYES Ba OF 89498 FTEVILIVEE S¥ ROOS S¥ LN G3THBYD 30 OL JeY ONKGIS ONY ONUBNI sShOWUGNOD A1I5 1S OL 9AUYENISIBSTY $.WINNOD FHI AG OIBWA a AVM ONY V0 JHE AG .TOULNOD LNHOIS ONY MOISOXD HOS. HAIA DNYONDIIY GINASIO TEV SFENSVIN INBAIOVHVH LS 2AdGY HHL “INWNGLN HO. IW LEIIIY “Wen OBNVINTYH 39 OL FEV STANSWIN INBMIDVHY 1S INDY FHL SCLDTEO SV SAVeL LTS AUVHOAWIL 30A0Hd “aa123WO IEIHM OMY SLITING KIvEO TYEVL L¥ SH¥O WIM) IOIAOHE “SugLAve THd TH 20 301 FKL LY S92NGd 1S 3OKATHE PUVISD INSNIOWNVA INSAIOSS
Page 106
a
£ ys
240 | L23HS| ‘oman ae wa aw faLWAIL 90 HSa¥E : MONS S¥ 81025 oa ee
¥ @osaTy/e%oc vid TouiNo Nosous 7 INaMGS| Es ES a eet sons] entug Loves ava | a ws TE er BPE LF
oo S120 ZDVHIVED ONY SHMOAQVOY] ERT | Me OS are oma awa
‘ ‘vamernd Tres
2 ai avo nen my Fem
SRLVIDOSS % SYDH NIM 2) JTTAVSOON Tee asi, aa pate ee mt wore mn
QYOW NIRA) INIT 'LNANAOIIAIC OFSOd0Yd w27e¥4 | crYMNNGY ONY OORD ATWVE ‘STR wre SDVT WRU CAV? sexe ven | era ee stirs
Way eat TS
ean eee eee
m 6H Ka we
+
speannaa ty sa0y pened £0430)71103
v
sd
ap .
a Auyneryey sj spunessna justUo.Anue ¥y{ pUD poouegyijrU TDFvs Ht
e8 yo Aguawo ayy 420990 ApaquPMeD Jou Pp ByZeR TO sous BaNsUD Of
a Tene do SOWIGUVD UNM SAL JO TOWINOS
. tisep vo fuspurdap sayoesb ow prog volrDUNEDS
ys soy
rd ng mUONS,
oye SON)
a i ot mi mesa Be
os teve9 HOLY) WGA wpm sed Oy 4 enue a5
oust sapoads (pany
bas wypag aders
fedha we Buxpuedapl ou a WOx) WORT
Davy jUMWYIIOD wUOW adh aaa
SIHAIC TOMINOD INSNIORS BOS SVIUY INIRHILV) WOWIXVH
~jTO04| UoynUysuED MAAN mUL OL) EOL IRTEY LredsUD| IUFMBsS fesjve?
apwe-upw oye Weli2n4ysv9 Byarp prqniap weed 5m
wogg# ] WOLLIRNONd 13TH 183ATND
yD penese aayoq Key go oer my AQ 0 AIRY PINE
pune Suspaniee smuyyd patios B20 SdveL ANIWDIS 17 OO
spapaas pu paperdey rag sary syzndjeey puro tyuneTieyPO PUD peyeydem) wneg
‘soy uoj)mnaysue> pes wu AuDsKPIOU WH4se 5 NOLTTIONd 137M ATTN
Va ‘prumhes sD SDP HDR Je seg
pee Sunsqsndns ybnesyy J9pJ0 pus quedas 0 UouRIO) BUS SUH 9 94117900}
saves Cupeey mp
gmsing fun emjou deus 7) womens) emp pD eb SION OUTS Anan Bu sede, wepas yxjuos Hy pexh Hhansoow DLO) 11D
woryesqubg “suman so 4s Ke Guffey» pun ebpwep 19) W013 IDS
sueyrednig 49 apgruedses aq ay ewOI0) HIS poatsng Hertvedsny ue nee ore Oe or ome et Palast x
“Tone eyoq-koy 6D pM seaneDNE KiDAdeNy eApMN pUD ABE RY £8600)
Aapoy (unan 491) wrvomse) sed soruew ey owase) AIS, nenpneg, fauenbess 11 Basjaq jisumg E94) TORRAAS BADNTDL 0} HRLBISEP 940 TAIMED OxHEL
BIOAIT TOUINOD INAATISS
“speed wos Gump Buen osm tw9p AWD {OV
™ . Suoees bata snay, JIM 94 Ady POYDAZTAIMED AIO) Of STRLO HOTAANT JP Pu Wi] IE
suns 49470 tqusuyogue je eseg
MeL AD eno) juTMRORE gUD UEHTEL IDA ey UOWwOIN BILE | $20;D>PU BDUDMIOLING apogd esr [0 prymsisues T1BLINe peroAore 840 SYIOVIES TAIT
soap doqs yo upun
stad Ayr. typ cp Aspsenown oq Aow (s3tvd AVH 2) SHOLYESSIO 19820
buna renp xoac areyd AyomBau4is “SuADsp au) Ue UASiE “ado pasedee oo vARp wD UOT TA Bye POF mys Wed)
30 syueuyunges ye doy my 48 taquzOg WemDET 0219 sory 713001 anyon erowEp HNN soup peTAgDLe AyjDususs
e.aq 40 xUDG ‘eDIP Ind DFO pane) aq ADW SHTHO ROISYIAID
csaepaeade [sem fUD
a ri srejogsep Mw vos “suaup uereseap spnyn KHL
oes ee sqaodsupal juranpas wonitusop sepeerep Aiquenbnsuea puD iit
ueypnazrues D 4D Uersesn atranue of pautsap Aro sRTlAAp Bey
BISNAT WOUINOD NOWOUT
mysos9 [vaqu9> 04 ‘urd YosIUE> sWPEnp:
que fide “poued aououRjuyOW YY PUD UoiprnafsuE> BULA
ways OWEN peo sumyayebas Asoinyeys Te UNA AKtOO) saBs0j /eayrttag
Page 107
a _——/ et _——t -——E oe et ae ee —— ee i ee ——e a eye a Appendix | Ken Hicks & Associates Drawing 060506D
Page 108
bysoosia -o— we poe yp te bey a vrov Ly SOUR eo pD4_Oo —wHn_ 70 wy C6 ro 4 a ? women f e'+5 4 uno 4 2% m m , wz m = go wane > SZ 2 a2 a Qa => ~~ 2 wS a las z sors 3 — 3 oy o sie 3 ms vou THIS IS A PROPOSAL PLAN ONLY a AND IS SUBJECT TO LOCAL E ‘ AND ENGINEERING CONSTRAINTS. von AUTHORITY SUBDIVISION APPROVAL i= 433 —__4 AREAS AND DISTANCES ARE APPROX ONLY es amt TpeayREe) pay ir PHY Tiny BILE} ad atl ge ob Boe st . tte — = 3 905090 a ¢ AND SUBJECT TO FINAL SURVEY
Page 109
— Golder Associates Pty Ltd A.B.N. 64 006 107 857 Unit 1, Dalton Centre, Newspaper Place Maroochydore, Qld 4558 Austraila (PO Box 5569, Maroochydore 8C, Qld 4558 Austalla] Telaphone (07) 5443 3511 Fax (07) 5443 6645 hitp:/Awww.golder.com OPERATIONAL ENVIRONMENTAL MANAGEMENT PLAN COMMERCIAL DEVELOPMENT EENIE CREEK ROAD NOOSAVILLE QUEENSLAND 4566 Submitted to: BARLOW GREGG & ASSOCIATES P.O Box 200 Mooloolaba QLD 4557 DISTRIBUTION: 2 Copies — Barlow Gregg & Associates (1 hard copy; 1 electronic copy) 1 Copy - Golder Associates Pty Ltd October 2006 06683025 - 4000(AA) oe OFFICES IN ADELAIDE, BRISBANE, CAIRNS, MAROOCHYDORE, MELBOURNE, PERTH, SYDNEY, NEW ZEALAND, INDONESIA, HONG KONG, CHINA, THAILAND, PHILIPPINES etm aavectation of OFFICES ACROSS NORTH AMERICA, SOUTH AMERICA, EUROPE, ASIA, AUSTRALASIA, AFRICA. ——v,
Page 110
e Operational Environmental Management Plan Commercial Development 06683025-4000(AA) October 2006 Rev: 000 Pagei Eenie Creek Road TABLE OF CONTENTS SECTION PAGE DEFINITIONS ..csceccssssssessssssecsssssesscssscseseanseccsssecsssssecsunegsnsessnnecsutessessessersusensuneseasanenseesansecaseetee 1 GLOSSARY uo. cccecccssecesscccesssescesescensseesesceecaessensceseserseescssesasesenesseesenecsaseesseeneesnessesseceseeersesieeeseaes 2 1.0 INTRODUCTION... ceeecssssssssssscssssssescscsssssecsecsnnecsesssesessntssenetessnvecesssueesssneessuaweneeavaseenns 3 2.0 PROPOSED DEVELOPMENT ...........c:ccscsssssssscerssseesnrenseeeseeesesssceenernronsertesteeneess 3 3.0 OBJECTIVES oc eccccccessscsssssescsseesccscescenerneessescseesseceesnserenieseeeesesecsesaesaeeraeneepaesisseeaaaseren 3 4.0 DOCUMENT REVISION .,.......ccccescsccsseseesessccneessecnsreteseesesesnsenssennersnesaieeseeensseeriseeseees 4 5.0 ENVIRONMENTAL MANAGEMENT ORGANISATION CHART ....ccccseeeceeeeeesees 4 6.0 MONITORING AND INSPECTION 8.0 NON CONFORMANCE. ......csscsseseesssseceseeeeessensenenensieeanscssssesesernsnenes 9.0 AUDITING OF THE EMP ......ccecsssseseessenereeeetenerenetsssnscssecssserssenenses 10.0 COMMUNITY RELATIONS. .....ccccccccscseseressseeneneeseesseeeseenenrasnensnes 11.0 DOCUMENTATION AND REPORTING FRAMEWORK ..........05 13.0 ENVIRONMENTAL LEGISLATION .....cccccesseeeseeiesenenesereseneeeeeees 14.0 OVERVIEW OF ENVIRONMENTAL ISSUES... setseneseees 15.0 REFERENCES Qu... ccccscssseceseeresseennesesssseeneseseeceeneneeecseaniesssereeerereresesnes LIST OF FIGURES Figure 1 Site Location LIST OF FORMS Form | Concerns Register Form 2 Inspection and Monitoring Sheet Form 3 Site Induction (Attendance Sheet) Golder Associates
Page 111
Operational Environmental Management Plan Commercial Development Eenie Creek Road 06683025-4000(AA) October 2006 Rev: 000 Pageii LIST OF APPENDICES Appendix A — General Site Maintenance Appendix B — Water Quality Management Appendix C — Water quality Management Plan Appendix D — Ken Hicks & Associates Drawing 060506 Golder Associates
Page 112
Operational Environmental
Management Plan October 2006
Commercial Development
Eenie Creek Road
06683025-4000(AA)
Rev: 000 Paget
DEFINITIONS
Environmental Harm -
Environmental Nuisance -
Material Environmental Harm -
Serious Environmental Harm -
any adverse effect, or potential adverse effect (whether
temporary or permanent and of whatever magnitude,
duration or frequency) on an environmental value, and
includes environmental nuisance.
is unreasonable interference or likely interference with an
environmental value caused by
{a) noise, dust, odour, light; or
(b) an unhealthy, offensive or unsightly condition
because of contamination; or
(c) another way prescribed by regulation. ”
“Material environmental harm” is environmental harm
(other than environmental nuisance)
(a) that is not trivial or negligible in nature, extent or
context; or
(b) that causes actual or potential loss or damage to
property of an amount of, or amounts totalling, more
than the threshold amount but less than the
maximum amount; or
(c) that results in costs of more than the threshold
amount but less than the maximum amount being
incurred in taking appropriate action to
(i) prevent or minimise the harm; and
(ii) rehabilitate or restore the environment to its
condition before the harm.
“Maximum amount” means the threshold amount for
serious environmental harm.
“Threshold amount” means $5000 or, if a greater amount
is prescribed by regulation, the greater amount.
“Serious environmental harm” is environmental harm
(other than environmental nuisance)
(a) that causes actual or potential harm to environmental
values that is irreversible, of a high impact or
widespread; or that causes actual or potential harm to
environmental values of an area of high conservation
value of special significance; or
Golder Associates
Page 113
Operational Environmental 06683025-4000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page 2 Eenie Creek Road GLOSSARY ANZECC ARMCANZ NSC EMP OP-EMP DO SS EPA EAR (b) that causes actual or potential loss or damage to property of an amount of, or amounts totalling, more than the threshold amount; or (c) that results in costs of more than the threshold amount begin incurred in taking appropriate action to (i) prevent or minimise the harm; and (ii) rehabilitate or restore the environment to its condition before the harm. “Threshold amount’ means $50,000 or, if a greater amount is prescribed by regulation, the greater amount. Australian & New Zealand Environment and Conservation Council Agricultural and Resource Management Council of Australia and New Zealand Noosa Shire Council Environmental Management Plan Operational Environmental Management Plan Dissolved Oxygen Suspended Solids Environmental Protection Agency Environmental Assessment Report Golder Associates
Page 114
Operational Environmental 06683025-4000(AA) Management Pian October 2006 Commercial Development Rev: 000 Page 3 Eenie Creek Road 1.0 INTRODUCTION This OP-EMP has been prepared in order to manage and minimise the impact on the environment of the commercial development on Lot 1 on SP182880, Fenie Creek Rd, Noosaville 4566. The location of the site is shown on Figure | (Site Location). 2.0 PROPOSED DEVELOPMENT 21 Site Description The real property description of the site is Lot 1 on SP182880 and covers a total area of approximately 14 hectares. The northern boundary of the site adjoins Eenie creek road with a large environmental park covered in vegetation. A number of access tracks exist throughout the site and with a fire trail along the eastern boundary 2.2 Description of Development Plans provided by Barlow Gregg & Associates drawn by Ken Hicks Associates (Drawing No. 060506, 01/06/2006 Appendix D) show details of the site layout. The development consists of thirteen commercial lots and a single environmental parkland lot. It is intended that a majority of the allotments will contain commercial offices. 3.0 OBJECTIVES The objectives of the OP-EMP are to: e Protect life, health and well being of human and other forms of life; e Protect the local amenity; « Base the environmental management of the development in accordance with the principles of Ecologically Sustainable Development (ESD), * Inform land owners and lessees of appropriate safeguards and control measures to be implemented to minimise the environmental impact; ¢ Comply with relevant statutory environmental requirements, ¢ Provide strategies aimed at minimising environmental harm during the construction stage; and ¢ Provide an Environmental Management System, generally based on the key elements of the AS/NZS ISO 14001-1996 Environmental Management Systems — Specification with Guidance for use. A copy of the EMP and associated forms and registers will be supplied to all landowners. Golder Associates
Page 115
Operational Environmental 06683025-4000(AA) Management Plan October 2006 Commercial Development Eenie Creek Road Rev: 000 Page 4 4.0 DOCUMENT REVISION The following table outlines revisions made to this document. Revisions to the document are made to reflect changes to environmental procedures, environmental management, or the findings of environmental monitoring. Date Nature of Revision Editor Any complete revision of the document will be accompanied by a new revision number (ie 001 in the upper right hand comer of reissued pages). A copy of the revisions to the OP-EMP will be sent to land owners and be disseminated to all relevant tenants. 5.0 ENVIRONMENTAL MANAGEMENT ORGANISATION CHART This section outlines the framework that will be used by the Landowner to manage, document, and report on environmental issues for the development. Landowner Body corporate Lessee / Offices The Landowner is ultimately responsible for Environmental Management. The Landowner will identify which actions are to be delegated to those responsible for managing environmental issues. Golder Associates
Page 116
Operational Environmental 96683025-4000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page 5S Eenie Creek Road 6.0 MONITORING AND INSPECTION Environmental inspections will be carried out by means of a quarterly meeting of responsible personnel and a site walk through. This will be used to identify any areas of non- conformance or opportunities for improvement. Any non-conformances will be reviewed at the quarterly meeting. Monitoring is to be documented as outlined in Section 11.2 and monitoring programs will be modified based on the findings of site inspections and/or results of testing. 8.0 NON CONFORMANCE Any non-conformance to the OP-EMP must be addressed as soon as is practicable. The personnel responsible for the non-conformance must be notified immediately for purposes of issuing rectification instructions. Non-conformances are formally documented through an audit report (Refer Section 11.3). 9.0 AUDITING OF THE EMP 9.1 Responsibilities The daily activities at the development will be audited for compliance with the OP-EMP and its procedures by the environmental auditor. The environmental auditor will be appointed by the land owner. It is the environmental auditor’s responsibility to: 1. Provide an independent assessment of compliance with the Environmental Procedures in Appendices A and B. 2. Report on observed activities that have, or may cause, an impact to the environment or non-conformance to regulation. 3. Provide recommendations to the land owner regarding practical initiatives that can be employed to improve the effectiveness of environmental management at the development site. 4. Provide a copy of the Environmental Audit Report to the land owner. Golder Associates
Page 117
Operational Environmental 06683025-4000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page 6 Eenie Creek Road 9.2 Frequency The frequency of Environmental Audits from commencement of site activities will be as follows: * Quarterly during operation. 10.0 COMMUNITY RELATIONS Where concerns are made by the community or third parties to the land owner, or individuals under their direction, these will be forwarded to the land owner immediately. The process for dealing with concerns is documented in Section 11.4. 11.0 DOCUMENTATION AND REPORTING FRAMEWORK The following documents relate to environmental performance and form part of the OP-EMP: 1. Operational Environmental Management Plan (OP-EMP); 2. Environmental Procedures (Appendices to the OP-EMP); 3. Inspection and Monitoring Records; 4. Environmental Audit Reports; 5. Concerns Register; and 6. Rectification Requests and Instructions. Items 3 to 7 are defined in the following sections. 11.1 Records of Inspection and Monitoring The outcome of the quarterly meeting and site walk through will be recorded on the inspection form given in the List of Forms. Any monitoring that requires more frequent attention will be completed as required and recorded on the Inspection & Monitoring Sheet. The originals of these sheets shall be kept at the site office (Form 2). Golder Associates
Page 118
Operational Environmental 96683025-4000(AA) Management Plan October 2006 Commercial Development Eenie Creek Road Rev: 000 Page7 11.3. Environmental Audit Report The Land Owner will appoint an independent auditor to carry out audits of the implementation of the OP-EMP. A copy of the environmental audit report shall be provided to the Land Owner. 11.4 Concerns Register Complaints will be directed to the land owner who will issue the concern to the appropriate personnel for action. A hard copy record of all concerns will be kept at the Site office and filed for future reference, if required. (Form 1). The concems register will record the following information: 1. Details: Name, address and phone number. 2. Nature of concern: Detail of issue, date of incident, people involved, and location. 3. Action taken or required: Any action proposed or undertaken to address the concern, including time and date. 4. Response to Action: Was the complainant satisfied with the outcome of the actions taken, if not, what else needs to be done, or is it outside the scope of the development works. 5. Prevention or re-occurrence: What action has been taken by the nominated responsible person to ensure the problem will not re-occur. 11.5 Rectification Requests and Instructions Non-conformances will be documented on the Inspection and Monitoring Form. The form states the nature of the non-conformance and the mechanisms implemented to rectify the problem. A copy of this form shall be undertaken by the Land Owner on a quarterly basis, immediately in the case of emergencies, or significant non-conformance. 13.0 ENVIRONMENTAL LEGISLATION The construction activities must conform to the relevant Environmental Protection Policies and environmental regulations promulgated under the Environmental Protection Act 1994. A brief discussion of the key elements of each of the Acts and the relevant aspects of the Environmental Protection Policies is provided in the following sections. Golder Associates
Page 119
Operational Environmental 06683025-4000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page 8 Eenie Creek Road 13.1. Environmental Protection Act 1994 The principal legislative vehicle for environmental protection in Queensland is the Environmental Protection Act, 1994 (EP Act). General Environmental Duty Under the EP Act, all people have a general environmental duty to take all reasonable and practicable measures to carry out any activity in a manner that prevents or minimises environmental harm. 13.2 Environmental Protection Policies Environmental Protection Policies (EPPs) within the EP Act are used to control and reduce environmental pollution and harm and nuisance. They are briefly summarised below. Environmental Protection Water Policy 1997 The purpose of this policy is to achieve the objectives of the EP Act in relation to Queensland waters. Under this policy, it is an offence to release or deposit the following into, or put in a place where it could reasonably be expected to move or be washed into a gutter, stormwater drain or water: a) rubbish; b) scrap metal, motor vehicle parts, motor vehicle bodies or tyres; c) building waste; d) sawdust; e) solid or liquid waste from an on-site domestic waste water treatment system; f) cement or concrete; g) a degreasing agent, paint, varnish or paint thinner; h) any manufactured product, or any by-product or waste from a manufacturing process, that has a pH less than 6 or greater than 9; i) an insecticide, herbicide, fungicide or other biocide; and j) oil. It is also an offence to allow stormwater run-off into a roadside gutter, stormwater drain or a water that results in the build-up of sand silt or mud in the gutter, drain or water (Note: the offence also applies if a person deposits sand, silt or mud in a place where it could reasonably be expected to move or be washed into a roadside gutter, stormwater drain or a water body resulting in the buildup of sand silt or mud in the gutter, drain or water). Golder Associates
Page 120
Operational Environmental 06683025-4000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page? Eenie Creek Road 14.0 OVERVIEW OF ENVIRONMENTAL ISSUES This section provides a brief overview of environmental issues associated with the construction of the proposed unit development. 14.4 Water Quality During rainfall events, uncontrolled runoff leaving the site could potentially cause turbid water to enter the stormwater system. Solid waste and soil stockpiles, unvegetated and unsealed carparks, concrete wastes and fertilisers are some sources with the potential to contaminate surface water. The water quality monitoring program for the development is contained in Appendix - B Water Quality Management. Performance criteria for surface water exiting the site have been established using the Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2000 for a “fresh” receiving environment. 14.5 Solid Waste Solid wastes will be produced from a range of waste streams. Waste management practices will be to achieve, where possible, the adoption of the following waste management hierarchy: ¢ Waste Avoidance; e Waste Reuse; e¢ Waste Recycling; e Energy Recovery From Waste; and e¢ Waste Disposal. 14.5.1 Storage and Disposal of Waste Wastes would be sorted by type with each individuals being responsible for ensuring that wastes are placed in the appropriate bin or disposal location. Bins would be colour coded or labelled according to the type of waste to be deposited with clear signage on each bin. Bins would be provided where appropriate depending on the stage of the development. In keeping with the waste hierarchy, the first step in the waste management process would involve reducing the production of wastes through efficient planning of resources. Secondly, those wastes produced would be reused on the site where possible. Where reuse is not possible the waste would be recycled via the colour coded bins/skips. For non-recycled wastes energy recovery methods would be employed before final disposal to landfill. Golder Associates
Page 121
Operational Environmental 06683025-4000(AA) Management Plan October 2006 Commercial Development Rev: 000 Page 10 Eenie Creek Road 14.9 Flora and Fauna The sensitivity of the surrounding vegetation requires management of impacts on surrounding flora and fauna. Clear signage is to be in place for areas not to be entered 15.0 REFERENCES The EMP has been prepared based on information supplied by the following reports, and based on the requirements of the following legislation. Environmental Protection Act 1994 Environmental Protection Policy (Water) 1997 Environmental Protection Regulation (1998) Environmental Protection (Waste Management) Policy 2000 Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2000, ANZECC/ARMCANZ. 6. Brisbane City Council, Best Practice Guidelines for the Control of Stormwater Pollution from Building Sites (2000). wRYeNOT QD | Daniel Joyce BSc(Env Science) Geoff Hurley MSc DIC C.Geol RPEQ 5716 Ecologist Associate Office Manager J\2006\Environmental\06683025\TASK_3000 EMP\00_CORRESPONDENCE\OUTIOP works\AB06683025-3000r.doc DINGAHdij Golder Associates
Page 122
_Figures y = ab $d
Page 123
= Enarged Wop
Pry td Unautnanees ose of rezioducson of ia pan ether whoby oi pan wine wrtlan parcsion anges copyToh. © Goklas Associates Ply is.
. —_
7h t
“S-Subjest Site “4
Barlow Gregg & Associates.
Commercial Development Eenie Cr Road.
DJJ
ATE
04/10/06
DATE
Site Location
Inlornation contaned on fie ceavarg isthe copytigtt of Gokdas
* 1£:19000 (Approx.)
lA4
06683025
FIGURE No
‘J:\2006\Environmentah06683025\TASK_3000 EMPW3_FIGURES_DRA\
ig 1
Page 124
Forms —_——— _ _— -_ ~ — — ——5 —s 4 Hy - a - - = a
Page 125
Lot 1 SP156690 Mawhinney Road Complainant Detalls: Name: Address: Contact Phone No. Nature of Concern: Detail of Complaint: Location of Incident: Date of Incident: Persons Involved: Action Taken or Required: Action Required (Y/N): Time/date of Action: Type of Action: Responsible Person: Follow Up Remedial activities performed : Complainant Response To Action: Further Action Required ? (Y/N) if Yes, Details of Further Action Required: Prevention Of Re-Occurrence Preventative Action Required ? If Yes, Details of Further Action Required: Form | CONCERNS REGISTER Golder Associates Complaint No. Date : Time: Received by: Concern Received By: Telephone: In Person: In Writing: Performed by: October 2006
Page 126
Lot 1 SP156690 Mawhinney Road INSPECTION & MONITORING SHEET Environmental Procedure: Responsible Person: ’ [Date of inspection: Weather durin jin riod: . [Personnel ent during in tion: Form 2 Golder Associates October 2006
Page 127
Site Induction Form (Attendance Sheet) el eonon = October 2006 Form 3 Golder Associates
Page 128
Appendices - = =- = - = —_— — — —
Page 129
Appendix A — General Site Maintenance Environmental Procedures Commercial Development Eenie Creek Road. Al, ENVIRONMENTAL VALUES The overali protection of the surrounding environmental life, health and wellbeing of humans. A2. OBJECTIVES 1. To meet the requirements of the Environmental Protection Act 1994, all Queensland Environmental Protection Policies. 2. Minimise impact on the environment, specifically on the amenity of The surrounding premises, from operation of the proposed development. A3. ENVIRONMENTAL CONTROL MEASURES _ The following provides a list of the environmental control measures for the general management of the site. Environmental Control Measure . . Responsibility 1. Ensure that all open park areas remain open. Land owner 2. Open areas of the site are to be regularly slashed. Land owner 3. Park reserve is to be weed* free. Land owner 4. Fire trails are to remain clear to ensure clear access at all | Land owner times. 5. Revegetation areas are to meet guidelines of the revegetation | Land owner plan and be established in a manner that ensures deceased individuals are replaced and canopy coverage is established. 6. Landscaping is to be adequately maintained to ensure access | Land owner and visual amenities are met. 7. Maintain a high standard of housekeeping and ensure that | Land owner materials that are likely to attract vermin are properly disposed of. 8. Dispose of any waste illegally dumped at the site. Land owner 9. Storm water quality devices are maintained, swales are | Land owner adequately vegetated, cleaned and slashed. * Class 1, 2 &3 weeds as defined by the Pest and Stock Route Management Act 2002 and Noosa Shire Council Worst Weeds. A4. INSPECTION AND MONITORING The following inspection and monitoring program will be conducted at the site. The results of these activities will be recorded on the inspection/monitoring data sheets provided with the OP-EMP. Activity : a Frequency Responsibility 1. Inspect open park areas are open and do | Quarterly Land owner not contain storage or being used as car parks. 2. Inspect open park areas and ensure that } Quarterly Land owner the site is ascetically pleasing and slashed to an appropriate level. 3. Inspect park reserve including vegetative | Quarterly Land owner areas, gardens and revegetation areas do not contain weeds * Golder Associates 06683025 - 3000(AB)
Page 130
Environmental Procedures Commercial Development Appendix A — General Site Maintenance Eenie Creek Road. Activity Frequency Responsibility 4. Inspect site for general tidiness and | Quarterly Land owner illegal dumping of wastes. 5. Inspect swales and weir for appropriate | Quarterly Land Owner vegetation cover. 6. Inspect swales and weir for inappropriate | Quarterly Land Owner litter. A5. PERFORMANCE INDICATORS Item my Performance Indicator 1. Open areas No incidences of storage or car parking. 2. Fire trail Access is achieved, contains no obstacles. 3. Site Site remains tidy. No complaints from local community or Housekeeping relevant regulatory authorities. 4. Site No occurrence of illegal dumping of waste at site or in general Housekeeping site waste bins. 5. Weed control No occurrence of weeds* 6. Litter Minimal liter caught within swales and weir. 7. Vegetation Complete vegetation coverage of grassed swales. Golder Associates 06683025 - 3000(AB})
Page 131
Appendix B — Water Quality Environmental Procedures Commercial Development Eenie Creek Road. Bi. B2. B3.. B4. B5. ENVIRONMENTAL VALUES The protection of surrounding surface water and groundwater. OBJECTIVES Control potential sources of contaminated stormwater. PON> Comply with the Environmental Protection (Water) Po. local laws, codes and policies. a Limit environmental impact on adjacent residential and commercial premises. Manage all discharges of water from the construction site. licy 1997, and NSC Use the Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2000 for the protection of environmental values. "ENVIRONMENTAL CONTROL MEASURES The following provides a list of the environmental control measures for management of surface and ground waters at the site. Environmental Control Measure. Responsibility | 1. All stormwater will be managed in gecordance with the stormwater treatment Appendix C. Construction Manager INSPECTION AND MONITORING. The following inspection and monitoring program will be conducted at the site. Activity:* : vO, . ‘Frequency Responsibility 1. Inspect disturbed areas for signs of land e Quarterly tainfall event*. Construction erosion or deterioration. e After each major Manager *> 25mm within a 24 hour period. PERFORMANCE INDICATORS - Item < - Performance Indicator 1. Surface Water All control systems are maintained in good working order. Control System Surface water is separated from disturbed and undisturbed areas. 2. Non conformance | All non-conformances are reported and rectified. Golder Associates 06683025- 3000(AB)
Page 132
‘ — —— —t at —— et + Appendix C Water Quality MAnagment Plan
Page 133
Fae eee MINVAGL #0 Worive WAOHE SY 9105 d/890EW =e SS aun] aneenas 01 08 sp WHO) We aus 14 “on ORO Wi man monet shes 7 =a S130 WALWAMUOLS | TES eae ex] shiva TAN rom aa 1m OST} SINIHdOT3AIO 17 S 40) ITIAYSOON rar a aon fa yaad er nanaanen Pal QVOY 33H FINYDI ININADTZAIO A3SOdOYd 493M | crLyNOSSY ONY OR ACHING ‘STON saw SIRVIVISROS USIVIOSST seen “ax | "0 8] eneey Weis NQILIIS SSOYI IWIIdAL wow NOWIIS SSO¥) YIM - @ NOWLIIS sx0NNY QYOU NOd - ~ HRIVAMHOLS BIST . 95 ssveo any > [ _ ee %= 101 HOBd Ee He wivatoor 2OYNYAD 1 30H OFOR e 2 ws. - ass Ey - ett9 3 i a a & i kes g ; i” g gpg nouAn an —! . weet THNNVH) NadO TWoldAl - W NOILIAS wemNGILIIS DNOT WIidAL Jetd DR1¥HOId Bot SHOLYIED2ES 350M “mors M01 YO AWIGAL) S384 01 Yau NOILMIL ZICH — LRIAME TLTEIMO) JOA OTE, MOU ADT pase xz ] Se | ssn— AES taal saad | > | re | — HOW M01 BOS *Z J) at | -— f le ao . 1 S 1 norsaza0 WW uBA
Page 134
RAGHS SY M1005. ay Fa
SEES we a man Sa
20/084/8108H =a | eS , "a ayo woul] oneness et ea canon] any ts
$101 133Hs| eS BS 7a aOR ‘
M940] — UOAVT BBLVMWYOLS ONY SHOMOVOY| mwas mene = ern ax nop ve ON RT om] ony
wy ge “en gun | Seu nee Oe Zs Meine renin im se emayo WATT
Here S weet mn irae
S31vI0SSV_¥ SHIH NBN J) STUAVSOON oe acate su wiht pone se a Soa
vou N38) INS) “NNO13A30 O3S0dOUd w>s.o8e | uyNSsY CNY SOR ATIOE era = CSIRVEVORDY CVSS? we ye) sma eee] uray
| i We @ te TS
S38 wel
29 wana a Roreest
AlNTen EL YAMEDIS i
. =
sof
Theeag 2 z
?:
PERTRR
TAA LnBACBe
=O sivas iweas—
me \ “*. 7 L" (AO1 shes7t
WWO8Y NOLLVARS TAG 0 Xoved DMLSIG
TEN AMOS ANS \ LY LIGA Kot
TT¥aS sawO - $50 % patisx? Grd AYATEULYAO08
vv _ —AREMHS BOA EE CISOMEEE
-— — fn
a
2
gs
a
=>
a
Led
=
&
PY
So
(NOLLINYLSNO YACNN}
JULNID
sS3Nisna
3TNAYSOON
{f
if
i
{
\
\
\
ANOAYT 13785 oY \ &
QNIDI1 HOS ANOAWT TLIS HF4TE \ ie
Ws \
‘
a
Page 135
co/arys! om nn net lv on wut er MOANVAGL 30 WHOAS S¥ 90 ey eakag
onysar0eH sezums| S28 “SS or [| aun woona| ing 4 aay ee ee .
INGAY YULVMHYOLS ONY SHBOMOVOU| me's weeks re: ‘eps na raped 20] omy Pkt oY
fuego ™ su | "She or OY as cane ii ts Ga bon fan erty | ‘way WAR
sen S ee sera ra oy fete
CRAY DOSSY 2, SHDH NOY. 04 TTTAYSOON errant ss tain preas nn om
VOU ARH) 3INAI “ININOTIARG CISOdOed D30Ws minha mam md
, 3 Oud SAIYDOSSY ONY DOI) ATTAVE Sh seomn tax | 170% ers
Ve in awe
SS
@ ma 8
Pe for
r ALMYAD WBLYAMTOLS.
Pry Naren)
+ MINION YANEOLS:
onzonn ood INGLY ts USER
(NOLLINULSNOD_UIONN 702) Wd AnOAYT 22
HIND) ONDE
ssanisna
ATHAYSOON a
Page 136
nd Appendix D Ken Hicks & Associates Drawing 060506D
Page 137
Amand. ) Drawing No, 060506 0 ke re KAJ i fle wv tees = 1:1500 woe 1 ot 1 wens ma S & L pet PROPOSED RECONFIGURATION OF OF LOT 1 ON SP182880 LOTS 1 - 5° PARISH OF TEWANTIN
Used in these records
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.