SITE REHABILITATION PLAN

LOT 1 RP215933, EENIE CREEK ROAD

NOOSAVILLE

JUNE 2007

A REPORT TO KEN HICKS & ASSOCIATES PTY LTD

Brisbane Office Head Office Sunshine Coast Office

Suite 28 Cathedral Village PO Box 490 . Office 12 Caloundra City Centre
115 Wickham Street ALSTONVILLE NSW 2477 51-55 Bulcock Street

FORTITUDE VALLEY QLD 4006 PH: (02) 6628 6778 CALOUNDRA QLD 4551

PH: (07) 3257 2703 Fax: (02) 6628 6779 PH: (07) 5437 8011

Fax: (07) 3257 2708 : Fax: (07) 5437 8022

 

 

 
Full text of the other 136 pages

Page 2

1.

o
eZ

Site Rehabilitation Plan

Table of Contents

 
 
 
 
 
  
  
 
 
 
 
 
 
 
  
 
 
 
 
  
 
 
 
 
 
 

INTRODUCTION ......ccesccccceececceccesesccececteccscnsensenscassassecsensessessesseneessons 3
Background....... 3
Site Description........... 3
Open Space Designations....................068 4
Performance Objectives............c0:ceeeeeeee 5

REGENERATION STRATEGY ..... 6
Introduction.......... .6
TIMING «0... eee e cece eee 6
Personnel / Procedures .......... 7
Thinning of Dense Undergrowth............2..22.0068 7
Weed Control Methods ............csceseeseesereereees ..8
Primary Weeding ......... 9
Boundary Marking ..................eeeeeeee . -10

REVEGETATION STRATEGY ....--sseceessncvcesces wee 11
Introduction............ cc eece eee ese ee vee I
Personnel, Procedures and Timing ..............2....e eee eee ee . 1

2.1 Revegetation PhaSeS.........cccccc cee sc ca ceaeeeceaeesenseecensesaee 97
2.2 Personnel..........0.. 12
2.3 Propagation ........ccsceceseereeeeee 12
2.4 Site Preparation (Weed Control) 2 13
2.5 Revegetation Works ...........0645 .. 13
2.6 Planting Program ... ..14
2.7 Fire Management ..... 15
2.8 Long term management. 015

MONITORING .....cccccceveccesecccescssccercecseosense 16
Introduction vee 16
Performance Targets ............. wee 7
Reporting of Monitoring Results.............ccccccceeeeeseeseseenceeeecensenes weed

Completion of Reporting ..........cccceceecee ee eee eee eeeeneeeeeseteesseereeeene
TIMING AND RESPONSIBILITIES ...
SUMMARY .....ccccescscvescsccccnsccecssenscnsesesececsecssceeessecseccees

 

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 2

Page 3

a ®

vase

Site Rehabilitation Plan

 

1. INTRODUCTION
1.1 Background

James Warren & Associates (JWA) have been engaged by Ken Hicks & Associates, on
behalf of S & L Developments, to prepare a Site Rehabilitation Plan (SRP) for the
proposed development site at Eenie Creek Road, Noosaville.

The subject site forms a part of land envisaged to be developed as the Noosa Shire
Business Centre (NSBC). The NSBC, including the subject site, is the subject of Master
Plan Stage 2 (MP2), which sets out future land uses within the NSBC. Stage 1 of the
NSBC occurs immediately to the east of the subject site and is currently under
development. A number of vegetation surveys and management plans were completed
as part of the Stage 1 development process and which are relevant to this VMP. These
include:

e WBM Oceanics (1999) - Eenie Creek Flora and Fauna Impact Assessment
Study;

e URS Australia Pty. Ltd. (2002) - Noosa Shire Business Centre Environmental
Management Plan;
URS Australia Pty. Ltd. (2003) - Concept Stormwater Management Plan;
Chenoweth Environmental Planning and Landscape Architecture (EPLA)
(2004) - Vegetation and Landscape Report; and

e Landscape Assessment, Management and Rehabilitation Pty Ltd. (2004) -
Flora Report (Planning and Environment Court report for Appeal no. 48 of
2003).

1.2 Site Description

The subject site is located at Eenie Creek Road, Noosaville and is described as Lot 1 on
RP215933, Parish of Tewantin, Shire of Noosa (FIGURE 1). The site is bounded by Eenie
Creek Road to the north, industrial development to the west, Eenie Creek to the south
and Stage 1 of the NSBC to the east. The subject site is approximately 21.47 hectares
(ha) in area.

The topography of the subject site is slightly undulating and generally slopes to the
south towards Eenie Creek. Numerous depressions occur throughout the site,
particularly within the lower-lying areas to the south. A drainage lines occurs within
the eastern portion of the site, which joins to a drainage line within Stage 1 of the
NSBC to the east, below the Q100 Average Recurrence Interval (ARI) level at RL 2.8 m
level (URS 2006). After prolonged rainfall, ponding of water occurs within depressions
along the drainage line, predominantly below Q100 (URS 2003). A small constructed
dam is located in the central portion of the site.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 3

Page 4

 

 

 

 

Lake
Weyba
Legend
—] Subject Site
LJ] Noosa Shire Business Centre
0 500m
[Ss
m CLIENT TITLE
SGUREEs GrsbaretIBD Ken Hicks & Associates Pty Ltd FIGURE 1
; PROJECT
SCALE: 1: 20000 @A4 Site Rehabilitation Pian PREPARED: BW LOCALITY
Lot 1 on RP215933 PLAN

 

 

JAMES WARREN & ASSOCIATES PTY LIMITED
Environmental Consultants

Eenie Creek Road, Noosaville, QLD
Noosa Shire Council LGA

 

DATE: 06 June 2007
FILE: Q06030_SRP_Locality.cdr

 

 

 

Page 5

 

Site Rehabilitation Plan

 

The vegetation within the site is composed of predominantly Swamp mahogany
(Eucalyptus robusta) and Broad-leaved paperbark (Melaleuca quinquenervia) in the
southern portion and Flooded gum (E. grandis) and Red mahogany (E. resinifera) occur
in the northern portion. Much of the vegetation within the site was cleared during the
1970’s and subsequent regrowth vegetation has been subject to frequent fire events.
An aerial photograph depicting vegetation coverage is presented in FIGURE 2.

A child-care centre and other associated built infrastructure occurs within the
northern portion of the site. In addition, numerous vehicle tracks occur throughout the
site.

The approved layout plan for the Subject site is shown in FIGURE 3.

1.3 Open Space Designations

Vegetation will be retained within Open Space Areas in accordance with the Open
Space Management Plan (OSMP) (JWA 2007) as follows:

Open Space (Conservation and Waterway Protection):

The OS2 (Conservation and Waterway Protection) area is to be retained in a near-
natural state, therefore limited infrastructure is required within this area. Some
clearing of vegetation may be required for fire trails/breaks. Public access to Eenie
Creek will not be encouraged. Walking tracks and jetties will not be constructed.
Playground and picnic facilities, rubbish bins and other facilities associated with
recreational parkland will not be provided.

Vehicle access will be kept to a minimum and limited to fire and emergency vehicles
and Council maintenance vehicles, All unnecessary existing tracks and trails witl be
closed off and rehabilitated and vehicle access points will be limited to as few as
possible.

The Fire Management Plan (JWA 2007) recommends that a fire break be created within
this area to provide access for fire fighting vehicles and to ensure compliance with
bushfire management objectives. This fire break will have a minimum width of ten
(10) metres, which will involve the clearing of all vegetation. Other fire breaks will be
created within this Open Space area, however these will require the clearing of
vegetation to a four (4) metre width. The location of all fire breaks will take into
account the requirement to retain habitat trees, where possible.

Open Space (Preservation of Visual Amenity):

 

The Open Space: 083 and OS6 areas will be retained primarily for screening purposes.
Proposed works within these areas shall be limited to minimal landscaping and
supplementary plantings of endemic species. Adjacent infrastructure such as
footpaths, lighting and signage and stormwater control devices/measures may be

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 4

Page 6

 

0 100 200m
pS! peng Ck)

Legend
Subject Site
Noosa Shire Business Centre

 

 

 

 

 

 

 

SOURCE: Google Earth 2006 Aerial Photograph

SCALE: 1: 8000 @A4

 

JAMES WARREN & ASSOCIATES PTY LIMITED

 

 

Environmental Consultants

 

 

 

CLIENT

Ken Hicks & Associates Pty Ltd
PROJECT

Site Rehabilitation Plan

Lot 1 on RP215933

Eenie Creek Road, Noosaville, QLD
Noosa Shire Council LGA

 

FIGURE 2

PREPARED: BW
DATE: 06 June 2007
FILE: Q06030_SRP_Aerial.cdr

 

TITLE

AERIAL
PHOTOGRAPH

 

 

Page 7

 

 

 

 

 

B1

B2

B3

Ee

E2

E3

E4

E5

E6

E7

os1

os2

OS3

Os4

oss

OS6

OS7

RES

Legend

BUSINESS

(Retail Centre & Business)

BUSINESS

(Car Parking & Offices)

BUSINESS

(Showroom, Offices & Business)
EMPLOYMENT

(Technology Based R&D Business Offices & Civic)
EMPLOYMENT

(Educative & Environmental R&D Business & Offices)
EMPLOYMENT

(Environmental R&D Business & Offices)
EMPLOYMENT

(Industry & Business)

EMPLOYMENT

(Industry & Business)

EMPLOYMENT

(Business Offices & Transit)
EMPLOYMENT

(Business & Offices)

OPEN SPACE

(Environmental)

OPEN SPACE

(Conservation & Waterway Protection)
OPEN SPACE

(Preservation of Visual Amenity)

OPEN SPACE

(Environmental Drainage & Conservation)
OPEN SPACE

(Preservation of Visual Amenity)

OPEN SPACE

(Preservation of Visual Amenity)

OPEN SPACE

(Environmental Drainage)
RESIDENTIAL

(Employment Support)

 

 

 

REC/MU RECREATION MINOR MIXED USE
(Minor recreation / minor mixed use or open space)
Bicycle Path
Walking Path
RL 2.8
re tl.)
[9 082 Conservation & Waterway Protection
L_] OS3 Preservation of Visual Amenity
HM 084 Environmental Drainage & Conservation
GN «OSG Preservation of Visual Amenity
co Subject Site
Noosa Shire Business Centre
0 150m
ce I
14: 5000
SOURCE: Hopgood Ganim Lawyers (05.04.04) | CLIENT TITLE
(Ref: Stage2Masterplanv6.pdf); URS Flood aries & Associates Ply Ltd FIGURE 3
Inundation Line JECT OPEN SPACE
SCALE: 1: 5000@A3 eee een PREPARED: BW AREAS
JAMES WARREN & ASSOCIATES PTY LIMITED |}, DATE: 06 June 2007
Environmental Consultants ‘enie Creek Road, Noosaville, QLD
Noosa Shire Council LGA FILE:Q06030_SRP_Open Space.cdr

 

 

 

 

 

 

 

 

 

Page 8

Hg

Site Rehabilitation Plan

 

included as part of the detailed design stage however, shall not adversely impact on
the existing native vegetation.

Open Space (Environmental Drainage and Conservation):

All native vegetation in this area will be retained. No infrastructure is proposed to
occur within the OS4 area as all stormwater will be treated prior to discharge into the
drainage line.

1.4 Performance Objectives

The aim of the SRP is to specify actions to be undertaken to restore the natural
ecological processes and facilitate ecological sustainability of the areas OS2, 053, 0S4
and OS6. The objectives of this plan are:

° Overall enhancement of the current vegetation in the Open space areas;

. To regenerate relevant areas through thinning of dense fire-induced
undergrowth that has stalled natural regenerative processes;

. To revegetate with reinforcement plantings of local species with a view to
ameliorate structural deficiencies, biodiversity deficiencies or habitat
deficiencies;

° To provide specific actions to be undertaken for wetland areas using species

endemic to the site so that they become viable and efficient systems in

terms of stormwater management, as well as self-sustaining ecosystems;

To provide required visual screening;

To improve the value of the subject site as habitat for fauna groups;

To manage weeds using plantings of native species; and

‘To utilise endemic species to reduce nutrient and sediment toads and other

potential impacts arising from the proposed development.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 5

Page 9

 

Site Rehabilitation Plan

 

2. REGENERATION STRATEGY
2.1 Introduction

Portions of the vegetation within Open space areas have experienced historical and
current anthropogenic alterations (e.g. fire, grazing, slashing and clearing). This
modification has provided a series of opportunities for weed species to invade the
subsequently fragmented communities. Following natural regeneration, foreign
species have persisted and competed with native species for limited resources (e.g.
light, nutrients and water). Also in some areas, dense growth of native shrub species
has resulted in a monoculture within the understorey and has stalled natural
regenerative processes. This acts as a limiting factor to native regeneration.
Therefore, in order to enhance the natural values of the site, thinning of dense fire-
induced vegetation as welt as weed control and weed removal techniques are required
in varying circumstances.

The objectives of the site regeneration strategy are to:

Thin dense fire-induced undergrowth;

e Remove weeds utilising “best practice” protocols;

e Conserve the current ecological values of areas containing habitat for
identified significant species; and

e Naturally regenerate vegetation.

2.2 Timing

Regeneration will commence during the development phase or as soon as possible
after development approval and when the area has been designated as suitable for
regeneration.

Thinning of dense undergrowth will commence as the initial stage of site regeneration.
An ecologist in consultation with Council shall determine the need for thinning within
Open space areas. Thinning works will occur in two (2) phases as described below:

e Phase 1: Initial thinning works; and
e Phase 2: Ongoing maintenance.

The timing of each stage will:

e Phase 1: commence as soon as possible after development approval; and
e Phase 2: continue on an “as needs” basis.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 6

Page 10

eS
as

Site Rehabilitation Plan

 

Primary weeding will occur in two (2) phases as described below:

e Phase 1: Primary Weeding; and
e Phase 2: Ongoing maintenance.

The timing of each stage will:

2.3

2.3.1

2.3.2

2.3.3

2.3.4

2.4

e Phase 1: commence as soon as possible after thinning works; and
e Phase 2: continue on an “as needs” basis.

Personnel / Procedures

Suitably qualified site personnel, or an enterprise experienced in native bush
regeneration, will be engaged for all regeneration works.

The Bush Regeneration team will include suitably qualified Bush Regenerators,
including a Regeneration Site Manager, who will be responsible for all project
management and staff supervision and report directly to the Project Manager.

The Bush Regeneration team will consist of a team consisting of a sufficient
number of personnel, including the Regeneration Site Manager, for site works.

The Regeneration Site Manager will have demonstrated expertise in successful

project management, staff supervision and hold/gain all necessary licenses and
approvals.

Thinning of Dense Undergrowth

Vegetation within Open space areas comprised of monocultures of dense understorey
species will be thinned to allow for natural regeneration as follows:

Shrub species will be thinned to allow a minimum 1m separation between
canopies;

Primary weeding will then be implemented where necessary as outlined in
Section 2.6;

On-going maintenance and monitoring of natural regeneration will be
completed in accordance with Section 4;

Where natural regeneration does not occur, reinforcement plantings will be
provided and maintained as outlined in Section 3.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 7

Page 11

2.5

2.5.1

uz
ee

Site Rehabilitation Plan

Weed Control Methods

The following are control techniques that are to be utilised during site
regeneration works:

Cut Stump Method (CS) - This method involves cutting plant stems as close
to ground level as possible and immediately painting the cut stump with
herbicide. This treatment can also be applied as a basal bark application to
the first 15-20 cm (entire circumference) of an uncut stem if the adult bark
has not yet developed. Chemical use with this application is dependant on
the proximity of the weed to naturally ponding water or waterways and
whether or not the chemical is registered for aquatic use.

Basal Bark Method (BB) - This method involves applying a herbicide to the
lower 35-45 cm bark around the entire stem using a hand-pump backpack
sprayer fitted with a shut-off at the wand tip and an adjustable cone nozzle
or a small, ATV (All Terrain Vehicle)-mounted sprayer with a shut-off at the
wand tip and an adjustable cone nozzle.

Ring Barking (RB) - This method involves removing the lower bark from the
stem using a sharp implement to expose the phloem and xylem tissue to the
outer environment thereby destroying it.

Spray Method (SP) - There are two (2) types of spraying methods that will
be employed where appropriate:

o Selective blanket spraying: The area must initially be checked
for the presence of any native species. Any weeds within 2 m of
the drip zone of existing native species will be removed by hand.
Alternatively, native species will be covered with impermeable
material (e.g. a tarpaulin) for protection during spraying;

o Spot spraying: The spray nozzle will be kept close to ground to
avoid any overspray. Individual weeds will be spot-sprayed at the
site. This method of spraying will be employed as native species
are interspersed throughout the exotic grasses; and

o Herbicides specific to each target species, where appropriate,
will be identified prior to the implementation of any works.
Herbicides will be applied in accordance with the manufacturer’s
specifications and when environmental conditions are most
preferred (e.g. wind and rainfall).

Stem Injection (SI) - Herbicides may be applied directly to the plant via
stem injection. This involves applying a herbicide to the plant directly
through drilling a hole into the stem and inserting the chemical.

Wick Wiping (WW) - This method employs vehicle-mounted (broad acre
application) or hand-held equipment (small area/single plant application)

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 8

Page 12

Ee
Se

Site Rehabilitation Plan

to wipe or brush concentrated herbicide onto weeds. The herbicide is
applied from permeable rope that is permanently connected to a reservoir
containing Glyphosate. For purposes of weed control where accessibility to
the infestation is low, a hand held ‘wick wipe’ will be used. This will also
be incorporated for the control of emergent species. This method is
particularly safe to use in areas where weed species are interspersed within
native plants as there is no spray drift of herbicide.

e Hand Pulling (HP) and Chipping (CH) - Manual weeding may involve
chipping, pulling, digging or slashing and is preferred, depending on the
growth stage and situation as detailed:

o where native plants are growing within a weed infestation and
the use of selective herbicide is not possible; and

o where inadequate foliage is present to allow for successful
uptake of herbicide e.g. Mile-a-minute runners typically exhibit
this trait.

o When hand weeding, the stem must be grasped firmly at the
base of the plant and pulled. A trowel, mattock or sharp knife
may be needed to loosen the soil. Care must be taken not to
leave behind stems or other plant pieces that may re-shoot.
Hand weeding should also be undertaken at times when weeds
are not seeding to reduce dispersal and spread. Hand pulling is
not recommended for some weed species as they readily sucker
if their roots are disturbed e.g. Lantana camara. This method
will be employed when removing exotic grass species with
retained vegetation.

2.6 Primary Weeding

2.6.1 Primary weeding will take into account all weeds within Open space areas.
These species are to be treated simultaneously.

2.6.2 Primary weeding should commence at the start of.the active growing period
(approximately November), or on an as needed basis.

2.6.3 Weed eradication will be undertaken on a progressive basis through localised
treatment of grass species via mechanical removal (hoe/rake, hand pulling
and/or slashing) or with Glyphosate. Woody weed species under 20 cm tall will
be hand pulled or controlled using weed control techniques discussed above.

2.6.4 Preparation before spraying, in the form of manual clearing weeds from around
native plants, must be carried out. Smalt plants less than 20 cm in height are to
be marked with a stake.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 9

Page 13

oot

Site Rehabilitation Plan

 

2.6.5 Weed material will be disposed of at an approved waste disposal facility such
as Council landfills or transfer stations.

2.6.6 All chemical users should be experienced and licensed in accordance with the
Queensland Agricultural Chemical Distribution Act 1966.

2.7 Boundary Marking

2.7.1. The boundaries of regeneration areas will be marked with star pickets and tape
and will be erected immediately before regeneration work commences.

2.7.2 Signage is to be erected stating: “No Entry - Native Plant Regeneration Area”.

2.7.3 All contractors are to be made aware of restrictions applying to the exclusion
zones.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 10

Page 14

 

Site Rehabilitation Plan

 

3.
3.1

3.1.1

3.1.2

3.1.3

3.1.3

3.1.4

3.2

3.2.1

REVEGETATION STRATEGY

Introduction

Portions of vegetated areas within OS2 and OS4 are suffering from structural
deficiencies, and/or biodiversity deficiencies and/or habitat deficiencies.
These areas should be revegetated with reinforcement plantings.

Within disturbed areas, competition between native propagules and exotic
weeds often favours the exotic pioneering. Thus, in order to enhance the
ecological functioning of areas degraded by exotic species, revegetation works
will provide a framework by which indigenous species may reclaim lost habitat
via the processes of natural recruitment and succession. Therefore, the aim of
the revegetation works is to restore the historical ecological values of the site
through the use of weed removal techniques and the provision of indigenous
canopy species.

OS3 and O56 areas are to be planted with locally endemic tree species.

Wetland areas should be revegetated using locally endemic species so that they
become viable and efficient systems in terms of stormwater management, as
well as self-sustaining ecosystems.

Revegetation will commence during the development phase or as soon as
possible after development approval and when the area has been designated as
suitable for revegetation.

Personnel, Procedures and Timing

Revegetation Phases

Site revegetation works within all revegetation areas will be undertaken in five (5)
phases, these are:

Phase 1: Site preparation;

Phase 2: Initial planting;

Phase 3: Growth and maintenance;

Phase 4: Supplementary planting to replace dead seedlings;
Phase 5: Additional plantings; and

Phase 6: Ongoing maintenance.

It is envisaged that all capital works associated with the proposed development will be
completed within three (3) years of the development approval.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 11

Page 15

 

Site Rehabilitation Plan

 

e Phase 1 will commence as soon as possible after approval and when Open
space areas have been designated as suitable for revegetation.

e Phase 2 will commence as soon as the horticulturalist is satisfied that weed
species have been successfully controlled.

e Phase 3 will commence after planting and will be ongoing.

e Phase 4 will commence within two (2) months of the initial planting in each
area and replacement of any seedlings that have perished will occur.

e Phase 5 works can commence where advanced canopy growth is evident and
the Horticulturist determines that additional planting is necessary to satisfy the
aims of the site rehabilitation plan.

e Phase 6 maintenance will continue indefinitely on an as needs basis for a
period not more than three (3) years from the completion of Phase 1.

3.2.2 Personnel

A suitably qualified nursery (Horticulturist) and Revegetation Team will be engaged via
a tender process.

The Ecologist will consult with the appointed Nursery/Revegetation Team to finalise
the list of species to be planted in relevant locations. The final list will depend upon
the availability of species at the time required. If required species are not available
provision will be made to secure and plant these species at a later stage.

The Nursery/Revegetation Team will provide the Ecologist with a revegetation
strategy which will include a program for the collection of material (seed and cuttings)
to be utilised in vegetative revegetation. The strategy will discuss the following
points;

Collection proposal;

Species mix and density;

The source of seeds/cuttings to be utilised;

Size of the cuttings/seedlings to be utilised;

Date at which revegetation is to commence; and

Strategies for early care and monitoring of the revegetation area.

The Ecologist will review the strategy, programs and plans. The Ecologist should
suggest amendments where required. The revegetation can commence when the
strategy has been finalised and approved. .

3.2.3 Propagation

Seed collected for propagation will come from the site and immediate surrounds as
well as local provenance (i.e. from local stock within 20 km of the subject site). The
following details will be collected from each source plant:

e Location (GPS position);

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 12

Page 16

Ea
oa

Site Rehabilitation Plan

 

Date of collection;
Name of collector;
Soil type;

Health of plant; and
Collection method.

Whenever possible, seed will be removed directly from plants by shaking or cutting
branches over a tarpaulin. Secateurs will be sterilised between each use. Seed will be
placed in small envelopes with the collection details clearly marked. If the seed is
extremely small it will be stored in glass or plastic vials to avoid undue loss.

It is expected that during the seed collection program, a site will be visited on several
occasions to ensure optimum seed ripeness. The seed collection program will be
prepared in consultation with Council and Queensland Parks and Wildlife Service
(QPWS) prior to the commencement. The program will be prepared by the
Nursery/Revegetation team in consultation with the Ecologist.

The amount of seed collected will not exceed 5% per plant. Seed will not be collected
from isolated populations or rare plants.

The seed will be cleaned, its viability checked and prepared for storage. Seed that has
lost viability will not be used in the revegetation works due to the dangers of genetic
aberration.

If seed collection proves difficult or impossible, other forms of propagation, such as
cuttings, may be attempted.

3.2.4 Site Preparation (Weed Control)
Site preparation will be as per the Regeneration Strategy (SECTION 2.5).

3.2.5 Revegetation Works

Seedlings will be sufficiently developed so as to have a significant chance of survival.
Seedlings will be at least the sixth leaf stage and/or 20 cm in height.

Tube stock seedlings would primarily be used for the plant-out.
Tube stock should be sun hardened (plants should be held in full sunlight and

systematically droughted to the point of wilting for at least two months prior to
planting).

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 13

Page 17

uz
ar

Site Rehabilitation Plan

 

3.2.6 Planting Program

Existing native trees and shrubs will be retained. These areas will be enhanced with
plantings as deemed appropriate by the horticultural team and/or ecologist.

Planting will occur at the optimum time of the year when there is high soil moisture
(between January and May), unless irrigation is available and accessible.

If required, the Horticulturist may make minor alterations to this revegetation plan
depending on the site requirements. The following revegetation strategy will be
employed:

e Long grass will be slashed a maximum of two (2) weeks before the
revegetation commences;

e Seedling sites will be spot sprayed with Glyphosate one (1) week prior to
commencement;

All seedlings will be soaked in water overnight prior to planting;

e All seedlings will be provided with a retentative agent such as rain-saver’
crystals;

e Weed will be controlled through the application of suitable mulch around
individual plantings and with spot applications of an appropriate
herbicide.

e All seedlings will be protected by a tree guard (commercial tubing or
equivalent); and

« Regular watering must be undertaken after the seedlings have been
planted. Watering will be provided on an as needed basis via water
tanker at the first signs of water stress.

The plants growing medium would be soaked prior to planting and the plant cores
should be buried to ca. 2cm deep.

The seedlings would be planted on the same day as their transport from the nursery.
No seedlings would be left unprotected on the site whilst awaiting planting. Planted
seedlings would be marked with a piece of biodegradable tape.

Fertiliser used should be only nitrogenous to avoid introduction of Phosphorous,
Potassium and other micronutrients.

Planting in areas exposed to full sun or westerly sun should be avoided in the peak
summer months, where possible.

" Rain-saver is a polymer water crystal that has been specifically developed for plants. The polymer absorbs and holds
water and nutrients at a specific tension which makes it available to plant roots but does not release to the soil. Rain-saver
has proven very successful in more difficult environments (eg Roadside plantings on the Pacific Motorway between
Brisbane and the Gold Coast and in frontal dunes at Pottsville (R. Keene pers comm. 2000).

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 14

Page 18

 

Site Rehabilitation Plan

3.2.7. Fire Management

Fire is an important component in maintaining the floristic composition and structure
of native vegetation and some flora species. Some flora species rely on fire for seed
germination and seedling recruitment.

The objective of fire management within the regeneration and revegetation areas is
to:

e maintain fire regimes in native vegetation; and
e reduce the potential for fire risk to surrounding areas (including residential
areas, commercial buildings and the Sunshine Motorway).

Fire management within Open space areas will be in accordance with the Fire
Management Plan (JWA 2007).

3.2.8 Long term management

The revegetation and regeneration areas will be subject to ongoing monitoring over a
three (3) year period. Over that period, the foltowing management strategies will be
employed:

e Progressive weed control (as needed), determined during routine monitoring;
Follow-up watering as required and determined by landscape contractors;
Installation of erosion and sedimentation control measures prior to any
construction activities, weed control or revegetation activities in adjacent
areas, where necessary (e.g. if large areas of weeds are to be physically
removed);

« Maintenance of existing vegetation except where water sensitive urban design
facilities/devices are required. Landscaping of infiltration drains, swales and
other stormwater management facilities/devices will also be implemented to
facilitate integration of these facilities/devices into the surrounding natural
environment.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 15

Page 19

a2
9 eee

Site Rehabilitation Plan

 

4, MONITORING
4.1 Introduction

Site management will inspect the revegetation zones before planting commences to
ensure suitable preparation. Site management will also check that the proposed
planting and revegetation works satisfy the aims and methods of this Plan.

After planting, and revegetation works, the following is required from the
Revegetation Team:

e General maintenance of the revegetation areas (including the health of
seedlings) on a monthly basis for a period of three (3) years.

e Removal of weed regrowth and replacement of dead seedlings on a monthly
basis for a period of three (3) years.

The revegetation areas are to be formally inspected by the Revegetation Team at the
following points of establishment:

Immediately after the revegetation works;

Three (3) months after the revegetation works;
Six (6) months after the revegetation works;
Twelve (12) months after the revegetation works;
Two (2) years after the revegetation works; and
Three (3) years after the revegetation works.

Inspections will assess the health of the seedlings (growth rates, foliage status and
survival rates) within revegetation areas to ensure that maintenance of planted
individuals has occurred. Within both regeneration and revegetation areas, weed
abundance, chemical usage, any significant problems are to be monitored. The
Revegetation Team will report to site management within fourteen (14) days from
each inspection period.

Three (3) years after revegetation works, site management will determine if the
stated objectives of this management plan have been achieved. If not, a report will
need to be prepared by site management identifying the works and the time frames
required to ensure that the Site Revegetation Strategy meets the stated objectives
and that, most importantly, a self sustaining population is established within
revegetation areas.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 16

Page 20

 
   

AEA

Site Rehabilitation Plan

 

4.2 Performance Targets

Structural and floristic criteria are provided within this plan in order to measure the
success of the revegetation and regeneration works after 1, 2 and 3 years.

Average projected foliage cover (PFC) is. often used to measure the success of
revegetation programs however PFC is considered unsuitable in this context as a
parameter for measuring the success of revegetation/regeneration. This parameter is
subject to variables outside the scope of this plan (e.g. climatic variables,
unpredictable growth rates) and therefore has limited application in this context. The
measurement of average projected foliage cover is essentially a surrogate of plant
density. Therefore a suitable performance target would be that 95% of the plant
density will be maintained.

With regards to floristic diversity, a suitable performance target would be that 100% of
the floristic diversity of the original plant matrix is maintained.

Average canopy height is another measure often used to determine the success of
revegetation works. Again it is considered that this parameter is subject to variables
outside the scope of this plan. Regardless of the implementation of appropriate
maintenance regimes, the applicant has no control over plant growth rates, and can
not guarantee that plants will reach an arbitrary minimum height. {t is therefore
considered that canopy height is not a suitable measurement of the success of the
regeneration and revegetation and works.

Finally, with regards to survival rate a suitable performance target would be the
survival of 95% of the total number of trees planted.

TABLE 1 summarises the proposed Performance Targets for the Regeneration and
Revegetation of buffers on the subject site.

 

 

 

 

 

TABLE 1
PERFORMANCE TARGETS
Performance Indicator Target
Plant density Maintained at 95%
Floristic diversity Maintained at 100%
Canopy height n/a
Survival rate 95%

 

 

 

 

4.3 Reporting of Monitoring Results

Following each inspection by the Revegetation Team, a report will be prepared for the
Site Manager and Council. The report will discuss the following:

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 17

Page 21

 

Site Rehabilitation Plan

 

« Works undertaken; '
Progress of regeneration/revegetation areas. in accordance with Performance
Targets;

e Significant problems encountered (death of seedlings, vandalism etc.) and the
effect of these on the plantings and aims of the revegetation strategy;

e Success or failures of measures implemented to rectify previously identified
problems; and .

® Measures to be taken to rectify new problems.

4.4 Completion of Reporting

Three (3) years after the initial planting, site management will determine if the stated
objectives and performance targets of the Site Revegetation Strategy have been
achieved (or close to being achieved). If not, a report will be prepared by site
management identifying the works and the time frames required to ensure that the
vegetation in the buffer zone has been successfully established.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 18

Page 22

G2

Site Rehabilitation Plan

 

5.

TIMING AND RESPONSIBILITIES

TABLE 2

PROPOSED REVEGETATION SCHEDULE

All capital works associated with this Regeneration and Revegetation Plan would be
completed over a one (1) year period following the development approval under the
recommended schedule below (TABLE 2).

 

 

 

 

 

 

 

 

 

 

 

 

i Description Timing Expected Duration | Responsibility
Thinning of | commence as soon as| 1 week - 1 month Contractor
understorey possible after development

i (where approval as the initial stage

@ required) of regeneration/revegetation
works.

i Weed Control Once the site preparation of | 1-2 months Contractor

each section is complete
Planting and Plants are sourced and the | 1 week - 1 month Contractor
Fertilising planting plan is complete

i Mulching and | Progress immediately after | 1-3 months (in | Contractor
Watering planting to maximise the | conjunction with

chance of seedling survival weeding)

i Reporting and | Weekly for the first month and then three monthly | Contractor
Monitoring thereafter for one year

i Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 19

 

Page 23

 

Site Rehabilitation Plan

6. SUMMARY

This plan contains a detailed set of directions and measurable performance criteria to
guide the rehabilitation program of the Open space areas within the development site.
The plan aims to improve the overall conservation and landscape values of the open
space areas and to restore the natural ecological processes and facilitate ecological
sustainability.

Through implementation of the strategies to achieve the set objectives contained
within this plan, all disturbed areas of vegetation will be revegetated or subject to
regeneration works. This will provide improved and extended habitat for a variety of
flora and fauna found within the locality and will inhibit the impacts of the
development upon retained vegetation including invasion by weed and pest species,
and will also control human access and reduce edge effects.

Each of the Performance Objectives contains measures designed to allow the applicant
to demonstrate that effective revegetation requirements are being achieved and for
Council to sign off on the success of the implementation program.

Ongoing monitoring of existing and planted vegetation will be carried out over a three
(3) year period to assess the health and vigour of this vegetation and to identify and
control any weed species that have resprouted or dispersed to the site over a three
year period.

 

Q06030/AM/SRP/RW2 JAMES WARREN & ASSOCIATES 20

Page 24

LANDSCAPE MANAGEMENT PLAN

 

l_o

EXISTING VEGETATION

Al existing vegetation and particulary large
trees are to be retained, protected during
‘construction and incorporated in new
planting areas

 

As por Tabl
please note

\g planted swale and embankament to De

ined along road

 

LANDSCAPE CONCEPTS

 

0 Landscape Concepts for Development Approval for
Noosa Lifestyle Centre and Lot 2 - Noosa Corporate for
further site landscape detail, including Covenant area A - OS3
and Covenant area B - OS6. Refer to Lot Reconfiguration
Development Approval 2006) 1594 for details of all Open Space
Areas (OS

 

 

a minimum of

In accordance with 2006/1594 Condition 36
street tree will be provided
every 8m of street frontage

> oat

—
SS

                                 
        

 

- Landscaping under The Noosa Plan
jowing responses to Specific Outcomes and

Probable Solutions relevant to the Streetscape works. a

 

>)

Landscaped areas have deen provided to
‘enhance the natural landscape character 2

 

     

d).c) Natural features such as existing trees will be
ratained and including in buffer areas where
4). 0) f) ve been designed to a}
1ulk from the road and
selected for height and form
responsive to the duilldings and to screen and ®)
shade carparks and visable service areas
9).h)

 

improved through selective undergrowth dearing —*)
and reinforcement plantings to major roadways

and new buffering is to be installed where this
development interfaces with adjoining existing
developments

Landscaping has been designed and the
Indicative Plant Selection has 5een made from
the Woodlands / Open Forest Areas from PSP3

g).h).i)

s34

»)

 

tion

Plant species are appropriate to the biophysical
conditions and locality landscape character
Species have deen selected for the space
available, visual and climatic exposure, as a
functional component of the design and in
falation to the scale of the development

1@ appropriate levels of shade and
occupants and users of the
oadway access throughout the

  

seasons
The species selected will require minima
additional watering as they have deen selected

hetving on site naturally
vide effective canopy
the road reserve and

   

Road reserve
shade and be
relate to infrastructure
Street Trees species are consistent with the
locality and natural setting of this spectfic

  

species though will de low maintenance and
selected as appropriate for this area and
landscape character.

Species have Deen selected for specific

evelopment, such as
ings in Buffer/Open Space
Areas, Shade and Feature Planting. Each
species fulfills a specific function and Is not
suitable for all uses
planted near structur
and dangerous species
high pedestrian areas. Species in pedestrian
areas will be hardy plants able to tolerate high
levels of activity.

 

    

Plant species have Deen selected trom
Woodlands / Open Forest Areas form PSP3.
There are no undesirable species proposed

 

Safety and

There are no palm plantings proposed except for
some loose group plantings of Livistona species

 

species should b@ able to be transplanted from
existing healthy specimens on site

Root guards will not be required as any species
with potentially invasive roots will not 9e planted
near any paved or built areas that may be
damaged

secunty
Sate sight distances to and from road comers

and driveway entries wil be maintained

Street trees and trees in carpark areas will
achieve a maximum 0.9m dear trunk for a 20m

 

All underplanting to be a maximum of 0.7m from
finished road pavement level (not top of kerb).

 

Any landscaping adjacent to substations or
electricity transmission line easements are to be
less than 4m high at maturity and will not
encroach within 3m of any substation boundary
Any trees taller than 4m will be canted at least
as far aw: @ electricity transmission line
as they are expected to be high at maturtty

It is expected that all power connections to
buildings will be underground

However trees and large shrubs must fallow the
minimum locations as outlined in this section
Plantings will not intertere with trade access to
service meters

Species with invasive roots will not de located
near enough to services to cause damage

 

14.155 Open space areas and road reserves

Road reserves

oz

a) Landscaping enhances the streetscape quality
and natural landscape character of the area

b) Allows for buffering to adjoining uses

°) The functionality of the road reserve is
maintained for vehicles and for pedestrians and
bicycles through a shared pathway system and
some lawn areas

a) All suitable existing trees anc remnant vegetation
will be retained and incorporated into the overall,
streetscape sheme

®) Lawn and low planting allows for the opening of
cat doors along the roadway

f) Landscaping allows for maintenance and
emergency access to service corridors and
utilities

9) Sight distances are maintained to and from
corners. intersections, driveways and pedestrian
crossing points

h) Landscaping maintains overland stormwater flow
to avoid ponding to footpath, nature strips or
adjoining premises. Landscaping is also integral
to the treatment and of drainage devices.

 

A minimum of 1 street tree is provided for every
8m of frontage
Lawn and low planting only are within 500mm of

    

ursas and drainage lines

Landscaping works along watercourses and as
part of drainage solutions retains and enhances
existing riparian vagetation induding understorey

 

5 have been avoided at waterway and
drainage line edges to prevent mowing damage
and debris

3) Engineering solutions to drainage have been
avoided where

 

solutions Implemented (refer swale section)
e) Natural materials have Deen used where possible
In order to blend with the natural environment

protection

  

Landscaping retains and enhances habitats and

native wildlife comidors by replicating adjacent

remnant vegetation including understorey

vegetation

>) Landscaped areas have Deen sited to
complement ang integrate with existing
vegetation

°) Old trees including dead trees wil be retained
where possible to retain hollows for local native
fauna

4) Vegetation links will be created or enhanced
through garden planting between existing
habitats,

°) Adverse effects on koalas wil be minimised by

not planting koala food species near roadways

and facilitating movement in koala habitat areas

  

Water Management

 

ration and conservation of water is
opti through the selection of native plant
species from PSP3 Landscaping Plants and
Guidelines - Woodlands / Open Forest

>) Plants have been group in mulch garden beds

c) impervious surfaces have deen minimised in the
road reserve

 

®) Hard surfaces will be drained to landscaped
areas rather than tl eet drainage system

f Microphytes will be planted along driveways to
absorb hydrocarbons

9) Swales will be integrated as part of the overall
landscape scheme and use planting as a
stormwater filter

  

57 Carparking areas
reat car parks

 

A minimum of 500mm from back of kerb of low
planting of lawn has been allowed for along the
roadway to ensure adequate access from parallel
parked vehicies

S292

Street trees are planted a minimum of 1m from
back of kerb in the road reserve verge

 

 

FURTHER INFORMATION
Please refer to all documentation by James:
Warren & Assoc Pty Ltd Environmental

 

for this development |

LANDSCAPE DESIGN INTENT
Reter to sheet LMPO2 and LMPGS for
documentation of the Landscape Design
Intent to create an overall theme for the
entire 5 Lot Development

 

AMENDMENTS
a) ae | onctien sn |
mat
M38
as

 

 

 

e a rl
LaNnDGRAPHICS

 

5 LOT RECONFIGURATION
Eenie Creek Road, Noosaville

S&L Developments

Ken Hicks & Associates

ning Te

LANDSCAPE
MANAGEMENT PLAN

Overall Layout, Design Notes |

 
 

 

Last 1203 LMP on

 

Page 25

General Na
Wooc

   

SPECIES SELECTED FROM
TABLE 7.1 PRIMARY CHARACTER SPECIES

Botanical Name Common Name

 

Qld Biue Gum

 

   

or site derived!

 
 

SPECIES SELECTED FROM
TABLE 7.2 - SECONDARY CHARACTER - TREES AND LARGE SHRUBS

Botanical Name Common Name Min, Size

  

SPECIES SELECTED FROM
TABLE 7.3 - SECONDARY CHARACTER - SMALL / MEDIUM SHRUBS, VINES AND
GROUNDCOVERS

Botanical Name

Common Name

 

trunk neight

 

         

f site (re! Vegetation

in. dear trunk of 0.9m at planting
Honeyeater

NOTE : Plant

Incorporated.

be prapared

re availal
(grown on’ spec
ne selected species

  
 

KOALA FOOD SPECIES: Koala food tree species as denoted above are not to be planted near
roadways or in a way to encourage Koala crossing of roadways.

Backhousia myrtifolia

Fistaniopsis laurina
tree and flower detail

Hovea acut

usea floribunda

w A N

Refer to s for Landscaped Swale
and Section showing typical

Baumea rudiginosa

Juncus usitatus

fentifclia Cis:

Schoenoplactus validus

SUS al

   
     

 
   

of the Landscape Desigr
0 create an overal
ot Development

  

 

 

LaANDGRAPHICS

 

5 LOT RECONFIGURATION

Eenie Creek Road, Noo

  

S&L Developments

Ken Hicks & Associates

LANDSCAPE ~
MANAGEMENT PLAN
Planting Intent

LGSL 1203 | LMpo2 | 020F 03 8

Page 26

Op fj

Butfer planting
to embankments

  

This Landscape Managem
planning to de incorporate
A unique landscape c!
and hardscape eleme:

pinimum 2500mm wi

 
  

for the entire 5 Lot development.
be created through combinattion plantings

          

 

perform spec

Such as’

 

ning

w Shrubs and groun ad / pathway edge planting to maintain
casual surveillance and sight lines

~ Sedge and grass / tufting plants for swale planting

 

The planting intent is to rec

    

 

PAVEMENT

Feature Coloured Concrate with
vegetation imprinting

fe (CCS Mexico in Grey Cement)

 

 

 

     

 

 

Feature Colo. concrete with
vagetation imprinting in perspective

 

Clear trunk trees
and low placing to
central macian simp

plarting to maintain casual

Retention of all existing
vegetation and large tees

    

where possible —

 

General Areas Concrete (CCS Paperdark in Grey Cement)

  

General Areas Coloured Concrete
with light exposed finish

Botanical Name

Crinum pedunculat
Gahnia sieberana
Isoplectus nodosa
Juncus usttatus
Lomandra longifolia
Baumea articulata
Baumea rubiginasa
Schoenopiect
Schoenoplec:

 

 

 

Common Name

River Lily

Sawsedge Swordgrass
Knobby Club Rush
Common Rush

 

  

Tall Mat Rush 50mm
Jo Twig Rush TUBESTOCK
Soft Twig Rush

Shore Clup Rush
River Club Rush

 

In accordance with 2006/1594 Condition 36 swales are to be fully
established using endemic species and occasional grasses

      

 

AMENDMENTS -
in| ae | concn ian
: {ee
« [ve 8
3 [oe 8

 

i

az

LaANDGRAPHICS

 

5 LOT RECONFIGURATION
Eenie Creek Road, Noosaville

 

S & L Developments

Ken Hicks & Associates

LANDSCAPE
MANAGEMENT PLAN

Design Intent and Details

 

LGSL 1203 | LMPo3 | 03 OF 03 a

Page 27

 

STORMWATER MANAGEMENT
PLAN
PART A
STORMWATER QUANTITY

 

PROPOSED BUSINESS CENTRE
DEVELOPMENT
EENIE CREEK ROAD, NOOSAVILLE

for

KEN HICKS & ASSOCIATES

M3048
April 2007

AES WES RA.
B arnouPp
(je? EARL OGEEGG AERA. member

i www.vdmg.com.au

Page 28

STORMWATER MANAGEMENT PLAN

 

TABLE OF CONTENTS

1.0 Imtroduction...........cscccssssccrssssesseccscssecsesscesestecesscessscnsecssesseccsencssecesssnccsscesscsseeseseene 3
2.0 Existing Conditions..... weed
3
3

 
 
 
 

3.0 Proposed Development..............00+
3.1 Nature of Proposed Development... base
4.0 Site Stormwater Modelling..............cssscccscsscssssssscssssssersenscsesscessenseeseseessssreseasensvens 4
4.1 Methodology... eecsesesssssssesesssscsessnsesseseessssecsesseasesseesseaessseesessassseesanseesaseaeees 4
4.2 Selection of Modelling Parameters. wed
4.2.1 Impervious Areas..............4 v4
5
5
5

 
  
 
 
 

4.2.2 Manning’s ‘n’............
4.2.3 Energy Loss Coefficients..
4.2.4 Infiltration Characteristics vine
5.0 Pre-Development FIOWS............cccsscssscrsccescsssessessscsesssseesssscenssassersccousscssssseosooesonenee 6
5.1 Rationale... ccesescssesesecesseseseeeseseeseseenetsssavsceasssseeecsstsseeccsaseseseeesatesaeeesaeenenee 6
5.2 Results...
6.0 Post-Development Flows.
6.1 Rationale..........00.... .
6.2 Results.......ccceecscssseeesccesceesesetsseeeseesees
6.2.1 Post-Development Flow Summary .
6.3 Overland Q100 FIOW oo. esecessssesseessesstsreesssesceeeesessescseneeeescasesssnseersessedseseseneenees 8
7.0 Conclusion.........cccssesesrscesssereesecesecrecesseecerecesaseusssasenesnecenssansceasnecacsacasesenreaessseneesee 9

  
  
 
 

APPENDIX A...........0seceees Proposed Development Layout

APPENDIX B...........00eeeceee XP-STORM Pre-Development Drainage Model Layout and
Results

APPENDIX C..........c0seeseeee XP-STORM Post-Development Drainage Model Layout and
Results

BARLOW GREGG VOM M3048

 

APRIL 2007

Page 29

STORMWATER MANAGEMENT PLAN 3

1.0 Introduction

The purpose of this stormwater management plan is to determine general requirements for
bulk stormwater management for the proposed business centre development at Eenie Creek
Road, Noosaville.

The specific objectives of this stormwater strategy are as follows:

« Determine pre and post-development flows;

+ Identify how the non-worsening of stormwater flows will be achieved;

2.0 Existing Conditions

The site of the proposed development is approximately 21.6 Ha in area and contains a child
care centre in the northern part of the lot, with the balance characterised by bushland. Access
to the child care centre is from Commerce Court, while maintenance access to the sewer pump

station is from Rene Street to the West.

The site slopes at an approximate gradient of 4% generally towards the south of the site and
eventually into Eenie Creek. The south-eastern portion of the site is designated for
Environmental Drainage under the Noosa Plan and as such no development works may be

carried out in this area.
3.0 Proposed Development

3.1 Nature of Proposed Development

The proposed development involves the reconfiguration of the proposed lot into 5 lots. This
includes 4 lots suitable for business centre style construction. Access to the site will be
provided from the proposed link road that skirts the east of the site, with a link road
connection through to Rene Street. Lot 1 will maintain it's current access from Commerce

Court.

The proposed development layout is attached in appendix A.

 

BARLOW GREGG VDM M3048
APRIL 2007

Page 30

STORMWATER MANAGEMENT PLAN 4

4.0 Site Stormwater Modelling

4.1 Methodology

The hydrology and hydraulics of the pre and post development scenarios were analysed using
the XP-STORM stormwater management model with storm patterns derived from Australian

Rainfall and Runoff publication and rainfall intensities derived for the Noosa area.

Due to the topography of the land and the layout of the site, it was determined that the site of
the proposed development has an external upstream catchment of approximately 5.5 ha. This
catchment consists of adjacent commercial/industrial properties whose stormwater should not
discharge onto the subject site. However allowances will be made for any flow onto the site,
and catch drains could be utilised to direct this flow away from any future construction on the
subject site. Therefore to conform to the pre-developed drainage scenario it is proposed to also
discharge post developed flows to the south. It is proposed to utilise five separate discharge
points into the environmental drainage area to reduce the extent of construction of stormwater
infrastructure required on the site. The five “sub-catchments” consist of lots 1, 2a, 2b, lot 3,
and lot 4. This split up of discharges is due largely to the topography and proposed layout of
the site.

To accurately determine pre and post development flows, | in 2, 10, and 100 year storms were
modelled. For each storm intensity, storm durations of 10, 20, 30 ,45, 60, 75, 90 and 180

minutes were investigated.

4.2 Selection of Modelling Parameters

XP-STORM modelling parameters were assessed from layout drawings, contours, QUDM
(Queensland Urban Drainage Manual) and considering the extent of proposed development

within the catchment.

4.2.1 Impervious Areas

In accordance with the current pre-developed situation, 0% of impervious ground area was
used in the pre-developed model. In the post developed model the percent of impervious

‘ound area was increased to 90% to represent a commercial development.
gr Pp

 

BARLOW GREGG VDM M3048
APRIL 2007

Page 31

STORMWATER MANAGEMENT PLAN 5

4.2.2 Manning's ‘n’

Values for the dimensionless Manning’s ‘n’ coefficient for open channel and piped flows were

assigned according to Table 4.1 in accordance with QUDM.

Table 4.1: Study Manning’s ‘n’

 

 

 

Conduit condition Manning’s ‘n’
Grassed, Landscaped Swales 0.045
Reinforced Concrete 0.014

 

 

 

4.2.3 Energy Loss Coefficients

Entrance and exit loss coefficients were utilised according to Table 4.2 in general accordance
with QUDM.

Table 4.2: Pipe Energy Loss Coefficients

 

 

 

 

Energy Loss Loss Coefficient
Entry Loss 0.5
Exit Loss 0.2

 

 

 

4.2.4 Infiltration Characteristics

The Horton infiltration method was adopted for the drainage study and Manning’s ‘n’ for the
impervious areas and pervious areas were left as the default values of 0.015 and 0.045
respectively. The values used for maximum infiltration rate, minimum infiltration rate and
decay rate of infiltration were 10mnv/hr, 2.5mm/hr, and 0.00056/sec respectively.

 

BARLOW GREGG VDM M3048
APRIL 2007

Page 32

STORMWATER MANAGEMENT PLAN 6

 

5.0 Pre-Development Flows

5.1 Rationale

The proposed site is currently undeveloped, and therefore an impervious area of 0% was used.
As the majority of the site contains no identifiable watercourses of concentrated overland
flow, it is assumed that the pre development overland flow occurs as sheet flow. The pre-
development model was set up so as that the stormwater runoff will drain to the southern

environmental drainage area of the site.

The peak flows for the pre development conditions were derived using a conservative method

by utilising only the XP-STORM model hydrologic runoff layer.

A node layout plan for the pre development scenario is included in Appendix B.

5.2 Results

The peak flows for the pre development conditions are indicated in Table 5.1. These results

are for the catchment of proposed lots 1-2.

Table 5,1; Pre development Peak Flows

 

 

 

 

 

ARI Design Storm (min) | Peak Flow (m?/s)
2 60 | 131
10 60 2.44
100 60 3.75

 

 

 

 

XP-STORM pre development model output is included in Appendix B for ARI 2, 10, and 100

year storms.

 

BARLOW GREGG VDM M3048
APRIL 2007

Page 33

STORMWATER MANAGEMENT PLAN 7

6.0 Post-Development Flows

6.1 Rationale

The peak flows for the design storms for the post development conditions were derived using

the XP-STORM model set up in accordance with the proposed development layout.

In accordance with the pre development scenario the post developed site was modelled with
the discharge point being the southern environmental drainage area. Runoff from the
allotments will generally be collected in open channel drains to run at the front of lots, prior to
discharge into the environmental drainage area at selected locations. Runoff from the road will
be collected and discharged separately from that collected on the allotments. This flow will be
routed in an underground pipe system located within the road reserve. Details of this drainage

system can be found in the accompanying operational works drawings.

As a result of the increase in impervious ground areas and defined flow paths, detention of
stormwater will be required to ensure that the development does not increase existing flow
rates at the point of discharge. This storage volume will be achieved by a combination
roofwater harvesting tanks and lots 3 and 4, and detention swales elsewhere. Roofwater is to
be collected at a rate of 12 I/m? of roof area as specified by Noosa Shire Council. Additional

storage will be provided in the open channels.

An XP-STORM node layout plan for the post-development scenario is included in Appendix
c.

6.2 Results

6.2.1 Post-Development Flow Summary

Table 6.1 indicates the greatest peak flows for the post development model for the sub-
catchment containing proposed lots 1-2.

 

BARLOW GREGG VDM 43048
APRIL 2007

Page 34

STORMWATER MANAGEMENT PLAN 8

 

able 6.1: Post development pe lows

 

 

 

 

ARI Design Storm (min) | Peak Flow (m*/s)
2 90 1.30
10 60 1.88
100 60 2.19

 

 

 

 

 

Table 6.2 represents the greatest peak flows for the pre and post development scenarios as well
as the difference between the two. XP-STORM post development model output is included in
Appendix C for ARI 2, 10, and 100 year storms.

Table 6.2: Pre development and Post development Peak Flows

 

 

 

 

 

ARI Pre-development Post-development Difference (m°/s)
Peak Flow (m’/s) Peak Flow (m?/s)_
2 1,31 1.30 -0.01
10 2.44 1.88 -0.56
100 3.75 2.19 -1.56

 

 

 

 

 

As shown in the above table the post-developed flows compare very well to that of pre-
developed. This is due to the stormwater mitigation included in the development in the form of

harvesting tanks and the open channels.

 

 

 

le 6.3: Pre devel: t, Post development ws and Required Stora:
Sub-catchment |Pre-development |Post-development | Approximate Storage
; 3
Peak Flow (m?/s) |Peak Flow (m’/s) Required (m’)
Lot 3 0.58 1.26 590
Lot 4 0.21 0.49 212

 

 

 

 

 

 

Lot 3 and lot 4 will utilise roofwater harvesting tanks to mitigate stormwater flows. These

tanks will be installed when the lots are built upon.

6.3 Overland Q100 Flow

The swales to be constructed on site as detailed in the accompanying engineering drawings
have been designed to fully cater for storm events up to a 100 year ARI. This means that flood

free access to lots and roads will be maintained in storm events up to a 100 year ARI.

 

BARLOW GREGG VDM M3048
APRIL 2007

Page 35

STORMWATER MANAGEMENT PLAN 9

 

7.0 Conclusion

In conclusion it should be stated that the findings of this stormwater management plan are that
it is possible to incorporate adequate stormwater detention as part of the proposed
development, to result in non-worsening of both major and minor storm flows. It is also
possible to direct Q100 flow through the site whilst maintaining flood free access to the lots

and roads.

 

BARLOW GREGG VDM M3048
APRIL 2007

Page 36

APPENDIX A
PROPOSED DEVELOPMENT LAYOUT

Page 37

 

 

 

   

        

MEW ROAD

PUNING SPUIEND

 

 
 

 

  

 

2
SPITE

 

 

Bus

90°08 JO"

   
      

a6 say

 

 

 

 

 

 

 

 

 

 

aver

 

CHANGE LOT & KEEPING SAME AREA

 

 

 

 

 

 

 

 

 

 

 

wae
3s
Ke
|
AOELO.68
, oe a
ffs eee ETC EMTC
rail ROUSE PPDSIND
J uit —
&
§
g
98
as f.
fs
8f
Of
sh
. :
m3
OEE ge
2740886 avou M3N ea
tne te onistre in {
° WIE = NS, & g e 4
s¥99'25 . ~ x “le
8 * vA
~ N x
1 Se
ze ~N Ki
3 x
z N D
P ~ b908
=55.004012
= ——. ee od £89 EE LOVEE oneke 199 05) H £06 18
_ 85.0000 985.0000
NOR ~ 3 » & wy «8 wk] 8 : ws & 5 § mn & :
s >: 3 83 GQ : a z Qs as we x5 gs 23 93 Ss Ss ga 8 1 q
3 ™~ ™ x N N g NO N NE Nz g Rs Re 2 ms & R 3
g g & x 3 lly
hu & F ls
> \ &
2 QW lt
x C
zo mR '
. pe,
2 g88a LW
6 Ze2e
20
agatga ky
aoe bug ~
<I Zz
Brees. hy
SOzane Ge
YRS.
eg? oO
<g2>88
“onza
es kua
onlee
YootSa
FEEZS%
Notes LEVEL omc rsmesz7 * Associated Consultants Designed
i LEVEL DATUM AMD
ci =S & L DEVELOPMENTS ease seme KAJ
. K 98/02/07 CHANGE BOUNDARY OF LOT & SAME AREA
Project. PROPOSED RECONFIGURATION OF t 15/02/07 CHANGE COVERNANT B TO 2000ME?
Antondmenfie CHANGE LOTS 18 2 COMMON BOY Orawn AMR ay shan Surnamaihentacs can oy |
Mo. Bate Apandmants, .
OF LOT 1 ON RP215933 c we MARE LOTS 1-4 OM LOT ‘ SECT aon BATP RNAP Orawing No. Amend.
LOTS 1-5 cf ome cea owe 057 037 2007 srrvuernatsttt en hicks Sewing He
- pp | eee eas tee 1 KEN hick
PARISH OF TEWANTIN ® cartes foo mA rome Computer Fle +S00/A1 sean ts, AND ABBOCIATER Q60506E M
1 waver ‘Grance oad wot To 2a sheet 9, 1 oot 1 anes HAAubaCADNOAN OOOO BETO Peng tte 5] Scale 215 Deve banee USAT
d

 

 

 

Page 38

APPENDIX B
XP-STORM PRE-DEVELOPMENT DRAINAGE
MODEL LAYOUT AND RESULTS

Page 39

 

oe

 

 

 

XP-Storm Genie Creek Road, Noosa - Pre-Development Node Layout
Version 9.13

Comte (6) X7 Retware Licenced To: Barlow Gragg & Associates (68-910-0539}

 

 

Page 1/1

 

 

Page 40

®
Node - N1 - Pre-Development
[Max Q2 Flow = 1.3075]

 

———

Rainfall Total Flow

Hydrology Rates
S88

oS —_
oo oO

°
a

Flow (cms)

0.4
0.2

0.0 i

1 Sun 3AM 6AM 9AM
Jan 1995 Time

Page 41

Hydrology Rates
8 8 o

g

Flow (cms)
an

=
oO

_

 

———)

Rainfall Total

Node - N1 - Pre-Development
[Max Q10 Flow = 2.4356]

3AM 6AM

9AM

Page 42

Hydrology Rates

Flow (cms)

wy Nw S| =
388

®
Node - N1 - Pre-Development

eE

Rainfall Total

88 o

1.0

0.5

0.0 nm ia
1 Sun

Jan 1995

[Max Q100 Flow = 3.7487]

 

eS

9AM
Time

Page 43

APPENDIX C
XP-STORM POST-DEVELOPMENT DRAINAGE
MODEL LAYOUT AND RESULTS

Page 44

 

 

L32
4.N31 L317
, ty
L28 ie}
ee i
L4sN28 Vv

Lanés

in49

 

 

 

Version 9.13

Copyright (c) XP Sofware

 

Eenie Creek Road, Noosa - Post-Development Node Layout

Licenced To: Barlow Gregg & Associates [66-910-0339]

 

Page 1/1

 

 

Page 45

Conduit culverts-e from N4 to N27
[Max Q2 Flow = 0.6775}[Max Velocity = 0.95]
a ——
Upstream Elevation Downstream Elevation
ae ———-
Flow Velocity
5.50 | 445
| 440
5.45 | 435
E e**
5.40 425
i
| 2
W535 W415
4.10

0.35

0.30

0.10

0.05

 

Conduit culverts from N9 to OUT
{Max Q2 Flow = 0.3867}{Max Velocity = 0. 76)
ae ——_- ———
Upstream Elevation Downstream Elevation
—_ oone
Flow Velocity

Jan 1995

 

 

Conduit culverts3 from N28 to N29
[Max Q2 Flow = 02389}{Max Velocity = 1.48}
oe — ———
Upstream Elevation Downstream Elevation
— eons
Flow Velocity
34
Se
| E
3.4
|
w 30
{ 29
|
28
0.25
le
|
0.20
06
| 05
| 0.15
|
| 048?
1 =
| 3*
los 0.10
|
| 02
| 0.05
01
|
'
y 0.00
1Sun 1AM = 2AM-—s 3AM AM SAM
Jan 1995 Time

1.4

Page 46

 

 

oun eet ver
ws oWeOWNWECOWNWZ——s«CSG eS
00 00
300
so
oro
sto
oF
E oro
j | |
= ; | sto
! t
! t
1 |
| | oc0
oz | |
|
\| seo
if!
a
i}
sz \ ovo
az
of
ze
re
9t
se

 

ARORA,

noid
Se ——
ORB WwRasUVOG uonenery weensdr
[zs 7 = AEOPA KANT P1Or 0 = “Ld 01D YPM]

67N © 8TN WOR ESHIATNS UNPUO

(w) Uogeasi3

 

 

 

 

 

 

S661 ver

ws wr Wve Wz wt uns ws wr Wve wz wh uns as
oo oo (00
f |
soo
40 | 1 60 |
oro
zo} gol
| sd svo
£0 £0
| . =
€0
oT v0 /
j —— | szo .
me n .
” gis |
90 | er) 2 1, i ccod
j Sal
40} 90 =6£0 oro
| | /
5 sro
*° | 20 90 | \ |
| oso
ee 60
7 t
ae \ \ sso
oF a \ .
60 090
we "
| oes ' y
| zy
ses | m
m ”
| 3 ev 3
| ows g | vr 8
| = | ,a
j _3 } sy 3
[ ows |
{ | oP
{
| oss Ly
| | sons ar
TN mold AORN
on re em om a = —
UORBAS Wee SUVOG uonenay weansdl UONRAD] WEARSLVOG uoReAa|A weesd)
= = Ox]
[90 1 = Anoop, xeWTOL88'0 = MoLd OID XeW] [£01 = Anoop XeW]OS6S 0 = MOLI O1
LZN 91 bN WO SSPAAINI WNpUoD NO 01 6N WOH SHaayns WNpUudy

Page 47

Velocity (a2)

3.0
25
2.0
1.0

Os
0.0

 

3.05)

f\
H
it
1 |
i |
if
I |
iy
i 4
i |
i

1 i
i 4
t {
i 1
'

1Sun 1AM 2AM 3AM 4AM SAM
Time

= 0.491 1){Max Velocity

Conduit culverts3 from N28 to N29
[Max Q100 Flow

9:28:33 3282 2 2 8 &8 §& 8&8 2# 2 8 8
o °o So o So So o So So So o
(wi) voReAs|3 (suo) Mois
Velocity (m/s)
“5 22282 nr @ © £€ 2 Y 5 8B
e@ i A at Sad So So o So So °o o o o o

1.23]

= 0.7088}{Max Velocity

Conduit culverts from N9 to OUT

[Max Q100 Flow

0.9946}{Max Velocity = 1.11]

Conduit culverts-e from N4 to N27
[Max Flow

 

 

Page 48

 

STORMWATER MANAGEMENT
PLAN

PART B
STORMWATER QUALITY

 

PROPOSED BUSINESS CENTRE
DEVELOPMENT
EENIE CREEK ROAD, NOOSAVILLE

for

KEN HICKS & ASSOCIATES

M3048
April 2007

Fie ne ~
eB aeQrRouP
[ie BARLOW GREGG EDI. member

— www.vdmg.com.au

Page 49

STORMWATER QUALITY MANAGEMENT PLAN

TABLE OF CONTENTS

 
 
 
  
 

1.0 Imtroduction............ccscocssssssesssssssensssarsscssssacssnssccscnsenssssssesesesessessscnssassasonseossnsesnsseeoes 3

2.0 Pollutant Export Modelling... 4
2.1 — Water Quality Objectives. wf
2.2 ~ Treatment Nodes........... 4
2.3 — Rainfall Data.............. 5
2.4 — Assessment of Results... 5

3.0 Background Water Quality 6

4.0 Conclusion...........ccccccsssssssessescsnsssssecronscsssescessceoessssssvessassecesssasesessnesnserscssenssesseones 7

APPENDIX A,.....ccceceececeene Proposed Development Layout

APPENDIX B............0eceeeee MUSIC Output

 

BARLOW GREGG VDM

M3048
APRIL 2007

Page 50

STORMWATER QUALITY MANAGEMENT PLAN 3

 

1.0 Introduction

Part B of this Stormwater Management Plan aims to outline stormwater quality objectives and
how they will be achieved for the business centre development at Eenie Creek Road,
Noosaville.
The specific objectives of Part B are as follows:

+ Determine post-development water quality;

« Identify relevant water quality objectives (WQO's);

« Outline how the WQO's will be achieved.

« Investigate background water quality (refer attached Golder Associates Report).

The Model for Urban Stormwater Improvement Conceptualisation (MUSIC) has been utilised
to model predicted pollutant export loads and concentrations, and assess the suitability of a

range of treatment devices.

The site of the proposed development is approximately 21.6 Ha in area and contains a child
care centre in the northern part of the lot, with the balance characterised by bushland. Access
to the child care centre is from Commerce Court, while maintenance access to the sewer pump
station is from Rene Street to the West. The site slopes at an approximate gradient of 4%
generally towards the south of the site and eventually into Eenie Creek. The south-eastern
portion of the site is designated for Environmental Drainage under the Noosa Plan and as such

no development works may be carried out in this area.

The proposed development involves the reconfiguration of the proposed lot into 5 lots. This
includes 4 lots suitable for business centre style construction. Access to the site will be
provided from the proposed link road that skirts the east of the site, with a link road
connection through to Rene Street. Lot 1 will maintain it's current access from Commerce
Court.

The proposed development layout is attached in appendix A.

 

BARLOW GREGG VDM M3048
APRIL 2007

Page 51

STORMWATER QUALITY MANAGEMENT PLAN 4

2.0 Pollutant Export Modelling

As previously mentioned the MUSIC modelling software was utilised to predict performance
characteristics of the proposed water treatment train. Modelling parameters were set up in
accordance with Brisbane City Council's recommendations as specified in “Guidelines for
Export Pollutant Modelling in Brisbane Version 7” (October 2003). The node layout of the

music model is provided in appendix C.

2.1 — Water Quality Objectives

This model uses the water quality objectives set out by Noosa Shire Council. A

summary of the key indicator standards is set out below in table 2.1.

Table 2.1: Noosa Shire Council Water Quality Objectives

 

 

 

 

 

 

Indicator Value
Total Suspended Solids 15 mg/L
Total Phosphorus 0.05 mg/L
Total Nitrogen 0.5 mg/L

 

 

2.2 — Treatment Nodes

The recommended BCC values for commercial source nodes have been used in
MUSIC to generate predicted pollutant loads from the site. The following devices have

been used in the treatment train to reduce these pollutant loads to an acceptable level.

« Gross Pollutant Traps - The model has used a GPT for each individual lot before
tunoff is discharged into swales. The locations of these GPT's is shown in
Appendix B. These GPT's were modelled to remove 90% of gross pollutants for up
to a Q3 month ARI storm. The GPT's to treat runoff from lots will be installed

when construction on that lot commences.

+ Vegetated Swales — Runoff passes through vegetated channels as detailed on the
accompanying engineering drawings. As the majority of stormwater infrastructure
proposed for the site is of open channel construction, vegetated drainage channels
will be used extensively throughout the site. The typical width of these channels is

3 metres.

 

BARLOW GREGG VDM 3048
APRIL 2007

Page 52

STORMWATER QUALITY MANAGEMENT PLAN 5

+ Bio-Retention Areas — These areas will be placed in-line with the vegetated swales
at several locations as indicated on the engineering drawings. These areas will have
an extended detention depth of 0.3m with a combined storage surface area of
790m’. The filter material will consist of a 0.15m deep sandy loam layer overlying
a 0.15m deep layer of gravel. The total area of bio-retention is to be 790 m’.
Perforated pipes in this bottom layer will carry flow to the outlet of the bio-

retention area.

Details and locations of proposed stormwater infrastructure can be found in the

accompanying engineering drawings.
2.3 - Rainfall Data

Rainfall data for the site was chosen to give the best representation of actual conditions
to be expected. The meteorological data selected in the MUSIC program was the
Cooroy 30/11/1980 — 31/05/1990 data provided by the Bureau of Meteorology, using
a 6 minute time step. This period of data was used as requested by Noosa Shire

Council.
2.4 — Assessment of Results

The specified water quality objectives have been met on the subject site for total
suspended solid (TSS), total phosphorus (TP), and total nitrogen (TN) concentrations
through the use of gross pollutant traps, vegetated swales, and bio-retention areas.
Appendix C contains the following MUSIC output:

+ Flow based sub-sample daily mean cumulative frequency graphs,

+ Treatment train effectiveness for the system,

« Node Layout

Table 2.2 below indicates the predicted export pollutant concentrations calculated by
MUSIC;

 

BARLOW GREGG VOM M3048
APRIL 2007

Page 53

STORMWATER QUALITY MANAGEMENT PLAN 6

 

 

 

 

‘able 2.2: Predicted Post-Development ited _Wai wali
Indicator Predicted Value
Total Suspended Solids 1.25 mg/L
Total Phosphorus 0.031 mg/L
Total Nitrogen 0.487 mg/L

 

 

 

 

The above results indicate that through use of the specified treatment train, the site will
achieve a:

« 96.4% reduction in total suspended solids
« 75.4% reduction in total phosphorus

+ 52.8% reduction in total nitrogen

3.0 Background Water Quality

Golder Associates have prepared a surface water quality monitoring program for the site.

Some of the key indicators measured are listed below in table 3.1.

 

 

 

 

Table 3.1: icted -Devi ie fr
Indicator Measured | Measured | Measured
Valuel | Value2 | Value 3
Total Suspended Solids 8mg/L | 16mg/L | 32 mg/L
Total Nitrogen 1.5 mg/L | 4.4 mg/L | 1.8mg/L
Total Phosphorus 0.03 mg/L | 0.03 mg/L | 0.11 mg/L

 

 

 

 

 

 

These results show that existing pollutant concentrations are actually higher than the future
concentrations as predicted by MUSIC. The entire surface water quality report by Golder
Associates is included elsewhere in the application. An additional water quality program is

proposed for the site, details of which can be found elsewhere in this application.

 

BARLOW GREGG VDM M3048
APRIL 2007

Page 54

STORMWATER QUALITY MANAGEMENT PLAN 7

4.0 Conclusion

Part B of this stormwater management plan has outlined the stormwater quality objectives for
this development and how these will be achieved. Predictions from the MUSIC software have
been used to measure the performance of the proposed stormwater treatment train. Modelling
shows that Noosa Shire Council requirements can be met for total suspended solids, total

phosphorus, and total nitrogen concentrations.

 

BARLOW GREGG VDM M3048
APRIL 2007

Page 55

APPENDIX A
PROPOSED DEVELOPMENT LAYOUT

Page 56

 

 

  

  

_ NEW ROAD
"PENDING SPI82EG0

 
  

NEW ROAD

      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

   
  

8
“3 le
5 ale
° 2226, 565
WP See
$
SA
SK |
Ib
=06.10.081 3 + ——
tat TTC Te EMT C
P2194 P29)
em 4 a jz
a
ms,
af
X
\
gf of
S$: fs
So i;
a8
zePT
55.009 wf
(56a we
fs =
nists as* m §
17509 we
5
\ 2700886 avoy M3N |
z imines etd 2 ~ sly |
& “agNeo> aacee s 5 E
S o 8 z wh
2 ONS N Xe
“ E 2 oe ON ,
Wy 2 E BS Ne
& 2 N ad. 1 sy
x & = N he x5
¢ N wy 190 ¢ 3 is
“ yer 20 $5400... \Se £0615
l ee ett ser e
THE00-0
,
3 & g & & ® z & & 5 nxn 8 A
x3 a 3 zx 3 » 3 2s ps ze es 28 ws 33 Ss 3
. 3 aes 3 R < ws w xs ws sz 3 = & 5
@l-p tp ob Pee Lee | RG Se | Pe] Se) Ae) RP Re] Rep Re] Re | .
5 5 é g ~ & ‘l
g g uy & 3 i
5 ww a
a Oe
25 ~
oe
2 4985 ”
S zat z
fetus Ly
azetea
aoa =
2oguuZ WG
S2°ssi
g-Basa Ce
veau™ '
gye35- :
ew a’
«32728 |
Stata
4,2& 2
“foogaa
YesiGa
REZ2E2
- LEVEL OGM Psens4sz7 Associated Consultants Cesigneds
Notes ALEVE, Oa TUN ano KAJ
tint = S&L L ene severe
« 08/02/07 CHANGE BOUNDARY OF (OT ¢ SAME AREA.
it 15762797 CHANGE COVERNANT 8 TO 2000mE2
Project PROPOSED RECONFIGURATION OF A x dmenfi”? GUNGE LOTS 14 2 ComttoN BOY Drawn AMR Chr ynan Surmameibertchs com a ]
. mendments
OF LOT 1 0N RP215933 a ta a travegie [amma
: ene ote 057 037% 2007] mitiureien cover :
€ s90t06 ounce tor « sue ate Pig ner Te en hicks
LOTS 1-5 + | om | Searetatenr ces wifoaeote 060506 E M
‘ 206 50 8049 P05 Computer File LISOO/At cours, AWD aseociaree
P A R | S H 0 F T E W A N T | N , " CUNEE LOTS sheat no, Tot 1 heets Ranta aOeeneeesennneeyes Prop isis 5] Scale ° nia Baner US
1 7 CHANGE ROAD WiOTH TO 27m
L a 21701707 CHANGE LOT & KEEPING SAME anEA .

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 57

APPENDIX B
MUSIC OUTPUT

Page 58

oN,

Ss Rainwater Toe

Lot 2 Gross Pollutant Trap 1 pict 4

= Swale ia =
GU
Rainwater TaNyga

Bio-Retention 1 a Tank 4
= a 'e 5 lute Trap 4
S — Gross Pollutant Trap 2a

Lot 2b Swale 2a

  
   
      
  

Pa

Bio-Retention 4

= Bio-Retention 2 A
Rainwater Ta b io-Retention 2a ae
Bio-Retention 3 Se ~
2~, Gross Pollutant Trap 3 4 Ss
Gross Pollutant Trap 2b =

Rainwater Tank 3 Lot 3
Swale 2b

Bio-Retention 2b

Page 59

 

Treatment Train Effectiveness

 

 

 

 

 

 

 

 

 

Sources [Residual Load |% Reduction
Flow (MLi/yr) 83.4 63.5 23.8
Total Suspended Solids (kg/yr) 1.47E+004 632 96.4
Total Phosphorus (kg/yr) 44.9 11.1 75.4
Total Nitrogen (kg/yr) 256 121 52.8
Gross Pollutants (kg/yr) 1.76E+003 0 100

 

 

Page 60

Page 61

 

 

eyep je SuIeE}UOD
smuoydsoyd [e}0L
yNNC - L0-E-yLesoou

Page 62

Page 63

a

eee

y

Golder Associates Pty Ltd
A.B.N. 64 006 107 857

  

Unlt 1, Oaiton Centre, Newspaper Place
Maroochydore, Qid 4558 Australia

(PO Box 5569, Maroochydore BC, Qld 4558 Australia)
Telephone (07) 5443 3511

Fax (07} 5443 6645

hitp:/Avww.golder.com

( JAN. Golder
Ss Associates

 

CONSTRUCTION ENVIRONMENTAL
MANAGEMENT PLAN
COMMERCIAL DEVELOPMENT
EENIE CREEK ROAD
NOOSAVILLE QUEENSLAND 4566

Submitted to:

BARLOW GREGG & ASSOCIATES
P.O Box 200
Mooloolaba QLD 4557

DISTRIBUTION:

2 Copies — Barlow Gregg & Associates (1 hard copy; 1 electronic copy)
1 Copy - Golder Associates Pty Ltd

October 2006 06683025 - 3000(AA)

S

 

 

OFFICES IN ADELAIDE, BRISBANE, CAIRNS, MAROOCHYDORE, MELBOURNE, PERTH, SYDNEY, NEW ZEALAND, INDONESIA, HONG KONG, CHINA, THAILAND, PHILIPPINES. The Aaveciation
OFFICES ACROSS NORTH AMERICA, SOUTH AMERICA, EUROPE. ASIA, AUSTRALASIA, AFRICA, ‘frst

Page 64

ts

 

 

Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Pagei
Eenie Creek Road, Noosaville

 

 

 

 

 
  

TABLE OF CONTENTS
SECTION PAGE
DEFINITIONS o..ccsssssssssscessececeeeeceserenseseeeuesceeenenceneessenseeneneneaeenaeeneeeeeee sire 000000009 0Ut gee EEE e e208 1
GLOSSARY on ecccsscsscscesesccseeecscenseeeesenesneneneseenseenes ses eeeeneenenaeeU ane ctSOUOS ESRD CDCR ERASERS gE MESES Sot e 2
1.0 INTRODUCTION .....csecsseceessesessessssneseenennesenacenesnaneneesennensenseneneen secs een eee sg c0e genes ete 3
2.0 PROPOSED DEVELOPMENT ......ccccceseesstesssesstessenssecnensnneteeacasarsteeeensnasasaneeng es re nett 3
3.0 OBJECTIVES ooccceccescecseccesssssssessessescenesncenssecuscneneessenesecaneaeeeensenenessenee snes gegg een gens eee stig 3
4.0 DOCUMENT REVISION........c:cceccceceseteeeeeereneerenenseseneneneeeensensnessnneneenennegnegnnnnenegeeee eee 4
5.0 ENVIRONMENTAL MANAGEMENT ORGANISATION CHART ......cccseresstsesenrees 5
6.0 CONTRACTOR MANAGEMENT .........cecsccssescssseesssnenerernssenensnsneneecenanennenennen ens ete 5
7.0 MONITORING AND INSPECTION. ........:ccecessssreessesersesaseeerenesensenesensneesnsnsannenensensns eres 5
8.0 NON CONFORMANCE.........
9.0 AUDITING OF THE EMP
10.0 COMMUNITY RELATIONS
11.0 DOCUMENTATION AND REPORTING FRAMEWORK
12.0
13.0 ENVIRONMENTAL LEGISLATION ........-:csseceesesesetenenneneinarertennenssnencanentnn en teesee gets 9
14.0 OVERVIEW OF ENVIRONMENTAL ISSUES.......sssssssssseeeeseeetsstresneeesntesecensnnnetines lL
15.0 REFERENCES j...cccsssessecseseesessessensssesseesenecsnensensevensanansneacisencnsensscaseacesesezaseneacnasentessenees 13

LIST OF FIGURES

Figure 1 Site Location

LIST OF FORMS

Form 1 Concerns Register
Form 2 Inspection and Monitoring Sheet
Form 3 Site Induction (Attendance Sheet)

Golder Associates

 

Page 65

 

Construction Environmental
Management Plan
Commercial Development
Eenie Creek Road, Noosaville

 

 

 

06683025-3000(AA)
October 2006

Rev: 000 Page ii

 

LIST OF APPENDICES

Appendix A — General Site Management
Appendix B - Water Quality Management
Appendix C — Noise & Vibration Management
Appendix D — Air Quality

Appendix E — Emergency Response

Appendix F — Waste Management

Appendix G — Acid Sulfate Soil Management

Appendix H — Roadwork Works and Drainage Details Sediment & Erosion Control Plan

Appendix I — Ken Hicks Associates Drawing 060506 D

Golder Associates

 

Page 66

 

 

 

Construction Environmental 06683025-3000(AA)

Management Plan October 2006
Commercial Development

Eenie Creek Road, Noosaville

Rev: 000 Page |

 

 

DEFINITIONS

Environmental Harm -

Environmental Nuisance -

Material Environmental Harm -

Serious Environmental Harm -

any adverse effect, or potential adverse effect (whether
temporary or permanent and of whatever magnitude,
duration or frequency) on an environmental value, and
includes environmental nuisance.

is unreasonable interference or likely interference with an
environmental value caused by

(a) noise, dust, odour, light; or

(b) an unhealthy, offensive or unsightly condition
because of contamination; or

(c) another way prescribed by regulation.

“Material environmental harm” is environmental harm
(other than environmental nuisance)

(a) that is not trivial or negligible in nature, extent or
context; or

(b) that causes actual or potential loss or damage to
property of an amount of, or amounts totalling, more
than the threshold amount but less than the
maximum amount; or

(c) that results in costs of more than the threshold
amount but less than the maximum amount being
incurred in taking appropriate action to

(i) _ prevent or minimise the harm, and

(ii) rehabilitate or restore the environment to its
condition before the harm.

“Maximum amount” means the threshold amount for
serious environmental harm.

“Threshold amount” means $5000 or, if a greater amount
is prescribed by regulation, the greater amount.

“Serious environmental harm” is environmental harm
(other than environmental nuisance)

(a) that causes actual or potential harm to environmental
values that is irreversible, of a high impact or
widespread; or that causes actual or potential harm to
environmental values of an area of high conservation
value of special significance; or

Golder Associates

 

Page 67

 

Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page2
Eenie Creek Road, Noosaville

 

 

 

 

 

(b) that causes actual or potential loss or damage to
property of an amount of, or amounts totalling, more
than the threshold amount; or

(c) that results in costs of more than the threshold
amount begin incurred in taking appropriate action to

(i) prevent or minimise the harm; and
(ii) rehabilitate or restore the environment to its

condition before the harm.

“Threshold amount’ means $50,000 or, if a greater
amount is prescribed by regulation, the greater

amount.
GLOSSARY
ANZECC - Australian & New Zealand Environment and Conservation Council
ARMCANZ~ - Agricultural and Resource Management Council of Australia and
New Zealand
NSC - Noosa Shire Council
EMP - Environmental Management Plan
DO - Dissolved Oxygen
SS - Suspended Solids
EPA - Environmental Protection Agency
EAR - Environmental Assessment Report

Golder Associates

Page 68

 

Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

. Rev: 000 Page3
Eenie Creek Road, Noosaville

 

 

 

 

 

1.0 INTRODUCTION

This EMP has been prepared in order to manage and minimise the impact on the environment
during construction of the commercial development on Lot | on SP182880, Eenie Creek Rd,
Noosaville 4566. The location of the site is shown on Figure | (Site Location).

2.0 PROPOSED DEVELOPMENT

2.1 Site Description

The real property description of the site is Lot 1 on SP 182880 and covers a total area of
approximately 14 hectares. The northern boundary of the site adjoins Eenie creek road with a
majority of the property currently covered in vegetation. A number of access tracks exist
throughout the site and with a fire trail along the eastern boundary

2.2 Description of Development

Plans provided by Barlow Gregg & Associates drawn by Ken Hicks Associates (Drawing No.
060506, 01/06/2006)) show details of the proposed lot reconfiguration. The proposed
development consists of the reconfiguration of a lot to form a number of commercial sites as
well as dedicating a proportion of the site to parkland. As part of construction during the
operational works stage vegetation clearing, road construction, filling, and installation of
underground services are to be undertaken.

3.0 OBJECTIVES

The objectives of the EMP are to:
¢ Protect life, health and well being of human and other forms of life;
e Protect the local amenity;

e Base the environmental management of the development in accordance with the
principles of Ecologically Sustainable Development (ESD);

¢ Inform staff, contractors and consultants of appropriate safeguards and control measures
to be implemented to minimise the environmental impact,

e Comply with relevant statutory environmental requirements,

* Provide strategies aimed at minimising environmental harm during the construction
stage; and

e Provide an Environmental Management System, generally based on the key elements of
the AS/NZS ISO 14001-1996 Environmental Management Systems — Specification with
Guidance for use.

A copy of the EMP and associated forms and registers will be kept at the site office during

the construction stage of the development.

Golder Associates

Page 69

 

 

 

Construction Environmental
Management Plan
Commercial Development
Eenie Creek Road, Noosaville

06683025-3000(AA)
October 2006

Rev: 000 Page 4

 

 

4.0 DOCUMENT REVISION

The following table outlines revisions made to this document. Revisions to the document are
made to reflect changes to environmental procedures, environmental management, or the
findings of environmental monitoring.

 

Date

Nature of Revision

Editor

 

 

 

 

 

 

 

 

 

Any complete revision of the document will be accompanied by a new revision number
(ie 001 in the upper right hand corner of reissued pages).

A copy of the revisions to the EMP will be sent to site personnel, or a site meeting may be
called to discuss the implications of the revision to all affected site personnel. The Project
Manager is responsible for the updating of all revisions to the EMP, and information
distribution to site personnel.

Golder Associates

 

Page 70

 

Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page 5
Eenie Creek Road, Noosaville

 

 

 

 

 

5.0 ENVIRONMENTAL MANAGEMENT ORGANISATION CHART

This section outlines the framework that will be used by the Project Manager to manage,
document, and report on environmental issues for the development.

 

Project Manager

 

 

Site Manager

 

 

 

CONTRACTORS
Eg. Civil
Landscapers
Utilities
Builders

 

 

 

The Project Manager is ultimately responsible for Environmental Management during the
construction phase of the development.

The Project Manager will identify which actions are to be delegated to those responsible for
managing environmental issues.

6.0 CONTRACTOR MANAGEMENT

Contractors and their staff are required to comply with the provisions of the EMP at all times.
An understanding of environmental responsibility will be documented by each contractor, or
the nominated site representative, for each organisation on the Site Induction Signatory Form
(Refer Section 11.1). Contractor’s environmental performance obligations shall be
incorporated into the contractor’s conditions of work for the proposed development.

7.0 MONITORING AND INSPECTION

Environmental inspections will be carried out by means of a weekly meeting of responsible
personnel and a site walk through. This will be used to identify any areas of non-
conformance or opportunities for improvement. Any non-conformances will be reviewed at
the weekly meeting.

Monitoring is to be documented as outlined in Section 11.2 and monitoring programs will be
modified based on the findings of site inspections and/or results of testing.

Golder Associates

Page 71

n

 

Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page 6
Eenie Creek Road, Noosaville

 

 

 

8.0 NON CONFORMANCE

Any non-conformance to the EMP must be addressed as soon as is practicable. The
personnel responsible for the non-conformance must be notified immediately for purposes of
issuing rectification instructions.

Non-conformances are formally documented through an audit report (Refer Section 11.3).

9.0 AUDITING OF THE EMP
9.1 Responsibilities

The construction activities at the development will be audited for compliance with the EMP
and its procedures by the environmental auditor. The environmental auditor will be
appointed by the Project Manager.

It is the environmental auditor’s responsibility to:

1. Provide an independent assessment of compliance with the Environmental
Procedures in Appendices A to F.

2. Report on observed activities that have, or may cause, an impact to the environment
or non-conformance to regulation.

3. | Provide recommendations to the Project Manager regarding practical initiatives that
can be employed to improve the effectiveness of environmental management at the
development site.

4. Provide a copy of the Environmental Audit Report to the project manager.

9.2 Frequency

The frequency of Environmental Audits from commencement of site construction activities
will be as follows:

¢ Every fortnight until the construction phase is completed.

10.0 COMMUNITY RELATIONS

Where concerns are made by the community or third parties to the Project Manager, or any
contractors under its control, these will be forwarded to the project manager immediately.

The process for dealing with concems is documented in Section 11.4.

Golder Associates

 

Page 72

 

Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page7
Eenie Creek Road, Noosaville

 

 

 

 

 

11.0 DOCUMENTATION AND REPORTING FRAMEWORK

The following documents relate to environmental performance and form part of the EMP:

1. Environmental Management Plan (EMP);

2. Environmental Procedures (Appendices to the EMP);
3. Site Induction Signatory Form;

Inspection and Monitoring Records;

Environmental Audit Reports;

Concerns Register; and

2 an Ww

Rectification Requests and Instructions.

Items 3 to 7 are defined in the following sections.

11.1 Site Induction Signatory Form

All contractors or employees of the Project Manager working at the proposed development
site must undergo a Site Induction for Environmental Management. The inductee shall sign a
form stating their attendance at the site induction. It is the responsibility of the Project
Manager to verify the satisfactory completion of the form.

The Site Induction attendance signatures shall be documented at the end of the site
induction (Form 3).

11.2 Records of Inspection and Monitoring

The outcome of the weekly meeting and site walk through will be recorded on the inspection
form given in the List of Forms. Any monitoring that requires more frequent attention will
be completed as required and recorded on the Inspection & Monitoring Sheet.

The originals of these sheets shall be kept at the site office (Form 2).
113. —_ Environmental Audit Report

The Project Manager will appoint an independent auditor to carry out audits of the
implementation of the EMP.

A copy of the independent environmental audit report shall be provided to the Project
Manager.

Golder Associates

Page 73

ue

 

Construction Environmental 06683025-3000{AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page 8
Eenie Creek Road, Noosaville

 

 

 

 

 

11.4 Concerns Register

Complaints will be directed to the Project Manager who will issue the concern to the
appropriate personnel for action.

A hard copy record of all concerns will be kept at the Site office and filed for future
reference, if required. (Form 1).

The concerns register will record the following information:

1. Details: Name, address and phone number.

2. Nature of concern: Detail of issue, date of incident, people involved, and location.

3. Action taken or required: Any action proposed or undertaken to address the concern,
including time and date.

4. Response to Action: Was the complainant satisfied with the outcome of the actions
taken, if not, what else needs to be done, or is it outside the scope of the development
works.

5. Prevention or re-occurrence: What action has been taken by the nominated responsible
person to ensure the problem will not re-occur.

11.5 Rectification Requests and Instructions

Non-conformances will be documented on the Inspection and Monitoring Form. The form
states the nature of the non-conformance and the mechanisms implemented to rectify the
problem.

A copy of this form shall be undertaken by the Project Manager on a monthly basis,
immediately in the case of emergencies, or significant non-conformance.

12.0 TRAINING

All site staff of the Project Manager and contractors, will be required to undergo a site
induction covering all the elements of the EMP. The induction will aim to instil
environmental awareness in personnel and:

e Introduce and explain the duty of care required under the Environmental Protection Act
1994.

¢ Introduce the Environmental Management Plan (EMP) and responsibilities it places on
all contractors and consultants.

e Explain the various subordinate components of the EMP and the reporting and
monitoring procedures of the EMP and how they work.

Golder Associates

Page 74

 

Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

. Rev: 000 Page9
Eenie Creek Road, Noosaville

 

 

 

 

 

e Explain how to use the environmental procedures and plans in the EMP.

The content of the induction program will be endorsed and presented by the Project Manager,
or delegate.

13.0 ENVIRONMENTAL LEGISLATION

The construction activities must conform to the relevant Environmental Protection Policies
and environmental regulations promulgated under the Environmental Protection Act 1994.

A brief discussion of the key elements of each of the Acts and the relevant aspects of the
Environmental Protection Policies is provided in the following sections.

13.1 Environmental Protection Act 1994

The principal legislative vehicle for environmental protection in Queensland is the
Environmental Protection Act, 1994 (EP Act).

General Environmental Duty

Under the EP Act, all people have a general environmental duty to take all reasonable and
practicable measures to carry out any activity in a manner that prevents or minimises
environmental harm.

Duty to Notify Environmental Harm

While carrying out an activity, if a person becomes aware that serious or material
environmental harm is caused or threatened by the person’s or someone else’s act or omission
in carrying out the activity, that person MUST as soon as is reasonably practicable after
becoming aware of the event causing the harm inform the employer, or if the employer
cannot be contacted, give written notice to the Administering Authority of the event, it’s
nature and the circumstances in which it occurred.

13.2 Environmental Protection Policies

Environmental Protection Policies (EPPs) within the EP Act are used to control and reduce
environmental pollution and harm and nuisance, They are briefly summarised below.

Golder Associates

Page 75

 

Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page 10
Eenie Creek Road, Noosaville

 

 

 

 

 

Environmental Protection Water Policy 1997

The purpose of this policy is to achieve the objectives of the EP Act in relation to Queensland
waters.

Under this policy, it is an offence to release or deposit the following into, or put in a place
where it could reasonably be expected to move or be washed into a gutter, stormwater drain or
water:

a) rubbish;

b) scrap metal, motor vehicle parts, motor vehicle bodies or tyres;

c) building waste;

d) sawdust;

e) solid or liquid waste from an on-site domestic waste water treatment system,

f) cement or concrete;

g) a degreasing agent, paint, varnish or paint thinner;

h) any manufactured product, or any by-product or waste from a manufacturing
process, that has a pH less than 6 or greater than 9;

i an insecticide, herbicide, fungicide or other biocide; and

j) oil.

It is also an offence to allow stormwater run-off into a roadside gutter, stormwater drain or a
water that results in the build-up of sand silt or mud in the gutter, drain or water (Note: the
offence also applies if a person deposits sand, silt or mud in a place where it could reasonably
be expected to move or be washed into a roadside gutter, stormwater drain or a water body
resulting in the buildup of sand silt or mud in the gutter, drain or water).

Environmental Protection (Air) Policy 1997

The aim of this policy is to achieve the objectives of the EP Act in relation to Queensland’s
Air Environment.

The policy lists goals and air quality indicators for parameters including dust.

Environmental Protection (Noise) Policy 1997

The aim of this policy is to achieve the objectives of the EP Act in relation to Queensland’s
acoustic environment. The policy sets out an acoustic quality objective for an ambient level of
55 dB(A), Leg 24 hr OF less for the majority of Queensland’s population living in residential
areas. :

Golder Associates

Page 76

 

Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page 11
Eenie Creek Road, Noosaville

 

 

 

 

 

Environmental Protection (Waste Management) Policy 2000

The aim of this policy is to achieve the objectives of the EP Act in relation to waste
management. The policy lists the preferred hierarchical option for adoption of waste
management practices as:

Waste avoidance;

Waste re-use;

Waste recycling;

Energy recovery from waste; and
Waste disposal.

14.0 OVERVIEW OF ENVIRONMENTAL ISSUES

This section provides a brief overview of environmental issues associated with the
construction of the proposed unit development.

14.1 Noise

As the construction site is situated within a commercial area, the noise generated by
construction activities and transportation of materials creates a potential for noise impact.
Adjacent land users include residential housing and commercial premises.

14.2 Dust

Activities undertaken during construction create a potential for a reduction in air quality
through the generation of dust. Best practice environmental management will be undertaken
to reduce this impact.

14.4 Water Quality

During rainfall events, uncontrolled runoff leaving the site could potentially cause turbid
water to enter the stormwater system. Solid waste and soil stockpiles, unvegetated and
unsealed carparks, concrete wastes and fertilisers are some sources with the potential to
contaminate surface water. The water quality monitoring program for the development is
contained in Appendix - B Water Quality Management. Performance criteria for surface
water exiting the site have been established using the Australian and New Zealand Guidelines
for Fresh and Marine Water Quality 2000 for a “fresh” receiving environment.

Golder Associates

Page 77

 

Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page 12
Eenie Creek Road, Noosaville

 

 

 

 

 

14.5 Solid Waste

Solid wastes will be produced from a range of waste streams. Waste management practices
will be to achieve, where possible, the adoption of the following waste management
hierarchy:

« Waste Avoidance;

e Waste Reuse;
e Waste Recycling;
e Energy Recovery From Waste; and

e Waste Disposal.

14.5.1 Storage and Disposal of Construction Waste

Wastes would be sorted by type with each contractor being responsible for ensuring that
wastes are placed in the appropriate bin or disposal location. Bins/skips would be colour
coded or labelled according to the type of waste to be deposited with clear signage on each
bin and around the construction site. Bins would be provided where appropriate depending on
the stage of the development.

In keeping with the waste hierarchy, the first step in the waste management process would
involve reducing the production of wastes through efficient planning of resources. Secondly,
those wastes produced would be reused on the site where possible. Where reuse is not
possible the waste would be recycled via the colour coded bins/skips. For non-recycled
wastes energy recovery methods would be employed before final disposal to landfill.

14.6 Dangerous Goods

It is expected that during construction quantities of flammable and combustibles on the site
will be less than the minor storage volumes listed in AS1940 — The Storage and Handling of
Flammable and Combustible Liquids.

14.7. Control of Nuisances

The management for the control of nuisances created during earthworks and construction
phases, including dust and noise created by vehicular traffic on and off the site, is detailed in
Appendices A (General Site Management), C (Noise Management), and D (Air Quality).

Golder Associates

Page 78

ee —

 

 

 

Construction Environmental 06683025-3000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page 13
Eenie Creek Road, Noosaville

 

 

 

 

 

14.8 Amenity

The site, which is located within a commercial area, could potentially have an impact on the
general amenity of the area. Temporary fencing would be erected on the northern boundary
of the site, to improve site safety and reduce visual impacts. Any litter, dust and other
materials emanating from the site, could potentially be detrimental to the amenity of the area.

Temporary security lighting will be angled so neighbouring premises are not affected.
14.9 Flora and Fauna

The sensitivity of the surrounding vegetation requires management of impacts on surrounding
flora and fauna. During construction a number of issues may affect the viability of
surrounding populations. Adequate care is to be undertaken for the protection of surrounding
flora and fauna.

15.0 REFERENCES

The EMP has been prepared based on information supplied by the following reports, and
based on the requirements of the following legislation.

Environmental Protection Act 1994

Environmental Protection Policy (Air) 1997

Environmental Protection Policy (Noise) 1997

Environmental Protection Policy (Water) 1997

Environmental Protection Regulation (1998)

Environmental Protection (Waste Management) Policy 2000

Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2000,

ANZECC/ARMCANZ.

Institution of Engineers (Qld), Soil Erosion and Sediment Control Guideline (1996).

9. Brisbane City Council, Best Practice Guidelines for the Control of Stormwater Pollution
from Building Sites (2000).

10. AS 1940-1993 The Storage and Handling of Flammable and Combustible Liquids.

11. AS 1055.2-1997 Acoustics — Description and Measurement of Environmental Noise.

iD. NK

NAWRYNT

oe

Daniel Joyce BSc(Env Science) Geoff Hurley MSc DIC C.Geol RPEQ 5716
Ecologist Associate
Office Manager

J\2006\Environmental\06683025\TASK_3000 EMP\00_CORRESPONDENCBIOUT\AA06683025-3000r.doc
DINGAH

Golder Associates

Page 79

Figures

 

Page 80

 

 

 

 

: - 2 Targed M =p 7 7

 

 

 

 

yd,

 
  

7

 

~2CHON's
5 TT]
OOUCHO lets

at

~

  
 

 
 

 

 

‘Subject Site |

 

 

a

 

 

 

 

 

 

 

 

Barlow Gregg & Associates.

PROJECT

Commercial Development Eenie Cr Road.

 

DRAWN

DJJ

DATE

04/10/06

 

CHECKED

 

ATE

me

Site Location

 

 

“* 4:40000 (Approx.)

 

 

PROJECT No

06683025

 

FIGURE No

1

 

 

 

NTASK_3000 EMP\03_FiGURES_DRAWINGS¥Ag 1

Page 81

Forms

 

-_—s + . 2

 

Page 82

 

 

Commercial Development Eenie Creek Road CONCERNS REGISTER Complaint No.
Complainant Details: Date:
Name: Time:
Address: Received by:

Contact Phone No.

Nature of Concern:

Detail of Complaint: Concern Received By:

Telephone:
In Person:

Location of Incident:
In Writing:

Date of Incident:
Persons Involved:

  

Action Taken or Required:
Action Required (Y/N): Time/date of Action:

 

 

Type of Action:

 

Responsible Person:

Follow Up

Remedial activities performed 2 nummer Date :

; Performed by:
Complainant Response To Action: a mmmennmnmmnmnnnnnnnttnnnninninninnnnnnne ne
Further Action Required ? (Y/N)

lf Yes, Details of Further Action Required:

Prevention Of Re-Occurrence
Preventative Action Required ?

  

If Yes, Details of Further Action Required:

October 2006

Golder Associates

Form |

Page 83

Commercial Development Eenie Creek Road

INSPECTION & MONITORING SHEET

 

Environmental Procedure:

Responsible Person:

¥

Date of Inspection:

Weather durin edin.

Personnel ent during inspection:

D:MONITORING/ENVIRO! 1 ACTIMITNE 27: ge i | SECHECKED

An

 

Form 2 Golder Associates Octoberr 2006

Page 84

Site Induction Form (Attendance Sheet)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

October 2006
Form 3 Golder Associates

Page 85

 

Appendices

le
4
14

i

eee
- i 4 :

Page 86

 

 

Appendix A — General Site Management
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

 

 

Revision No: 000

October 2006

1 of 2.

 

Al,

A2.

A3.

ENVIRONMENTAL VALUES

The overall protection of the surrounding environmental life, health and
wellbeing of humans.

OBJECTIVES

To meet the requirements of the Environmental Protection Act 1994, all

Queensland Environmental Protection Policies.

Minimise impact on the environment, specifically on the amenity of The

surrounding premises, from activities during construction.

ENVIRONMENTAL CONTROL MEASURES

The following provides a list of the environmental control
general management of the site.

measures for the

 

Environmental Control Measure

Responsibility

 

1.

Ensure that all staff and contractors are aware of the potential
environmental impacts and required minimum environmental
control measures and their responsibilities before they
commence any site works.

Project Manager

 

. Any dangerous areas of the site to be adequately sign posted

indicating the danger.

Project Manager

 

Occupants of adjoining premises will be notified prior to the
commencement of works of the nature and estimated duration
of construction activity and environmental management
controls to be implemented to limit potential nuisances.

Project Manager

 

Temporary security lighting of the site must be designed and
located to ensure that there is no direct light spill that alters
the amenity of the adjacent properties.

Project Manager

 

. General hours of work will be between 7.00 am to 6.00 pm

Monday to Saturday, excluding public holidays, or as agreed
with the Council. If approved by Council, work outside of the
specified hours (7am to 6pm) may be carried out if suitable
measures are undertaken to suppress noise and air
emissions/dust from the site. Written warning must be
provided to the neighbouring residents if the activity with the
potential to emit excessive noise is to be undertaken outside
the general hours.

Project Manager

 

All complaints received must be recorded in writing including
investigations undertaken, conclusions formed and actions
taken. This information must be made available to the
administrating authority on request.

Project Manager

 

Maintain a high standard of housekeeping and ensure that
materials that are likely to attract vermin are properly
disposed of.

Project Manager

 

Dispose of any waste illegally dumped at the site.

Project Manager

 

Provide bins for contractors and staff at locations where they
consume food. Ensure bins are emptied regularly.

Project Manager

 

10.Sweep roads abutting the site at regular frequencies during

construction periods or whenever inspections show signs of
soil on access roads or the site entrance.

Project Manager

 

 

11. Install and maintain a grate at the site entrance to reduce

unwanted soil from leaving site via vehicle tyres.

Project Manager

 

 

 

Golder Associates 06683025 - 3000(AA)

 

 

Page 87

 

 

Appendix A — General Site Management
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

 

 

Revision No: 000
October 2006

2 of 2

 

A4.

AS.

 

Environmental Control Measure

Responsibility

 

12. All stockpiles to be watered or covered with tarpaulins to
minimise dust emissions and not stored where soil could enter
the stormwater system.

Project Manager

 

13. All site personnel to report all non-conformances to the Project
Manager within 1 hour of occurrence or observance.

Project Manager

 

 

14. All dangerous goods (eg distillate and petroleum) to be stored
in a bunded area.
A distance of not Jess than 3 m from the storage site will be
clear of combustible vegetation and refuse.
No more than 2 500 L for class PG | or class PG Il liquids are
to be stored on site during operation. No more than 5 000 L of
PG Ill or 10 000 L of Combustible liquids (such as diesel) are
to be stored on site during operation.

 

Project Manager

 

INSPECTION AND MONITORING

The following inspection and monitoring program will be conducted at the site.
The results of these activities will be recorded on the inspection/monitoring
data sheets provided with the EMP.

 

 

 

 

 

 

 

 

 

 

 

Activity Frequency Responsibility

1. Inspect signage at dangerous areas of | Weekly Project Manager
the site.

2. Inspect security lighting. Weekly Project Manager

3. Inspect content and quantity of material | Weekly Project Manager
in bins.

4, Inspect site for general tidiness and Weekly Project Manager
illegal dumping of wastes.

5. Inspect roads abutting the site for soil, Weekly Project Manager
sand, clay or stones originating from the
construction activities on site.

6. Check all stockpiles are covered or | Daily Project Manager
maintained moist when not in use.

7. Check for correct storage of all Weekly Project Manager
dangerous good on site.

 

PERFORMANCE INDICATORS

 

 

 

Item Performance Indicator
1. Signage No incidences due to absence or adequacy of signage.
2. Lighting No community complaints regarding security lighting.

 

3. Hours of work

No work conducted outside normal hours without evidence of
measures taken to suppress noise and air emissions/dust.

 

 

4, Site Site remains tidy. No complaints from local community or
Housekeeping relevant regulatory authorities.
5. Site No occurrence of illegal dumping of waste at site or in general

Housekeeping site waste bins.

 

6. Public Roads

No adjacent public roads contain soil, sand, clay or stones
originating from the construction activities on site.

 

7. Dangerous Goods

No sign of seepage or spills of dangerous goods stored on site.

 

 

8. Non
conformances

 

All non conformances are reported and rectified.

 

 

Golder Associates

06683025 - 3000(AA)

 

 

Page 88

 

 

Appendix B — Water Quality
Construction Stage
Environmental Procedures
Commercial Development

 

Revision No: 000

October 2006

1of2

 

 

 

 

 

 

 

 

 

 

Eenie Creek Road.
B1. ENVIRONMENTAL VALUES
The protection of surrounding surface water and groundwater.
B2. OBJECTIVES
1. Limit environmental impact on adjacent residential and commercial premises.
2. Control potential sources of contaminated stormwater.
3. Limit the quantity of soil lost during construction activities.
4. Manage all discharges of water from the construction site.
5. Comply with the Environmental Protection (Water) Policy 1997, and NSC
local laws, codes and policies.
6. Use the Australian and New Zealand Guidelines for Fresh and Marine Water
Quality 2000 for the protection of environmental values.
7. Undertake Erosion and Sediment Control in accordance with the Institution
of Engineers (Qld) Erosion and Sediment Control Guidelines (1996).
B3. ENVIRONMENTAL CONTROL MEASURES
The following provides a list of the environmental control measures for
management of surface and ground waters at the site.
Environmental Control Measure Responsibility
1. All stormwater will be managed in accordance with the | Construction Manager
stormwater treatment plan (Appendix H).
2. The velocity of stormwater over the site will be teduced | Construction Manager
where gradients exist by the installation of retarding
structures, such as silt fences.
3. Stockpiles when not in use will be watered to minimise Construction Manager
dust emissions and not placed on footpaths, or
stormwater drains.
B4. INSPECTION AND MONITORING

The following inspection and monitoring program will be conducted at the site.

 

Activity

Frequency

Responsibility

 

1. Inspect disturbed areas for signs of land
erosion or deterioration.

«Weekly
* After each major
rainfall event*.

Construction
Manager

 

2. Inspect location, design and stormwater
protection of stockpiles so that
sediment is not deposited into the
stormwater system.

 

 

«Weekly
e After each major
rainfall event.

 

Construction
Manager

 

* > 25mm within a 24 hour period.

 

Golder Associates

06683025- 3000(AA)

 

 

Page 89

 

 

 

Appendix B — Water Quality Revision No: 000
Construction Stage October 2006
Environmental Procedures
Commercial Development
Eenie Creek Road.

2of2

 

 

B5. PERFORMANCE INDICATORS

 

Item

Performance Indicator

 

1. Surface Water
Control System

All control systems are maintained in good working order.
Surface water is separated from disturbed and undisturbed
areas.

 

2. Stockpiles

Location and design of stockpiles meets control measures in
B2,. Stormwater protection of stockpiles is maintained,
effective and in good working order.

 

 

3. Non conformance

 

All non-conformances are reported and rectified.

 

 

Golder Associates 06683025- 3000(AA)

 

 

Page 90

 

 

Appendix C - Noise & Vibration
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

 

 

Revision No: 000
October 2006

tof 2

 

C1.

C2.

c3.

ENVIRONMENTAL VALUES

The protection of the surrounding acoustic environment.

OBJECTIVES

. Limit nuisance due to noise and vibration.
. Regulate noise from construction activities to limit nuisance to nearby noise

sensitive places.

ENVIRONMENTAL CONTROL MEASURES

. Comply with the Environmental Protection (Noise) Policy 1997.

The following provides a list of the environmental control measures for the
management of noise at the site.

 

Environmental Control Measure

Responsibility

 

1,

General hours of work will be between 7.00 am to 6.00 pm
Monday to Saturday, excluding public holidays, or as agreed
with Council. {f approved by Council, work outside of the
specified hours (7am to 6pm) may be carried out if suitable
measures are undertaken to suppress noise and air
emissions/dust from the site. Warning must be provided to the
neighbouring residents if activity with the potential to emit
excessive noise is to be undertaken outside the general hours.

Project Manager

 

Use hydraulic equipment in preference to pneumatic.

Project Manager

 

2

Fit manufacturer approved muffler to all mobile equipment,

Project Manager

 

. Ensure plant and equipment is maintained and serviced

regularly.

Project Manager

 

. No truck associated with construction or delivery activities

must be left standing with its engine operating in a street
adjacent to residential or commercial premises.

Project Manager

 

. All deliveries to and from the site must be made during the

scheduled working hours.

Project Manager

 

When requested by the Administrating Authority noise
monitoring must be undertaken to investigate any complaint of
noise annoyance. Monitoring must include:
Lao Lasor Lago, baer (1 5mins)' and background
measurements.
Atmospheric conditions including wind speed and
direction;
Effects due to extraneous factors such as traffic noise;
Location, date and time of recording and the method
of measurement and reporting of noise levels must
compty with the Environmental Protection Agency's
Noise Measurement Manual, Third Edition, 1 March 2000,
or more recent editions or supplements to that document
as they become available.

Project Manager

 

 

8.

If pneumatic breakers or blasting is required to excavate rock,
then vibration monitoring will be undertaken at the site
boundary.

Project Manager

 

 

 

Golder Associates 06683025 - 3000(AA)

 

 

Page 91

“

 

 

Appendix C - Noise & Vibration
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

 

 

Revision No: 000

October 2006

2of2

 

c4.

C5.

INSPECTION AND MONITORING

The following inspection and monitoring program will be conducted at the site.
The results of these activities will be documented as they are completed.

 

Activity Frequency

Responsibility

 

1. Inspect the maintenance and servicing |} Bi Monthly
records of plant equipment.

Project Manager

 

adjacent sites during site activities that are | Project Manager
expected to result in noise levels that may
exceed performance indicators.

2. Conduct noise monitoring surveys at! As judged by the

Project Manager

 

3. Monitoring of noise in accordance with | On
AS1055-1 Acoustics - Description and | more than
measurement of environmental noise will | similar noise
be undertaken in response to noise | complaint
complaints.

 

receipt of

1

Project Manager

 

 

PERFORMANCE INDICATORS

 

Item Performance Indicator

 

1. Working Hours

7.00 am to 6.00pm Monday to Saturday, excluding public
holidays, except as agreed by Council and suitable measures
are implemented to suppress noise emissions.

 

2. Noise Levels at

 

Construction noise inaudible within a habitable room during:

 

noise sensitive « 6.00pm to 7.00am Monday to Saturday
place e Sundays & Public Holidays
3. Noise Noise measured at a “Noise Sensitive Place”

 

 

 

 

 

 

Level Monday to Saturday Sundays and public holidays
dB(A) Jam-6pm | 6pm- 10pm- Yam-6pm 6pm-10pm | 10pm-9am
measured 10pm Jam
as
Laro-ddj, 65 60 50 65 60 50
1Omins
Lavadj, 1Omins 70 65 55 70 65 55

 

Noise measured at a “Commercial Place”

 

Monday to Saturday

Sundays and public holidays

 

 

 

Tam— 6pm-10pm | 10pm-7am | 9am-6pm 6pm-10pm | 10pm-9am
6pm.
Lato-adj, 70 65 55 70 65 50
10mins
La1.adj, 10mins 75 70 60 75 70 60

 

 

 

 

 

 

 

 

4, Complaints

No complaints received regarding noise.

Any complaints

regarding noise are to be dealt with immediately and if
necessary measures implemented to prevent recurrence.

 

 

5. Vibrational Energy

 

Peak Particle Velocity <5 mm/s.

 

 

Golder Associates

06683025 - 3000(AA)

 

Page 92

 

 

Appendix D — Air Quality Management | Fevision No: 000
Construction Stage October 2006
Environmental Procedures
Commercial Development
Eenie Creek Road.

1of2

 

 

 

 

D1.

D2.

D3.

ENVIRONMENTAL VALUES

The protection of air quality for the environment and life, health and well being
of humans.

OBJECTIVES

14. Minimise the health risk or reduction in air quality due to air emissions and
dust to site workers, and nearby residences premises.

2. Minimise the creation of airborne dust and excessive vehicle exhaust
emissions.

3. Minimise the quantity of soil lost during construction activities.

4. Comply with the Environmental Protection (Air) Policy 1997.

ENVIRONMENTAL CONTROL MEASURES

The following provides a list of the environmental contro! measures for air
quality management at the site.

 

Environmental Control Measure Responsibility

 

1. Exposed areas including stockpiles and unsealed internal Project Manager
roads will be sprayed with water on a regular basis. Care will
be taken not to over apply water.

2. Install dust screens during earth moving operations where | Project Manager
water spraying is not practical.

3. Loads of material on trucks will be covered with tarpaulins or | Project Manager
sliding covers prior to leaving the site.

4. Work schedules will be arranged so that the area of disturbed | Project Manager
land is kept to a minimum.

5. Restrict. concrete dust emissions through the use of | Project Manager
preventative measures such as water sprays.

6. Site vehicles will be maintained in an operable condition in | Project Manager
accordance with manufacturer's specifications.

7. Exhaust emission effects will be minimised by ensuring that | Project Manager
site vehicles and machinery are fitted with appropriate
emission control equipment that is maintained and serviced
to manufacturer's specifications.

8. Earth bunds to be covered or maintained moist (eg. tarpaulin | Project Manager
or turf etc) when not in use.

 

 

 

 

 

 

 

 

 

 

 

Golder Associates 06683025 - 3000(AA)

 

Page 93

 

 

 

Appendix D — Air Quality Management
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

Revision No: 000

October 2006

2 of 2

 

 

D4.

DS.

INSPECTION AND MONITORING

The following inspection and monitoring program will be conducted at the site.
The results of these activities will be recorded on the inspection/monitoring
data sheets provided.

 

 

 

 

 

 

 

Activity Frequency Responsibility
1. Inspect the site for un-stabilised soil, | Weekly Project Manager
stockpiles, dust risks.
2. Inspect transport vehicles for load coverage. | Per Truck Project Manager
3. Inspect adjacent sites for deposition of dust. | Weekly Project Manager
4. Inspect road frontage for dust deposition | Daily Project Manager
and remove residual material relating to the
site. Assess whether monitoring is required.

 

PERFORMANCE INDICATORS

 

item

Performance Indicator

 

 

 

 

 

 

 

1. Soil Surfaces ¢ All bare earth areas stabilised and wetted where necessary.
e All stockpiles stabilised and seeded where necessary.
2. Vehicles © Limited vehicular trafficking of unsealed areas.
e All vehicles fitted with appropriate exhaust systems.
3. Complaints « No complaints regarding dust are received from residents
and users of nearby public open space.
4. Dust At the boundary of an affected sensitive piace:
¢ Dust fallout less than 120 mg/m? day.
¢ PM, of 150 wg/m® over a 24 hour averaging time.
5. Non conformance | All non conformances are reported and rectified.

 

 

Golder Associates 06683025 - 3000(AA)

 

 

Page 94

~~

 

 

Revision No: 000

Appendix E — Emergency Response
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

October 2006

1of 2

 

 

 

E1.

E2.

E3.

E4.

ENVIRONMENTAL VALUE

The protection of life, health and wellbeing of humans and the environment.

OBJECTIVES

Provide a mechanism to address and mitigate the impact of significant
breaches of the environmental procedures, or resulting from unforeseen
hazards.

EMERGENCY RESPONSE PLAN

The following provides a list of potential breaches, respective control measures
and key contacts.

 

 

HAZARD

EMERGENCY ACTION

CONTACT

 

Excessive Dust

Spray offending area with water.

Project Manager

 

Excessive Noise

identify source(s) of noise and stop activity
immediately.

Project Manager

 

Chemical spill onto
soil

Use spill containment equipment to mop up
and contain spill. Conduct complete clean
up of contaminated area and dispose to
landfill as approved by EPA.

Project Manager

 

Chemical spill into
stormwater drain

Identify stormwater exit drain and isolate.
Mop up spill and clean stormwater exit
drain.

Project Manager

 

High sediment loads
in stormwater
exiting from site.

Inspect all active areas of site for signs of
erosion or uncontrotled runoff. Identify
source. Rectify any non conformance.

Project Manager

 

Other

 

 

Contact Project Manager as soon as
possible. Contact the site environmental
consultant for advice if required.
Implement emergency procedure as
advised.

Project Manager

 

 

CONTACT PROCEDURE

 

The Project Manager must be immediately informed of the emergency such that
action can be taken to mitigate any potential impacts. If environmental harm
has occurred, notify Council and the Environmental Protection Agency (as soon
as is practicable at least within 24 hours).

 

Golder Associates 06683025-3000(AA)

Page 95

 

 

Appendix E — Emergency Response Revision No: 000
Construction Stage October 2006
Environmental Procedures

 

 

 

 

 

 

 

 

 

 

 

 

 

. 2 of 2
Commercial Development
Eenie Creek Road.
E5. CONTACT NAMES AND NUMBERS
Role Organisation Contact Number
Project To be
Manager advised
Fire Qid Fire & Rescue _ 000 (Emergency only)
Authority
Environmental Environmental _ 1300 130 372
Emergencies Protection Agency (24 hours)
Local Council Maroochy Shire _ 1300 366 695
Council
E6. FOLLOW UP

lf an emergency response action is initiated at the site, then the Project
Manager or representative must prepare a follow up report that contains the
following information:

Date.

Time.

People present at the time, or responsible for emergency (if any).

Location of incident.

Cause of incident.

Nature and extent of incident.

People contacted.

Measures taken to rectify the issue.

Monitoring (if any) undertaken to assess any impact of incident.
Preventative measures undertaken in order to prevent incident occurring
again (if possible).

Any changes to the Environmental Management Plan that may be required.

The report must be submitted to the Directors of S & L Developments Pty Ltd
for action and advice on nature of the works undertaken to rectify, clean up
and prevent reoccurrence of the incident.

 

Golder Associates 06683025-3000(AA)

 

 

Page 96

 

 

 

Appendix F — Waste Management
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

 

Revision No: 000

October 2006

1of3

 

F1. ENVIRONMENTAL VALUE

The protection of life, health and wellbeing of people and the density of
ecological processes and associated ecosystem.

F2. OBJECTIVES

1. Ensure that the waste material on site is handled and disposed of in an

appropriate way.
2. Minimise any environmental impact on the quality of soil or groundwater.
3. Minimize waste discharge to the environment.
4. Comply with Environmental Protection (Waste) Policy 2000.

F3. ENVIRONMENTAL CONTROL MEASURES

The following provides a list of the environmental control measures for
management of waste at the site.

 

Environmental Control Measure

Responsibility

 

1. Implement good house-keeping measures, including:

staff training;

appropriate facilities to ensure satisfactory removal of
waste substances;

layout of work site; the designation of areas for certain
types of high risk activities;

collection of wind blown litter;

immediate clean-up of spills;

sediment traps will be installed at stormwater discharge
points;

maintain sediment traps ; and

remove waste so as not to produce a fire hazard.

Project Manager

 

2. Concrete wastes must be managed in the following manner:

mixing is to be conducted in designated areas to prevent
washings entering stormwater drainage systems;

excess wet concrete mix must be kept in designated areas
of the site so that runoff is prevented from entering
stormwater drains; and

washing of equipment and vehicles to be done in
designated areas of the site so that runoff is prevented
from entering stormwater drains.

Project Manager

 

3. Acrylic painting wastes must be managed in the following
manner:

equipment must be cleaned in designated areas of the site
so that washings are prevented from entering stormwater
drainage systems;

aqueous paint washings must be directed to a sump to
allow paint residues to settle out;

paint sludge must not be disposed of onto bare ground;
following sedimentation, supernatant {wash water) will be
directed to sewer under the conditions of a trade waste
permit from Council; and

paint containers must be placed into bins.

Project Manager

 

 

4. Solvent or oil based paint wastes must be disposed of into
dedicated bins as Regulated Waste’.

Project Manager

 

 

 

' Regulated Waste ~ as defined by the Environmental Protection Policy 2000.
Golder Associates 06683025-3000(AA)

 

 

Page 97

 

Appendix F —- Waste Management Revision No: 000
Construction Stage October 2006 -
Environmental Procedures
Commercial Development
Eenie Creek Road.

2of 3

 

 

 

 

 

5. Provide dedicated bins for disposal of the following waste | Project Manager
streams: Concrete, timber, plasterboard, steel, plastics, general
waste, and Regulated Waste”, and dealt with according to the
waste disposal table outlined below.

 

6. Waste disposal is to be undertaken according to the Identify | Project Manager
recycling options for waste streams collected and implement
procedures to ensure these waste disposal options are
followed.

 

7. Educate staff and contractors as to the correct disposal of | Project Manager
waste materials.

 

8. Follow the Waste Management hierarchy: waste avoidance, | Project Manager
waste re-use, waste recycling, energy recovery from waste,
waste disposal for all materials used on site.

 

9. Fence the site to prevent wind blown waste from leaving the | Project Manager
site.

 

 

 

 

F4. INSPECTION AND MONITORING

The following inspection and monitoring program will be conducted at the site.
The results of these activities will be recorded on the inspection/monitoring
data sheets provided.

Activity Frequency Responsibility

 

 

1. Monitor areas, such as wire fences, | Weekly Project Manager
where litter may accumulate from
sources external to the site. Remove
any such litter and dispose of into bins.

 

 

 

 

 

2. Inspect designated concrete mixing and | * Weekly Project Manager
wash up areas. e After each
major rainfall
event*
3. Inspect designated paint wash up areas.__| Weekly _ Project Manager
4. Inspect waste disposal bins for correct | Weekly Project Manager
placement of waste materials
5. Sediment traps free of waste. Weekly Project Manager
6. Inspect fences for wind blown waste. Weekly Project Manager

Remove Waste.

 

 

 

 

 

*> 25mm within a 24 hour period.

 

2 Regulated Waste — as defined by the Environmental Protection Policy 2000.
Golder Associates 06683025-3000(AA)

Page 98

 

 

 

Appendix F — Waste Management
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

Revision No: 000

October 2006

3 of 3

 

 

PERFORMANCE INDICATORS

 

Item

Performance Indicator

 

1. Housekeeping

No complaints from community or regulatory authorities
tegarding litter or other wastes originating from the site.

 

2. Concrete

Ail concrete mixing and equipment cleaning conducted in
designated areas.

 

 

3. Paint « No paint sludge disposed onto bare ground.
¢ All paint wash waters directed to sewer.
¢ Atl paint wash up conducted in designated areas.
4. Regulated All regulated wastes placed only in dedicated bins.
wastes

 

5. Gross Pollutants

The site is free from wastes such as plastic bottles, glass
bottles, food wrappers, papers etc.

 

6. Non conformance

 

 

All non conformances are reported and rectified.

 

OUTLINE OF RECYCLING FOR WASTE MATERIALS

The following outlines the separation of wastes and disposal for reuse or

refuse.

 

Excavated Material

Clean fill from site will be transported to Noosa Shire Council
Refuse tip for reuse.

 

Green Waste

Transported to Noosa refuse tip for mulching.

 

 

Bricks Concrete and brick is to be segregated on site and reused within
Noosa Shire Council’s refuse site for recycling.
Concrete Concrete and brick is to be segregated on site and reused within

Noosa Shire Council’s refuse site for recycling.

 

Plasterboard

Separated on site and transported to Noosa refuse tip.

 

Metals

 

 

Roof sheeting is to be sorted separately and transported to
Noosa Shire Council’s refuse site for recycling.

 

 

Golder Associates 06683025-3000(AA)

 

 

 

Page 99

 

 

Appendix G — Acid Sulfate Soil
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

 

 

Revision No: 000

October 2006

1of4

 

B1. ENVIRONMENTAL VALUES

To avoid potential adverse effects on the natural and
(including infrastructure) and human health.

B2. OBJECTIVES

1.

built environment

Satisfy the requirements of the Guidelines for Sampling and Analysis of

Lowland Acid Sulfate Soils in Queenstand 1998.

Comply with the State Planning Policy 2/02, Planning and Managing

Development Involving Acid Sulfate Soils.

Comply with the Environmental Protection (Water) Policy

1997.

Comply with the instructions for the Treatment and Management of Acid

Sulfate Soils, 2001.

B3. ENVIRONMENTAL CONTROL MEASURES

The following provides a list of the environmental control measures for the
management for potential acid sulfate soils at the site.

 

Environmental Control Measure

Responsibility

 

1.

The Construction Manager is to appoint an Environmental
Representative to supervise and report on environmental
management of the development works.

Construction
Manager

 

Training to be provided to all site staff and contractors engaged in
earthworks or drainage activities on the site. An emphasis should
be placed on the field recognition of PASS on the site. The scope
of training should also include:

An outline of the sensitivity of the area to environmental harm

¢ The potential for acid generation on the site and its potential
impacts

e Details of the management strategies in place for PASS

« Responsibilities of individuals in the implementation of the
management strategies

« Descriptions of PASS and how to identify them on site

* Steps to be taken if PASS are encountered

© Details of reporting and monitoring responsibilities

Construction
Manager

 

. Accurate and up to date records must be maintained for all

monitoring. Records will consist of:

¢ Testing and treatment undertaken in the management of acid
sulfate soils on the site.

volumes of excavated soil

pH testing results

liming dosage rates

location of placement of fill on or off-site

surface water testing results (if required)

groundwater testing results

Construction
Manager

 

 

. All complaints, sightings of indicators of acid sulfate damage or

other environmental incidents, to be recorded together with any
resulting investigation or response and reported to CCC.

Construction
Manager

 

 

 

Golder Associates

06683025-3000(AA)

 

 

Page 100

 

 

Appendix G — Acid Sulfate Soil Revision No: 000
Construction Stage October 2006
Environmental Procedures
Commercial Development
Eenie Creek Road.

2 of 4

 

 

B4.

 

 

5. Maintain a supply of not tess than 0.5 tonne (check against likely | Construction
daily usage) of lime (CaCO) on site at all times. A supply of | Manager
hydrated (slaked) lime shall be kept on-site for the treatment of
acidic waters. Treatment rate of surface water will be in
accordance with SPP’. The supplies should be stored in a
covered and bunded area to prevent accidental release.

 

6. Site access and all records must be made available to Council or | Construction
Departmental officers on official business at all times. Manager

 

7. All surface run-off and groundwater seepage within excavated | Construction
areas to be directed to a treatment or detention basin for quality | Manager
correction prior to off site discharge, or reuse on site.

 

8. Surface runoff from undisturbed areas of the site to be isolated | Construction
from active work areas by drains or bunding and directed to an | Manager
approved stormwater discharge point.

 

9. Lime treat exposed soils in any open excavation in accordance | Construction

 

with Section B4 Lime Application Rate and Methodology. Manager
10.Wherever practical, earthworks handling is to involve transport | Construction
directly from cut to treatment/fill area on site. Manager

 

11. Treatment pads on site are to be contained by bund walls, | Construction
constructed with non PASS (Potential Acid Sulfate Soils) or fully | Manager
lime treated soils.

 

12. Lime is to be added to expose excavated soils in accordance with | Construction

 

 

Section B4 below. Manager

13. Subgrade soil under footings and slabs to be lime treated at a | Construction
rate of 5 kg/m’. Manager

14. Subgrade soil to be lime treated at a rate of 5 kg/m? for each 1m | Construction
height of soil under the base of any stockpile before placement. Manager

 

15. If groundwater pH change exceeds the performance criteria (refer | Construction
Appendix A), then treat excavation batters with a surface | Manager
application of lime at 5kg/m’,

 

16, Monthly water monitoring reports are to be maintained on site for | Construction

 

 

review by CCC or EPA, at their request Manager

 

LIME APPLICATION RATES AND METHODOLOGY

The foliowing procedure applies to the treatment of excavated soils either to be
exported from the site, or backfilled into the excavation.

A number of key assumptions were considered in calculating liming rates from
test results, viz:

e Material dry bulk density of 1.8 t/m3;

e Use of a minimum safety factor of 1.5;

¢ The neutralising value of the selected liming product 2 90%.

Within 18 hours, all excavated soils are to be treated at a rate of 9 kg lime/m?.
Lime treatment is to be undertaken in accordance with the attached flow
diagram, Figure 1.

1 Planning & Managing Development Involving Acid Sulfate Soils, State
Planning Policy 2/02.

 

Golder Associates 06683025-3000(AA)

 

Page 101

 

 

Appendix G — Acid Sulfate Soil Revision No: 000
Construction Stage October 2006"
Environmental Procedures
Commercial Development
Eenie Creek Road.

3 of 4

 

 

 

Figure 1 Lime Application for Potential Acid Sulfate Soils

 

Soil Spreading
Spread excavated soil in layers with a
maximum 300mm loose thickness.

!

(———_Wiethanical Mixing ——~S~«&@Y
Mechanically tum the soil to promote
thorough mixing through the full depth
of the layer.

 

!

Maintain Moisture
Maintain soil moisture through:(i) controlled
irrigation or (ii) covering with plastic (reduce
evaporation) or (iii) application of lime soon
after excavation of moist soils. These
measures will improve the dispersion
of lime throughout the soil profile

 

 

 

 

 

Lime Application
* Add and thoroughly mix time (again using
lappropriate mechanical means eg. a disk
lplough or harrows) using the
calculated liming rate

 

 

 

Maximum Exposure Time Before Treatment -18 hours (overnight).

 

Golder Associates 06683025-3000(AA)

 

Page 102

 

 

Appendix G - Acid Sulfate Soil
Construction Stage
Environmental Procedures
Commercial Development
Eenie Creek Road.

 

Revision No: 000

October 2006

4of4

 

 

B5.

B6.

INSPECTION AND MONITORING

The results of the following activities are to be recorded.

 

 

 

 

 

 

 

 

 

 

 

Activity Frequency Responsibility
1. Maintain regular photographic record of site | Daily Construction
development works associated with PASS soil Manager

movements.

2. Maintain records tracking of soil movements | As required Construction
around the site including diagrams, volumes and Manager
soil descriptions for stockpiles in temporary storage
areas as well as final placement sites.

3. Inspect the condition of stockpile batters, drains, | Weekly or Construction
open trenches and structure excavations. following Manager

rainfall

4. Maintain record of lime dosing rates. Per dose Construction

Manager
5. Field testing of ground water in accordance with | Weekly Construction
Appendix A Section A4 and AS. Manager
PERFORMANCE INDICATORS
Item Performance Indicator
1. Soil pH No obvious drop in localized soil pH levels associated with

excavations into natural soils. Compare results to Golder’s
preliminary ASS Assessment for the site dated July 2006.

 

 

 

 

 

 

2. Verify lime Verify the effectiveness of lime treatment of PASS using the
treatment SPOCAS suit or Chromium suit method at a rate of 1 test per
250 m? of treated soil.
3. Water and Refer Appendix B.
groundwater
4, Photo record No obvious degeneration of the aesthetic value of the open-
space that may be possibly attributed to acid leachate.
5, Non All non conformances are reported to the Construction Manager
conformance and rectified as soon as is practical.

 

 

Golder Associates

06683025-3000(AA)

 

 

Page 103

we

 

“w>oa

Appendix H
Sediment and Erosion Control Plan

Page 104

°

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a 7 NMOS S¥ #025 narg youl,

¥ O1/038/870EW N¥1d_10H1N09 Noise ganas wl "al = a cnn} une ieee wpe rns | nn ng [RDA | Sta s

“ev 970 SiIV130 3D¥NIVUd ONY SXXOMGYOY sn a en re et -aord eer
soe x ni E ee roman mee ome

a
SBLVIDOSSY  SHDH NIM 40) JTWAYSOON ~ int te prem ae oosn| we
G¥Ou ¥33H) 3IN3I "ININGOTIAI0 GISOdOYd 930% | criyNNSsY CY SOR MOND pieineenenne = SITVEROY CVIOSSY eee tn | em ven] sory
Siw

TIS OL LM

   

SE9 WOU ya1 Sa) Wd
AHS SHU DVO ATS aD

ESVaAg WGHOTS OATS
01 .@ WOU MHD 70 OL .¥.

WAONS SY KONI. 40 HOLIOS
HL MEV 20 €79 W-BOL BML YT

dophe pasestes on pessys MIL WOT LTS

YeEVd £0 105 MYTRISWAOO HO CHNOLISOS 38 OL
‘$1504 “IDOLS 10 15 KO OMEN It
GL $1504 30 DHDVES LOVE) “F waKOCTH ENT 1Y
OUIVES 20 01 Tees sos wreMs / THIS

“Pr0s  NOUVINaRS LEATES
DL gE AV PL TWN OnY YRKLIOL ADArY S1SOE JANG +
WONOWLL MOW LNIATES 01 NROHS S¥ SLSOd CYROAD -

Annod on $43 1s00

   
    

1804 30 01 onnoery
ORISIAL 38 OL 4008 171

 

195 0 JaSHVRSED
wo WAVED GaLI¥S40>

 

 

        

-ANONALNTORENS
ML AQ OTV7ONO
ms a WOUEY 30H

 

@ NOIISaS

WIS XO TOY WORE
“yUxa1039

  

|
“SSVdAR ANTHAIS LNIATUd
O1 8 NYHL HIHDH 30 OL VY.

SLM

NOWVAST3

2/4 St Hid30
FHOIIE 1NI8OIS:
ORLY WNNDIY IAOHTY

 

 

            
  

20VW WH

 

 

 

Page 105

“ye

 

 

 

 

 

 

Z 302 133HS ” wey mt ier TUNER] 20 HSN HAOHS S¥ 81005 ve peo | |
¥ sosaRa/er0eW wwvg 79uINO) NoISOWS FNaMOIS| EES TRS F Ww] el sae wun] mee a erart ee ee ee
ae S1V130 JDVNIVUO ONY SXHOMOWOY ae ES q re mend ome mast cond OY ag TAN
su | ew orm i Sasa
SRLVOOSSY 2 SHIH N3X 194 ITTAVSOON eee resists aa wearers, an oe
CVO 39H) BINID “INIWdO13AIG ISOdOYd 1230%4 | SyLYDOSSY ONY SORE ATTVE sare SINVE TERT TLV seme aan | 17020 amen

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

Iv Av ones 2185
a

NV 1d INOAVT

ij +

 

 

 

 

 

 

 

 

 

 

 

 

 

Tp MVC OID TEAL
* Ne, :

“3UIS NO 2SNHY HOI OTNITIW 3B OL SI THYILYW F18VLINS
“ANBONBLNAGENS FHL 9O TWAGKddY NALLMIA FHL LOCH
NOLINUISNOD SINARBS BOF ABYSSIIIM IVIHM YO SHLOAHLEVI

$0 ANGDC FAL GWOATA 10 Can) 39 TTVHS ONTEVITD ON
RHI 9 HRV

“SOOHLIW ROLY ddY

NY SIKH CRIS HO NOYES Ba OF 89498 FTEVILIVEE

S¥ ROOS S¥ LN G3THBYD 30 OL JeY ONKGIS ONY ONUBNI
sShOWUGNOD A1I5 1S OL 9AUYENISIBSTY $.WINNOD FHI AG OIBWA
a AVM ONY V0 JHE AG .TOULNOD LNHOIS ONY MOISOXD HOS. HAIA
DNYONDIIY  GINASIO TEV SFENSVIN INBAIOVHVH LS 2AdGY HHL

“INWNGLN HO. IW LEIIIY
“Wen OBNVINTYH 39 OL FEV STANSWIN INBMIDVHY 1S INDY FHL

SCLDTEO SV SAVeL LTS AUVHOAWIL 30A0Hd
“aa123WO IEIHM OMY SLITING KIvEO TYEVL L¥ SH¥O WIM) IOIAOHE

“SugLAve THd TH 20 301 FKL LY S92NGd 1S 3OKATHE

PUVISD INSNIOWNVA INSAIOSS

 

Page 106

a

£ ys

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

240 | L23HS| ‘oman ae wa aw faLWAIL 90 HSa¥E : MONS S¥ 81025 oa ee
¥ @osaTy/e%oc vid TouiNo Nosous 7 INaMGS| Es ES a eet sons] entug Loves ava | a ws TE er BPE LF
oo S120 ZDVHIVED ONY SHMOAQVOY] ERT | Me OS are oma awa

‘ ‘vamernd Tres
2 ai avo nen my Fem
SRLVIDOSS % SYDH NIM 2) JTTAVSOON Tee asi, aa pate ee mt wore mn
QYOW NIRA) INIT 'LNANAOIIAIC OFSOd0Yd w27e¥4 | crYMNNGY ONY OORD ATWVE ‘STR wre SDVT WRU CAV? sexe ven | era ee stirs

 

 

 

 

 

 

 

 

 

Way eat TS

ean eee eee
m 6H Ka we

 

+

 

 

 

 

 

speannaa ty sa0y pened £0430)71103

   

 

 

 

 

 

       

 

v
sd
ap .
a Auyneryey sj spunessna justUo.Anue ¥y{ pUD poouegyijrU TDFvs Ht
e8 yo Aguawo ayy 420990 ApaquPMeD Jou Pp ByZeR TO sous BaNsUD Of
a Tene do SOWIGUVD UNM SAL JO TOWINOS
. tisep vo fuspurdap sayoesb ow prog volrDUNEDS
ys soy
rd ng mUONS,
oye SON)
a i ot mi mesa Be
os teve9 HOLY) WGA wpm sed Oy 4 enue a5
oust sapoads (pany
bas wypag aders
fedha we Buxpuedapl ou a WOx) WORT
Davy jUMWYIIOD wUOW adh aaa

 

 

 

SIHAIC TOMINOD INSNIORS BOS SVIUY INIRHILV) WOWIXVH

~jTO04| UoynUysuED MAAN mUL OL) EOL IRTEY LredsUD| IUFMBsS fesjve?
apwe-upw oye Weli2n4ysv9 Byarp prqniap weed 5m
wogg# ] WOLLIRNONd 13TH 183ATND
yD penese aayoq Key go oer my AQ 0 AIRY PINE
pune Suspaniee smuyyd patios B20 SdveL ANIWDIS 17 OO
spapaas pu paperdey rag sary syzndjeey puro tyuneTieyPO PUD peyeydem) wneg

‘soy uoj)mnaysue> pes wu AuDsKPIOU WH4se 5 NOLTTIONd 137M ATTN

 

 

       

 

 

 

 

 

Va ‘prumhes sD SDP HDR Je seg
pee Sunsqsndns ybnesyy J9pJ0 pus quedas 0 UouRIO) BUS SUH 9 94117900}
saves Cupeey mp
gmsing fun emjou deus 7) womens) emp pD eb SION OUTS Anan Bu sede, wepas yxjuos Hy pexh Hhansoow DLO) 11D
woryesqubg “suman so 4s Ke Guffey» pun ebpwep 19) W013 IDS
sueyrednig 49 apgruedses aq ay ewOI0) HIS poatsng Hertvedsny ue nee ore Oe or ome et Palast x
“Tone eyoq-koy 6D pM seaneDNE KiDAdeNy eApMN pUD ABE RY £8600)
Aapoy (unan 491) wrvomse) sed soruew ey owase) AIS, nenpneg, fauenbess 11 Basjaq jisumg E94) TORRAAS BADNTDL 0} HRLBISEP 940 TAIMED OxHEL

BIOAIT TOUINOD INAATISS

“speed wos Gump Buen osm tw9p AWD {OV
™ . Suoees bata snay, JIM 94 Ady POYDAZTAIMED AIO) Of STRLO HOTAANT JP Pu Wi] IE

suns 49470 tqusuyogue je eseg
MeL AD eno) juTMRORE gUD UEHTEL IDA ey UOWwOIN BILE | $20;D>PU BDUDMIOLING apogd esr [0 prymsisues T1BLINe peroAore 840 SYIOVIES TAIT

 

soap doqs yo upun

 

stad Ayr. typ cp Aspsenown oq Aow (s3tvd AVH 2) SHOLYESSIO 19820
buna renp xoac areyd AyomBau4is “SuADsp au) Ue UASiE “ado pasedee oo vARp wD UOT TA Bye POF mys Wed)
30 syueuyunges ye doy my 48 taquzOg WemDET 0219 sory 713001 anyon erowEp HNN soup peTAgDLe AyjDususs

    

 

e.aq 40 xUDG ‘eDIP Ind DFO pane) aq ADW SHTHO ROISYIAID
csaepaeade [sem fUD

a ri srejogsep Mw vos “suaup uereseap spnyn KHL
oes ee sqaodsupal juranpas wonitusop sepeerep Aiquenbnsuea puD iit
ueypnazrues D 4D Uersesn atranue of pautsap Aro sRTlAAp Bey

BISNAT WOUINOD NOWOUT

 

 

mysos9 [vaqu9> 04 ‘urd YosIUE> sWPEnp:
que fide “poued aououRjuyOW YY PUD UoiprnafsuE> BULA
ways OWEN peo sumyayebas Asoinyeys Te UNA AKtOO) saBs0j /eayrttag

 

 

 

 

 

 

 

Page 107

a _——/ et _——t -——E oe et

 

ae

ee

—— ee i ee ——e

a eye a

Appendix |
Ken Hicks & Associates Drawing 060506D

Page 108

bysoosia -o— we poe yp te

 

 

 

 

  
   

bey
a
vrov Ly
SOUR eo
pD4_Oo
—wHn_ 70
wy C6
ro 4 a ?
women f
e'+5 4
uno
4 2%
m m ,
wz m
= go wane
> SZ
2 a2
a Qa
=> ~~
2 wS a
las z sors
3 —
3 oy
o sie
3
ms
vou
THIS IS A PROPOSAL PLAN ONLY
a AND IS SUBJECT TO LOCAL
E ‘ AND ENGINEERING CONSTRAINTS.
von AUTHORITY SUBDIVISION APPROVAL
i= 433 —__4 AREAS AND DISTANCES ARE APPROX ONLY

 

 

 

es amt

TpeayREe) pay

 

 

 

 

 

 

ir

PHY
Tiny BILE}
ad atl
ge ob

Boe st .
tte
—
=

  

 

3 905090

a

 

 

¢

 

 

 

 

 

AND SUBJECT TO FINAL SURVEY

 

 

 

 

 

 

 

 

Page 109

 

—

 

Golder Associates Pty Ltd
A.B.N. 64 006 107 857

Unit 1, Dalton Centre, Newspaper Place
Maroochydore, Qld 4558 Austraila

(PO Box 5569, Maroochydore 8C, Qld 4558 Austalla]
Telaphone (07) 5443 3511

Fax (07) 5443 6645

hitp:/Awww.golder.com

 

OPERATIONAL ENVIRONMENTAL
MANAGEMENT PLAN

COMMERCIAL DEVELOPMENT
EENIE CREEK ROAD
NOOSAVILLE QUEENSLAND 4566

Submitted to:

BARLOW GREGG & ASSOCIATES
P.O Box 200
Mooloolaba QLD 4557

DISTRIBUTION:
2 Copies — Barlow Gregg & Associates (1 hard copy; 1 electronic copy)
1 Copy - Golder Associates Pty Ltd

October 2006 06683025 - 4000(AA)

oe

OFFICES IN ADELAIDE, BRISBANE, CAIRNS, MAROOCHYDORE, MELBOURNE, PERTH, SYDNEY, NEW ZEALAND, INDONESIA, HONG KONG, CHINA, THAILAND, PHILIPPINES etm aavectation of
OFFICES ACROSS NORTH AMERICA, SOUTH AMERICA, EUROPE, ASIA, AUSTRALASIA, AFRICA. ——v,

 

Page 110

e

 

Operational Environmental
Management Plan
Commercial Development

 

 

06683025-4000(AA)
October 2006

Rev: 000 Pagei

 

 

Eenie Creek Road
TABLE OF CONTENTS
SECTION PAGE
DEFINITIONS ..csceccssssssessssssecsssssesscssscseseanseccsssecsssssecsunegsnsessnnecsutessessessersusensuneseasanenseesansecaseetee 1
GLOSSARY uo. cccecccssecesscccesssescesescensseesesceecaessensceseserseescssesasesenesseesenecsaseesseeneesnessesseceseeersesieeeseaes 2
1.0 INTRODUCTION... ceeecssssssssssscssssssescscsssssecsecsnnecsesssesessntssenetessnvecesssueesssneessuaweneeavaseenns 3
2.0 PROPOSED DEVELOPMENT ...........c:ccscsssssssscerssseesnrenseeeseeesesssceenernronsertesteeneess 3
3.0 OBJECTIVES oc eccccccessscsssssescsseesccscescenerneessescseesseceesnserenieseeeesesecsesaesaeeraeneepaesisseeaaaseren 3
4.0 DOCUMENT REVISION .,.......ccccescsccsseseesessccneessecnsreteseesesesnsenssennersnesaieeseeensseeriseeseees 4
5.0 ENVIRONMENTAL MANAGEMENT ORGANISATION CHART ....ccccseeeceeeeeesees 4

6.0 MONITORING AND INSPECTION

8.0 NON CONFORMANCE. ......csscsseseesssseceseeeeessensenenensieeanscssssesesernsnenes
9.0 AUDITING OF THE EMP ......ccecsssseseessenereeeetenerenetsssnscssecssserssenenses
10.0 COMMUNITY RELATIONS. .....ccccccccscseseressseeneneeseesseeeseenenrasnensnes
11.0 DOCUMENTATION AND REPORTING FRAMEWORK ..........05
13.0 ENVIRONMENTAL LEGISLATION .....cccccesseeeseeiesenenesereseneeeeeees
14.0 OVERVIEW OF ENVIRONMENTAL ISSUES... setseneseees
15.0 REFERENCES Qu... ccccscssseceseeresseennesesssseeneseseeceeneneeecseaniesssereeerereresesnes

LIST OF FIGURES

Figure 1 Site Location

LIST OF FORMS

Form | Concerns Register

Form 2 Inspection and Monitoring Sheet

Form 3 Site Induction (Attendance Sheet)
Golder Associates

 

 

Page 111

 

Operational Environmental
Management Plan
Commercial Development
Eenie Creek Road

 

 

 

06683025-4000(AA)
October 2006

Rev: 000 Pageii

 

LIST OF APPENDICES

Appendix A — General Site Maintenance

Appendix B — Water Quality Management

Appendix C — Water quality Management Plan
Appendix D — Ken Hicks & Associates Drawing 060506

Golder Associates

 

Page 112

 

 

 

Operational Environmental

Management Plan October 2006

Commercial Development
Eenie Creek Road

06683025-4000(AA)

Rev: 000 Paget

 

 

DEFINITIONS

Environmental Harm -

Environmental Nuisance -

Material Environmental Harm -

Serious Environmental Harm -

any adverse effect, or potential adverse effect (whether
temporary or permanent and of whatever magnitude,
duration or frequency) on an environmental value, and
includes environmental nuisance.

is unreasonable interference or likely interference with an
environmental value caused by

{a) noise, dust, odour, light; or

(b) an unhealthy, offensive or unsightly condition
because of contamination; or

(c) another way prescribed by regulation. ”

“Material environmental harm” is environmental harm
(other than environmental nuisance)

(a) that is not trivial or negligible in nature, extent or
context; or

(b) that causes actual or potential loss or damage to
property of an amount of, or amounts totalling, more
than the threshold amount but less than the
maximum amount; or

(c) that results in costs of more than the threshold
amount but less than the maximum amount being
incurred in taking appropriate action to

(i) prevent or minimise the harm; and

(ii) rehabilitate or restore the environment to its
condition before the harm.

“Maximum amount” means the threshold amount for
serious environmental harm.

“Threshold amount” means $5000 or, if a greater amount
is prescribed by regulation, the greater amount.

“Serious environmental harm” is environmental harm
(other than environmental nuisance)

(a) that causes actual or potential harm to environmental
values that is irreversible, of a high impact or
widespread; or that causes actual or potential harm to
environmental values of an area of high conservation
value of special significance; or

Golder Associates

 

Page 113

 

 

 

Operational Environmental 06683025-4000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page 2
Eenie Creek Road

 

 

GLOSSARY

ANZECC

ARMCANZ

NSC

EMP

OP-EMP

DO

SS

EPA

EAR

(b) that causes actual or potential loss or damage to
property of an amount of, or amounts totalling, more
than the threshold amount; or

(c) that results in costs of more than the threshold
amount begin incurred in taking appropriate action to

(i) prevent or minimise the harm; and

(ii) rehabilitate or restore the environment to its
condition before the harm.

“Threshold amount’ means $50,000 or, if a greater
amount is prescribed by regulation, the greater
amount.

Australian & New Zealand Environment and Conservation Council

Agricultural and Resource Management Council of Australia and
New Zealand

Noosa Shire Council

Environmental Management Plan
Operational Environmental Management Plan
Dissolved Oxygen

Suspended Solids

Environmental Protection Agency

Environmental Assessment Report

Golder Associates

 

Page 114

 

Operational Environmental 06683025-4000(AA)
Management Pian October 2006

Commercial Development

Rev: 000 Page 3
Eenie Creek Road

 

 

 

 

 

1.0 INTRODUCTION

This OP-EMP has been prepared in order to manage and minimise the impact on the
environment of the commercial development on Lot 1 on SP182880, Fenie Creek Rd,
Noosaville 4566. The location of the site is shown on Figure | (Site Location).

2.0 PROPOSED DEVELOPMENT

21 Site Description

The real property description of the site is Lot 1 on SP182880 and covers a total area of
approximately 14 hectares. The northern boundary of the site adjoins Eenie creek road with a
large environmental park covered in vegetation. A number of access tracks exist throughout
the site and with a fire trail along the eastern boundary

2.2 Description of Development

Plans provided by Barlow Gregg & Associates drawn by Ken Hicks Associates (Drawing No.
060506, 01/06/2006 Appendix D) show details of the site layout. The development consists
of thirteen commercial lots and a single environmental parkland lot. It is intended that a
majority of the allotments will contain commercial offices.

3.0 OBJECTIVES

The objectives of the OP-EMP are to:
e Protect life, health and well being of human and other forms of life;
e Protect the local amenity;

« Base the environmental management of the development in accordance with the
principles of Ecologically Sustainable Development (ESD),

* Inform land owners and lessees of appropriate safeguards and control measures to be
implemented to minimise the environmental impact;

¢ Comply with relevant statutory environmental requirements,

¢ Provide strategies aimed at minimising environmental harm during the construction
stage; and

¢ Provide an Environmental Management System, generally based on the key elements of
the AS/NZS ISO 14001-1996 Environmental Management Systems — Specification with
Guidance for use.

A copy of the EMP and associated forms and registers will be supplied to all landowners.

Golder Associates

Page 115

 

Operational Environmental 06683025-4000(AA)
Management Plan October 2006

Commercial Development
Eenie Creek Road

Rev: 000 Page 4

 

 

 

 

 

4.0 DOCUMENT REVISION

The following table outlines revisions made to this document. Revisions to the document are
made to reflect changes to environmental procedures, environmental management, or the
findings of environmental monitoring.

 

Date Nature of Revision Editor

 

 

 

 

 

 

 

 

 

Any complete revision of the document will be accompanied by a new revision number
(ie 001 in the upper right hand comer of reissued pages).

A copy of the revisions to the OP-EMP will be sent to land owners and be disseminated to all
relevant tenants.
5.0 ENVIRONMENTAL MANAGEMENT ORGANISATION CHART

This section outlines the framework that will be used by the Landowner to manage,
document, and report on environmental issues for the development.

 

Landowner

 

 

Body corporate

 

 

 

 

 

Lessee / Offices

 

The Landowner is ultimately responsible for Environmental Management.

The Landowner will identify which actions are to be delegated to those responsible for
managing environmental issues.

Golder Associates

Page 116

 

Operational Environmental 96683025-4000(AA)
Management Plan October 2006

Commercial Development

Rev: 000 Page 5S
Eenie Creek Road

 

 

 

 

 

6.0 MONITORING AND INSPECTION

Environmental inspections will be carried out by means of a quarterly meeting of responsible
personnel and a site walk through. This will be used to identify any areas of non-
conformance or opportunities for improvement. Any non-conformances will be reviewed at
the quarterly meeting.

Monitoring is to be documented as outlined in Section 11.2 and monitoring programs will be
modified based on the findings of site inspections and/or results of testing.

8.0 NON CONFORMANCE

Any non-conformance to the OP-EMP must be addressed as soon as is practicable. The
personnel responsible for the non-conformance must be notified immediately for purposes of
issuing rectification instructions.

Non-conformances are formally documented through an audit report (Refer Section 11.3).

9.0 AUDITING OF THE EMP

9.1 Responsibilities

The daily activities at the development will be audited for compliance with the OP-EMP and
its procedures by the environmental auditor. The environmental auditor will be appointed by
the land owner.

It is the environmental auditor’s responsibility to:

1. Provide an independent assessment of compliance with the Environmental
Procedures in Appendices A and B.

2. Report on observed activities that have, or may cause, an impact to the environment
or non-conformance to regulation.

3. Provide recommendations to the land owner regarding practical initiatives that can be
employed to improve the effectiveness of environmental management at the
development site.

4. Provide a copy of the Environmental Audit Report to the land owner.

Golder Associates

Page 117

 

Operational Environmental 06683025-4000(AA)

Management Plan October 2006
Commercial Development

Rev: 000 Page 6
Eenie Creek Road

 

 

 

 

 

9.2 Frequency

The frequency of Environmental Audits from commencement of site activities will be as
follows:

* Quarterly during operation.

10.0 COMMUNITY RELATIONS

Where concerns are made by the community or third parties to the land owner, or individuals
under their direction, these will be forwarded to the land owner immediately.

The process for dealing with concerns is documented in Section 11.4.

11.0 DOCUMENTATION AND REPORTING FRAMEWORK

The following documents relate to environmental performance and form part of the OP-EMP:

1. Operational Environmental Management Plan (OP-EMP);
2. Environmental Procedures (Appendices to the OP-EMP);
3. Inspection and Monitoring Records;

4. Environmental Audit Reports;

5. Concerns Register; and

6. Rectification Requests and Instructions.

Items 3 to 7 are defined in the following sections.

11.1 Records of Inspection and Monitoring

The outcome of the quarterly meeting and site walk through will be recorded on the
inspection form given in the List of Forms. Any monitoring that requires more frequent
attention will be completed as required and recorded on the Inspection & Monitoring Sheet.

The originals of these sheets shall be kept at the site office (Form 2).

Golder Associates

Page 118

 

Operational Environmental 96683025-4000(AA)

Management Plan October 2006

Commercial Development
Eenie Creek Road

Rev: 000 Page7

 

 

 

 

 

11.3. Environmental Audit Report

The Land Owner will appoint an independent auditor to carry out audits of the
implementation of the OP-EMP.

A copy of the environmental audit report shall be provided to the Land Owner.

11.4 Concerns Register

Complaints will be directed to the land owner who will issue the concern to the appropriate
personnel for action.

A hard copy record of all concerns will be kept at the Site office and filed for future
reference, if required. (Form 1).

The concems register will record the following information:

1. Details: Name, address and phone number.

2. Nature of concern: Detail of issue, date of incident, people involved, and location.

3. Action taken or required: Any action proposed or undertaken to address the concern,
including time and date.

4. Response to Action: Was the complainant satisfied with the outcome of the actions
taken, if not, what else needs to be done, or is it outside the scope of the development
works.

5. Prevention or re-occurrence: What action has been taken by the nominated responsible
person to ensure the problem will not re-occur.

11.5 Rectification Requests and Instructions

Non-conformances will be documented on the Inspection and Monitoring Form. The form
states the nature of the non-conformance and the mechanisms implemented to rectify the
problem.

A copy of this form shall be undertaken by the Land Owner on a quarterly basis,
immediately in the case of emergencies, or significant non-conformance.

13.0 ENVIRONMENTAL LEGISLATION

The construction activities must conform to the relevant Environmental Protection Policies
and environmental regulations promulgated under the Environmental Protection Act 1994.

A brief discussion of the key elements of each of the Acts and the relevant aspects of the
Environmental Protection Policies is provided in the following sections.

Golder Associates

Page 119

 

Operational Environmental 06683025-4000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page 8
Eenie Creek Road

 

 

 

 

 

13.1. Environmental Protection Act 1994

The principal legislative vehicle for environmental protection in Queensland is the
Environmental Protection Act, 1994 (EP Act).

General Environmental Duty

Under the EP Act, all people have a general environmental duty to take all reasonable and
practicable measures to carry out any activity in a manner that prevents or minimises
environmental harm.

13.2 Environmental Protection Policies

Environmental Protection Policies (EPPs) within the EP Act are used to control and reduce
environmental pollution and harm and nuisance. They are briefly summarised below.

Environmental Protection Water Policy 1997

The purpose of this policy is to achieve the objectives of the EP Act in relation to Queensland
waters.

Under this policy, it is an offence to release or deposit the following into, or put in a place
where it could reasonably be expected to move or be washed into a gutter, stormwater drain or
water:

a) rubbish;

b) scrap metal, motor vehicle parts, motor vehicle bodies or tyres;

c) building waste;

d) sawdust;

e) solid or liquid waste from an on-site domestic waste water treatment system;

f) cement or concrete;

g) a degreasing agent, paint, varnish or paint thinner;

h) any manufactured product, or any by-product or waste from a manufacturing
process, that has a pH less than 6 or greater than 9;

i) an insecticide, herbicide, fungicide or other biocide; and

j) oil.

It is also an offence to allow stormwater run-off into a roadside gutter, stormwater drain or a
water that results in the build-up of sand silt or mud in the gutter, drain or water (Note: the
offence also applies if a person deposits sand, silt or mud in a place where it could reasonably
be expected to move or be washed into a roadside gutter, stormwater drain or a water body
resulting in the buildup of sand silt or mud in the gutter, drain or water).

Golder Associates

Page 120

 

Operational Environmental 06683025-4000(AA)
Management Plan October 2006
Commercial Development

Rev: 000 Page?
Eenie Creek Road

 

 

 

 

 

14.0 OVERVIEW OF ENVIRONMENTAL ISSUES

This section provides a brief overview of environmental issues associated with the
construction of the proposed unit development.

14.4 Water Quality

During rainfall events, uncontrolled runoff leaving the site could potentially cause turbid
water to enter the stormwater system. Solid waste and soil stockpiles, unvegetated and
unsealed carparks, concrete wastes and fertilisers are some sources with the potential to
contaminate surface water. The water quality monitoring program for the development is
contained in Appendix - B Water Quality Management. Performance criteria for surface
water exiting the site have been established using the Australian and New Zealand Guidelines
for Fresh and Marine Water Quality 2000 for a “fresh” receiving environment.

14.5 Solid Waste

Solid wastes will be produced from a range of waste streams. Waste management practices
will be to achieve, where possible, the adoption of the following waste management
hierarchy:

¢ Waste Avoidance;

e Waste Reuse;
e¢ Waste Recycling;
e Energy Recovery From Waste; and

e¢ Waste Disposal.

14.5.1 Storage and Disposal of Waste

Wastes would be sorted by type with each individuals being responsible for ensuring that
wastes are placed in the appropriate bin or disposal location. Bins would be colour coded or
labelled according to the type of waste to be deposited with clear signage on each bin. Bins
would be provided where appropriate depending on the stage of the development.

In keeping with the waste hierarchy, the first step in the waste management process would
involve reducing the production of wastes through efficient planning of resources. Secondly,
those wastes produced would be reused on the site where possible. Where reuse is not
possible the waste would be recycled via the colour coded bins/skips. For non-recycled
wastes energy recovery methods would be employed before final disposal to landfill.

Golder Associates

Page 121

 

Operational Environmental 06683025-4000(AA)
Management Plan October 2006

Commercial Development Rev: 000 Page 10

 

 

 

Eenie Creek Road

 

 

14.9 Flora and Fauna

The sensitivity of the surrounding vegetation requires management of impacts on surrounding
flora and fauna. Clear signage is to be in place for areas not to be entered

15.0 REFERENCES

The EMP has been prepared based on information supplied by the following reports, and
based on the requirements of the following legislation.

Environmental Protection Act 1994

Environmental Protection Policy (Water) 1997

Environmental Protection Regulation (1998)

Environmental Protection (Waste Management) Policy 2000

Australian and New Zealand Guidelines for Fresh and Marine Water Quality 2000,
ANZECC/ARMCANZ.

6. Brisbane City Council, Best Practice Guidelines for the Control of Stormwater Pollution
from Building Sites (2000).

wRYeNOT

QD |

Daniel Joyce BSc(Env Science) Geoff Hurley MSc DIC C.Geol RPEQ 5716
Ecologist Associate
Office Manager

J\2006\Environmental\06683025\TASK_3000 EMP\00_CORRESPONDENCE\OUTIOP works\AB06683025-3000r.doc
DINGAHdij

Golder Associates

Page 122

_Figures

 

y

= ab

$d

Page 123

 

 

= Enarged Wop

 

 

 

Pry td Unautnanees ose of rezioducson of ia pan ether whoby oi pan wine wrtlan parcsion anges copyToh. © Goklas Associates Ply is.
. —_
7h t

 

 

 

 

“S-Subjest Site “4

 

 

    

 

Barlow Gregg & Associates.

Commercial Development Eenie Cr Road.

 

DJJ

ATE

04/10/06

 

 

DATE

Site Location

 

 

Inlornation contaned on fie ceavarg isthe copytigtt of Gokdas

 

* 1£:19000 (Approx.)

 

 

lA4

06683025

FIGURE No

 

 

‘J:\2006\Environmentah06683025\TASK_3000 EMPW3_FIGURES_DRA\

ig 1

 

Page 124

Forms

 

—_——— _ _— -_

~ — — ——5 —s 4 Hy

- a - - = a

Page 125

Lot 1 SP156690 Mawhinney Road

Complainant Detalls:
Name:
Address:
Contact Phone No.

Nature of Concern:
Detail of Complaint:

Location of Incident:
Date of Incident:

Persons Involved:

Action Taken or Required:
Action Required (Y/N): Time/date of Action:

Type of Action:
Responsible Person:

Follow Up
Remedial activities performed :

Complainant Response To Action:

Further Action Required ? (Y/N)

if Yes, Details of Further Action Required:

Prevention Of Re-Occurrence
Preventative Action Required ?

If Yes, Details of Further Action Required:

Form |

CONCERNS REGISTER

Golder Associates

Complaint No.

Date :
Time:
Received by:

Concern Received By:

Telephone:
In Person:
In Writing:

Performed by:

 

October 2006

Page 126

Lot 1 SP156690 Mawhinney Road
INSPECTION & MONITORING SHEET

Environmental Procedure:

 

Responsible Person:

’ [Date of inspection:
Weather durin jin riod:

. [Personnel ent during in tion:

 

Form 2 Golder Associates October 2006

Page 127

Site Induction Form (Attendance Sheet)

 

el eonon =

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

October 2006
Form 3 Golder Associates

Page 128

Appendices

 

- = =- = - = —_— —
— —

Page 129

 

Appendix A — General Site Maintenance
Environmental Procedures
Commercial Development
Eenie Creek Road.

 

 

 

 

 

 

Al, ENVIRONMENTAL VALUES

The overali protection of the surrounding environmental life, health and
wellbeing of humans.

A2. OBJECTIVES

1. To meet the requirements of the Environmental Protection Act 1994, all
Queensland Environmental Protection Policies.

2. Minimise impact on the environment, specifically on the amenity of The
surrounding premises, from operation of the proposed development.

A3. ENVIRONMENTAL CONTROL MEASURES _

The following provides a list of the environmental control measures for the
general management of the site.

 

 

 

 

Environmental Control Measure . . Responsibility
1. Ensure that all open park areas remain open. Land owner
2. Open areas of the site are to be regularly slashed. Land owner
3. Park reserve is to be weed* free. Land owner

 

4. Fire trails are to remain clear to ensure clear access at all | Land owner
times.
5. Revegetation areas are to meet guidelines of the revegetation | Land owner
plan and be established in a manner that ensures deceased
individuals are replaced and canopy coverage is established.
6. Landscaping is to be adequately maintained to ensure access | Land owner
and visual amenities are met.
7. Maintain a high standard of housekeeping and ensure that | Land owner
materials that are likely to attract vermin are properly
disposed of.
8. Dispose of any waste illegally dumped at the site. Land owner
9. Storm water quality devices are maintained, swales are | Land owner
adequately vegetated, cleaned and slashed.
* Class 1, 2 &3 weeds as defined by the Pest and Stock Route Management Act 2002 and
Noosa Shire Council Worst Weeds.

A4. INSPECTION AND MONITORING

 

 

 

 

 

 

 

 

 

The following inspection and monitoring program will be conducted at the site.
The results of these activities will be recorded on the inspection/monitoring
data sheets provided with the OP-EMP.

 

 

 

Activity : a Frequency Responsibility
1. Inspect open park areas are open and do | Quarterly Land owner
not contain storage or being used as car
parks.
2. Inspect open park areas and ensure that } Quarterly Land owner

the site is ascetically pleasing and
slashed to an appropriate level.

3. Inspect park reserve including vegetative | Quarterly Land owner
areas, gardens and revegetation areas do
not contain weeds *

 

 

 

 

 

 

 

Golder Associates 06683025 - 3000(AB)

Page 130

 

 

Environmental Procedures
Commercial Development

 

Appendix A — General Site Maintenance

 

 

 

Eenie Creek Road.

Activity Frequency Responsibility

4. Inspect site for general tidiness and | Quarterly Land owner
illegal dumping of wastes.

5. Inspect swales and weir for appropriate | Quarterly Land Owner
vegetation cover.

6. Inspect swales and weir for inappropriate | Quarterly Land Owner
litter.

A5. PERFORMANCE INDICATORS

Item my Performance Indicator

1. Open areas No incidences of storage or car parking.

2. Fire trail Access is achieved, contains no obstacles.

3. Site Site remains tidy. No complaints from local community or
Housekeeping relevant regulatory authorities.

4. Site No occurrence of illegal dumping of waste at site or in general
Housekeeping site waste bins.

5. Weed control No occurrence of weeds*

6. Litter Minimal liter caught within swales and weir.

7. Vegetation Complete vegetation coverage of grassed swales.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Golder Associates

06683025 - 3000(AB})

Page 131

 

 

Appendix B — Water Quality
Environmental Procedures
Commercial Development
Eenie Creek Road.

 

 

 

 

 

Bi.

B2.

B3..

B4.

B5.

ENVIRONMENTAL VALUES

The protection of surrounding surface water and groundwater.

OBJECTIVES

Control potential sources of contaminated stormwater.

PON>

Comply with the Environmental Protection (Water) Po.
local laws, codes and policies.

a

Limit environmental impact on adjacent residential and commercial premises.

Manage all discharges of water from the construction site.

licy 1997, and NSC

Use the Australian and New Zealand Guidelines for Fresh and Marine Water

Quality 2000 for the protection of environmental values.

"ENVIRONMENTAL CONTROL MEASURES

The following provides a list of the environmental control measures for

management of surface and ground waters at the site.

 

Environmental Control Measure.

Responsibility |

 

1. All stormwater will be managed in  gecordance with the
stormwater treatment Appendix C.

 

 

Construction Manager

 

 

INSPECTION AND MONITORING.

The following inspection and monitoring program will be conducted at the site.

 

Activity:* : vO, . ‘Frequency

Responsibility

 

1. Inspect disturbed areas for signs of land e Quarterly

 

 

tainfall event*.

Construction

erosion or deterioration. e After each major Manager

 

 

*> 25mm within a 24 hour period.

PERFORMANCE INDICATORS -

 

 

 

 

 

Item < - Performance Indicator
1. Surface Water All control systems are maintained in good working order.
Control System Surface water is separated from disturbed and undisturbed
areas.
2. Non conformance | All non-conformances are reported and rectified.

 

 

 

Golder Associates 06683025- 3000(AB)

 

Page 132

‘ — —— —t at —— et

 

+

Appendix C
Water Quality MAnagment Plan

Page 133

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fae eee MINVAGL #0 Worive WAOHE SY 9105
d/890EW =e SS aun] aneenas 01 08 sp WHO) We aus 14
“on ORO Wi man monet shes 7
=a S130 WALWAMUOLS | TES eae ex] shiva TAN
rom aa 1m OST}
SINIHdOT3AIO 17 S 40) ITIAYSOON rar a aon fa yaad er nanaanen Pal
QVOY 33H FINYDI ININADTZAIO A3SOdOYd 493M | crLyNOSSY ONY OR ACHING ‘STON saw SIRVIVISROS USIVIOSST seen “ax | "0 8] eneey
Weis NQILIIS SSOYI IWIIdAL
wow NOWIIS SSO¥) YIM - @ NOWLIIS sx0NNY QYOU NOd - ~
HRIVAMHOLS BIST . 95 ssveo
any >
[ _ ee %= 101 HOBd
Ee He wivatoor 2OYNYAD
1 30H OFOR e 2
ws. - ass Ey - ett9 3
i a
a &
i kes g
; i” g
gpg nouAn an —! .
weet THNNVH) NadO TWoldAl - W NOILIAS wemNGILIIS DNOT WIidAL
Jetd DR1¥HOId Bot
SHOLYIED2ES 350M
“mors M01 YO AWIGAL) S384 01 Yau NOILMIL ZICH —
LRIAME TLTEIMO) JOA OTE, MOU ADT pase xz ]
Se | ssn— AES taal saad
| > | re | — HOW M01 BOS *Z
J) at
| -— f le ao
. 1 S 1 norsaza0
WW uBA

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

Page 134

 

RAGHS SY M1005. ay Fa

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

  

 

 

SEES we a man Sa
20/084/8108H =a | eS , "a ayo woul] oneness et ea canon] any ts
$101 133Hs| eS BS 7a aOR ‘
M940] — UOAVT BBLVMWYOLS ONY SHOMOVOY| mwas mene = ern ax nop ve ON RT om] ony
wy ge “en gun | Seu nee Oe Zs Meine renin im se emayo WATT
Here S weet mn irae
S31vI0SSV_¥ SHIH NBN J) STUAVSOON oe acate su wiht pone se a Soa
vou N38) INS) “NNO13A30 O3S0dOUd w>s.o8e | uyNSsY CNY SOR ATIOE era = CSIRVEVORDY CVSS? we ye) sma eee] uray
| i We @ te TS

 

 

       

 

 

 

 

 

 

 

S38 wel

29 wana a Roreest
AlNTen EL YAMEDIS i
. =
sof
Theeag 2 z
?:

 

 

 

 

  

 

   
               

PERTRR
TAA LnBACBe
=O sivas iweas—
me \ “*. 7 L" (AO1 shes7t
WWO8Y NOLLVARS TAG 0 Xoved DMLSIG
TEN AMOS ANS \ LY LIGA Kot
TT¥aS sawO - $50 % patisx? Grd AYATEULYAO08
vv _ —AREMHS BOA EE CISOMEEE
-— — fn
a
2
gs
a
=>
a
Led
=
&
PY
So

(NOLLINYLSNO YACNN}

 

 

 

JULNID
sS3Nisna
3TNAYSOON
{f
if
i
{
\
\
\
ANOAYT 13785 oY \ &
QNIDI1 HOS ANOAWT TLIS HF4TE \ ie
Ws \
‘
a

Page 135

 

 

 

 

 

 

 

 

 

 

 

 

            

 

 

 

 

 

 

 

 

 

 

 

 

 

co/arys! om nn net lv on wut er MOANVAGL 30 WHOAS S¥ 90 ey eakag
onysar0eH sezums| S28 “SS or [| aun woona| ing 4 aay ee ee .
INGAY YULVMHYOLS ONY SHBOMOVOU| me's weeks re: ‘eps na raped 20] omy Pkt oY
fuego ™ su | "She or OY as cane ii ts Ga bon fan erty | ‘way WAR
sen S ee sera ra oy fete
CRAY DOSSY 2, SHDH NOY. 04 TTTAYSOON errant ss tain preas nn om
VOU ARH) 3INAI “ININOTIARG CISOdOed D30Ws minha mam md
, 3 Oud SAIYDOSSY ONY DOI) ATTAVE Sh seomn tax | 170% ers
Ve in awe
SS

@ ma 8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

       

Pe for

r ALMYAD WBLYAMTOLS.

Pry Naren)
+ MINION YANEOLS:

 

 

 

 

 

 

 

onzonn ood INGLY ts USER
(NOLLINULSNOD_UIONN 702) Wd AnOAYT 22
HIND) ONDE
ssanisna

ATHAYSOON a

 

 

 

Page 136

nd

 

 

Appendix D
Ken Hicks & Associates Drawing 060506D

Page 137

 

 

 

 

Amand.

)

 

 

Drawing No,

060506 0

 

 

ke

re

 

KAJ

 

i

 

 

 

 

 

fle
wv tees = 1:1500

 

woe 1 ot 1 wens

 

 

 

 

 

 

 

 

ma S & L

pet PROPOSED RECONFIGURATION OF

OF LOT 1 ON SP182880

LOTS 1 - 5°

PARISH OF TEWANTIN

 

 

 

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 3 [As Published].pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.